I I I I I I II I II II I I I I ·1 I I I CITY OF PEORIA ENGINEERING DIVISION PROJECT S-9403 - NORTHERN AVENUE 21-INCH SANITARY SEWER 87TH AVENUE - 12-INCH SANITARY SEWER ALIGNMENT STUDYIDESIGN REPORT OCTOBER 1994 Prepared by: SFC ENGINEERING COMPANY 7776 Pointe Parkway West Suite 290 Phoenix, AZ 85044 ,., , .... AM,mb"'f th , Stanley Technology Group A...j A025.60 1-------------- ------- ENGINEERING COMPANY

Upload: others

Post on 07-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ENGINEERING COMPANY - Maricopaapps.fcd.maricopa.gov/pub/docs/scanfcdlibrary/A025...7 Pavement ReplacementType A SY 2,890 $6.50 $18,785.00 8 MH Installation (5-ftdia.) EA 10 $7,500.00

IIIIIIIIIIIIIIIII·1III

CITY OF PEORIAENGINEERING DIVISION

PROJECT S-9403 - NORTHERN AVENUE21-INCH SANITARY SEWER

87TH AVENUE - 12-INCH SANITARY SEWER

ALIGNMENT STUDYIDESIGN REPORT

OCTOBER 1994

Prepared by:SFC ENGINEERING COMPANY

7776 Pointe Parkway WestSuite 290

Phoenix, AZ 85044

,., ,....

AM,mb"'f th, ~~ ~ •Stanley Technology Group A...j

A025.601--------------------- ENGINEERING COMPANY

Page 2: ENGINEERING COMPANY - Maricopaapps.fcd.maricopa.gov/pub/docs/scanfcdlibrary/A025...7 Pavement ReplacementType A SY 2,890 $6.50 $18,785.00 8 MH Installation (5-ftdia.) EA 10 $7,500.00

IIIIIIIIIIIIIII

IIIII

CITY OF PEORIAENGINEERING DIVISION

PROJECT S-9403 - NORTHERN AVENUE21-INCH SANITARY SEWER

87TH AVENUE - 12-INCH SANITARY SEWER

ALIGNMENT STUDYIDESIGN REPORT

OCTOBER 1994

Prepared by:SFC ENGINEERING COMPANY

7776 Pointe Parkway WestSuite 290

Phoenix, AZ 85044

Page 3: ENGINEERING COMPANY - Maricopaapps.fcd.maricopa.gov/pub/docs/scanfcdlibrary/A025...7 Pavement ReplacementType A SY 2,890 $6.50 $18,785.00 8 MH Installation (5-ftdia.) EA 10 $7,500.00

ALIGNMENT STUDYIDESIGN REPORT

Basis for Design

Scope of Work

Project Description - S-9403

1

• Field investigation

OCTOBER 1994

The following functions were performed prior to preparation of the design report:

The intent of the report is to identify existing utilities and to determine available "corridor(s)"

suitable for construction of the sanitary sewer line. The sewer line route selection shall be

coordinated with two other major utilities; a 60-inch to 72-inch storm drain being planned by

the Flood Control District of Maricopa County and a 12-inch water line designed by the City

of Glendale. In addition to the sewer line alignment, the study proposes interconnection points

(manholes) to the existing sanitary sewers in 91st and 83rd Avenues. Determination of the

horizontal and vertical alignments will serve as a basis for the development of probable

construction costs. The alignment study and design report is supported by photographic

documentation taken during the initial site investigation.

The project includes the design and post-design services for the construction of a 21-inch

sanitary sewer on Northern Avenue from 83rd Avenue to 91st Avenue and design services for

a 12-inch sanitary sewer on 87th Avenue from Olive Avenue to Monroe Street. This study

covers the 21-inch sanitary sewer on Northern Avenue only in order to expedite the project

coordination with other agencies and the alignment approval. A similar study for the 87th

Avenue sanitary sewer will be submitted separately.

IIIIIIII

IIIIIIIII

:1II

IIIII

Page 4: ENGINEERING COMPANY - Maricopaapps.fcd.maricopa.gov/pub/docs/scanfcdlibrary/A025...7 Pavement ReplacementType A SY 2,890 $6.50 $18,785.00 8 MH Installation (5-ftdia.) EA 10 $7,500.00

Alignment Study

The proposed utility locations shown on the attached cross-sections meet the above goals. The

proposed utilities will be located as follows:

The proposed 7 foot separation between the sanitary sewer and the stonn drain exceeds

minimum requirements recommended by the MAG standards. In case the storm drain diameter

exceeds 6 feet, the separation could be increased to 8 feet without causing problems or additional

2OCTOBER 1994

• Minimize the number of changes to the already designed Glendale water line

• Locate the sanitary sewer line to allow for connections from the north

• Provide a suitable corridor for construction of the large diameter storm drain

• The proposed sanitary sewer will be located 7 feet north of the monument line

• The stonn drain will be located approximately on the monument line

• The proposed 12-inch water line will require minimum adjustments to accommodate the

storm drain and sanitary sewer

Using prepared base sheets, cross-sections were developed (in critical points) to determine

available corridors that would accommodate the sanitary sewer, storm drain and water line.

After determination of the available space, several utility locations were evaluated in order to:

• Collection of as-builts and utility records

• Review of plans for the proposed 12-inch water line

• Review of the conceptual storm drain design (size, scope)

• Site survey following existing utility "blue stake"

• Preparation of base sheets in 1" =20' scale, including utility locations, based on available

records and survey

• Proposed list of field utility locations (potholing)

I:1,!I!II

:1

:1I

,II

III

II

IIII!I

III

Page 5: ENGINEERING COMPANY - Maricopaapps.fcd.maricopa.gov/pub/docs/scanfcdlibrary/A025...7 Pavement ReplacementType A SY 2,890 $6.50 $18,785.00 8 MH Installation (5-ftdia.) EA 10 $7,500.00

Opinion of Probable Construction Costs

The opinion was developed using City of Phoenix and Scottsdale indicators (bid results, etc.)

and Richardson's "General Construction Estimating Standards."

relocations. The proposed separation is sufficient to construct the stonn drain without

"endangering" the sewer line. "Swapping" the sewer and drain line locations was also

considered, but it was then discovered that the stonn drain would "screen" the sanitary sewer,

blocking any new connections from the north due to its size. The proposed arrangement allows

for connections to both the sanitary and storm drain lines throughout most of the project's

length.

IIIIIIIIIIIIIIIIIII

OCTOBER 1994 3

Page 6: ENGINEERING COMPANY - Maricopaapps.fcd.maricopa.gov/pub/docs/scanfcdlibrary/A025...7 Pavement ReplacementType A SY 2,890 $6.50 $18,785.00 8 MH Installation (5-ftdia.) EA 10 $7,500.00

IIIIIIIIIIIIIIIIIII

PROJECT 8·940321·INCH SANITARY SEWER ON NORTHERN AVENUEOPINION OF PROBABLE CONSTRUCTION COSTS

OCTOBER 1994SFC NO. 1610701

ITEM UNIT AMOUNTNO. DESCRIPTION UNIT QUANTITY PRICE

1 Mobilization LS 1 $21,400.00 $21,400.00

2 Pavement Removal (Sawcut) SY 2,890 $2.20 $6,358.00

3 Sewer Line Excavation CY 13,481 $6.50 $87,626.50

4 Sewer Line Installation LF 5,175 $45.00 $232,875.00

5 Sewer Line Backfill (Native) CY 11,555 $4.50 $51,997.50

6 Sewer Line Backfill (ABC) CY 1,926 $15.00 $28,890.00

7 Pavement Replacement Type A SY 2,890 $6.50 $18,785.00

8 MH Installation (5-ft dia.) EA 10 $7,500.00 $75,000.00

9 Existing Line Interconnection EA 3 $4,200.00 $12,600.00

10 Project Close-out (Demobilization) LS 1 $20,000.00 $20,000.00

SUBTOTAL $555,532.00

INCIDENTAL COSTS @ 10% $55,553.20

CONTINGENCY @ 15% $83,329.80

TOTAL $694,415.00

Page 7: ENGINEERING COMPANY - Maricopaapps.fcd.maricopa.gov/pub/docs/scanfcdlibrary/A025...7 Pavement ReplacementType A SY 2,890 $6.50 $18,785.00 8 MH Installation (5-ftdia.) EA 10 $7,500.00

IIIIIIIIIIIIIIIIIII

ALIGNMENT

PHOTOGRAPH'S

Page 8: ENGINEERING COMPANY - Maricopaapps.fcd.maricopa.gov/pub/docs/scanfcdlibrary/A025...7 Pavement ReplacementType A SY 2,890 $6.50 $18,785.00 8 MH Installation (5-ftdia.) EA 10 $7,500.00

IIIIIIII'IIIIIIIIII

"

I'ii!ilil!I!I!!

Northern Avenue at 91st Avenue Looking Northwest

DI

Northern Avenue at 91st Avenue- South Side Looking West

---------------------------~~

Page 9: ENGINEERING COMPANY - Maricopaapps.fcd.maricopa.gov/pub/docs/scanfcdlibrary/A025...7 Pavement ReplacementType A SY 2,890 $6.50 $18,785.00 8 MH Installation (5-ftdia.) EA 10 $7,500.00

IIIIIIIIIIIIIIIIIII

Northern Avenue at 91st Avenue- Looking East

Northern Avenue at 89th Lane- Looking East

---------------------------~.L'!

Page 10: ENGINEERING COMPANY - Maricopaapps.fcd.maricopa.gov/pub/docs/scanfcdlibrary/A025...7 Pavement ReplacementType A SY 2,890 $6.50 $18,785.00 8 MH Installation (5-ftdia.) EA 10 $7,500.00

IIIIIIIIIIIIIIIIIII

I

Northern Avenue at 89th Avenue Looking East

IINorthern Avenue Looking East

---------------------------~~

Page 11: ENGINEERING COMPANY - Maricopaapps.fcd.maricopa.gov/pub/docs/scanfcdlibrary/A025...7 Pavement ReplacementType A SY 2,890 $6.50 $18,785.00 8 MH Installation (5-ftdia.) EA 10 $7,500.00

IIIIIIIIIIIIIIIIIII

Northern Avenue Looking East

IIIrrigation Structure at 87th Avenue Alignment- North Side

--------------------------~~

Page 12: ENGINEERING COMPANY - Maricopaapps.fcd.maricopa.gov/pub/docs/scanfcdlibrary/A025...7 Pavement ReplacementType A SY 2,890 $6.50 $18,785.00 8 MH Installation (5-ftdia.) EA 10 $7,500.00

IIIIIIIIIIIIIIIIII

Irrigation Structure- North Side Looking East

II

Irrigation Structure- South Side Looking North

--------------------------~~~

Page 13: ENGINEERING COMPANY - Maricopaapps.fcd.maricopa.gov/pub/docs/scanfcdlibrary/A025...7 Pavement ReplacementType A SY 2,890 $6.50 $18,785.00 8 MH Installation (5-ftdia.) EA 10 $7,500.00

IIIIIIIIIIIIIIIIIII

Northern Avenue Looking East- North Side

Northern Avenue Looking East

---------------------------~~

Page 14: ENGINEERING COMPANY - Maricopaapps.fcd.maricopa.gov/pub/docs/scanfcdlibrary/A025...7 Pavement ReplacementType A SY 2,890 $6.50 $18,785.00 8 MH Installation (5-ftdia.) EA 10 $7,500.00

IIIIIIIIIIIIIIIIIII

Northern Avenue & 83rd Avenue- Looking East

Northern Avenue & 83rd Avenue- Looking Northeast

---------------------------~~

Page 15: ENGINEERING COMPANY - Maricopaapps.fcd.maricopa.gov/pub/docs/scanfcdlibrary/A025...7 Pavement ReplacementType A SY 2,890 $6.50 $18,785.00 8 MH Installation (5-ftdia.) EA 10 $7,500.00

------ - - - ------------ -,- - - ----------,;,.. - - - ------

-------------------------.---------------------------

-----------------------------------------------------

00

,.- '_....- ENGINEERING COMPANY

~•~ 7776 Pointe Parkway West• ~ Suite 290

Phoenix. Arizona 85044-

,( (602) 438-2200

CllY OF PEORIA, ARIZONA21 INCH SANITARY SEWER - NORTHERN AVENUE

83RD AVENUE TO giST AVENUE

CITY OF PEORIA\_

:reiN OF GLENDAL: , _

CONC DITCH

----------

-~ -- -- - --~ .~ pp

\ ~ .-CI =0=.,.. .,..

........- ~ ----- ~---------=--------

-----~,..,..-"..,. ,,.,, ~oJ \' ,_. '/

\ +1- ~

)-COUNTY.... t") iiJ !I +1lOC'l C'l (0-

00 / 12+00 I"- 13-1;I .1.

+1+1lO

iXJ ----------1----------------------- i-+T i:J. -...,------------,60"SD (0 -'- 60"SD....., ~ ~ ~ ~

I.... ,. _...:.!____ ~l

1-- - 1---... "'., _.- C'l- \

_------ v-------- ----\-- I - ....~-- _",.--

/....

--- -- - --12'"N (PROP) ,"',,\0,,- \.' ,.... /

11+

IIIIIIIIIIIIIIIIIII

Page 16: ENGINEERING COMPANY - Maricopaapps.fcd.maricopa.gov/pub/docs/scanfcdlibrary/A025...7 Pavement ReplacementType A SY 2,890 $6.50 $18,785.00 8 MH Installation (5-ftdia.) EA 10 $7,500.00

CROSS SECTION AT STA 12+00 LOOKING EAST

------- ------- -----1----------------

CITY OF PEORIA, ARIZONA21 INCH SANITARY SEWER - NORTHERN AVENUE

83RD AVENUE TO giST AVENUE

,.- '_...... ENGINEERING COMPANY

~•~ 7776 Pointe Parkway West• ~ Suite 290

Phoenix. Arizona 85044

-4 (602) 438-2200

:J:

~Cl

°_------, Z r--, 0 /,0/\...../

5'10'

------- ,----- -------- ------ ~.

?

55' R/W

40'

42'±

31'+

26'±

IB'±

15'±

........Cl

~

!0:: 0::I.LJ I.LJ

Z E5 3=

~(I) I.LJ

(I)I.LJ

&Cl 0::

::E :::>~(I)

0:: (I) 0::

~I.LJ

~I.LJ

0:: !<(L ;:b ~ ~ (0<0 - N

I-II

7'

15'±

0::I.LJ3=I.LJ(I)

>-~~(I)

~-N

C) (L0

(0 0::- (L

33'±

25'±2B'±

VARIES

40' R/W

--_.- .._.~

IIIIII I

II

I ........Cl

I~

!0::I.LJ

I E5(I)

I.LJI 0::I I.LJ :::>

I I °Z 0:: (I)

0 I.LJ (I)

0:: :J: !< I.LJ

t> a- 0::I.LJ ;: (L

~...J

~ ~II.LJt-

---- - --."

IIL T"-I JL

l

I 0

I ?

IIIII

Page 17: ENGINEERING COMPANY - Maricopaapps.fcd.maricopa.gov/pub/docs/scanfcdlibrary/A025...7 Pavement ReplacementType A SY 2,890 $6.50 $18,785.00 8 MH Installation (5-ftdia.) EA 10 $7,500.00

-0

III30' R/W

I II w III II ~ III II w III II ~ IItM11 J:~ II I J. I- IQ II

Fl:W.~ m~ I-, II II JI I I I

/

------------------------ ------TI-----, rtt---,

---------- - --

II

"

"

CllY OF PEORIA, ARIZONA21 INCH SANITARY SEWER - NORTHERN AVENUE

83RD AVENUE TO giST AVENUE

"

,...- , _... ENGINEERING COMPANY

~•~ 7776 Pointe Parkway West• ~ Suite 290

Phoenix. Arizona 85044

4. (602) 438-2200

~;$I.I'1 ~_--~--~======iII~~18~ +-:_1__8~_'__

----~---------------------------~---- --__SI~~FGLEN~L~ CONC~ITC_H------------------ : II II-~I __---------- - - - ---------- - - - ---------- - - - -----r:r-1.

I~I I'°1 II~I I/81 !

================= - -::::..--.....1-._-L'

f',-

II' ---+4!.!.j:"l.£-+,~~--P-1S."JM~H------~--------_·_-----_"':"'-----~I~llf"Pl£Sr-+(,AE~:3A;:Nl~D~)--"- -.H~ _

n 101II n l

~.......,.-------- - - - -~---/---,~~-.:--- - - - ----~...,...:::;;;;",.".;;.;:~--'

21+~O -----2~~Q---------~---------H--~+Q~-H ------I I -~--.....IIL....--_--;-i-L-------------------T------------------------f------~--~---~---W-------

PROP. 60" DIA STORM DRAIN~ WV WV WV a::: I I

,,II

II

I

tI,~II!,,II

I,

Page 18: ENGINEERING COMPANY - Maricopaapps.fcd.maricopa.gov/pub/docs/scanfcdlibrary/A025...7 Pavement ReplacementType A SY 2,890 $6.50 $18,785.00 8 MH Installation (5-ftdia.) EA 10 $7,500.00

55'R/W 501 R/W

IS' 40' 40'

421± I 31'±

331± 25'±

I251± 18'±

I I 15'± 1 101±I I

I 71

"'"'"' 80

~ 0::: 1 ~~ lLJ m-....J ~ z '8 ~

lLJ «0::: (f) lLJ 0::: 0:::lLJ 0::: (f) lLJ lLJ~ ~ 0 0 ~ ~lLJ

~I 0- lLJ(f) ~ (f) lLJ

0::: 0 (f)lLJ

~0 0::: w >-0::: ti ~ 0:::

I lLJ :::> :::>~I 0::: Z (f)

00::: (f)

0:::lLJ I 0 (f) - lLJ (I)

~lLJI '< J: lLJ

~ C'ol <01 !;;( wI

0- 0::: 0::: '<~ I 0- " 0- 0- ~ 0-lLJ 0 0 3:...J~N lLJ ~ (0 0::: 0::: N ~ (0- I- - - 0- 0- - - C'ol

CROSS SECTION AT STA 22+00 LOOKING EAST

IIIIIIIIIIIIIIIIIII

f_--- _

o

-l::::m~L..,...----f--------I:--------I IL...J

?

1-----y--------------- -----------

o?

10'

J:

~o(J

-, Z r­\ 0 /\ (J /

\.-1

CITY OF PEORIA, ARIZONA21 INCH SANITARY SEWER - NORTHERN AVENUE

83RD AVENUE TO giST AVENUE

,..- '_...... ENGINEERING COMPANY

~•~ 7776 Pointe Perkway West, ~ Suite 290

Phoenix, Arizona 85044

A . (602) 438-2200

Page 19: ENGINEERING COMPANY - Maricopaapps.fcd.maricopa.gov/pub/docs/scanfcdlibrary/A025...7 Pavement ReplacementType A SY 2,890 $6.50 $18,785.00 8 MH Installation (5-ftdia.) EA 10 $7,500.00

------

II

+10)

SSMHII

"

"

---------- 39+00---- -----------------------------

---------------

---------------------

ol()

PROP. 60" DIA STORM DRAIN

CITY OF PEORIA, ARIZONA21 INCH SANITARY SEWER - NORTHERN AVENUE

f33RD AVENUE TO giST AVENUE

"

r- ~' ~......- ENGINEERING COMPANY

~7776 Pointe Parkway West

Suite 290Phoenix. Arizona 85044-

. 4 (602) 438-2200

r---------------I ?: 0I ~-:t

---------_._- .._--

---.,r-++------- - - _ ~__r..____+----- _

-COUNTY ----------------

CITY OF PEORIA.-I

I

I,I

---.r--- - - - --------- Et.....=l:...=...-r-=======~==-=--=-...:=-==r=========t:===;::::.~2~P=-=-=-================W~M=-=~=+==r=~~=========-=_-=-:_=-=i========

37+00 . ~B+OO- - - - - - - - - - - - - - - - - - - - - - - - - :!Ill. --1.- -

IIIIIIIIIIIIIIIIIII

Page 20: ENGINEERING COMPANY - Maricopaapps.fcd.maricopa.gov/pub/docs/scanfcdlibrary/A025...7 Pavement ReplacementType A SY 2,890 $6.50 $18,785.00 8 MH Installation (5-ftdia.) EA 10 $7,500.00

".. , _....- ENGINEERING COMPANY

~•~ 7776 Pointe Parkway \fest• ~ Suite 290

Phoenix. Arizona 85044

g( (602) 438-2200

CllYOF PEORIA, ARIZONAANITARY SEWER - NORTHERN AVENUE3RD AVENUE TO giST AVENUE

CROSS SECTION AT STA 38+00 LOOKING EAST

401 R/W 50' R/W7 1 331 401 10'

I 381::!::

31 I::!::

39 1::!:: 261::!::I 251::!:: I 121:!: 61::!:: II I I II

I 16'::!:: 5'::!:: I I.I I

7''" '"0 0~ 0:: ~! w !~ z

'" '"~I

0 00:: (/) W 0:: W Z 0::W& 0 (/) w (/) 0 w3= 0 3= 0

~3=w

~ ~ a. 0 w a. w(/)0:: 0 W (/) 0 U (/)w

~ ~ 0:: ;z w 0:: 9 >-I 0:: a. 0 0:: a.~

II :::> (/) (/)1 -~:::> -I (/) 0:: (/) 0:: 0 I II 0:: (/) = 0 w (/) w W 0:: IW I - Z Z w Iw

~N <0

~(~ w t;(~ I 0::1.1.1 0:: 0 « ~ ~ Ia. C) a. a. 3= a. 3:

~Vl3: 0 0 ill 3: C)

'" ~ Co 0::

~---~i---~.:".) ~ '" ~- - a. !-'- .. - 0:: N Co '"

------ ------- ------- ---------- ------ --------- ------1-- ---------I

I.1 0

? ~

21 INCH S8

IIIIIIIII,I

IIIIIIIII

Page 21: ENGINEERING COMPANY - Maricopaapps.fcd.maricopa.gov/pub/docs/scanfcdlibrary/A025...7 Pavement ReplacementType A SY 2,890 $6.50 $18,785.00 8 MH Installation (5-ftdia.) EA 10 $7,500.00

ENGINEERING COMPANY7776 Pointe Parkway West

SUite 290Phoenix. Arizona 85044

(602) 438-2200

)()()(

----I- .

)(

CITY OF' PEORIA. ARIZONA21 INCH SANITARY SEWER - NORTHERN AVENUE

83RD AVENUE TO giST AVENUE

)(

... -' -

)()()()()()(

~ I--------------

)(

.'

a:: -­it>

___....c~ ;g.~. -=--

)()(

-

)()()()()(

+1

)()(

______________ 11

I .----t--t---------Jt------,-------I

I

,.....

r

)(

'Lc;;;O-F-G-L-E-N-OA-L-E----- - - - -----~~-- - - - -----

)()(

__-+--+- --l~,.J-'W.~ + E-:--__.1-\--91~P:_P===~ J'------------ - - - -t------------- ~- - - ------~----

b___ 1-_ .sI:-------------------------,- ,....

V 'oJ

~ iO-- . t()1-- - - -

~ - - -

____ -, _ ~-------~-----------.60+J)Q..,r...., ;.. I 61+00-----Jr---I-....L------+---r-,:--r--.-..,.---.----.---.- .L - --. - - - - - - - r - - - - - - - - .,- - - - ...... - - - - - - - - ~ - - I'-- ..JI_ ...... - ~ ....~1'f - .- - - - - - - - -...., . I.

''''''' I. +1 tl ~ 21_PROP. 60" DIASTORM~RAI~ -COUNlY.=(-----(LJ,-----,- \' I +1 U ,I"'>" \

IIII!IIIIIIIIIIIIIII

Page 22: ENGINEERING COMPANY - Maricopaapps.fcd.maricopa.gov/pub/docs/scanfcdlibrary/A025...7 Pavement ReplacementType A SY 2,890 $6.50 $18,785.00 8 MH Installation (5-ftdia.) EA 10 $7,500.00

CROSS SECTION AT STA 60+00 LOOKING EAST

51 51

,...- , _.,...-- ENGINEERING COMPANY

~•~ 7776 Pointe Parkway West• ~ Suite 290

Phoenix. Arizona 85044

,( (602) 438-2200

------- ---

CllY OF PEORIA, ARIZONA21 INCH SANITARY SEWER - NORTHERN AVENUE

83RD AVENUE TO giST AVENUE

50' R/W40'

-33'±

31'±1-

251±-221±

201±

16'±

10'±

I

'0 ........az~«

........ ~ ~......,I a a::: a:::I.&J a:::

(J) I.&J I.&J I.&J0 3: 3: ~a.. I.&J I.&J0 (I) (I) (I)

a::: I.&J & I.&J1 a.. a::: a:::......,

::J ;:! ::J I.&Ja::: (I) a::: (J) z a:::I.&J (I)

~ 0!;( I.&J W Z I W

a::: ~ !;( « a::: 0.. ~(J)~ 0..

" ~ a.. I.&J 3=I ~

...JN ~ N N C'\I ~ ~ Co- -

--------- ---- ----- -- -----I - --

I0

? ?

zCia~a:::

~o(0

0..oa:::0..

71-12'±

16'±

a:::I.&J3:I.&J(J)

~t:~(I)

u =-a::: C'\II- 0..U 0I.&J.....l a:::I.&J 0..

551

651 R/W

---""..-..-"- \-- \ I----------- \ ~ ,--

\ a /\ /

\ /\ /

\ /\ /'-.-/

101

--------

r---­IIIIIIIIIIIIIIIIII