van buren street channel project - maricopaapps.fcd.maricopa.gov/projects/ppm/downloads/van... ·...

12
VAN BUREN STREET CHANNEL PROJECT (99 TH AVENUE TO AGUA FRIA RIVER) Gary Wesch, P.E. Project Manager Public Meeting No. 1 March 20, 2013 City of Avondale

Upload: others

Post on 30-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th

VAN BUREN STREET CHANNEL PROJECT

(99TH AVENUE TO AGUA FRIA RIVER)

Gary Wesch, P.E. Project Manager

Public Meeting No. 1 March 20, 2013 City of Avondale

Page 2: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th

Project Location

CHANNEL

DRAINAGE AREA

Page 3: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th

Van Buren Street Channel

El M

irage R

d

107th

Ave

99

th A

ve

VAN BUREN ST CHANNEL

Avondale

Blv

d

CITY CENTER

Phase I Phase II

Page 4: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th

Background • Requested by Avondale in 2009 CIP

Prioritization, approved

• Project provides

– Drainage outlet to Agua Fria for developing 2.2 Sq. Mi. area south of I-10, including Avondale City Center

– Drainage along Van Buren

– Trail connection to Agua Fria River

– Landscaped channel to enhance community character

• Design Concept Report prepared

Page 5: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th

Project Features • 10-year design flows

• Phase I - 8,300 lf Agua Fria to 113th Ave

– Landscaped channel on north side of Van Buren with multi-use trail

– Utilizes existing retention basins

– Agua Fria Levee penetration with box culvert

– Box culverts at road crossings

• Phase II - 9,500 lf 113th to 99th

• $13.8 Million estimated cost

Page 6: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th

Agua Fria east levee at Van Buren

Page 7: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th

Channel will utilize existing retention basins

Page 8: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th

Channel-Industrial area

Page 9: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th

Channel-Residential area

Page 10: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th

Channel-City Center area

Page 11: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th

Upcoming milestones

• 2013-Complete DCR

• 2013-Agreement with Avondale for Design, Rights of Way Acquisition, Utility Relocation, Construction, Operation & Maintenance

• 2013-14 Prepare Final Design

• 2013-15 Acquire Rights of Way for Project

• 2014-15 Relocate conflicting utilities

• 2015-16 Construct Phase I

Page 12: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th

Questions?