![Page 1: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th](https://reader033.vdocuments.us/reader033/viewer/2022043003/5f814444eb901a3611622d84/html5/thumbnails/1.jpg)
VAN BUREN STREET CHANNEL PROJECT
(99TH AVENUE TO AGUA FRIA RIVER)
Gary Wesch, P.E. Project Manager
Public Meeting No. 1 March 20, 2013 City of Avondale
![Page 2: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th](https://reader033.vdocuments.us/reader033/viewer/2022043003/5f814444eb901a3611622d84/html5/thumbnails/2.jpg)
Project Location
CHANNEL
DRAINAGE AREA
![Page 3: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th](https://reader033.vdocuments.us/reader033/viewer/2022043003/5f814444eb901a3611622d84/html5/thumbnails/3.jpg)
Van Buren Street Channel
El M
irage R
d
107th
Ave
99
th A
ve
VAN BUREN ST CHANNEL
Avondale
Blv
d
CITY CENTER
Phase I Phase II
![Page 4: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th](https://reader033.vdocuments.us/reader033/viewer/2022043003/5f814444eb901a3611622d84/html5/thumbnails/4.jpg)
Background • Requested by Avondale in 2009 CIP
Prioritization, approved
• Project provides
– Drainage outlet to Agua Fria for developing 2.2 Sq. Mi. area south of I-10, including Avondale City Center
– Drainage along Van Buren
– Trail connection to Agua Fria River
– Landscaped channel to enhance community character
• Design Concept Report prepared
![Page 5: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th](https://reader033.vdocuments.us/reader033/viewer/2022043003/5f814444eb901a3611622d84/html5/thumbnails/5.jpg)
Project Features • 10-year design flows
• Phase I - 8,300 lf Agua Fria to 113th Ave
– Landscaped channel on north side of Van Buren with multi-use trail
– Utilizes existing retention basins
– Agua Fria Levee penetration with box culvert
– Box culverts at road crossings
• Phase II - 9,500 lf 113th to 99th
• $13.8 Million estimated cost
![Page 6: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th](https://reader033.vdocuments.us/reader033/viewer/2022043003/5f814444eb901a3611622d84/html5/thumbnails/6.jpg)
Agua Fria east levee at Van Buren
![Page 7: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th](https://reader033.vdocuments.us/reader033/viewer/2022043003/5f814444eb901a3611622d84/html5/thumbnails/7.jpg)
Channel will utilize existing retention basins
![Page 8: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th](https://reader033.vdocuments.us/reader033/viewer/2022043003/5f814444eb901a3611622d84/html5/thumbnails/8.jpg)
Channel-Industrial area
![Page 9: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th](https://reader033.vdocuments.us/reader033/viewer/2022043003/5f814444eb901a3611622d84/html5/thumbnails/9.jpg)
Channel-Residential area
![Page 10: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th](https://reader033.vdocuments.us/reader033/viewer/2022043003/5f814444eb901a3611622d84/html5/thumbnails/10.jpg)
Channel-City Center area
![Page 11: VAN BUREN STREET CHANNEL PROJECT - Maricopaapps.fcd.maricopa.gov/Projects/PPM/downloads/Van... · Project Features •10-year design flows •Phase I - 8,300 lf Agua Fria to 113th](https://reader033.vdocuments.us/reader033/viewer/2022043003/5f814444eb901a3611622d84/html5/thumbnails/11.jpg)
Upcoming milestones
• 2013-Complete DCR
• 2013-Agreement with Avondale for Design, Rights of Way Acquisition, Utility Relocation, Construction, Operation & Maintenance
• 2013-14 Prepare Final Design
• 2013-15 Acquire Rights of Way for Project
• 2014-15 Relocate conflicting utilities
• 2015-16 Construct Phase I