    An update on the Irrawaddy Myitsone Dams Project

    Kachin Development Networking Group

    October 14, 2011

  • 8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl

    2/16

    An update on the Irrawaddy Myitsone Dams Project

    Following Thein Seins announcement on September 30 that construction of the Irrawaddy Myitsone dam

    would be suspended, villagers living near the project are living in a state of uncertainty and fear as there is

    no evidence on the ground that the dam project has indeed been suspended. KDNG has been monitoring the

    Irrawaddy Myitsone Dams Project since 2005 and provides this brief update based on research conducted just

    before and after the suspension announcement.

    !"#$%&"'&("')**+,*-"."*&'/0+.'1,0.)2#'$0"#%3"*&4'&("0"'()#'5""*'*+'-+*60.)&%+*'/0+.'&("'$0+7"-&'.)*)8"04

    China Power Investment Corporation (CPI). In a October 3rd interview with Chinese media, Lu Qizhou,

    the President of CPI was very clear that CPI wants to go ahead with the construction: I strongly hope that

    with unremitting efforts of relevant parties, this project can smoothly move forward on schedule, and mutual

    5"*"6&')*3'9%*:9%*'0"#,;&'9%;;'5"-+."')'0");%&0@A,'B%C(+,@'

    D*&%;'&("0"'%#')*'+/6-%);')**+,*-"."*&'/0+.'=EF'&()&'%&'9%;;'#&+$');;'&("'3).#'+*'F00)9)33

  • 8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl

    3/16

    SH("0"'%#'*+'9)&"0')&'&("'/)0.;)*3'&()&'&(");%

    Yang relocation camp in October 2011)

    Houses at Mali Yang relocation camp, 4 miles downstream of Myitsone

    Despite suspension announcement, workers are still active and waiting next

    instructions

    The majority of Chinese workers had left the Myitsone dam site before the suspension announcement onSeptember 30th. This was most likely due to the rainy season conditions, as Sinohydro explained in its

    $0+.+&%+*);'J%3"+'I'(&&$YZZJ%."+@-+.ZQV[V\[]T'K'&()&'9+0M"0#'-)*'+*;

  • 8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl

    4/16

    Chinese workers conduct land surveys between Lahpye and Tawngban villages on October 11, 2011. This

    photo is taken looking upstream and the Irrawaddy Myitsone bridge and a containment wall are seen in the

    3%#&)*-"@'=+*#&0,-&%+*'_%&"'`+@'\'%#'3%0"-&;

  • 8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl

    5/16

    Myitsone Project Diagram Plan

    Current status of Myitsone dam project

    Construction of the main dam has not yet begun but several diversion tunnels and containment walls have

    been completed. A supply road, bridge, and railway are nearly completed.

    The Irrawaddy Myitsone bridge south of Myitsone dam site. The 600 meter long, 300 ton

    capacity suspension bridge is planned to be completed in 2011. This bridge will link the

  • 8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl

    6/16

    L'0)%;9)

  • 8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl

    7/16

    L'-+*&)%*."*&'9);;'3+9*#&0").'+/'&("'>

  • 8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl

    8/16

    >)-(%*"#')*3'"X,%$."*&'0".)%*')&'&("'>

  • 8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl

    9/16

    Trucks and machines are parked and ready at Chinese workers compound

    L /)-&+0< /+0 50")M%*8 #&+*"# )*3 .)M%*8 50%-M# )& =+*#&0,-&%+* _%&" `+ \

  • 8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl

    10/16

    0

    Tight security at the dam site

    _%8*5+)03'%*'1,0."#"';)*8,)8"Y'SE0+7"-&'L0")4'`+'"*&0

  • 8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl

    11/16

    L 8,)03 &+9"0 "X,%$$"3 9%&( #"-,0%&< -)."0)# %# #&)&%+*"3 )& );; -+*#&0,-&%+* #%&"#

  • 8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl

    12/16

    2

    a+;3' .%*%*8' 0)J)8%*8' &("' ;)*3#-)$"' )*3' 0%J"0#' )&' &("' -+*G,"*-"' )*3' ,$#&0").' +/

    Myitsone

    Mining and logging concessions were given after dam plans were announced in order to clear out the dam

    and reservoir areas. Large scale gold mining began in 2010 and continues today. Mercury and cyanide used

    in the processing of the gold is dumped without regulation into local rivers and directly into the Irrawaddy,

    threatening downstream populations with exposure to toxins which leads to health problems and birth defects.

    Hka Ka Bo Mining Co. Ltd. and the governments No (2) Mining Ministry have a joint venture to mine for

    gold at the Myitsone

    Gold mining on

    the river banks

    at the Myitsone

    dam site

  • 8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl

    13/16

    Gold mining on the river banks at the Myitsone dam site

  • 8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl

    14/16

    Fearanduncertaintyremainforvillagers atMyitsonedam site

    October14,2011

    FORIMMEDIATERELEASE

    Press re leasefromKachinDeve lopmentNetworkingGroup

    Despite the announcement by Burmas m il itary government that the My itsone dam w il l be

    suspended, loca l Kachin vil lagers have yet to see ev idence the pro ject will be stopped and

    remainfearfulanduncertainaboutthe irfuture.

    An update re leased today by the Kachin Development Networking Group (KDNG) shows

    ev idence that equipment and supp lies for the pro ject remain in place, security restrict ions

    continueforloca lresidents,anddestructive goldminingintheplannedMy itsone damreservoir

    areais ongoing.

    Therehadbeenalull inconstructionatthedam site be fore the suspensionannouncementdue

    totherainy season.However,workonthedamprojectinfrastructurehas cont inued,evenafter

    theannouncement.As ofOctober11,Chineseworkers were stil lcarry ingout land surveywork

    southofthedam site,andwerecont inu ingconstructionofa supplyroad linking theMy itsone

    dam site totheChinesebordertownofTengchong.

    Staff from China Power InvestmentCorporation (CPI), themain project holder, recently to ld

    loca l staff of theirpro jectpartner,AsiaWorld,not tomoveanyequipmentas thepro jectwil l

    continueaftertherainy season,despite the suspensionannouncement.

    We donottrustwhatthePresident saidabout suspendingtheMy itsone dam, saidavil lager

    fromthedam site.We can see theworkers anddamconstructionmachines stil latthe site.

    KDNGis ca llingforanoff icia lcancellationannouncementfromCPI,withdrawalofallequipment

    andpersonnel,andforthe safereturnofa llthere loca tedvil lagers backtotheirorigina lhomes.

    All seven dams of the Irrawaddy pro ject will have devastat ing effects on themillions living

    alongtheriver.Wewil lcont inue toresistthedams unt iltheyarealloff icia llycancelled,not just

    suspended, saidAhNanofKDNG.

    Contact: AhNan(+66)848854154

    Email:[email protected]

    ToreadfullAnUpdateontheIrrawaddyMyitsonedamsproject,pleasevisitwww.kdng.org

  • 8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl

    15/16

    (KDNG) Tengchong (CPI)

  • 8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl

    16/16

    " " " "KDNG CPI " "" "KDNG: (+66) 848854154Email: [email protected]

    www.kdng.org