Page 1 of 6 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING 1 ST FLOOR RESEARCH LABORATORY RENOVATION 1 Hospital Drive Columbia, MO 65212 PGAV Project #53474-00 MU Project #CP171091 ADDENDUM #1 November 16, 2017 This addendum is hereby made part of the Contract Documents for the above named project. It supplements and modifies the drawings and specifications dated November 6, 2017 prepared by Peckham Guyton Albers & Viets, Inc. (PGAV) and their consultants. This addendum is part of the Bid Documents and Contract Documents and shall govern in the performance of the work. Receipt of this addendum shall be acknowledged on the Bid Form. GENERAL A non-mandatory prebid meeting was held on November 9 th , 2017. A list of attendees can be found at http://operations-webapps.missouri.edu/pdc/adsite/projects/cp171091/pb.pdf. The following clarifications were made at the prebid: 1. The renovation is to be completed in two phases as illustrated on sheet A100. Scheduling requirements related to each phase are outlined in 1.E Special Conditions paragraph 2. Phase 2 may commence prior to substantial completion of Phase 1. Owner will occupy the Phase 1 project area upon substantial completion of that Phase. 2. The cost breakout requested in 1.E Special Conditions paragraph 20 should include a portion of general conditions, overhead, profit, etc. proportionate to the scope of work. 3. Existing lay-in ceilings have been partially removed, and existing interior walls have been opened up throughout the renovation area to reveal above ceiling conditions and existing wall construction. Bidders are strongly encouraged to visit the project site prior to preparing their bid to familiarize themselves with existing conditions. Change orders will not be considered for work associated with existing conditions that are readily observable during the bid period. See General Conditions paragraph 4.5.2 for additional info. 4. Coordination drawings are required to include both new construction and existing construction to remain. The General Contractor shall be responsible for compiling coordination drawing content across disciplines from the various subcontractors responsible for the work, or delegating compilation responsibilities to a specific subcontractor. Subcontractors should clarify coordination drawing responsibilities with the General Contractors to whom they submit their bids. See 1.E Special Conditions paragraph 17.B. for additional information. Contact Jason Tippie, PGAV Architects with questions regarding bid documents. 913-362-6500, [email protected]. All bidder questions must be received by 5:00pm CST, Friday November 24 th . Questions received prior to the deadline will be answered in a final addendum on Monday afternoon, November 27 th . Bidder’s questions (Q.) that have been received to date along with responses (R.) are as follows: Q. On sheet A150, according to your partition designations, no wall types on sheet A301 are indicated to receive sound insulation. Is this correct?

Upload: others

Post on 11-Apr-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017-11-17 · Page 1 of 6 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

Page 1 of 6

UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING 1ST FLOOR RESEARCH LABORATORY RENOVATION 1 Hospital Drive Columbia, MO 65212 PGAV Project #53474-00 MU Project #CP171091 ADDENDUM #1 November 16, 2017 This addendum is hereby made part of the Contract Documents for the above named project. It supplements and modifies the drawings and specifications dated November 6, 2017 prepared by Peckham Guyton Albers & Viets, Inc. (PGAV) and their consultants. This addendum is part of the Bid Documents and Contract Documents and shall govern in the performance of the work. Receipt of this addendum shall be acknowledged on the Bid Form. GENERAL A non-mandatory prebid meeting was held on November 9th, 2017. A list of attendees can be found at http://operations-webapps.missouri.edu/pdc/adsite/projects/cp171091/pb.pdf. The following clarifications were made at the prebid:

1. The renovation is to be completed in two phases as illustrated on sheet A100. Scheduling requirements related to each phase are outlined in 1.E Special Conditions paragraph 2. Phase 2 may commence prior to substantial completion of Phase 1. Owner will occupy the Phase 1 project area upon substantial completion of that Phase.

2. The cost breakout requested in 1.E Special Conditions paragraph 20 should include a portion of general conditions, overhead, profit, etc. proportionate to the scope of work.

3. Existing lay-in ceilings have been partially removed, and existing interior walls have been opened up throughout the renovation area to reveal above ceiling conditions and existing wall construction. Bidders are strongly encouraged to visit the project site prior to preparing their bid to familiarize themselves with existing conditions. Change orders will not be considered for work associated with existing conditions that are readily observable during the bid period. See General Conditions paragraph 4.5.2 for additional info.

4. Coordination drawings are required to include both new construction and existing construction to remain. The General Contractor shall be responsible for compiling coordination drawing content across disciplines from the various subcontractors responsible for the work, or delegating compilation responsibilities to a specific subcontractor. Subcontractors should clarify coordination drawing responsibilities with the General Contractors to whom they submit their bids. See 1.E Special Conditions paragraph 17.B. for additional information.

Contact Jason Tippie, PGAV Architects with questions regarding bid documents. 913-362-6500, [email protected]. All bidder questions must be received by 5:00pm CST, Friday November 24th. Questions received prior to the deadline will be answered in a final addendum on Monday afternoon, November 27th. Bidder’s questions (Q.) that have been received to date along with responses (R.) are as follows:

Q. On sheet A150, according to your partition designations, no wall types on sheet A301 are indicated to receive sound insulation. Is this correct?

Page 2: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017-11-17 · Page 1 of 6 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

Page 2 of 6

R. No, all partitions indicated to extend to bottom of deck (head construction ‘B’ or ‘R’) shall receive batt insulation per specification 072100. Batt thickness shall match the stud cavity depth. See revisions to sheet A301 below.

Q. On sheet A150, detail A4 shows no deflection track, but detail A5 does show

deflection track. Both details show framing to the deck. Do you only want deflection track on partitions that have the drywall extended to the deck?

R. No, deflection track is required at all partitions where framing extends to deck. Q. Has the flooring product specified for LVT-3 (Mohawk Boulder- Hot and Heavy

LVT, 36x36x5MM, Color 172 Sulfur) been discontinued? If so, is a different product to be used?

R. Color 172 Sulfur has been discontinued by the manufacturer, however we have confirmed that existing stock of this color is still available for purchase and is on hold with the manufacturer for use on this project.

PROJECT MANUAL Revise the following specification sections as described below: Section Modification 1.A. Replace Bid Form dated 11/06/17 in its entirety with revised Bid Form dated

11/16/17 attached. Additive Alternates 1 and 3 have been revised to include protection of existing finishes to remain, and to exclude moisture mitigation for the affected areas. Base bid quantities for Unit Prices 7.a, 7.b, and 7.c have also been revised to include the Alternate 1 and 3 areas. The moisture mitigation associated with Alternates 1 and 3 shall be included in the base bid as per the revised base bid quantities listed. If Alternates 1 and/or 3 are not accepted, a credit change order will be issued for the adjusted quantity at the unit price submitted.

1.E Revise paragraph 2.A.(4) to read “Bid Alternate #2, if accepted, will be completed

between December 18th, 2017 and January 10th, 2018, and/or between March 24th, 2018 and March 30th, 2018. Limited work may also be completed in this area over weekends beginning at 5:00pm Friday provided all ceilings are reinstalled and the space is ready for Owner’s use by 7:00am each Monday. This space is scheduled for Owner’s use prior to and following these periods, so construction activities will be limited to the timeframe specified.”

Revise paragraph 2.H to read “Phase 1 Construction Requirement: Prior to AHU

start-up and 2nd pass (see Controls spec 230900) by Owner, all Dirty Activities will be complete. Contractor shall in all instances be responsible for “Thorough Clean” requirements. The Owner requires AHU start-up / air movement a minimum of 30 days prior to substantial completion of Phase 1 to perform TAB and 2nd pass controls. Pre-punch inspection will take place 45 days prior to substantial completion to allow 15 days to complete Dirty Activities.

Add paragraph 2.I. to read “Electrical panel ‘P5’ replacement illustrated on sheet

E401 shall be completed before 7:00am or after 5:00pm Monday through Friday; anytime Saturday or Sunday; or anytime during Winter Recess, Spring Break, or Summer Recess. This area must remain available to students during normal business hours.”

085113 Revise paragraph 2.1A. to read “Basis of Design: EFCO Fixed Sash Series

6700”.

Page 3: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017-11-17 · Page 1 of 6 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

Page 3 of 6

Revise paragraph 2.1B. to read “Written requests for substitution will be considered up to ten calendar days prior to the date for receipt of bids.” See 1.E Special Conditions Article 10 – Substitutions and Equals for substitution procedures.

Add paragraph 2.1C.1. to read “Manko Window System, Inc.”. Manko 3300

Series is approved as equal to the Basis of Design. 115313 Revise paragraph 1.1.4 to read “Fume hood base support. Including acid storage

and solvent storage cabinets.” Revise paragraph 1.3A.5. to read “ASHRAE 110-2016, American Society of

Heating, Refrigerating, and Air-Conditioning Engineers, Method of Testing Performance of Laboratory Fume Hoods”.

Add paragraph 2.1E. to read “CIF Lab Solutions.” CIF Lab Solutions’ Fume Hood

is approved as equal to the Basis of Design. Revise paragraph 2.5.C to read “Acid Storage.” Refer to drawings for location. Revise paragraph 2.5.D to read “Solvent Storage.” Refer to drawings for location. 115353 Revise paragraph 2.1D. to read “Written requests for substitution will be

considered up to ten calendar days prior to the date for receipt of bids.” See 1.E Special Conditions Article 10 – Substitutions and Equals for substitution procedures.

123553 Add paragraph 2.1.F to read as follows: F. Counter-weight system:

1. Provide concealed galvanized steel counter weights to prevent tipping of units.

2. Provide drawer interlocks to prevent multiple drawers from being opened at the same time.

Revise paragraph 2.5A. to read “Design: Flush overlay”. Revise paragraph 2.5B. to read “Wood Species: Maple, see finish legend on

drawings for more information”. Revise paragraph 2.5D.1. to read “Select and arrange components for

compatible grain and color.” Revise paragraph 2.5G.4. to read “Drawer box construction including backs,

fronts and sides: Plywood.” Delete paragraph 2.6E.2. in its entirety. Revise paragraph 2.7B. to read “Glass for Glazed Doors: Clear fully tempered

glass complying with ASTM C 1048, Type I, Class 1, Quality-Q3; not less than 6 mm.”

Add paragraph 2.9E. to read as follows:

E. Provide service chase for all piping, conduit and lines which would otherwise be exposed to view.

1. Fabricate metal utility/service chase enclosures of matching laboratory metal finishes to conceal from view any piping, conduit and other utilities. All such enclosures shall be shop formed to a finished appearance.

Page 4: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017-11-17 · Page 1 of 6 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

Page 4 of 6

Delete paragraph 2.11C.entirely. Butt hinges as specified in 2.11B. shall be used

throughout. Revise paragraph 2.11F to read as follows:

F. Drawer Slides: Side mounted, as follows: 1. Drawers sized 30” wide or less: a. Accuride 7434 all ball bearing, rail mount, full extension + 1” over travel

slides, hold open detent with a 100 lb./ pair load rating and progressive movement.

2. Drawers sized over 30” wide: a. Accuride 3640 all ball bearing, rail mount, full extension + 1” over travel

slides, hold open detent with a 200 lb./ pair load rating and sequential movement.

3. File drawers to be equipped with full extension with over-travel 150 lb. dynamic zinc plated Accuride 4034 series, or equal.

Delete paragraph 2.11G in its entirety. Revise paragraph 2.11.I.2 to read “Provide locks at all file drawers and where

otherwise indicated.” Revise paragraph 2.12A to read “Reagent Shelves: Provide 12” tubular supports.

Top of counter installation is acceptable. Metal shelves to be 15” deep with lip at front only. No lip at back of shelf.

Delete paragraphs 2.12B, 2.12 C, 2.12D and 2.12E in their entirety. Add paragraph 2.12G to read “Grommets: provide two at each area on drawing

listed as “COMP”. Each grommet to be 2 1/2” diameter black plastic with removable slotted top.”

Add paragraph 2.12H to read “Cylinder restraints: Provide cylinder restraints

capable of supporting tanks in orientation indicated on drawings. Both front/back orientation and side/side orientation are shown.”

Add paragraph 2.12I to read “Coat hooks: At locations indicated on drawings

provide Aluminum coat hook bar with (5) double pronged coat hooks per bar in natural aluminum finish. Product similar to Peter Pepper Model 2150 or equal.”

Renumber the Part 2 paragraph titled “Ceiling Service Panel” as 2.16. Delete paragraph 2.13B.1. in its entirety. Vandal-Resistant faucets will not be

required. 123554 Revise paragraph 1.1.B to read “New stainless steel metal cabinets and cabinet

hardware to match existing (currently in room M144 and M148).” 123653 Delete paragraph 1.2.B in its entirety. Revise paragraph 2.2A1 to delete the words “with 10 percent of filler certified as

post-consumer glass by SCS”. Remove paragraph 2.5B.4. in its entirety.

Page 5: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017-11-17 · Page 1 of 6 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

Page 5 of 6

230100 Add paragraph 1.5A.15. to read “Contractor shall show all existing systems that are to remain as-is in coordination drawings. Including but not limited to all existing piping, ductwork, electrical conduit and junction boxes, fire protection, plumbing systems and HVAC system equipment. All existing systems shall be modeled to correct locations and coordinated with all new work.”

PROJECT DRAWINGS Revise the following Drawing Sheets as described below: Sheet Modification A000 Revise the note on detail D3 - Construction Access Plan related to dumpsters to

read “Dumpster (Dump Truck or Roll-off)”. A roll-off dumpster will be acceptable provided it’s confined to the location shown.

A301 Revise all wall type tags with head construction “B” to “B-1”, and with head

construction “R” to “R-2”. Add wall type tag “3G2/B-1” at the north wall of Room M128. Add wall type tag “3G1/A” at the east wall of Room M128. Revise wall type tag at east wall of Room M114 to read “4S1/R-2”. A401 Revise detail B1 - Exterior Glazing South Courtyard Elevation as per Sketch

XA01 attached. The hatch pattern at existing honed stone panels to remain has been deleted to clarify that there is no work required at these locations.

A501 Revise detail B1 - Section Existing & Demolition as per Sketch XA02 attached.

Notes have been added to clarify typical demolition extents at exterior wall furring.

Revise detail B4 – Section Existing & Demolition as per Sketche XA03 and XA04

attached. Notes have been added to clarify casework to be salvaged and reinstalled by Contractor from casework to be salvaged and returned to Owner.

A710 Revised detail C4 - Pre-installed Electrical Outlets Section as per Sketch XA05

attached. The reagent shelf may be supported off the countertop, and need not be extended to the floor slab.

A801 Add detail C5 – Room M114 Mobile Casework Elevation as per Sketch XA06

attached. M000 Replace sheet M000 Mechanical Symbols & Abbreviations dated 11/06/17 in its

entirety with revised sheet M000 Mechanical Symbols & Abbreviations dated 11/16/17 attached. General Note 23 has been modified. General Notes 24, 25, 26 and 27 have been added.

M601 Replace sheet M601 Schedules dated 11/06/17 in its entirety with revised sheet

M601 Schedules dated 11/16/17 attached. Notes have been added for clarification to the Air Handling Unit Schedule.

M702 Replace sheet M702 Controls dated 11/06/17 in its entirety with revised sheet

M702 Controls dated 11/16/17 attached. AHU 1-01 Control Diagram has been modified.

Page 6: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017-11-17 · Page 1 of 6 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

Page 6 of 6

ATTACHMENTS Specifications 1.A Bid Form Drawing Sketches (8.5x11) Sketch XA01 – Revisions to detail B1/A401 Sketch XA02 – Revisions to detail B1/A501 Sketch XA03 – Revisions to detail B4/A501 Sketch XA04 – Revisions to detail B4/A501 Sketch XA05 – Revisions to detail C4/A710 Sketch XA06 – New detail C5/A801 Drawing Sheets (30x42) M000 Mechanical Symbols & Abbreviations M601 Schedules M702 Controls END OF ADDENDUM #1

Page 7: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017-11-17 · Page 1 of 6 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

MU Medical Science Building Addendum 1 First Floor Research Laboratory Renovation November 16, 2017 CP171091

A1

SECTION 1.A BID FOR LUMP SUM CONTRACT Date:____________________________ BID OF (hereinafter called "Bidder") a corporation* organized and existing under laws of the State of , a partnership* consisting of , an individual* trading as , a joint venture* consisting of , . *Insert Corporation(s), partnership or individual, as applicable. TO: Curators of the University of Missouri

c/o Director, Campus Facilities- Planning Design and Construction Room L100 General Services Building Columbia, Missouri 65211

1. Bidder, in compliance with invitation for bids for construction work in accordance with Drawings and

Specifications prepared by PGAV Architects and their sub-consultants, entitled "MU MEDICAL SCIENCE BUILDING FIRST FLOOR RESEARCH LABORATORY RENOVATION", project number CP171091, November 6, 2017 having examined Contract Documents and site of proposed work, and being familiar with all conditions pertaining to construction of proposed project, including availability of materials and labor, hereby proposes to furnish all labor, materials and supplies to construct project in accordance with Contract Documents, within time set forth herein at prices stated below. Prices shall cover all expenses, including taxes not covered by the University of Missouri’s tax exemption status, incurred in performing work required under Contract documents, of which this Bid is a part.

Bidder acknowledges receipt of following addenda: Addendum No. Dated Addendum No. Dated Addendum No. Dated Addendum No. Dated

2. In following Bid(s), amount(s) shall be written in both words and figures. In case of discrepancy between words

and figures, words shall govern. 3. BID PRICING a. Base Bid:

The Bidder agrees to furnish all labor, materials, tools, and equipment required to renovate portions of the Medical Science Building first floor as shown on the documents; all as indicated on the Drawings and described in these Specifications for sum of:

DOLLARS ($ ).

b. Additive Alternate Bids: Above Base Bid may be changed in accordance with following Alternate Bids as Owner may elect. Alternates are as described in Section 1.H of Project Manual. Alternates are written in a priority order, but Owner is not required to accept or reject in order listed. This is a one (1) contract project, therefore, Alternates shall be studied by each Bidder to determine effect on Bids of Contractor and each Subcontractor and/or Material supplier.

Page 8: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017-11-17 · Page 1 of 6 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

MU Medical Science Building Addendum 1 First Floor Research Laboratory Renovation November 16, 2017 CP171091

A2

(1) Additive Alternate No. 1: M148 Flooring Base Bid: Patch and repair existing resinous floor and integral cove as indicated. Protect existing finishes to remain. Add Alternate: Demolish existing resinous floor throughout, patch and repair existing slab to receive new finishes, and install new LVT floor and resilient base as specified. All for sum of: DOLLARS ($ ). (2) Additive Alternate No. 2: M123 Sprinklers Base Bid: Existing to remain. Add Alternate: Extend sprinkler coverage throughout M123 and surrounding spaces as indicated. All for sum of: DOLLARS ($ ). (3) Additive Alternate No. 3: M124 & M145 Finishes Base Bid: Patch and repair existing VCT floor and rubber base as indicated. Paint new construction walls in corridor to match existing. Protect existing finishes to remain. Add Alternate: Demolish existing VCT floor and rubber base throughout as indicated, patch and repair existing slab to receive new finishes, and install new VCT floor and rubber base as specified. Paint new and existing walls per schedule. All for sum of: DOLLARS ($ ).

c. Unit Prices:

(1) For changing specified quantities of work from those indicated by Contract Drawings and Specifications, upon written instructions of Owner, the following Unit Prices shall prevail in accordance with General Conditions.

(2) The following Unit Prices include all labor, overhead and profit, materials, equipment,

appliances, bailing, shoring, shoring removal, etc., to cover all work. (3) The following Unit Prices are required where applicable to particular Base Bid and/or

Alternate being submitted. (4) Only a single Unit Price shall be given and it shall apply for either MORE or LESS work

than that indicated on Drawings and called for in Specifications as indicated to be included in Base Bid and/or Alternates. In the event that more or less units than so indicated is actually furnished, Change Orders will be issued for increased or decreased amounts as approved by the Owner.

(5) Bidder understands that the Owner will not be liable for any Unit Price or any amount in

excess of Base Bid and any Alternate(s) accepted at time of award of Contract, except as expressed in written Change Orders duly executed and delivered by Owner's Representative.

(6) Note that the term “Base Bid Quantity” may not necessarily be directly related to the actual

base bid scope of work. Certain items may also apply in part or in whole to additive alternate scopes of work.

(7) Floor Preparation as defined in Divisions 3 & 9:

(a) Hydraulic Cement Underlayment as described in Sections 035416 & 090561. Base Bid Quantity = 9,500 s.f. $_________/s.f.

Page 9: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017-11-17 · Page 1 of 6 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

MU Medical Science Building Addendum 1 First Floor Research Laboratory Renovation November 16, 2017 CP171091

A3

(b) Floor slab moisture mitigation for use beneath LVT and/or VCT as described in

Sections 090561 and 096519. Base Bid quantity = 9,500 s.f.

$_________/s.f.

(c) Floor slab moisture mitigation for use beneath resinous flooring as described in Sections 090561 and 096723.

Base Bid quantity = 400 s.f. $_________/s.f.

(8) Hazardous Material Abatement as defined in Division 2:

(a) Removal of ACM pipe insulation (up to 6” pipe,) Base Bid quantity = 630 l.f. $________/l.f.

(b) Removal of ACM Pipe fitting insulation Base Bid quantity = 100 each $________/each

(d) Removal of ACM floor leveling material greater than ½” thick Base Bid quantity = 100 s.f. $________/s.f. (e) Removal of ACM Exterior Window Caulk Base Bid quantity = 20 windows each $_________/each

(f) Removal of ACM transite ductwork Basie Bid quantity = 340 l.f. $_________/l.f.

4. PROJECT COMPLETION

a. Contract Period - Contract period begins on the day the Contractor receives unsigned Contract, Performance Bond, Payment Bond, and "Instructions for Execution of Contract, Bonds, and Insurance Certificates." Bidder agrees to complete project within Two Hundred and Seventy (270) calendar days from receipt of aforementioned documents. Fifteen (15) calendar days have been allocated in construction schedule for receiving aforementioned documents from Bidder.

b. Commencement - Contractor agrees to commence work on this project after the "Notice to

Proceed" is issued by the Owner. "Notice to Proceed" will be issued within seven (7) calendar days after Owner receives properly prepared and executed Contract documents listed in paragraph 4.a. above.

c. Special Scheduling Requirements – Refer to Special Conditions for specific scheduling

requirements for this project. 5. SUBCONTRACTOR LIST:

Bidder hereby certifies that the following subcontractors will be used in performance of Work:

NOTE: Failure to list subcontractors for each category of work identified on this form or listing more than one subcontractor for any category of work without designating the portion of work performed by each shall be grounds for rejection of bid. List name, city, and state of designated subcontractor, for each category of work listed in Bid For Lump Sum Contract. If work within a category will be performed by more than one subcontractor, Bidder shall provide name, city, and state of each subcontractor and specify exact portion of work to be performed by each. If acceptance/non-acceptance of Alternates will affect designation of a subcontractor, Bidder shall provide information, for each affected category, with this bid form. If Bidder intends to perform any designated subcontract work by using Bidder's own employees, then Bidder shall list their own name, city, and state. The bidder may petition the Owner to change a listed subcontractor only within 48 hours of the bid opening. See Information For Bidders Section 16 List of Subcontractors for requirements.

Work to be performed Subcontractor Name, City, State

Page 10: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017-11-17 · Page 1 of 6 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

MU Medical Science Building Addendum 1 First Floor Research Laboratory Renovation November 16, 2017 CP171091

A4

Mechanical _______ Electrical _______

Plumbing _______ Laboratory Casework ______________ FM and/or UL Certified Fire Stopping Contractor ____________________________________________

6. SUPPLIER DIVERSITY PARTICIPATION GOALS

a. The Contractor shall have as a goal, subcontracting with Minority Business Enterprise (MBE) of ten percent (10%) with Service Disabled Veteran Owned Business (SDVE) of three percent (3%) and with Women Business Enterprise (WBE), Disadvantage Business Enterprise (DBE), and/or Veteran Owned Business of ten percent (10%) of awarded contract price for work to be performed.

b. Requests for waiver of this goal shall be submitted on the attached Application for Waiver form. A

determination by the Director of Facilities Planning & Development, UM, that a good faith effort has not been made by Contractor to achieve above stated goal may result in rejection of bid.

c. The Undersigned proposes to perform work with following Supplier diversity participation level:

MBE PERCENTAGE PARTICIPATION ______________________ percent ( _____%) SDVE PERCENTAGE PARTICIPATION ______________________ percent ( _____%) WBE, DBE and/or VETERAN PERCENTAGE PARTICIPATION ________ percent ( _____%)

d. A Supplier Diversity Compliance Evaluation form shall be submitted with this bid for each diverse subcontractor to be used on this project.

7. BIDDER'S ACKNOWLEDGMENTS

a. Bidder declares that he has had an opportunity to examine the site of the work and he has examined Contract Documents therefore; that he has carefully prepared his bid upon the basis thereof; that he has carefully examined and checked bid, materials, equipment and labor required thereunder, cost thereof, and his figures therefore. Bidder hereby states that amount, or amounts, set forth in bid is, or are, correct and that no mistake or error has occurred in bid or in Bidder's computations upon which this bid is based. Bidder agrees that he will make no claim for reformation, modifications, revisions or correction of bid after scheduled closing time for receipt of bids.

b. Bidder agrees that bid shall not be withdrawn for a period of sixty (60) days after scheduled closing

time for receipt of bids. c. Bidder understands that Owner reserves right to reject any or all bids and to waive any informalities

in bidding. d. Accompanying the bid is a bid bond, or a certified check, or an irrevocable letter of credit, or a

cashier's check payable without condition to "The Curators of the University of Missouri" which is an amount at least equal to five percent (5%) of amount of largest possible total bid herein submitted, including consideration of Alternates.

e. Accompanying the bid is a Bidder's Statement of Qualifications. Failure of Bidder to submit the

Bidder's Statement of Qualifications with the bid may cause the bid to be rejected. Owner does not maintain Bidder's Statements of Qualifications on file.

f. It is understood and agreed that bid security of two (2) lowest and responsive Bidders will be

retained until Contract has been executed and an acceptable Performance Bond and Payment

Page 11: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017-11-17 · Page 1 of 6 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

MU Medical Science Building Addendum 1 First Floor Research Laboratory Renovation November 16, 2017 CP171091

A5

Bond has been furnished. It is understood and agreed that if the bid is accepted and the undersigned fails to execute the Contract and furnish acceptable Performance/Payment Bond as required by Contract Documents, accompanying bid security will be realized upon or retained by Owner. Otherwise, the bid security will be returned to the undersigned.

8. BIDDER'S CERTIFICATE

Bidder hereby certifies:

a. His bid is genuine and is not made in interest of or on behalf of any undisclosed person, firm or corporation, and is not submitted in conformity with any agreement or rules of any group, association or corporation.

b. He has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid.

c. He has not solicited or induced any person, firm or corporation to refrain from bidding.

d. He has not sought by collusion or otherwise to obtain for himself any advantage over any other Bidder or over Owner.

e. He will not discriminate against any employee or applicant for employment because of race, color, religion, sex or national origin in connection with performance of work.

f. By virtue of policy of the Board of Curators, and by virtue of statutory authority, a preference will be given to materials, products, supplies, provisions and all other articles produced, manufactured, mined or grown within the State of Missouri. By virtue of policy of the Board of Curators, preference will also be given to all Missouri firms, corporations, or individuals, all as more fully set forth in "Information for Bidders."

9. BIDDER'S SIGNATURE

Note: All signatures shall be original; not copies, photocopies, stamped, etc.

Authorized Signature Date

Printed Name Title

Company Name Mailing Address City, State, Zip Phone No. Federal Employer ID No.

Fax No. E-Mail Address

Circle one: Individual Partnership Corporation Joint Venture If a corporation, incorporated under the laws of the State of__________ Licensed to do business in the State of Missouri? ____yes _____no

(Each Bidder shall complete bid form by manually signing on the proper signature line above and supplying required information called for in connection with the signature. Information is necessary for proper preparation of the Contract, Performance Bond and Payment Bond. Each Bidder shall supply information called for in accompanying "Bidder's Statement of Qualifications."

END OF SECTION

Page 12: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017-11-17 · Page 1 of 6 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

LEVEL ONE

743' - 0"

LEVEL TWO

756' - 8"

KL

(F.V.)

16'-0"

(F.V.)

4'-2"

(F.V.)

4'-1"

(F.V.)

7'-0"

(F.V.)

1'-6"

3'-6"

3'-6"

EXISTING

HONED STONE

PANELS TO

REMAIN

EXISTING

HONED STONE

PANELS TO

REMAIN

(F.V.)

12'-7"

(F.V.)

19'-9"

11

PROJECT NUMBER:

1900 W. 47th PlaceSuite 300Westwood, Kansas66205p: 913.362.6500www.pgav.com

Plumbing and Mechanical Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

(816) 421-0950

11/16/1753474

Medical Science First Floor Research Laboratory Renovation

UNIVERSITY OF MISSOURIFOR: The Curators of the University of Missouri - Project No: CP171091

ADDENDUM 01

XA01

3/1

6"

= 1

'-0"B

1/A

401

SO

UT

H C

OU

RT

YA

RD

ELE

VA

TIO

N

Page 13: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017-11-17 · Page 1 of 6 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

LEVEL ONE

743' - 0"

LEVEL TWO

756' - 8"

N

DEMO EXISTING PLASTER (HARD CEILING)

APPROX 12" BELOW EXISTING CONCRETE

STRUCTURE ABOVE, F.V.TYP

DEMO CMU TILE CHASE AROUND EXISTING

MEP SYSTEMS, TYP AT COLUMNS

INSTRUCTIONAL

M130

DEMO EXISTING FRAMING AND GYP BD AT ALL

EXTERIOR WALLS WITHIN PROJECT AREA, TYP.

EXISTING MASONRY/ CONCRETE TO REMAIN.

INCLUDES FRAMING ABOVE AROUND AND

BELOW WINDOW OPENINGS.

D3

ROOM #'S:

M114

M125A

M126

M128

M129

M130

M131

M132

1

1

PROJECT NUMBER:

1900 W. 47th PlaceSuite 300Westwood, Kansas66205p: 913.362.6500www.pgav.com

Plumbing and Mechanical Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

(816) 421-0950

11/16/1753474

Medical Science First Floor Research Laboratory Renovation

UNIVERSITY OF MISSOURIFOR: The Curators of the University of Missouri - Project No: CP171091

ADDENDUM 01

XA02

3/8

" =

1'-0"B

1/A

501

SE

CT

ION

- E

XIS

TIN

G &

DE

MO

LIT

ION

Page 14: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017-11-17 · Page 1 of 6 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

G

1

7'-0"

(2) RELOCATED TO ROOM M144, SALVAGE & RETURN REMAINDER TO OWNER

18'-0" F.V.

EQ

EQ

EQ

EQ

EQ

EQ

PROJECT NUMBER:

1900 W. 47th PlaceSuite 300Westwood, Kansas66205p: 913.362.6500www.pgav.com

Plumbing and Mechanical Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

(816) 421-0950

11/16/1753474

Medical Science First Floor Research Laboratory Renovation

UNIVERSITY OF MISSOURIFOR: The Curators of the University of Missouri - Project No: CP171091

ADDENDUM 01

XA03

3/8

" =

1'-0"B

4/A

501

SE

CT

ION

- E

XIS

TIN

G &

DE

MO

LIT

ION

Page 15: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017-11-17 · Page 1 of 6 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

I

2 1/2"

3'-0"

3'-0"

RELOCATED TO M144

3'-6" F.V.

RELOCATED TO M144

3'-6" F.V.

3'-0"

3'-0"

2 1/2"

1

SALVAGE AND RETURN TO OWNER

18'-6" F.V.

SALVAGE AND RETURN TO OWNER

SALVAGE AND RETURN TO OWNER

PROJECT NUMBER:

1900 W. 47th PlaceSuite 300Westwood, Kansas66205p: 913.362.6500www.pgav.com

Plumbing and Mechanical Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

(816) 421-0950

11/16/1753474

Medical Science First Floor Research Laboratory Renovation

UNIVERSITY OF MISSOURIFOR: The Curators of the University of Missouri - Project No: CP171091

ADDENDUM 01

XA04

3/8

" =

1'-0"B

4/A

501

SE

CT

ION

- E

XIS

TIN

G &

DE

MO

LIT

ION

Page 16: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017-11-17 · Page 1 of 6 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

123553 FIXED PANEL FOR OUTLETS

123553PATHWAY INSIDE CASEWORK FOR U.C.LIGHTING TOPLUG INTO NEW OUTLET.

123553 FIXED PANEL FOR OUTLETS

123553 POWER WIREMOLD

123553 REAGENT SHELVING

MEPELECTRICAL POWER TO BE RUN TO JUNCTION BOX,COORDINATE WITH ELECTRICAL DRAWINGS

123553REMOVEABLE AS REQUIRED TO ACCESS CHASE BEHINDCASEWORK

1

MEP

ELECTRICAL RACEWAY WITH PREINSTALLEDELECTRICAL OUTLETS - INCLUDES PRE WIRING DOWNUNDER COUNTER TOP TO KNEE SPACE ELECTRICALOUTLEY/ CONNECTION BOX / HARD WIRES

123553 FRONT LIP, NO BACK

12355312" WIDE VERTICAL SUPPORT. SUPPORT NOTREQUIRED TO GO TO FLOOR.2'

-0"

123553MIRROR THIS SIDE FOR OUTLETS, U.C. LIGHTS, POWERPLUGS, ETC...

PROJECT NUMBER:

1900 W. 47th PlaceSuite 300Westwood, Kansas66205p: 913.362.6500www.pgav.com

Plumbing and Mechanical Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

(816) 421-0950

11/16/1753474

Medical Science First Floor Research Laboratory Renovation

UNIVERSITY OF MISSOURIFOR: The Curators of the University of Missouri - Project No: CP171091

ADDENDUM 01

XA05

1" = 1'-0" C4/A710PRE INSTALLED ELEC OUTLETS

Page 17: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017-11-17 · Page 1 of 6 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

EQOFO

I

3'-0"123553

MOBILE CABINET W/ EPOXY TOP

48"

MOBILE

MTL

48"

MOBILE

MTL

LA LV LG(2)DATA

uc lights

LA LV LG

uc lights

1

123553

CEILING MOUNTED SERVICE PANEL

PROJECT NUMBER:

1900 W. 47th PlaceSuite 300Westwood, Kansas66205p: 913.362.6500www.pgav.com

Plumbing and Mechanical Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

(816) 421-0950

11/16/1753474

Medical Science First Floor Research Laboratory Renovation

UNIVERSITY OF MISSOURIFOR: The Curators of the University of Missouri - Project No: CP171091

ADDENDUM 01

XA06

1/4

" =

1'-0"C

4/A

801

M114 F

LE

X R

ES

EA

RC

H L

AB

Page 18: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017-11-17 · Page 1 of 6 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

EXISTING TO REMAIN

FLEXIBLE DUCT

ROUND DUCT SIZE, (ACTUAL SIZE INDICATED)

ACCESS PANEL, TOP OR SIDE

TURNING VANES

CHANGE OF ELEVATION - RISE (R) OR DROP (D)

FLEXIBLE DUCT CONNECTION

SUPPLY AND OUTSIDE AIR SECTION UP

RETURN AIR SECTION UP

MOTORIZED DAMPER

MANUAL VOLUME DAMPER

FIRE DAMPER

SMOKE DAMPER

FIRE/SMOKE DAMPER

GRAVITY BACKDRAFT DAMPER

SUPPLY DIFFUSER AS SCHEDULED. ARROWS INDICATEDIRECTION OF AIR DISCHARGE. IF NO ARROWS ARE SHOWNON PLAN, DEFAULT IS A 4-WAY THROW.

RETURN GRILLE OR REGISTER AS SCHEDULED

SIDEWALL DIFFUSER AS SCHEDULED

FLOW ARROW DOWNSTREAM OF FAN

FLOW ARROW UPSTREAM OF FAN

SPIRAL FLAT-OVAL DUCT SIZE, FIRST FIGUREIS SIDE SHOWN (ACTUAL SIZE INDICATED)

DEMO TO BE REMOVED

NEW WORK

DUCT SIZE

12x12

12x12

12x12

12ø

12x10ø

R

AP

DUCT SIZE

DUCT SIZE, FIRST FIGURE IS SIDE SHOWN(CLEAR INSIDE, ADJUST FOR LINER)

G

M

SUPPLY AND OUTSIDE AIR SECTION DOWN

RETURN AIR SECTION DOWN

SIDEWALL RETURN OR EXHAUST AS SCHEDULED

EQUIPMENT DESIGNATION GENERAL ABBREVIATIONS GENERAL ABBREVIATIONS, CONTINUED

DUCT SYSTEM SYMBOLS

GENERAL SYMBOLS

EXHAUST GRILLE OR REGISTER AS SCHEDULED

EXHAUST AIR SECTION UP

EXHAUST AIR SECTION DOWN

S

AHU

1

KEYED NOTE

SECTION NUMBER

SHEET WHERE LOCATED

INTERFACE, EXISTING TO NEW

UNIT NUMBER

EQUIPMENT DESIGNATION

TYPE OF SERVICE: S = SUPPLY

R = RETURN

E = EXHAUST

T = TRANSFER

AIR QUANTITY

IN CFM

SENSOR:

S-1

100

SCHEDULEDDEVICE NO

UNIT NUMBER

DAMPER TYPE DESIGNATION

##

FSD

1

CO2 =S=

CARBON DIOXIDESTATIC PRESSURE

1

M101

SIM

H

TEMPERATURE SENSOR

HUMIDITY SENSOR

T

1

PIPE LINE SYMBOLS

SHUT OFF VALVE (SEESPECIFICATION FOR TYPE)

BUTTERFLY VALVE

CHECK VALVE

GLOBE VALVE

CALIBRATED - ORIFICEBALANCING VALVE

IN-LINE PUMP

ELBOW DOWN

ELBOW UP

TEE DOWN

TEE UP

CAP

FLANGED

PIPING TO BE REMOVED

CONCENTRICREDUCER/INCREASER

ECCENTRICREDUCER/INCREASER

Y - PATTERN STRAINER

TWO-WAY CONTROL VALVE

MEDIUM DETAIL FINE DETAIL

UNION

AIR VENT (M - MANUAL,A - AUTOMATIC)

RELIEF VALVE

PRESSURE ANDTEMPERATURE TEST PORT

BALL VALVE

M

PIPE SYSTEM ABBREVIATIONS

C/HS

C/HR 2-PIPE CHILLED AND HEATING WATER RETURN

2-PIPE CHILLED AND HOT WATER SUPPLY

LPS

HWS

HWR

LPR

RS

RL

HPS

REFRIGERANT SUCTION

REFRIGERANT LIQUID

HIGH PRESSURE STEAM RETURN

LOW PRESSURE CONDENSATE RETURN

LOW PRESSURE STEAM SUPPLY

HEATING WATER SUPPLY

HEATING WATER RETURN

DRAIND

HPR HIGH PRESSURE STEAM SUPPLY

PC PUMPED CONDENSATE

1. THESE PLANS ARE DIAGRAMMATIC IN NATURE. THE CONTRACTOR SHALL BE PREPARED TO MAKESOME ALTERATIONS TO THE EXACT LOCATION OF DUCTWORK, PIPING AND EQUIPMENT FROM THELOCATION INDICATED ON THESE DRAWINGS TO FIT ACTUAL JOB CONDITIONS.

2. ALL ELBOWS, FITTINGS, ETC., IN PIPING AND DUCTWORK REQUIRED TO CLEAR ALL JOB OBSTRUCTIONSARE NOT NECESSARILY INDICATED. ALL NECESSARY TRANSITIONS, FITTINGS AND OFFSETS AREREQUIRED WHETHER SHOWN OR NOT.

3. BECAUSE OF THE LIMITED SPACE AVAILABLE TO INSTALL ALL OF THE MECHANICAL WORK,COORDINATION BETWEEN THE VARIOUS TRADES IS OF THE UTMOST IMPORTANCE.

4. THE CONTRACTOR SHALL COORDINATE STAGING AND SCHEDULING WITH THE OWNER'SREPRESENTATIVE.

5. EXISTING CONDITIONS ARE BASED ON INFORMATION OBTAINED FROM PREVIOUS CONSTRUCTIONDOCUMENTS AND INFORMAL FIELD OBSERVATION AND SHALL NOT BE CONSTITUTED AS "AS BUILT."THE CONTRACTOR SHALL FIELD-VERIFY EXISTING CONDITIONS BEFORE THE ONSET OF CONSTRUCTION.

6. DEMOLISH ALL PIPING, DUCTWORK EQUIPMENT, ETC., SHOWN TO BE REMOVED, IN ITS ENTIRETY, INCLUDING ALL HANGERS AND SUPPORTS.

7. WHERE CONTRACTOR IS REQUIRED TO CONCEAL NEW WORK, REMOVE OR MODIFY EXISTINGCONSTRUCTION OR EQUIPMENT, OR ATTACH TO EXISTING CONSTRUCTION, THE CONTRACTOR SHALLREPAIR OR REPLACE EXISTING CONSTRUCTION AND MATERIALS TO MATCH CONDITIONS AT THE ONSETOF CONSTRUCTION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REMOVE AND REPLACE EXISTINGCEILINGS AND WALLS REQUIRED FOR INSTALLATION OF MECHANICAL SYSTEMS.

8. THE OWNER SHALL MAINTAIN ALL SALVAGE RIGHTS OF EQUIPMENT AND MATERIALS REMOVED. ALLEQUIPMENT AND MATERIALS NOT CLAIMED BY THE OWNER SHALL BE REMOVED FROM THEPREMISES BY THE CONTRACTOR.

9. ALL WORK SHALL BE INSTALLED PER THE REFERENCE DETAILS, REGARDLESS OF WHETHER OR NOT THE DETAILS ARE CALLEDOUT ON THE PLANS. SEE 500 SERIES SHEET(S).

10. PROVIDE VENTS AT ALL HYDRONIC PIPING HIGH POINTS, AND DRAINS AT ALL PIPING LOW POINTS, REGARDLESS OF WHETHERSHOWN OR NOT. ALL MANUAL VENTS SHALL HAVE A 3/4" MALE HOSE BIB.

11. IN GENERAL, IF THE FINAL HYDRONIC PIPING RUNOUT TO A COIL OR OTHER TERMINAL DEVICE IS NOT SIZED ON THE PLANS, SEEHYDRONIC PIPE RUNOUT SIZE EQUIPMENT SCHEDULE ON SHEET(M602). MINIMUM HYDRONIC PIPE RUNOUT TO ANY COIL SHALL BE3/4".

12. DUE TO EXTENSIVE OCCURRENCE OF HAZARDOUS MATERIALS USED IN THE ORIGINAL CONSTRUCTION OF THE BUILDING (I.E.LEAD-BASED PAINT AND ASBESTOS INSULATION), THE CONTRACTOR SHALL COORDINATE ALL DEMOLITION WITH THE ABATEMENTCONTRACTOR. EFFORTS HAVE BEEN MADE TO SHOW THE MAJORITY OF THIS DEMOLITION ON THESE AND THE ARCHITECTURALPLANS, BUT CLEARLY, THE EXACT LOCATION AND EXTENT OF THIS DEMOLITION MUST BE FULLY COORDINATED. SEESPECIFICATION SECTIONS IN DIVISION 02 EXISTING CONDITIONS FOR REQUIREMENTS ASSOCIATED WITH THE REMOVAL OFHAZARDOUS MATERIALS. NOTE: FOR ALL PIPING SYSTEMS THAT HAVE EXISTING HAZARDOUS MATERIALS REMOVED AND THESYSTEMS REMAIN, CONTRACTOR SHALL INSTALL NEW INSULATION ON EXPOSED PIPING MEETING INSULATION SPECIFICATIONS. DONOT LEAVE ANY EXISTING PIPING UNINSULATED.

13. DO NOT SCALE THE LOCATION OF HVAC CEILING ELEMENTS, SUCH AS AIR INLETS AND OUTLETS, FROM THE M-SERIES DRAWINGS.SEE ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT HVAC CEILING ELEMENT LOCATIONS. REFLECTED CEILING PLANSGOVERN THE LOCATION OF DIFFUSERS, REGISTERS, AND GRILLES. M-SERIES DRAWINGS GOVERN TYPE, STYLE, AND SIZE OFDIFFUSERS, REGISTERS, AND GRILLES.

14. ALL DUCTWORK SHALL COMPLY WITH "HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE," 3RD EDITION, SMACNA2005, EXCEPT WHERE MORE RESTRICTIVE REQUIREMENTS ARE SPECIFIED. ANY PLAN REFERENCES TO "SMACNA FIGURE ---"REFERS TO THIS STANDARD. SEE SPECIFICATIONS FOR SCHEDULE OF DUCT PRESSURE CLASS AND SEAL CLASS.

15. IN GENERAL, THE FINAL FLEX DUCT RUNOUT TO EACH DIFFUSER, REGISTER, OR GRILLE IS NOT SIZED ON PLANS. FLEX DUCTRUNOUT SIZE SHALL MATCH AIR OUTLET NECK SIZE, UNO.

16. IT IS THE INTENT OF THESE DRAWINGS THAT A MANUAL BALANCING DAMPER BE PROVIDED AT EVERY INDIVIDUAL DUCTEDCONNECTION TO AN AIR DEVICE. NOTE, UNLESS A BALANCING DAMPER IS SCHEDULED TO BE FURNISHED WITH AIR DEVICE.PROVIDE A MANUAL BALANCING DAMPER IN EACH INDIVIDUAL BRANCH DUCT SERVING AN AIR DEVICE BETWEEN THE CONNECTIONTO THE DUCT SERVING MULTIPLE DEVICES AND THE AIR DEVICE WHEN HARD DUCTED AND AT EACH POINT OF CONNECTION OF FLEXDUCT RUNOUT TO BRANCH DUCT (AT THE SPIN-IN FITTING) WHERE FLEX DUCT IS USED. VAV BOXES WITH SINGLE DIFFUSERS ARE NOTREQUIRED TO HAVE A BALANCING DAMPER UNLESS SHOWN.

17. ALL NEW DUCTWORK SIZES SHOWN ON PLANS ARE CLEAR INSIDE DIMENSIONS. CONTRACTOR SHALL ADJUST SHEET METAL SIZES AS NECESSARY TO ACCOMMODATEINTERNAL DUCT LINER, IF SPECIFIED.

18. COORDINATE WITH OWNER'S REPRESENTATIVE TO VERIFY ALL EXISTING OWNER SALVAGED AND OWNER REMOVED CONTROLS WORK IS COMPLETE. ALL EXISTINGTEMPERATURE CONTROLS THAT ARE BEING DEMOLISHED OR DISABLED AS WORK OF THIS CONTRACT SHALL BE COMPLETELY REMOVED FROM THIS PROJECT WORKAREA. REMOVE ALL EXISTING CONTROL WIRING, PNEUMATIC TUBING AND RELATED CONTROLS AND ALL ACCESSORIES MADE OBSOLETE BY THE WORK OF THIS PROJECT.PROVIDE A BRASS COMPRESSION CAP TYPE FITTING AT ALL UNUSED PNEUMATIC TUBING TERMINATIONS. DO NOT PINCH- OFF TUBING.

19. THE CONTRACTOR SHALL CONNECT THE NEW HVAC SYSTEM TO THE OWNER'S EXISTING BUILDING CONTROL SYSTEM. REFER TO THE SPECIFICATIONS FOR ADDITIONALREQUIREMENTS.

20. THE WORK OF SECTION 230900 SHALL INCLUDE THE FOLLOWING ELECTRICAL WORK, COMPLYING WITH REQUIREMENTS OF DIVISION 26 SECTIONS:A. CONTROL WIRING BETWEEN FIELD-INSTALLED CONTROLS, INDICATING DEVICES, AND UNIT CONTROL PANELS.B. INTERLOCK WIRING BETWEEN ELECTRONICALLY OPERATED EQUIPMENT UNITS AND BETWEEN EQUIPMENT AND FIELD-INSTALLED CONTROL DEVICES.C. POWER SUPPLY WIRING FROM POWER SOURCES TO POWER CONNECTION ON CONTROLS AND/OR UNIT CONTROL PANELS, INCLUDING, BUT NOT LIMITED TO, AIR TERMINAL UNIT CONTROLLERS, DDC PANELS, DAMPER ACTUATORS, AND VALVE ACTUATORS.

21. IT SHOULD BE NOTED THAT SOME SYSTEMS (I.E. GENERAL AND ISOLATION EXHAUST) ARE REQUIRED TO BE BALANCED MORE THAN ONCE TO ASSURE DESIGNAIRFLOWS ARE PROVIDED.

22. ALL EXISTING SYSTEM (EQUIPMENT) SHUTDOWNS SHALL BE COORDINATED WITH OWNER'S REPRESENTATIVE A MINIMUM SEVEN (7) DAYS IN ADVANCE.

23. THE SCOPE OF WORK FOR THIS PROJECT IS LOCATED ON THE FIRST FLOOR AND ROOF OF THE MEDICAL SCIENCE BUILDING. IT IS STRONGLY ENCOURAGED THAT THECONTRACTOR VISITS THE SITE PRIOR TO SUBMITTING HIS OR HER BIDS. CONTRACTOR SHALL INCLUDE IN HIS OR HER BID ALL COSTS TO DISASSEMBLE AND REASSEMBLENEW EQUIPMENT IN ORDER TO MOVE IT INTO PLACE. COSTS SHALL INCLUDE MANUFACTURER SUPERVISION THAT IS REQUIRED TO MAINTAIN EQUIPMENT WARRANTIES INFULL. EQUIPMENT IS NOT ALLOWED TO BE CUT TO BE BROUGHT INTO PLACE.

24. CONTRACTOR SHALL FIELD VERIFY SERVICE ACCESS. REFER TO ARCHITECTURAL PLANS FOR PROJECT CONSTRUCTION ACCESS. THE CONTRACTOR SHALL NOTIFY THEOWNER'S REPRESENTATIVE A MINIMUM OF 72 HOURS PRIOR TO THE BEGINNING OF WORK THAT INVOLVES ACTIVITIY INTO THE CONSTRUCTION AREA. THE CONTRACTOR AND THEOWNER'S REPRESENTATIVE SHALL INSPECT THE AREAS INTO AND OUT OF CONSTRUCTION WORK AREA AND DOCUMENT THE CONDITION OF THE SPACES IN WRITTING AND/ORPHOTOGRAPHS PRIOR TO STARTING ANY WORK IN THE FIRST FLOOR AREA. ACCESS INTO AND OUT OF THE CONSTRUCTION AREA IS THROUGH FIRST FLOOR CORRIDORS THATSHALL REMAIN ACCESSIBLE TO PEDESTRIAN USE THROUGH THE ENTIRE PROJECT CONSTRUCTION PERIOD. CONTRACTOR SHALL INCLUDE IN HIS OR HER BID ALL ASSOCIATEDCOSTS FOR SPACE PROTECTION ACCESSING THE CONSTRUCTION WORK AREA INCLUDING BUT NOT LIMITED TO BRING IN AND REMOVE CONSTRUCTION DEBRIS, TOOLS,EQUIPMENT AND ALL OTHER NECESSITIES TO COMPLETE THE CONTRACT DOCUMENTS. CONTRACTOR SHALL FULLY PROTECT THE INTERIOR OF EACH SPACE, INCLUDING BUT NOTLIMIITED TO THE FLOOR, WALLS, CEILING AND ANY EQUIPMENT LOCATED IN THE SPACES TO AND FROM CONSTRUCTION AREA. THE CONTRACTOR SHALL PROTECT THE EXISTINGFLOOR DURING ALL CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL PLACE ONE LAYER OF 1/2 INCH CONSTRUCTION GRADE PLYWOOD OVER 1/2 INCH FOAM BOARD WITHOVERLAPPED JOINTS ON THE CORRIDOR FLOORS. THE CONTRACTOR SHALL ADVISE THE OWNER'S REPRESENTATIVE WHEN THE WORK IS COMPLETE AND THE PROTECTIONBOARDS HAVE BEEN REMOVED. THE CONTRACTOR AND THE OWNER'S REPRESENTATIVE SHALL EXAMINE ALL SURFACES WHERE WORK HAS OCCURED AND CONTRACTOR SHALLREPAIR ALL DEFECTS NOT PREVIOUSLY DOCUMENTED.

25. ALL PIPING AND DUCT WALL PENETRATIONS SHALL BE SEALED AIRTIGHT TO MAINTAIN ROOM AIR PRESSURE RELATIONSHIP TO ADJACENT ROOM.

26. ALL OPENINGS THROUGH WALLS MUST BE PATCHED AND SEALED AIR TIGHT TO MEET THE RATING OF THE WALL AND TO MAINTAIN AIR PRESSURE RELATIONSHIPS TOADJACENT SPACES.

27. DI-ELECTRIC PIPE FITTINGS ARE NOT ALLOWED. REFER TO SPECIFICATION SECTION 232113 3.3 T FOR REQUIREMENTS OF JOINING DISSIMILAR METALS.

GENERAL NOTES (THESE APPLY TO ALL M-SERIES SHEETS):

CONSTRUCTION PHASING NOTES

THIS PROJECT CONSISTS OF TWO (2) CONTRUCTION PHASES. THISCONTRACTOR SHALL COORDINATE WITH OWNERS REPRESENTATIVEFOR OUTAGES OF ALL SYSTEMS PRIOR TO STARTING ANDCOMPLETING EACH CONSTRUCTION PHASE. THE CONSTRUCTIONAREA OF THIS PROJECT IS ADJACENT AND BELOW AREAS OF THISBUILDING WHICH SHALL REMAIN FULLY FUNCTIONAL ANDOPERATIONAL THROUGHOUT ALL PHASES OF THIS PROJECT.SYSTEMS THAT SERVE OTHER AREAS OF THIS BUILDING CURRENTLYARE ROUTED THROUGH THIS PROJECT CONSTRUCTION BOUNDRIESANDOR ORGINATE IN THIS PROJECT CONSTRUCTION BOUNDRIES. ALLSYSTEM SHUT DOWNS SHALL BE COORDINATED WITH THE OWNERSREPRESENTATIVE A MINIMUM OF SEVEN (7) DAYS IN ADVANCE.

GROSS ANATOMY M148 SHALL REMAIN FULLY FUNCTIONAL DURINGPHASE 1 OF THIS PROJECT. NO DEMOLITION OF EXISTING SYSTEMSAND/OR EQUIPMENT SHALL NOT OCCUR UNTIL NEW WORK OF PHASE1 HAS BEEN COMPLETED, TESTED AND BALANCED. NEW SYSTEMSSHALL BE FULLY FUNCTIONAL. THE NEW 18X12 STAINLESS STEELEXHAUST DUCT AND NEW EXHAUST AIR VALVES (GEV 1-04, EAV 1-138AND EAV 1-139) SERVING ROOM ANATOMY CADAVER LAB SHALL BEINSTALLED AND FUNCTIONAL TO HAVE NEW WORK OF PHASE 1COMPLETE. THE NEW 18X12 EXHAUST AIR DUCT SHALL CONNECT THETHE EXISTING EXHAUST RISER LOCATED IN EXISTING GROSS ANATOMYM148.

THE LOW PRESSURE STEAM SHUT DOWNS SHALL ONLY BE ALLOWEDWHEN OUTSIDE AIR TEMPERATURES ARE TO BE ABOVE 65 DEGREESF FOR SEVEN (7) CONSECUTIVE DAYS UNLESS APPROVEDOTHERWISE BY OWNERS REPRESTATIVE.

HEATING HOT WATER AND CHILLED WATER SHUT DOWNS SHALL ONLYBE ALLOWED AFTER HOURS OR WEEKENDS AND MUST BEAPPROVED BY OWNERS REPRESENTATIVE A MINIMUM OF SEVEN (7)DAYS IN ADVANCE.

THE EXISTING FC BUS (2-PIPE) AND N2 (AHU) CONTROL SYSTEMLOCATED IN THE EXISTING M112 MECHANICAL ROOM SHALL BECOMPLETELY FUNCTIONAL AND MAINTAINED DURING DEMOLITION ANDCONSTRUCTION. OWNER SHALL SALVAGE ANY CONTROLS FROMEQUIPMENT IN MECHANICAL ROOM M112 PRIOR TO CONTRACTORDEMOLITION OF (2-PIPE SYSTEM AND AHU).

EXISTING TWO-PIPE CHILLED WATER, STEAM TO HEATING HOTSYSTEM LOCATED IN EXISTNG MECHANICAL ROOM M112 AND ALLPIPING, CONTROLS AND ACCESSORIES SERVES SPACES LOCATEDON THE SECOND FLOOR. THIS ENTIRE SYSTEM SHALL REMAIN FULLYFUNCTIONAL UNTIL A SCHEDULED WEEKEND ONLY (FRIDAY EVEN AT6PM UNTIL MONDAY MORNING AT 3AM) TRANSITION TO THE NEWSYSTEM. NEW HEATING HOT WATER AND CHILLED WATER SYSTEMSHALL BE FULLY FUNTIONAL AND TESTED PRIOR TO SCHEDULEDTRANSITION. SCHEDULED TRANSITION SHALL BE SCHEDULED WITHOWNERS REPRESENTATIVE A MINIMUM OF SEVEN (7) DAYS INADVANCE.

EXISTING AIR HANDLING UNIT LOCATED IN EXISTING MECHANICALROOM M120 SERVES ROOMS LOCATED WITHIN THIS CONSTRUCTIONAREA AND OTHER AREAS OUTSIDE THIS CONSTRUCTION ZONE. SHUTDOWN AND TEMPORARY CAPPING AND/OR TYING INTO EXISTINGUTILITIES ASSOCIATED WITH THIS AIR HANDLING UNIT SHALL OCCURONLY AFTER 5PM OR ON WEEKENDS AND MUST BE SCHEDULED WITHOWNERS REPRESENTATIVE A MINIMUM OF SEVEN (7) DAYS INADVANCE. ALL SHUT DOWN ARE ALLOWED FOR A 12 HOUR PERIODUNLESS APPROVED BY THE OWNERS REPRESENTATIVE IN ADVANCE.

THE EXISTING EXHAUST AIR SYSTEM (EXHAUST RISERS) WITHIN THISBUILDING TIE TOGETHER ON THE ROOF TO GANGED FAN SYSTEM.SHUT DOWN AND TEMPORARY CAPPING AND/OR TYING INTO ANEXISTING EXHAUST RISER SHALL OCCUR AFTER 5PM OR ONWEEKENDS AND MUST BE SCHEDULED WITH OWNERSREPRESENTATIVE A MINIMUM OF SEVEN (7) DAYS IN ADVANCE. ALLSHUT DOWN ARE ALLOWED FOR A 12 HOUR PERIOD UNLESSAPPROVED BY OWNERS REPRESENTATIVE IN ADVANCE.

1.

2.

3.

4.

5.

6.

7.

8.

CWR CHILLED WATER RETURN

CWS CHILLED WATER SUPPLY

A

B

C

D

E

6 5 4 3 2 1

1900 w.47th Place, #300, Westwood, KS 66205(913) 362-6500 www.PGAV.COM

DRAWN: CHECKED:

DATE:

PGAV # CLIENT #

SHEET #:

PECKHAM GUYTON ALBERS & VIETS, INC.

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

Plumbing, Mechanical & Fire Protection Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

(816) 421-0950

THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TOWHICH THEY ARE AFFIXED, AND EXPRESSLY DISCLAIM ANYRESPONSIBILITY FOR ALL OTHER PLANS, SPECIFICATIONS,

ESTIMATES, REPORTS, OR OTHER DOCUMENTS OR INSTRUMENTSRELATING TO OR INTENDED TO BE USED FOR ANY PART OR PARTS

OF THE ARCHITECTURAL OR ENGINEERING PROJECT.

PECKHAM GUYTON ALBERS & VIETS, INC.MO STATE CERTIFICATE OF AUTHORITY #000086

MO STATE CERTIFICATE OF AUTHORITY #E-2005013590

MO STATE CERTIFICATE OF AUTHORITY #000148

11/1

6/20

1 7 8

:33:

28 A

MC

:\Use

rs\r

diem

er\D

ocum

ents

\245

-32_

ME

CH

_CE

NT

RA

L_v1

6_rd

iem

er.r

vt

1 Hospital Drive, Columbia, MO65212

M000

11/06/2017

53474

MECHANICALSYMBOLS &

ABBREVIATIONS

NLP

BID DOCUMENTS

University of Missouri -Columbia

NLP

CP171091

RJD

Medical ScienceFirst FloorResearch

LaboratoryRenovation

AC AIR CONDITIONING UNIT

ACC AIR COOLED CONDENSER

ACU AIR CONDITIONING UNIT

AF AIR FILTER

AHU AIR HANDLING UNIT

AS AIR SEPARATOR

B BOILER

BCU BLOWER COIL UNIT

CAV CONSTANT AIR VOLUME

CB CHILLED BEAM

CC COOLING COIL

CFP CHEMICAL FEED PUMP

CH CHILLER

CP CONDENSER WATER PUMP

CRAC COMPUTER ROOM AIR CONDITIONING UNIT

CRP CONDENSATE RETURN PUMP

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CTF COOLING TOWER FILTER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CVR CONVECTOR

CWP CHILLED WATER PUMP

DFH DEAERATING FEEDWATER HEATER

EAV EXHAUST AIR VALVE

EF EXHAUST FAN

EJ EXPANSION JOINT

ERU ENERGY RECOVERY UNIT

ET EXPANSION TANK

EVC EVAPORATIVE COOLER

F FAN

FAV FUME AIR VALVE

FC FLUID COOLER

FCU FAN COIL UNIT

FD FIRE DAMPER

FSD COMBINATION FIRE/SMOKE DAMPER

FT FLASH TANK

FTR FIN-TUBE RADIATION

FTU FAN TERMINAL UNIT

GP GLYCOL PUMP

GV GRAVITY VENTILATOR

H HUMIDIFIER

HC HEATING COIL

HEV HOOD EXHAUST VALVE

HPU HEAT PUMP UNIT

HRU HEAT RECOVERY UNIT

HWP HEATING WATER PUMP

HX HEAT EXCHANGER

L LOUVER

MAU MAKE-UP AIR UNIT

MD MOTORIZED DAMPER

P PUMP

PAC PACKAGED AIR CONDITIONING UNIT

PCWP PRIMARY CHILLED WATER PUMP

PG PIPE GUIDE

PHWP PRIMARY HEATING WATER PUMP

PHX PLATE HEAT EXCHANGER

PRV PRESSURE REGULATING VALVE

RF RETURN FAN

RHC TERMINAL REHEAT COIL

RP RADIANT PANEL

RTU ROOFTOP UNIT

SAV SUPPLY AIR VALVE

SCWP SECONDARY CHILLED WATER PUMP

SD SMOKE DAMPER

SF SUPPLY FAN

SHWP SECONDARY HEATING WATER PUMP

ST STEAM TRAP

T TANK

UH UNIT HEATER

VAV VARIABLE AIR VOLUME BOX

WCC WATER COOLED CONDENSER

ISP INTERNAL STATIC PRESSURE

JS JOIST SPACE

KW KILOWATTS

L LENGTH

LAT LEAVING AIR TEMPERATURE

LB(S) POUNDS

LF LINEAR FEET

LRA LOCKED ROTOR AMPS

LS LIGHT SPACE

LVL LEVEL

LWT LEAVING WATER TEMPERATURE

MAN MANUAL

MANU MANUFACTURER

MAX MAXIMUM

MBH THOUSAND BRITISH THERMAL UNITS PER HOUR

MCA MINIMUM CIRCUIT AMPS

MCC MOTOR CONTROL CENTER

MECH MECHANICAL

MERV MINIMUM EFFICIENCY REPORTING VALUE (ASHRAE 52.2)

MFR MANUFACTURER

MIN MINIMUM OR MINUTE (PER CONTEXT)

MTD MOUNTED

MTL METAL

MV MANUAL VENT

NC NORMALLY CLOSED OR NOISE CRITERIA (PER CONTEXT)

NIC NOT IN CONTRACT

NO NORMALLY OPEN OR NUMBER (PER CONTEXT)

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

OA OUTSIDE AIR

OBD OPPOSED BLADE DAMPER

OC ON CENTER

OD OUTSIDE DIAMETER

OT OIL TRAP

PA PIPE ANCHOR

PBD PARALLEL BLADE DAMPER

PD PRESSURE DROP

PENT PENTHOUSE

PH PHASE

PHC PREHEAT COIL

PLBG PLUMBING

PNEU PNEUMATIC

PPH POUNDS PER HOUR

PRESS PRESSURE

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAUGE

QTY QUANTITY

RA RETURN AIR

RAD RADIATED

RD ROOF DRAIN

REFR REFRIGERANT

REQ REQUIRED

RH RELATIVE HUMIDITY

RLA RUNNING LOAD AMPS

RM ROOM

RND ROUND

RPM REVOLUTIONS PER MINUTE

SA SUPPLY AIR

SAN SANITARY

SEC'N SECTION

SEER SEASONAL ENERGY EFFICIENCY RATIO

SENS SENSIBLE

SF SQUARE FOOT

SH SENSIBLE HEAT

SHT SHEET

SND SOUND

SOL SOLENOID

SP STATIC PRESSURE

SPD STATIC PRESSURE DIFFERENTIAL

SPT STATIC PRESSURE TRANSMITTER

SQ SQUARE

SST STAINLESS STEEL

STL STEEL

STM STEAM

T&P TEMPERATURE AND PRESSURE

TC TEMPERATURE CONTROL

TD THERMODYNAMIC OR TEMPERATURE DIFFERENTIAL (PER CONTEXT)

TDH TOTAL DYNAMIC HEAD

TEMP TEMPERATURE

TOT TOTAL

TPD TOTAL PRESSURE DROP

TSP TOTAL STATIC PRESSURE

TYP TYPICAL

UC UNDERCUT DOOR

UG UNDERGROUND

UNO UNLESS NOTED OTHERWISE

V VOLTS

VAC VACUUM

VD VOLUME DAMPER (MANUAL)

VEL VELOCITY

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

VTR VENT THRU ROOF

W WATT OR WIDTH (PER CONTEXT)

W/ WITH

W/O WITHOUT

WB WET BULB

WC WATER COLUMN

WG WATER GAUGE

WPD WATER PRESSURE DIFFERENTIAL

WT WEIGHT

A AIR OR AMP (PER CONTEXT)

ACC ACCESSORIES

AD ACCESS DOOR

AFF ABOVE FINISHED FLOOR

AFS AIR FLOW SWITCH

AHRI AIR CONDITIONING, HEATING, AND REFRIGERATION INSTITUTE

AI ANALOG SIGNAL INPUT

AMB AMBIENT

AO ANALOG SIGNAL OUTPUT

AP ACCESS PANEL

APD AIR PRESSURE DROP

APLV APPLICATION PART LOAD VALUE

APPROX APPROXIMATE

ARCH ARCHITECTURE/ARCHITECT

AUX AUXILIARY

AV AUTOMATIC VENT

AVG AVERAGE

BDD BACK DRAFT DAMPER

BFC BELOW FINISHED CEILING

BFP BACKFLOW PREVENTER

BHP BRAKE HORSEPOWER

BI BINARY SIGNAL INPUT

BMS BUILDING MANAGEMENT SYSTEM

BO BINARY SIGNAL OUTPUT

BOB BOTTOM OF BEAM

BOD BOTTOM OF DUCT

BOP BOTTOM OF PIPE

BS BEAM SPACE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNITS PER HOUR

BWE BAKED WHITE ENAMEL

CAP CAPACITY

CAV CONSTANT AIR VOLUME

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CI CAST IRON

CLG COOLING DUCT (COLD DUCT)

CO CLEAN OUT

COMP COMPRESSOR

CONC CONCRETE

COND CONDENSATE

CONN CONNECTION

CORR CORRIDOR

CV CONTROL VALVE

D DEPTH

DB DRY BULB

DBA A-WEIGHTED DECIBELS

DEFL DEFLECTION

DEG DEGREES

DEG F DEGREES FAHRENHEIT

DES DESIGN

DIA DIAMETER

DIM DIMENSION

DISCH DISCHARGE

DIV DIVISION

DN DOWN

DP DIFFERENTIAL PRESSURE SENSOR

DPS DIFFERENTIAL PRESSURE SWITCH

DPT DIFFERENTIAL PRESSURE TRANSMITTER

DTL DETAIL

DWG(S) DRAWING(S)

EA EXHAUST AIR OR EACH (PER CONTEXT)

EAT ENTERING AIR TEMPERATURE

EER ENERGY EFFICIENT RATIO

EFF EFFICIENCY

ELEC ELECTRIC

ELEV ELEVATION

EQ EQUAL

ESP EXTERNAL STATIC PRESSURE

EWB ENTERING AIR WET BULB TEMPERATURE

EWT ENTERING WATER TEMPERATURE

EXH EXHAUST

EXIST, EX EXISTING

EXT EXTERNAL

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

FC FLEXIBLE CONNECTION

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FIN FINISHED

FLR FLOOR

FPF FINS PER FOOT

FPM FEET PER MINUTE

FS FLOW SWITCH

FT FEET

FT-HD HEAD IN FEET

GA GAUGE

GAL GALLONS

GALV GALVANIZED

GC GENERAL CONTRACTOR

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

H HEIGHT

HD HEAD

HEV HOSE END VALVE

HORIZ HORIZONTAL

HP HORSEPOWER

HR HOUR

HTG HEATING DUCT (HOT DECK)

HVAC HEATING, VENTILATING & AIR CONDITIONING

HW HOT WATER

HZ HERTZ

IB INVERTED BUCKET

IE INVERT ELEVATION

IN INCH/INCHES

INDIC INDICATOR

IPLV INTEGRATED PART-LOAD VALUE

# DATE DESCRIPTION

1 11/16/17 ADDENDUM 1

1

Page 19: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017-11-17 · Page 1 of 6 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

MAXSERVICE

MAX FLOW(GPM/PPH) NOTES

UNITSERVED

NOTES:

(PSIG)PRESSURE DROP

CLOSE-OFFPRESSURE

(PSI)

CONTROL VALVE SCHEDULE

REFER TO APPROPRIATE SCHEDULE FOR FLOW INFORMATION.

MAXIMUM PRESSURE DROP AT FULL OPEN POSITION.

PRESSURE INDEPENDENT 2-WAY MODULATING CONTROL VALVE.

SEE SPEC 230900.

CHILLED WATER 5

HOT WATER 5VAV (ALL)

STEAM 3HUMIDIFIER

SEE SPEC

SEE SPEC

SEE SPEC

2-WAY MODULATING CONTROL VALVE.

2-WAY 2-POSITION CONTROL VALVE.

VALVE SHALL FAIL NORMALLY OPEN.

VALVE SHALL FAIL NORMALLY CLOSED.

HOT WATER 5AHU SEE SPEC

RHC-(ALL) HOT WATER 5 SEE SPEC

AHU

ALL CONTROL VALVE FLOW RATES SHALL BE

ADJUSTED TO MATCH EQUIPMENT SHOP DRAWING

SUBMITTAL VALUES.

NEW PNEUMATIC CONTROL VALVE.

CHILLED WATER (CONTROL VALVE) 5HX 1-01 SEE SPEC

HX 1-01 PROCESS WATER 5 SEE SPEC

2, 3, 7, 8

2, 4, 6, 8

2, 3, 7, 8

2, 3, 6, 8

2, 4, 7, 8

2, 3, 7, 8

2, 5, 7, 8

1.

2.

3.

4.

5.

6.

7.

8.

9.

KEYED NOTE 1

KEYED NOTE 1

KEYED NOTE 1

KEYED NOTE 1

KEYED NOTE 1

KEYED NOTE 1

KEYED NOTE 1

A

B

C

D

E

6 5 4 3 2 1

1900 w.47th Place, #300, Westwood, KS 66205(913) 362-6500 www.PGAV.COM

DRAWN: CHECKED:

DATE:

PGAV # CLIENT #

SHEET #:

PECKHAM GUYTON ALBERS & VIETS, INC.

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

Plumbing, Mechanical & Fire Protection Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

(816) 421-0950

THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TOWHICH THEY ARE AFFIXED, AND EXPRESSLY DISCLAIM ANYRESPONSIBILITY FOR ALL OTHER PLANS, SPECIFICATIONS,

ESTIMATES, REPORTS, OR OTHER DOCUMENTS OR INSTRUMENTSRELATING TO OR INTENDED TO BE USED FOR ANY PART OR PARTS

OF THE ARCHITECTURAL OR ENGINEERING PROJECT.

PECKHAM GUYTON ALBERS & VIETS, INC.MO STATE CERTIFICATE OF AUTHORITY #000086

MO STATE CERTIFICATE OF AUTHORITY #E-2005013590

MO STATE CERTIFICATE OF AUTHORITY #000148

11/1

6/20

1 7 7

:47:

48 A

MC

:\Use

rs\r

diem

er\D

ocum

ents

\245

-32_

ME

CH

_CE

NT

RA

L_v1

6_rd

iem

er.r

vt

1 Hospital Drive, Columbia, MO65212

M601

11/06/2017

53474

SCHEDULES

NLP

BID DOCUMENTS

University of Missouri -Columbia

NLP

CP171091

RJD

Medical ScienceFirst FloorResearch

LaboratoryRenovation

AIR HANDLING UNIT SCHEDULEPLAN MARK

MFR. MODEL TYPE LOCATION MIN. OA (CFM)

SUPPLY FAN HOT WATER COIL CHILLED WATER COIL

TOTALAIRFLOW

(CFM)

STATIC PRESSURE

TYPE DRIVEMOTOR HP /

BHPMAX FAN

SPEED (RPM)MOTOR

SPEED (RPM)MIN. FAN EFF.

(%)CAPACITY

(BTUH)MAX FACE

VELC. (FPM) EAT / LAT (°F)WATER FLOW

(GPM) EWT / LWT (°F) MIN ROWS

MAX PD CAPACITY (BTUH)MAX FACE

VELC. (FPM)

EAT / LATWATER FLOW

(GPM) EWT / LWT (°F) MIN ROWS

MAX PD

TSP (IN WC) ESP (IN WC) AIR (IN WC) WATER (FT) TOTAL SENS. DB (°F) WB (°F) AIR (IN WC) WATER (FT)

AHU 1-01 DAIKIN VISION CAH033GDHM CUSTOM MECHANICAL M130 15000 15000 5.36 2.50 (6) AF ECM 5 HP PER FAN 3230 3230 PREMIUM 1121992 500 0/68 53.00 180/138 2 0.17 3.1 1315362 688678 500 95/53 78/52.8 189.00 46/60 10 1.18 11.3

AIR HANDLING UNIT SCHEDULE CONT.PLAN MARK HUMIDIFIER FILTERS

AHU_SNDOCT 63

AHU_SND OCT125

AHU_SND OCT250

AHU_SND OCT500

AHU_SND OCT1000

AHU_SND OCT2000

AHU_SND OCT4000

AHU_SND OCT8000 NOTES

STEAMRATE

(LBS/HR)

STEAMPRESSURE

(PSIG) EAT (°F)% RH

(ENTER/LEAVE)

FACEVELOCITY

(FPM)MAX APD(IN WC)

PRE FINAL

TYPEDESIGN APD (IN

WC) TYPEDESIGN APD (IN

WC)

AHU 1-01 129 10 55 (0/50) 500 0.01 2" MERV 8 0.5 12" MERV 15 1 71 70 81 69 63 56 50 51 1, 2, 3, 4, 5, 6, 7, 8, 9, 10

BLOWER COIL UNIT SCHEDULEPLAN MARK

MFR. MODEL TYPE LOCATION SERVICE CFMEXT SP (IN

WC)

COOLING DATA ELECTRICAL DATA

NOTESSENS CAP

(MBH)TOTAL CAP

(MBH) EAT (°F) LAT (°F) EWT (°F) LWT (°F) FLOW (GPM) WPD (FT) COIL ROWS MOTOR HP

BCU 1-03 IEC HBD20 HORIZONTAL BELT DRIVE FREEZER STORAGE/SUPPORT M132 FREEZER STORAGE/SUPPORT M132 2200 0.5 65 72 75/63 56/55 46 60 14.3 1.4 4 2 1, 2, 3, 4

BCU 1-04 IEC HBD20 HORIZONTAL BELT DRIVE FREEZER STORAGE/SUPPORT M112 FREEZER STORAGE/SUPPORT M112 2200 0.5 65 72 75/63 56/55 46 60 14.3 1.4 4 2 1, 2, 3, 4

LOUVER SCHEDULEPLAN MARK

MFR. MODEL TYPE LOCATION UNIT FUNCTION OPENING SIZE MAX CFMFREE AREA

(SQ FT)FREE AREAVELOCITY

MAX APD (INWC) NOTES

L 1-01 RUSKIN ELF6375DX STATIONARY MECH ROOM M130 AHU 1-01 OUTSIDE AIR 100x66 15000 27.5 545 0.05 1, 2, 3, 4

L 1-02 RUSKIN ELF6375DX STATIONARY MECH ROOM M130 EF 1-01 EXHAUST 47x42 2200 7.63 288 0.01 1, 2, 3, 4

NOTES:

1. SEE EQUIPMENT DATA SCHEDULE FOR ELECTRICAL INFORMATION.2. SOUND POWER LEVEL RATINGS SHOWN IN DECIBELS, REFERRED TO 10(-12) WATTS CALCULATED PER AMCA STANDARD 301, VALUES ARE DISCHARGE/INLET/RADIATED.3. REFER TO DIV 23 MOTOR SPECIFICATION FOR MOTOR REQUIREMENTS.4. FILTER PRESSURE DROP INCLUDES DIRTY FILTER ALLOWANCE OF 0.75".5. PROVIDE SEPARATE POWER CONNECTION POINT FOR GFI RECEPTACLES AND LIGHTS IN UNIT.6. PROVIDE A MINIMUM 10" TALL BASE RAIL.7. MAXIMUM DIMENSIONS OF UNIT ARE AS FOLLOWS: WIDTH:66 INCHES; HEIGHT: 106 INCHES INCLUDING 10 INCH BASE RAIL; LENGTH:18 FEET-8 INCHES8. PROVIDE OPTIONAL MOTOR BLANK-OFF PANELS.9. EACH FAN SHALL HAVE AN ECM MOTOR. REFER TO ELECTRICAL DRAWINGS.10. UNIT SHALL BE BROUGHT INTO BUILDING THROUGH FIRST FLOOR CORRIDOR SPACE. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO SUBMITTING SHOP DRAWINGS. ALL

EXISTING BUILDING COMPONENTS (DOORS, CEILINGS, WALLS, WINDOWS) SHALL REMAIN IN PLACE UNLESS NOTED IN THESE CONSTRUCTION DOCUMENTS. IN ANY COMPONENT REQUIRESDISASSEMBLY TO MOVE INTO BUILDING, MANUFACTURER SHALL WITNESS DISASSEMBLY AND REASSEMBLY TO MAINTAIN MANUFACTURER'S WARRANTY AND SCHEDULED PERFORMANCES.

NOTES:1. SEE EQUIPMENT DATA SCHEDULE FOR ELECTRICAL INFORMATION.2. FRONT OUTLET DUCT COLLAR AND BACK INLET LOUVERS.3. SUSPEND FROM STRUCTURE WITH 1" SPRING ISOLATORS PER SPECIFICATION.4. MANUFACTURER SHALL PROVIDE PRE-WIRED DISCONNECT AND 24V CONTROL TRANSFORMER.

NOTES:1. ARCHITECT SHALL PICK COLOR AND FINISH DURING SHOP DRAWING REVIEW.2. FURNISH LOUVER WITH 1/2" ALUMINUM BIRD SCREEN.3. LOUVERS ARE SCHEDULED ONLY FOR PERFORMANCE OF THE REQUIRED FREE AREA. REFER TO ARCHITECTURAL PLANS FOR TYPE, MODEL, ELEVATIONS AND

SECTIONS FOR ROUGH OPENING SIZES, EXACT LOCATIONS AND MOUNTING HEIGHTS. CONTRACTOR SHALL CONFIRM SIZE AND OPENING PRIOR TO SUBMITTINGSHOP DRAWING REVIEW.

4. THE SIZE INDICATED IS THE REQUIRED MINIMUM FREE AREA SIZE. REFER TO ARCHITECT DRAWINGS FOR OVERALL LOUVER DIMENSIONS.

FAN SCHEDULEPLAN MARK

MFR. MODEL TYPE LOCATION SERVICE DRIVEAIRFLOW

(CFM) ESP (IN WC)MAX FAN

SPEED (RPM)MOTOR

SPEED (RPM)

ELECTRICAL DATA

NOTESHP/KW/AMPS V/PH/HZ

EF 1-01 COOK 135 SQN17D INLINE CENTRIFUGAL FREEZER STORAGE/SUPPORT M132 FREEZER STORAGE/SUPPORT M132 DIRECT WITH EC MOTOR 2200 0.5 1725 1725 3/4 115/1/60

EF 1-02 COOK 135 SQN17D INLINE CENTRIFUGAL FREEZER STORAGE/SUPPORT M112 FREEZER STORAGE/SUPPORT M112 DIRECT WITH EC MOTOR 2200 0.5 1725 1725 3/4 115/1/60

PUMP SCHEDULEPLAN MARK

MFR. MODEL TYPE LOCATION SERVICEWATER FLOW

(GPM) TDH (FT)

MIN INLET /OUTLET SIZES

(IN)MAX NPSHREQD (FT) MIN EFF (%)

MOTORSPEED (RPM)

ELECTRICAL DATA

NOTESHP

HWRP 1-01 BELL & GOSSETT SERIES E-80 2X2X7B INLINE MECH ROOM M130 AHU 1-01 HW COIL 53.00 GPM 30 2/2 4.78 57 1800 1.5

CWP 1-01 BELL & GOSSETT SERIES E-80 2x2x9.5C INLINE MECH ROOM M120 HX 1-01 90.00 GPM 50 2/2 7.71 57 1800 3

NOTES:SEE EQUIPMENT DATA SCHEDULE FOR ELECTRICAL INFORMATION.

NOTES:SEE EQUIPMENT DATA SCHEDULE FOR ELECTRICAL INFORMATION.

MOTORIZED DAMPER SCHEDULEMARK

MFR. MODEL LOCATION SERVICEBLADE

CONFIGURATIONFAIL

POSITIONSIZE WxH (IN) MOUNTING NOTES

ID #

MD 1-01 RUSKIN CD50 MECH 130 AHU 1-01 OA OPPOSED CLOSED 92x62 DUCT

HEAT EXCHANGER SCHEDULEMARK

MFR. TYPE LOCATION SERVICE CAPACITY(MBH)

SYSTEMWATER IN (°F)

SYSTEMWATER OUT

(°F)PROCESS

WATER IN (°F)

PROCESSWATER OUT

(°F) GPMMAX WATER

PD (FT)NOTES

HX 1-01 BELL & GOSSETT GPX PLATE & FRAME MECH M120 CHILLED WATER FOR SECOND FLOOR 632 46 60 62 48 90.00 GPM 15 1, 2, 3, 4

FAN TERMINAL UNIT SCHEDULE

MARK

MFR. MODEL & SIZE TYPE LOCATION SERVICEPRIMARY

INLET SIZE (IN)

PRIMARY AIRFLOW (CFM)DESIGN INLETSTATIC PRESS

(IN)

MAX PRESSDROP (IN)

OUTLET DUCTSIZE WxD (IN)

UNIT FAN REHEAT ELECTRICAL DATA

NOTESID # MAX MIN

AIRFLOW(CFM)

# OFFANS

HP(EA)

HEATINGAIRFLOW

(CFM)

CAPACITY(MBH)

EAT(ºF)

LAT(ºF)

MAXAPD

CONTROLVALVE

HP VOLTS PHASE

FTU 1-01 TITUS DTFS-C SERIES VESTIBULE VESTIBULE 10 300 180 1.0 0.5 14X11 700 1 1/3 700 22.3 56 87 0.15 2-WAY 1/3 120 1

NOTES:SEE EQUIPMENT DATA SCHEDULE FOR ELECTRICAL INFORMATION.

# DATE DESCRIPTION

1 11/16/17 ADDENDUM 1

NOTES:1. UNIT SHALL BE SIZED FOR A MAXIMUM 2.0 DEGREES F APPROACH.2. THE UNIT SHALL BE AHRI CERTIFIED FOR PERFORMANCE.3. THE UNIT SHALL BE ASME CERTIFIED AND HAVE ASME "U" STAMP AND INCLUDE THE U-1 DATA REPORTS.4. ALL SURFACES ON THE GUIDE CARRY BARS SHALL BE STAINLESS STEEL.

11

Page 20: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017-11-17 · Page 1 of 6 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

MR M130MR M120MR M112

METASYS (SF-C)

SUPPLY FAN CT

R3

METASYS (SF-S)

METASYS (LT-A)

METASYS (HS-A)

R5

R4

R3STATUSRELAY

R2RSF-C

R1RFA

CONTACTS R4

R5

R4HS

RELAY

HIGHSTATICSWITCH

R1R RUNENAB

SF ECM

(SF-O)

LT-A R5LT-A

RELAY

R2R

SAFETY

24 VAC

HTG

RELAY

CONTACTS

ON R3DMP

RELAY

2MA ECM START CIRCUITNO SCALE 3

FC BUS SCHEMATIC DIAGRAMNO SCALE

R1RR2RR3R4R5DMP RELAYHTG RELAY

24VAC RIB1UC24VAC RIB1UC24VAC CONTROL RELAY -2POLE24VAC CONTROL RELAY -2POLE24VAC CONTROL RELAY -2POLE24 VAC CONTROL RELAY -2POLE24 VAC CONTROL RELAY -2POLE

1.

2.

3.

4.

5.

KEEP ALL LOW VOLTAGE CONTROL WIRING

(UNDER 25V) AND LOW VOLTAGE POWER WIRING

(OVER 25V) SEPARATED. (RUN IN SEPARATE

CONDUIT.)

PROVIDE RELAYS WITH MULTIPLE CONTACTS AS

REQUIRED.

ANY DISCONNECT WITH AUX CONTACTS WILL BE

ADDED TO SAFETY CIRCUIT

CURRRENT TRANSFORMER REQUIRED FOR

STATUS

R1, R2, AND R4 MOUNTED ON/NEAR I/O PANEL.

COORDINATE WITH OWNER REPRESENTATIVE.

FC BUS TO BE CONTINUOUS DAISY CHAIN. SEE PLANS FOR QUANTITY

AND LOCATIONS OF VAV/FCU CONTROLLERS.

OWNER WILL MAKE TERMINATION CONNECTIONS AT PANELS. LOCATE

PANELS IN SAME ROOM AS EQUIPMENT SERVED.

FC COMMUNICATION BUS WIRE SHALL BE 22 AWG, PLENUM RATED,

TWISTED SHIELDED, 3 CONDUCTOR, WITH BLUE OUTER CASING,

DESCRIPTED AS 22-03 OAS STR PLNM NEON BLU JK DISTRIBUTED BY

WINDY CITY WIRE, CONSTRUCTED BY CABLE-TEK, OR APPROVED

EQUIVALENT.

COORDINATE FIELD ROUTING WITH OWNERS REPRESENTATIVE.

KEEP EXISTING FC BUS INTACT THROUGHOUT CONSTRUCTION.

1.

2.

3.

4.

5.

FIRST FLOOR

SECOND FLOOR

VAVVAV PHOENIX

RMIAH85

2PIPE

1

INSTALL J-BOX ABOVE CEILING IN ROOM M112 FOR FC BUS SPLICEWHERE EXISTING 2-PIPE SYSTEM CONTROLLER WAS REMOVED.

1

(SEE SPECS):DEVICES

GENERAL NOTES:

KEYED NOTES:

GENERAL NOTES:

113

SF

-S

ECM

M

115

HWS

HWR

NC

LT

-A

SMK

111

PH

T-O

M

118114

PH

P-S

PH

P-C

110

CLG

-O

CO

OL

ING

CWS

CWR

NC

CO

IL

35 F

102

PH

T-T

SF

-C

DM

109

SF

-O

FILTERS

117

PR

EH

EA

T

CO

IL

OUTSIDEAIR

116

HS

-A

DPS

SEE AHU START CIRCUIT DETAIL ON SHEET THIS SHEET.

LOCATE AS SHOWN ON MECHANICAL DRAWINGS.

1. SEE SPECIFICATIONS FOR DEVICE SPECIFICATIONS.

2.ANY DEVICE REQUIRING POWER MUST BE POWERED BY

CONTRACTOR.

GENERAL NOTES:

KEYED NOTES:1

1

1

112

ST

M-O

ST

EA

M

LPS

NC

HU

MID

IFIE

R

SF

108

SA

-PR

S

DPT

SUPPLY

AIR

2

103

CLG

-T

119

ST

M-I

SO

2

TAG #101102103104105106107108109110111112113114115116117118119

TYPEAIAIAIAIAIAIAIAIAOAOAOAOBIBIBIBIBOBOBO

POINT NAMEOA-TPHT-TCLG-TSA-TSA-RHZN-H1ZN-H2SA-PRSSF-OCLG-OPHT-OSTM-OSF-SPHP-SLT-AHS-ASF-CPHP-CSTM-ISO

DESCRIPTIONOUTSIDE AIR TEMPHEATING AIR TEMPCOOLING AIR TEMPSUPPLY AIR TEMPSUPPLY AIR HUMIDITYZONE AIR HUMIDITYZONE AIR HUMIDITYSUPPLY AIR STATIC PRESSURESUPPLY FAN SPEED OUTPUTCOOLING OUTPUTHEATING OUTPUTSTEAM OUTPUTSUPPLY FAN STATUSPREHEAT PUMP STATUSLOW TEMP ALARMHIGH STATIC ALARMSUPPLY FAN COMMANDPREHEAT PUMP COMMANDHUMIDIFIER ISOLATION VALVE

DEVICESOFTWARE INPUTRTD/DUCT AVERAGINGRTD/DUCT AVERAGINGRTD/DUCT AVERAGINGHUMIDITY SENSORHUMIDITY SENSORHUMIDITY SENSORDIFF PRESSURE TRANSMITTERECMELECT ACTUATOR W/SPRING RETURNELECT ACTUATOR W/SPRING RETURNELECT ACTUATOR W/SPRING RETURNCURRENT SWITCHCURRENT SWITCHFREEZE STATDIFF PRESS SWITCHCONTROL RELAYCONTROL RELAYELECT ACTUATOR W/SPRING RETURN

106

ZN

-H1

107

ZN

-H2

WALL MOUNTEDWALL MOUNTED

HUM

105

SA

-RH

104

SA

-T

117

SF

-C

ESHHL

1

1

NOTES

FRONT VIEW

DDC CONTROLLERS ARE SUPPLIED BY OWNER AND MOUNTED BY

CONTRACTOR.

KEEP ALL LOW VOLTAGE CONTROL WIRING ( UNDER 25V) AND LOW

VOLTAGE POWER WIRING (OVER 25V) SEPARATED. (RUN IN SEPARATE

CONDUIT).

PLYWOOD SIZE IS BASED ON THE NUMBER OF CONTROLLERS IN EACH

LOCATION. COORDINATE WITH OWNERS REPRESENTATIVE.

4/0 BOX WITH PULL CHAIN.18W LED LIGHT WITH GUARD.

4'x4'x3/4" PLYWOOD (MIN)(PAINT FRONT AND

ENDS MACHINE GRAY.)

1-1/2" UNISTRUTCHANNEL (2)

1.

2.

3.

6" x 6" WIRE TROUGH

FLOOR

3/4" CONDUIT

120 VAC INPUT POWER

DEDICATED 15A CIRCUIT

1" CONDUITMINIMUM

I/O

6"x6" WIRETROUGH

FLOOR

EXP. ANCHORS

1-1/2" UNISTRUTCHANNEL (2)

4'x4'x3/4" PLYWOOD (MIN)(PAINT FRONT AND ENDSMACHINE GRAY)

3/4" CONDUIT

4/0 BOX WITHPULL CHAIN. 18WLED WITH GUARD.

WA

LL

ASC ASC

BY DIVISION 16

2" MIN. CONDUIT (2)

3'-6

" T

YP

ICA

L

3' MIN DISTANCE

POSTBASE (2)

BRACEFITTING (2)

OPTIONAL FLOOR MOUNT

SIDE VIEW

A

B

C

D

E

6 5 4 3 2 1

1900 w.47th Place, #300, Westwood, KS 66205(913) 362-6500 www.PGAV.COM

DRAWN: CHECKED:

DATE:

PGAV # CLIENT #

SHEET #:

PECKHAM GUYTON ALBERS & VIETS, INC.

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

Plumbing, Mechanical & Fire Protection Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

(816) 421-0950

THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TOWHICH THEY ARE AFFIXED, AND EXPRESSLY DISCLAIM ANYRESPONSIBILITY FOR ALL OTHER PLANS, SPECIFICATIONS,

ESTIMATES, REPORTS, OR OTHER DOCUMENTS OR INSTRUMENTSRELATING TO OR INTENDED TO BE USED FOR ANY PART OR PARTS

OF THE ARCHITECTURAL OR ENGINEERING PROJECT.

PECKHAM GUYTON ALBERS & VIETS, INC.MO STATE CERTIFICATE OF AUTHORITY #000086

MO STATE CERTIFICATE OF AUTHORITY #E-2005013590

MO STATE CERTIFICATE OF AUTHORITY #000148

11/1

6/20

1 7 7

:47:

48 A

MC

:\Use

rs\r

diem

er\D

ocum

ents

\245

-32_

ME

CH

_CE

NT

RA

L_v1

6_rd

iem

er.r

vt

1 Hospital Drive, Columbia, MO65212

M702

11/06/2017

53474

CONTROLS

NLP

BID DOCUMENTS

University of Missouri -Columbia

NLP

CP171091

RJD

Medical ScienceFirst FloorResearch

LaboratoryRenovation

NTS1

AHU 1-01 CONTROL DIAGRAM

NTS4

ASC PANEL MOUNTING DETAIL1

# DATE DESCRIPTION

1 11/16/17 ADDENDUM 1