UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING 1ST FLOOR RESEARCH LABORATORY RENOVATION 1 Hospital Drive Columbia, MO 65212 PGAV Project #53474-00 MU Project #CP171091 ADDENDUM #1 November 16, 2017 This addendum is hereby made part of the Contract Documents for the above named project. It supplements and modifies the drawings and specifications dated November 6, 2017 prepared by Peckham Guyton Albers & Viets, Inc. (PGAV) and their consultants. This addendum is part of the Bid Documents and Contract Documents and shall govern in the performance of the work. Receipt of this addendum shall be acknowledged on the Bid Form. GENERAL A non-mandatory prebid meeting was held on November 9th, 2017. A list of attendees can be found at http://operations-webapps.missouri.edu/pdc/adsite/projects/cp171091/pb.pdf. The following clarifications were made at the prebid:
1. The renovation is to be completed in two phases as illustrated on sheet A100. Scheduling requirements related to each phase are outlined in 1.E Special Conditions paragraph 2. Phase 2 may commence prior to substantial completion of Phase 1. Owner will occupy the Phase 1 project area upon substantial completion of that Phase.
2. The cost breakout requested in 1.E Special Conditions paragraph 20 should include a portion of general conditions, overhead, profit, etc. proportionate to the scope of work.
3. Existing lay-in ceilings have been partially removed, and existing interior walls have been opened up throughout the renovation area to reveal above ceiling conditions and existing wall construction. Bidders are strongly encouraged to visit the project site prior to preparing their bid to familiarize themselves with existing conditions. Change orders will not be considered for work associated with existing conditions that are readily observable during the bid period. See General Conditions paragraph 4.5.2 for additional info.
4. Coordination drawings are required to include both new construction and existing construction to remain. The General Contractor shall be responsible for compiling coordination drawing content across disciplines from the various subcontractors responsible for the work, or delegating compilation responsibilities to a specific subcontractor. Subcontractors should clarify coordination drawing responsibilities with the General Contractors to whom they submit their bids. See 1.E Special Conditions paragraph 17.B. for additional information.
Contact Jason Tippie, PGAV Architects with questions regarding bid documents. 913-362-6500, [email protected]. All bidder questions must be received by 5:00pm CST, Friday November 24th. Questions received prior to the deadline will be answered in a final addendum on Monday afternoon, November 27th. Bidder’s questions (Q.) that have been received to date along with responses (R.) are as follows:
Q. On sheet A150, according to your partition designations, no wall types on sheet A301 are indicated to receive sound insulation. Is this correct?
Page 2 of 6
R. No, all partitions indicated to extend to bottom of deck (head construction ‘B’ or ‘R’) shall receive batt insulation per specification 072100. Batt thickness shall match the stud cavity depth. See revisions to sheet A301 below.
Q. On sheet A150, detail A4 shows no deflection track, but detail A5 does show
deflection track. Both details show framing to the deck. Do you only want deflection track on partitions that have the drywall extended to the deck?
R. No, deflection track is required at all partitions where framing extends to deck. Q. Has the flooring product specified for LVT-3 (Mohawk Boulder- Hot and Heavy
LVT, 36x36x5MM, Color 172 Sulfur) been discontinued? If so, is a different product to be used?
R. Color 172 Sulfur has been discontinued by the manufacturer, however we have confirmed that existing stock of this color is still available for purchase and is on hold with the manufacturer for use on this project.
PROJECT MANUAL Revise the following specification sections as described below: Section Modification 1.A. Replace Bid Form dated 11/06/17 in its entirety with revised Bid Form dated
11/16/17 attached. Additive Alternates 1 and 3 have been revised to include protection of existing finishes to remain, and to exclude moisture mitigation for the affected areas. Base bid quantities for Unit Prices 7.a, 7.b, and 7.c have also been revised to include the Alternate 1 and 3 areas. The moisture mitigation associated with Alternates 1 and 3 shall be included in the base bid as per the revised base bid quantities listed. If Alternates 1 and/or 3 are not accepted, a credit change order will be issued for the adjusted quantity at the unit price submitted.
1.E Revise paragraph 2.A.(4) to read “Bid Alternate #2, if accepted, will be completed
between December 18th, 2017 and January 10th, 2018, and/or between March 24th, 2018 and March 30th, 2018. Limited work may also be completed in this area over weekends beginning at 5:00pm Friday provided all ceilings are reinstalled and the space is ready for Owner’s use by 7:00am each Monday. This space is scheduled for Owner’s use prior to and following these periods, so construction activities will be limited to the timeframe specified.”
Revise paragraph 2.H to read “Phase 1 Construction Requirement: Prior to AHU
start-up and 2nd pass (see Controls spec 230900) by Owner, all Dirty Activities will be complete. Contractor shall in all instances be responsible for “Thorough Clean” requirements. The Owner requires AHU start-up / air movement a minimum of 30 days prior to substantial completion of Phase 1 to perform TAB and 2nd pass controls. Pre-punch inspection will take place 45 days prior to substantial completion to allow 15 days to complete Dirty Activities.
Add paragraph 2.I. to read “Electrical panel ‘P5’ replacement illustrated on sheet
E401 shall be completed before 7:00am or after 5:00pm Monday through Friday; anytime Saturday or Sunday; or anytime during Winter Recess, Spring Break, or Summer Recess. This area must remain available to students during normal business hours.”
085113 Revise paragraph 2.1A. to read “Basis of Design: EFCO Fixed Sash Series
6700”.
Page 3 of 6
Revise paragraph 2.1B. to read “Written requests for substitution will be considered up to ten calendar days prior to the date for receipt of bids.” See 1.E Special Conditions Article 10 – Substitutions and Equals for substitution procedures.
Add paragraph 2.1C.1. to read “Manko Window System, Inc.”. Manko 3300
Series is approved as equal to the Basis of Design. 115313 Revise paragraph 1.1.4 to read “Fume hood base support. Including acid storage
and solvent storage cabinets.” Revise paragraph 1.3A.5. to read “ASHRAE 110-2016, American Society of
Heating, Refrigerating, and Air-Conditioning Engineers, Method of Testing Performance of Laboratory Fume Hoods”.
Add paragraph 2.1E. to read “CIF Lab Solutions.” CIF Lab Solutions’ Fume Hood
is approved as equal to the Basis of Design. Revise paragraph 2.5.C to read “Acid Storage.” Refer to drawings for location. Revise paragraph 2.5.D to read “Solvent Storage.” Refer to drawings for location. 115353 Revise paragraph 2.1D. to read “Written requests for substitution will be
considered up to ten calendar days prior to the date for receipt of bids.” See 1.E Special Conditions Article 10 – Substitutions and Equals for substitution procedures.
123553 Add paragraph 2.1.F to read as follows: F. Counter-weight system:
1. Provide concealed galvanized steel counter weights to prevent tipping of units.
2. Provide drawer interlocks to prevent multiple drawers from being opened at the same time.
Revise paragraph 2.5A. to read “Design: Flush overlay”. Revise paragraph 2.5B. to read “Wood Species: Maple, see finish legend on
drawings for more information”. Revise paragraph 2.5D.1. to read “Select and arrange components for
compatible grain and color.” Revise paragraph 2.5G.4. to read “Drawer box construction including backs,
fronts and sides: Plywood.” Delete paragraph 2.6E.2. in its entirety. Revise paragraph 2.7B. to read “Glass for Glazed Doors: Clear fully tempered
glass complying with ASTM C 1048, Type I, Class 1, Quality-Q3; not less than 6 mm.”
Add paragraph 2.9E. to read as follows:
E. Provide service chase for all piping, conduit and lines which would otherwise be exposed to view.
1. Fabricate metal utility/service chase enclosures of matching laboratory metal finishes to conceal from view any piping, conduit and other utilities. All such enclosures shall be shop formed to a finished appearance.
Page 4 of 6
Delete paragraph 2.11C.entirely. Butt hinges as specified in 2.11B. shall be used
throughout. Revise paragraph 2.11F to read as follows:
F. Drawer Slides: Side mounted, as follows: 1. Drawers sized 30” wide or less: a. Accuride 7434 all ball bearing, rail mount, full extension + 1” over travel
slides, hold open detent with a 100 lb./ pair load rating and progressive movement.
2. Drawers sized over 30” wide: a. Accuride 3640 all ball bearing, rail mount, full extension + 1” over travel
slides, hold open detent with a 200 lb./ pair load rating and sequential movement.
3. File drawers to be equipped with full extension with over-travel 150 lb. dynamic zinc plated Accuride 4034 series, or equal.
Delete paragraph 2.11G in its entirety. Revise paragraph 2.11.I.2 to read “Provide locks at all file drawers and where
otherwise indicated.” Revise paragraph 2.12A to read “Reagent Shelves: Provide 12” tubular supports.
Top of counter installation is acceptable. Metal shelves to be 15” deep with lip at front only. No lip at back of shelf.
Delete paragraphs 2.12B, 2.12 C, 2.12D and 2.12E in their entirety. Add paragraph 2.12G to read “Grommets: provide two at each area on drawing
listed as “COMP”. Each grommet to be 2 1/2” diameter black plastic with removable slotted top.”
Add paragraph 2.12H to read “Cylinder restraints: Provide cylinder restraints
capable of supporting tanks in orientation indicated on drawings. Both front/back orientation and side/side orientation are shown.”
Add paragraph 2.12I to read “Coat hooks: At locations indicated on drawings
provide Aluminum coat hook bar with (5) double pronged coat hooks per bar in natural aluminum finish. Product similar to Peter Pepper Model 2150 or equal.”
Renumber the Part 2 paragraph titled “Ceiling Service Panel” as 2.16. Delete paragraph 2.13B.1. in its entirety. Vandal-Resistant faucets will not be
required. 123554 Revise paragraph 1.1.B to read “New stainless steel metal cabinets and cabinet
hardware to match existing (currently in room M144 and M148).” 123653 Delete paragraph 1.2.B in its entirety. Revise paragraph 2.2A1 to delete the words “with 10 percent of filler certified as
post-consumer glass by SCS”. Remove paragraph 2.5B.4. in its entirety.
Page 5 of 6
230100 Add paragraph 1.5A.15. to read “Contractor shall show all existing systems that are to remain as-is in coordination drawings. Including but not limited to all existing piping, ductwork, electrical conduit and junction boxes, fire protection, plumbing systems and HVAC system equipment. All existing systems shall be modeled to correct locations and coordinated with all new work.”
PROJECT DRAWINGS Revise the following Drawing Sheets as described below: Sheet Modification A000 Revise the note on detail D3 - Construction Access Plan related to dumpsters to
read “Dumpster (Dump Truck or Roll-off)”. A roll-off dumpster will be acceptable provided it’s confined to the location shown.
A301 Revise all wall type tags with head construction “B” to “B-1”, and with head
construction “R” to “R-2”. Add wall type tag “3G2/B-1” at the north wall of Room M128. Add wall type tag “3G1/A” at the east wall of Room M128. Revise wall type tag at east wall of Room M114 to read “4S1/R-2”. A401 Revise detail B1 - Exterior Glazing South Courtyard Elevation as per Sketch
XA01 attached. The hatch pattern at existing honed stone panels to remain has been deleted to clarify that there is no work required at these locations.
A501 Revise detail B1 - Section Existing & Demolition as per Sketch XA02 attached.
Notes have been added to clarify typical demolition extents at exterior wall furring.
Revise detail B4 – Section Existing & Demolition as per Sketche XA03 and XA04
attached. Notes have been added to clarify casework to be salvaged and reinstalled by Contractor from casework to be salvaged and returned to Owner.
A710 Revised detail C4 - Pre-installed Electrical Outlets Section as per Sketch XA05
attached. The reagent shelf may be supported off the countertop, and need not be extended to the floor slab.
A801 Add detail C5 – Room M114 Mobile Casework Elevation as per Sketch XA06
attached. M000 Replace sheet M000 Mechanical Symbols & Abbreviations dated 11/06/17 in its
entirety with revised sheet M000 Mechanical Symbols & Abbreviations dated 11/16/17 attached. General Note 23 has been modified. General Notes 24, 25, 26 and 27 have been added.
M601 Replace sheet M601 Schedules dated 11/06/17 in its entirety with revised sheet
M601 Schedules dated 11/16/17 attached. Notes have been added for clarification to the Air Handling Unit Schedule.
M702 Replace sheet M702 Controls dated 11/06/17 in its entirety with revised sheet
M702 Controls dated 11/16/17 attached. AHU 1-01 Control Diagram has been modified.
Page 6 of 6
ATTACHMENTS Specifications 1.A Bid Form Drawing Sketches (8.5x11) Sketch XA01 – Revisions to detail B1/A401 Sketch XA02 – Revisions to detail B1/A501 Sketch XA03 – Revisions to detail B4/A501 Sketch XA04 – Revisions to detail B4/A501 Sketch XA05 – Revisions to detail C4/A710 Sketch XA06 – New detail C5/A801 Drawing Sheets (30x42) M000 Mechanical Symbols & Abbreviations M601 Schedules M702 Controls END OF ADDENDUM #1
MU Medical Science Building Addendum 1 First Floor Research Laboratory Renovation November 16, 2017 CP171091
A1
SECTION 1.A BID FOR LUMP SUM CONTRACT Date:____________________________ BID OF (hereinafter called "Bidder") a corporation* organized and existing under laws of the State of , a partnership* consisting of , an individual* trading as , a joint venture* consisting of , . *Insert Corporation(s), partnership or individual, as applicable. TO: Curators of the University of Missouri
c/o Director, Campus Facilities- Planning Design and Construction Room L100 General Services Building Columbia, Missouri 65211
1. Bidder, in compliance with invitation for bids for construction work in accordance with Drawings and
Specifications prepared by PGAV Architects and their sub-consultants, entitled "MU MEDICAL SCIENCE BUILDING FIRST FLOOR RESEARCH LABORATORY RENOVATION", project number CP171091, November 6, 2017 having examined Contract Documents and site of proposed work, and being familiar with all conditions pertaining to construction of proposed project, including availability of materials and labor, hereby proposes to furnish all labor, materials and supplies to construct project in accordance with Contract Documents, within time set forth herein at prices stated below. Prices shall cover all expenses, including taxes not covered by the University of Missouri’s tax exemption status, incurred in performing work required under Contract documents, of which this Bid is a part.
Bidder acknowledges receipt of following addenda: Addendum No. Dated Addendum No. Dated Addendum No. Dated Addendum No. Dated
2. In following Bid(s), amount(s) shall be written in both words and figures. In case of discrepancy between words
and figures, words shall govern. 3. BID PRICING a. Base Bid:
The Bidder agrees to furnish all labor, materials, tools, and equipment required to renovate portions of the Medical Science Building first floor as shown on the documents; all as indicated on the Drawings and described in these Specifications for sum of:
DOLLARS ($ ).
b. Additive Alternate Bids: Above Base Bid may be changed in accordance with following Alternate Bids as Owner may elect. Alternates are as described in Section 1.H of Project Manual. Alternates are written in a priority order, but Owner is not required to accept or reject in order listed. This is a one (1) contract project, therefore, Alternates shall be studied by each Bidder to determine effect on Bids of Contractor and each Subcontractor and/or Material supplier.
MU Medical Science Building Addendum 1 First Floor Research Laboratory Renovation November 16, 2017 CP171091
A2
(1) Additive Alternate No. 1: M148 Flooring Base Bid: Patch and repair existing resinous floor and integral cove as indicated. Protect existing finishes to remain. Add Alternate: Demolish existing resinous floor throughout, patch and repair existing slab to receive new finishes, and install new LVT floor and resilient base as specified. All for sum of: DOLLARS ($ ). (2) Additive Alternate No. 2: M123 Sprinklers Base Bid: Existing to remain. Add Alternate: Extend sprinkler coverage throughout M123 and surrounding spaces as indicated. All for sum of: DOLLARS ($ ). (3) Additive Alternate No. 3: M124 & M145 Finishes Base Bid: Patch and repair existing VCT floor and rubber base as indicated. Paint new construction walls in corridor to match existing. Protect existing finishes to remain. Add Alternate: Demolish existing VCT floor and rubber base throughout as indicated, patch and repair existing slab to receive new finishes, and install new VCT floor and rubber base as specified. Paint new and existing walls per schedule. All for sum of: DOLLARS ($ ).
c. Unit Prices:
(1) For changing specified quantities of work from those indicated by Contract Drawings and Specifications, upon written instructions of Owner, the following Unit Prices shall prevail in accordance with General Conditions.
(2) The following Unit Prices include all labor, overhead and profit, materials, equipment,
appliances, bailing, shoring, shoring removal, etc., to cover all work. (3) The following Unit Prices are required where applicable to particular Base Bid and/or
Alternate being submitted. (4) Only a single Unit Price shall be given and it shall apply for either MORE or LESS work
than that indicated on Drawings and called for in Specifications as indicated to be included in Base Bid and/or Alternates. In the event that more or less units than so indicated is actually furnished, Change Orders will be issued for increased or decreased amounts as approved by the Owner.
(5) Bidder understands that the Owner will not be liable for any Unit Price or any amount in
excess of Base Bid and any Alternate(s) accepted at time of award of Contract, except as expressed in written Change Orders duly executed and delivered by Owner's Representative.
(6) Note that the term “Base Bid Quantity” may not necessarily be directly related to the actual
base bid scope of work. Certain items may also apply in part or in whole to additive alternate scopes of work.
(7) Floor Preparation as defined in Divisions 3 & 9:
(a) Hydraulic Cement Underlayment as described in Sections 035416 & 090561. Base Bid Quantity = 9,500 s.f. $_________/s.f.
MU Medical Science Building Addendum 1 First Floor Research Laboratory Renovation November 16, 2017 CP171091
A3
(b) Floor slab moisture mitigation for use beneath LVT and/or VCT as described in
Sections 090561 and 096519. Base Bid quantity = 9,500 s.f.
$_________/s.f.
(c) Floor slab moisture mitigation for use beneath resinous flooring as described in Sections 090561 and 096723.
Base Bid quantity = 400 s.f. $_________/s.f.
(8) Hazardous Material Abatement as defined in Division 2:
(a) Removal of ACM pipe insulation (up to 6” pipe,) Base Bid quantity = 630 l.f. $________/l.f.
(b) Removal of ACM Pipe fitting insulation Base Bid quantity = 100 each $________/each
(d) Removal of ACM floor leveling material greater than ½” thick Base Bid quantity = 100 s.f. $________/s.f. (e) Removal of ACM Exterior Window Caulk Base Bid quantity = 20 windows each $_________/each
(f) Removal of ACM transite ductwork Basie Bid quantity = 340 l.f. $_________/l.f.
4. PROJECT COMPLETION
a. Contract Period - Contract period begins on the day the Contractor receives unsigned Contract, Performance Bond, Payment Bond, and "Instructions for Execution of Contract, Bonds, and Insurance Certificates." Bidder agrees to complete project within Two Hundred and Seventy (270) calendar days from receipt of aforementioned documents. Fifteen (15) calendar days have been allocated in construction schedule for receiving aforementioned documents from Bidder.
b. Commencement - Contractor agrees to commence work on this project after the "Notice to
Proceed" is issued by the Owner. "Notice to Proceed" will be issued within seven (7) calendar days after Owner receives properly prepared and executed Contract documents listed in paragraph 4.a. above.
c. Special Scheduling Requirements – Refer to Special Conditions for specific scheduling
requirements for this project. 5. SUBCONTRACTOR LIST:
Bidder hereby certifies that the following subcontractors will be used in performance of Work:
NOTE: Failure to list subcontractors for each category of work identified on this form or listing more than one subcontractor for any category of work without designating the portion of work performed by each shall be grounds for rejection of bid. List name, city, and state of designated subcontractor, for each category of work listed in Bid For Lump Sum Contract. If work within a category will be performed by more than one subcontractor, Bidder shall provide name, city, and state of each subcontractor and specify exact portion of work to be performed by each. If acceptance/non-acceptance of Alternates will affect designation of a subcontractor, Bidder shall provide information, for each affected category, with this bid form. If Bidder intends to perform any designated subcontract work by using Bidder's own employees, then Bidder shall list their own name, city, and state. The bidder may petition the Owner to change a listed subcontractor only within 48 hours of the bid opening. See Information For Bidders Section 16 List of Subcontractors for requirements.
Work to be performed Subcontractor Name, City, State
MU Medical Science Building Addendum 1 First Floor Research Laboratory Renovation November 16, 2017 CP171091
A4
Mechanical _______ Electrical _______
Plumbing _______ Laboratory Casework ______________ FM and/or UL Certified Fire Stopping Contractor ____________________________________________
6. SUPPLIER DIVERSITY PARTICIPATION GOALS
a. The Contractor shall have as a goal, subcontracting with Minority Business Enterprise (MBE) of ten percent (10%) with Service Disabled Veteran Owned Business (SDVE) of three percent (3%) and with Women Business Enterprise (WBE), Disadvantage Business Enterprise (DBE), and/or Veteran Owned Business of ten percent (10%) of awarded contract price for work to be performed.
b. Requests for waiver of this goal shall be submitted on the attached Application for Waiver form. A
determination by the Director of Facilities Planning & Development, UM, that a good faith effort has not been made by Contractor to achieve above stated goal may result in rejection of bid.
c. The Undersigned proposes to perform work with following Supplier diversity participation level:
MBE PERCENTAGE PARTICIPATION ______________________ percent ( _____%) SDVE PERCENTAGE PARTICIPATION ______________________ percent ( _____%) WBE, DBE and/or VETERAN PERCENTAGE PARTICIPATION ________ percent ( _____%)
d. A Supplier Diversity Compliance Evaluation form shall be submitted with this bid for each diverse subcontractor to be used on this project.
7. BIDDER'S ACKNOWLEDGMENTS
a. Bidder declares that he has had an opportunity to examine the site of the work and he has examined Contract Documents therefore; that he has carefully prepared his bid upon the basis thereof; that he has carefully examined and checked bid, materials, equipment and labor required thereunder, cost thereof, and his figures therefore. Bidder hereby states that amount, or amounts, set forth in bid is, or are, correct and that no mistake or error has occurred in bid or in Bidder's computations upon which this bid is based. Bidder agrees that he will make no claim for reformation, modifications, revisions or correction of bid after scheduled closing time for receipt of bids.
b. Bidder agrees that bid shall not be withdrawn for a period of sixty (60) days after scheduled closing
time for receipt of bids. c. Bidder understands that Owner reserves right to reject any or all bids and to waive any informalities
in bidding. d. Accompanying the bid is a bid bond, or a certified check, or an irrevocable letter of credit, or a
cashier's check payable without condition to "The Curators of the University of Missouri" which is an amount at least equal to five percent (5%) of amount of largest possible total bid herein submitted, including consideration of Alternates.
e. Accompanying the bid is a Bidder's Statement of Qualifications. Failure of Bidder to submit the
Bidder's Statement of Qualifications with the bid may cause the bid to be rejected. Owner does not maintain Bidder's Statements of Qualifications on file.
f. It is understood and agreed that bid security of two (2) lowest and responsive Bidders will be
retained until Contract has been executed and an acceptable Performance Bond and Payment
MU Medical Science Building Addendum 1 First Floor Research Laboratory Renovation November 16, 2017 CP171091
A5
Bond has been furnished. It is understood and agreed that if the bid is accepted and the undersigned fails to execute the Contract and furnish acceptable Performance/Payment Bond as required by Contract Documents, accompanying bid security will be realized upon or retained by Owner. Otherwise, the bid security will be returned to the undersigned.
8. BIDDER'S CERTIFICATE
Bidder hereby certifies:
a. His bid is genuine and is not made in interest of or on behalf of any undisclosed person, firm or corporation, and is not submitted in conformity with any agreement or rules of any group, association or corporation.
b. He has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid.
c. He has not solicited or induced any person, firm or corporation to refrain from bidding.
d. He has not sought by collusion or otherwise to obtain for himself any advantage over any other Bidder or over Owner.
e. He will not discriminate against any employee or applicant for employment because of race, color, religion, sex or national origin in connection with performance of work.
f. By virtue of policy of the Board of Curators, and by virtue of statutory authority, a preference will be given to materials, products, supplies, provisions and all other articles produced, manufactured, mined or grown within the State of Missouri. By virtue of policy of the Board of Curators, preference will also be given to all Missouri firms, corporations, or individuals, all as more fully set forth in "Information for Bidders."
9. BIDDER'S SIGNATURE
Note: All signatures shall be original; not copies, photocopies, stamped, etc.
Authorized Signature Date
Printed Name Title
Company Name Mailing Address City, State, Zip Phone No. Federal Employer ID No.
Fax No. E-Mail Address
Circle one: Individual Partnership Corporation Joint Venture If a corporation, incorporated under the laws of the State of__________ Licensed to do business in the State of Missouri? ____yes _____no
(Each Bidder shall complete bid form by manually signing on the proper signature line above and supplying required information called for in connection with the signature. Information is necessary for proper preparation of the Contract, Performance Bond and Payment Bond. Each Bidder shall supply information called for in accompanying "Bidder's Statement of Qualifications."
END OF SECTION
LEVEL ONE
743' - 0"
LEVEL TWO
756' - 8"
KL
(F.V.)
16'-0"
(F.V.)
4'-2"
(F.V.)
4'-1"
(F.V.)
7'-0"
(F.V.)
1'-6"
3'-6"
3'-6"
EXISTING
HONED STONE
PANELS TO
REMAIN
EXISTING
HONED STONE
PANELS TO
REMAIN
(F.V.)
12'-7"
(F.V.)
19'-9"
11
PROJECT NUMBER:
1900 W. 47th PlaceSuite 300Westwood, Kansas66205p: 913.362.6500www.pgav.com
Plumbing and Mechanical Engineers6 South Old OrchardSt Louis, MO 63119
ROSS & BARUZZINI, INC.
(314) 918-8383
Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102
ANTELLA CONSULTING ENGINEERS, INC.
(816) 421-0950
11/16/1753474
Medical Science First Floor Research Laboratory Renovation
UNIVERSITY OF MISSOURIFOR: The Curators of the University of Missouri - Project No: CP171091
ADDENDUM 01
XA01
3/1
6"
= 1
'-0"B
1/A
401
SO
UT
H C
OU
RT
YA
RD
ELE
VA
TIO
N
LEVEL ONE
743' - 0"
LEVEL TWO
756' - 8"
N
DEMO EXISTING PLASTER (HARD CEILING)
APPROX 12" BELOW EXISTING CONCRETE
STRUCTURE ABOVE, F.V.TYP
DEMO CMU TILE CHASE AROUND EXISTING
MEP SYSTEMS, TYP AT COLUMNS
INSTRUCTIONAL
M130
DEMO EXISTING FRAMING AND GYP BD AT ALL
EXTERIOR WALLS WITHIN PROJECT AREA, TYP.
EXISTING MASONRY/ CONCRETE TO REMAIN.
INCLUDES FRAMING ABOVE AROUND AND
BELOW WINDOW OPENINGS.
D3
ROOM #'S:
M114
M125A
M126
M128
M129
M130
M131
M132
1
1
PROJECT NUMBER:
1900 W. 47th PlaceSuite 300Westwood, Kansas66205p: 913.362.6500www.pgav.com
Plumbing and Mechanical Engineers6 South Old OrchardSt Louis, MO 63119
ROSS & BARUZZINI, INC.
(314) 918-8383
Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102
ANTELLA CONSULTING ENGINEERS, INC.
(816) 421-0950
11/16/1753474
Medical Science First Floor Research Laboratory Renovation
UNIVERSITY OF MISSOURIFOR: The Curators of the University of Missouri - Project No: CP171091
ADDENDUM 01
XA02
3/8
" =
1'-0"B
1/A
501
SE
CT
ION
- E
XIS
TIN
G &
DE
MO
LIT
ION
G
1
7'-0"
(2) RELOCATED TO ROOM M144, SALVAGE & RETURN REMAINDER TO OWNER
18'-0" F.V.
EQ
EQ
EQ
EQ
EQ
EQ
PROJECT NUMBER:
1900 W. 47th PlaceSuite 300Westwood, Kansas66205p: 913.362.6500www.pgav.com
Plumbing and Mechanical Engineers6 South Old OrchardSt Louis, MO 63119
ROSS & BARUZZINI, INC.
(314) 918-8383
Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102
ANTELLA CONSULTING ENGINEERS, INC.
(816) 421-0950
11/16/1753474
Medical Science First Floor Research Laboratory Renovation
UNIVERSITY OF MISSOURIFOR: The Curators of the University of Missouri - Project No: CP171091
ADDENDUM 01
XA03
3/8
" =
1'-0"B
4/A
501
SE
CT
ION
- E
XIS
TIN
G &
DE
MO
LIT
ION
I
2 1/2"
3'-0"
3'-0"
RELOCATED TO M144
3'-6" F.V.
RELOCATED TO M144
3'-6" F.V.
3'-0"
3'-0"
2 1/2"
1
SALVAGE AND RETURN TO OWNER
18'-6" F.V.
SALVAGE AND RETURN TO OWNER
SALVAGE AND RETURN TO OWNER
PROJECT NUMBER:
1900 W. 47th PlaceSuite 300Westwood, Kansas66205p: 913.362.6500www.pgav.com
Plumbing and Mechanical Engineers6 South Old OrchardSt Louis, MO 63119
ROSS & BARUZZINI, INC.
(314) 918-8383
Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102
ANTELLA CONSULTING ENGINEERS, INC.
(816) 421-0950
11/16/1753474
Medical Science First Floor Research Laboratory Renovation
UNIVERSITY OF MISSOURIFOR: The Curators of the University of Missouri - Project No: CP171091
ADDENDUM 01
XA04
3/8
" =
1'-0"B
4/A
501
SE
CT
ION
- E
XIS
TIN
G &
DE
MO
LIT
ION
123553 FIXED PANEL FOR OUTLETS
123553PATHWAY INSIDE CASEWORK FOR U.C.LIGHTING TOPLUG INTO NEW OUTLET.
123553 FIXED PANEL FOR OUTLETS
123553 POWER WIREMOLD
123553 REAGENT SHELVING
MEPELECTRICAL POWER TO BE RUN TO JUNCTION BOX,COORDINATE WITH ELECTRICAL DRAWINGS
123553REMOVEABLE AS REQUIRED TO ACCESS CHASE BEHINDCASEWORK
1
MEP
ELECTRICAL RACEWAY WITH PREINSTALLEDELECTRICAL OUTLETS - INCLUDES PRE WIRING DOWNUNDER COUNTER TOP TO KNEE SPACE ELECTRICALOUTLEY/ CONNECTION BOX / HARD WIRES
123553 FRONT LIP, NO BACK
12355312" WIDE VERTICAL SUPPORT. SUPPORT NOTREQUIRED TO GO TO FLOOR.2'
-0"
123553MIRROR THIS SIDE FOR OUTLETS, U.C. LIGHTS, POWERPLUGS, ETC...
PROJECT NUMBER:
1900 W. 47th PlaceSuite 300Westwood, Kansas66205p: 913.362.6500www.pgav.com
Plumbing and Mechanical Engineers6 South Old OrchardSt Louis, MO 63119
ROSS & BARUZZINI, INC.
(314) 918-8383
Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102
ANTELLA CONSULTING ENGINEERS, INC.
(816) 421-0950
11/16/1753474
Medical Science First Floor Research Laboratory Renovation
UNIVERSITY OF MISSOURIFOR: The Curators of the University of Missouri - Project No: CP171091
ADDENDUM 01
XA05
1" = 1'-0" C4/A710PRE INSTALLED ELEC OUTLETS
EQOFO
I
3'-0"123553
MOBILE CABINET W/ EPOXY TOP
48"
MOBILE
MTL
48"
MOBILE
MTL
LA LV LG(2)DATA
uc lights
LA LV LG
uc lights
1
123553
CEILING MOUNTED SERVICE PANEL
PROJECT NUMBER:
1900 W. 47th PlaceSuite 300Westwood, Kansas66205p: 913.362.6500www.pgav.com
Plumbing and Mechanical Engineers6 South Old OrchardSt Louis, MO 63119
ROSS & BARUZZINI, INC.
(314) 918-8383
Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102
ANTELLA CONSULTING ENGINEERS, INC.
(816) 421-0950
11/16/1753474
Medical Science First Floor Research Laboratory Renovation
UNIVERSITY OF MISSOURIFOR: The Curators of the University of Missouri - Project No: CP171091
ADDENDUM 01
XA06
1/4
" =
1'-0"C
4/A
801
M114 F
LE
X R
ES
EA
RC
H L
AB
EXISTING TO REMAIN
FLEXIBLE DUCT
ROUND DUCT SIZE, (ACTUAL SIZE INDICATED)
ACCESS PANEL, TOP OR SIDE
TURNING VANES
CHANGE OF ELEVATION - RISE (R) OR DROP (D)
FLEXIBLE DUCT CONNECTION
SUPPLY AND OUTSIDE AIR SECTION UP
RETURN AIR SECTION UP
MOTORIZED DAMPER
MANUAL VOLUME DAMPER
FIRE DAMPER
SMOKE DAMPER
FIRE/SMOKE DAMPER
GRAVITY BACKDRAFT DAMPER
SUPPLY DIFFUSER AS SCHEDULED. ARROWS INDICATEDIRECTION OF AIR DISCHARGE. IF NO ARROWS ARE SHOWNON PLAN, DEFAULT IS A 4-WAY THROW.
RETURN GRILLE OR REGISTER AS SCHEDULED
SIDEWALL DIFFUSER AS SCHEDULED
FLOW ARROW DOWNSTREAM OF FAN
FLOW ARROW UPSTREAM OF FAN
SPIRAL FLAT-OVAL DUCT SIZE, FIRST FIGUREIS SIDE SHOWN (ACTUAL SIZE INDICATED)
DEMO TO BE REMOVED
NEW WORK
DUCT SIZE
12x12
12x12
12x12
12ø
12x10ø
R
AP
DUCT SIZE
DUCT SIZE, FIRST FIGURE IS SIDE SHOWN(CLEAR INSIDE, ADJUST FOR LINER)
G
M
SUPPLY AND OUTSIDE AIR SECTION DOWN
RETURN AIR SECTION DOWN
SIDEWALL RETURN OR EXHAUST AS SCHEDULED
EQUIPMENT DESIGNATION GENERAL ABBREVIATIONS GENERAL ABBREVIATIONS, CONTINUED
DUCT SYSTEM SYMBOLS
GENERAL SYMBOLS
EXHAUST GRILLE OR REGISTER AS SCHEDULED
EXHAUST AIR SECTION UP
EXHAUST AIR SECTION DOWN
S
AHU
1
KEYED NOTE
SECTION NUMBER
SHEET WHERE LOCATED
INTERFACE, EXISTING TO NEW
UNIT NUMBER
EQUIPMENT DESIGNATION
TYPE OF SERVICE: S = SUPPLY
R = RETURN
E = EXHAUST
T = TRANSFER
AIR QUANTITY
IN CFM
SENSOR:
S-1
100
SCHEDULEDDEVICE NO
UNIT NUMBER
DAMPER TYPE DESIGNATION
##
FSD
1
CO2 =S=
CARBON DIOXIDESTATIC PRESSURE
1
M101
SIM
H
TEMPERATURE SENSOR
HUMIDITY SENSOR
T
1
PIPE LINE SYMBOLS
SHUT OFF VALVE (SEESPECIFICATION FOR TYPE)
BUTTERFLY VALVE
CHECK VALVE
GLOBE VALVE
CALIBRATED - ORIFICEBALANCING VALVE
IN-LINE PUMP
ELBOW DOWN
ELBOW UP
TEE DOWN
TEE UP
CAP
FLANGED
PIPING TO BE REMOVED
CONCENTRICREDUCER/INCREASER
ECCENTRICREDUCER/INCREASER
Y - PATTERN STRAINER
TWO-WAY CONTROL VALVE
MEDIUM DETAIL FINE DETAIL
UNION
AIR VENT (M - MANUAL,A - AUTOMATIC)
RELIEF VALVE
PRESSURE ANDTEMPERATURE TEST PORT
BALL VALVE
M
PIPE SYSTEM ABBREVIATIONS
C/HS
C/HR 2-PIPE CHILLED AND HEATING WATER RETURN
2-PIPE CHILLED AND HOT WATER SUPPLY
LPS
HWS
HWR
LPR
RS
RL
HPS
REFRIGERANT SUCTION
REFRIGERANT LIQUID
HIGH PRESSURE STEAM RETURN
LOW PRESSURE CONDENSATE RETURN
LOW PRESSURE STEAM SUPPLY
HEATING WATER SUPPLY
HEATING WATER RETURN
DRAIND
HPR HIGH PRESSURE STEAM SUPPLY
PC PUMPED CONDENSATE
1. THESE PLANS ARE DIAGRAMMATIC IN NATURE. THE CONTRACTOR SHALL BE PREPARED TO MAKESOME ALTERATIONS TO THE EXACT LOCATION OF DUCTWORK, PIPING AND EQUIPMENT FROM THELOCATION INDICATED ON THESE DRAWINGS TO FIT ACTUAL JOB CONDITIONS.
2. ALL ELBOWS, FITTINGS, ETC., IN PIPING AND DUCTWORK REQUIRED TO CLEAR ALL JOB OBSTRUCTIONSARE NOT NECESSARILY INDICATED. ALL NECESSARY TRANSITIONS, FITTINGS AND OFFSETS AREREQUIRED WHETHER SHOWN OR NOT.
3. BECAUSE OF THE LIMITED SPACE AVAILABLE TO INSTALL ALL OF THE MECHANICAL WORK,COORDINATION BETWEEN THE VARIOUS TRADES IS OF THE UTMOST IMPORTANCE.
4. THE CONTRACTOR SHALL COORDINATE STAGING AND SCHEDULING WITH THE OWNER'SREPRESENTATIVE.
5. EXISTING CONDITIONS ARE BASED ON INFORMATION OBTAINED FROM PREVIOUS CONSTRUCTIONDOCUMENTS AND INFORMAL FIELD OBSERVATION AND SHALL NOT BE CONSTITUTED AS "AS BUILT."THE CONTRACTOR SHALL FIELD-VERIFY EXISTING CONDITIONS BEFORE THE ONSET OF CONSTRUCTION.
6. DEMOLISH ALL PIPING, DUCTWORK EQUIPMENT, ETC., SHOWN TO BE REMOVED, IN ITS ENTIRETY, INCLUDING ALL HANGERS AND SUPPORTS.
7. WHERE CONTRACTOR IS REQUIRED TO CONCEAL NEW WORK, REMOVE OR MODIFY EXISTINGCONSTRUCTION OR EQUIPMENT, OR ATTACH TO EXISTING CONSTRUCTION, THE CONTRACTOR SHALLREPAIR OR REPLACE EXISTING CONSTRUCTION AND MATERIALS TO MATCH CONDITIONS AT THE ONSETOF CONSTRUCTION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REMOVE AND REPLACE EXISTINGCEILINGS AND WALLS REQUIRED FOR INSTALLATION OF MECHANICAL SYSTEMS.
8. THE OWNER SHALL MAINTAIN ALL SALVAGE RIGHTS OF EQUIPMENT AND MATERIALS REMOVED. ALLEQUIPMENT AND MATERIALS NOT CLAIMED BY THE OWNER SHALL BE REMOVED FROM THEPREMISES BY THE CONTRACTOR.
9. ALL WORK SHALL BE INSTALLED PER THE REFERENCE DETAILS, REGARDLESS OF WHETHER OR NOT THE DETAILS ARE CALLEDOUT ON THE PLANS. SEE 500 SERIES SHEET(S).
10. PROVIDE VENTS AT ALL HYDRONIC PIPING HIGH POINTS, AND DRAINS AT ALL PIPING LOW POINTS, REGARDLESS OF WHETHERSHOWN OR NOT. ALL MANUAL VENTS SHALL HAVE A 3/4" MALE HOSE BIB.
11. IN GENERAL, IF THE FINAL HYDRONIC PIPING RUNOUT TO A COIL OR OTHER TERMINAL DEVICE IS NOT SIZED ON THE PLANS, SEEHYDRONIC PIPE RUNOUT SIZE EQUIPMENT SCHEDULE ON SHEET(M602). MINIMUM HYDRONIC PIPE RUNOUT TO ANY COIL SHALL BE3/4".
12. DUE TO EXTENSIVE OCCURRENCE OF HAZARDOUS MATERIALS USED IN THE ORIGINAL CONSTRUCTION OF THE BUILDING (I.E.LEAD-BASED PAINT AND ASBESTOS INSULATION), THE CONTRACTOR SHALL COORDINATE ALL DEMOLITION WITH THE ABATEMENTCONTRACTOR. EFFORTS HAVE BEEN MADE TO SHOW THE MAJORITY OF THIS DEMOLITION ON THESE AND THE ARCHITECTURALPLANS, BUT CLEARLY, THE EXACT LOCATION AND EXTENT OF THIS DEMOLITION MUST BE FULLY COORDINATED. SEESPECIFICATION SECTIONS IN DIVISION 02 EXISTING CONDITIONS FOR REQUIREMENTS ASSOCIATED WITH THE REMOVAL OFHAZARDOUS MATERIALS. NOTE: FOR ALL PIPING SYSTEMS THAT HAVE EXISTING HAZARDOUS MATERIALS REMOVED AND THESYSTEMS REMAIN, CONTRACTOR SHALL INSTALL NEW INSULATION ON EXPOSED PIPING MEETING INSULATION SPECIFICATIONS. DONOT LEAVE ANY EXISTING PIPING UNINSULATED.
13. DO NOT SCALE THE LOCATION OF HVAC CEILING ELEMENTS, SUCH AS AIR INLETS AND OUTLETS, FROM THE M-SERIES DRAWINGS.SEE ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT HVAC CEILING ELEMENT LOCATIONS. REFLECTED CEILING PLANSGOVERN THE LOCATION OF DIFFUSERS, REGISTERS, AND GRILLES. M-SERIES DRAWINGS GOVERN TYPE, STYLE, AND SIZE OFDIFFUSERS, REGISTERS, AND GRILLES.
14. ALL DUCTWORK SHALL COMPLY WITH "HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE," 3RD EDITION, SMACNA2005, EXCEPT WHERE MORE RESTRICTIVE REQUIREMENTS ARE SPECIFIED. ANY PLAN REFERENCES TO "SMACNA FIGURE ---"REFERS TO THIS STANDARD. SEE SPECIFICATIONS FOR SCHEDULE OF DUCT PRESSURE CLASS AND SEAL CLASS.
15. IN GENERAL, THE FINAL FLEX DUCT RUNOUT TO EACH DIFFUSER, REGISTER, OR GRILLE IS NOT SIZED ON PLANS. FLEX DUCTRUNOUT SIZE SHALL MATCH AIR OUTLET NECK SIZE, UNO.
16. IT IS THE INTENT OF THESE DRAWINGS THAT A MANUAL BALANCING DAMPER BE PROVIDED AT EVERY INDIVIDUAL DUCTEDCONNECTION TO AN AIR DEVICE. NOTE, UNLESS A BALANCING DAMPER IS SCHEDULED TO BE FURNISHED WITH AIR DEVICE.PROVIDE A MANUAL BALANCING DAMPER IN EACH INDIVIDUAL BRANCH DUCT SERVING AN AIR DEVICE BETWEEN THE CONNECTIONTO THE DUCT SERVING MULTIPLE DEVICES AND THE AIR DEVICE WHEN HARD DUCTED AND AT EACH POINT OF CONNECTION OF FLEXDUCT RUNOUT TO BRANCH DUCT (AT THE SPIN-IN FITTING) WHERE FLEX DUCT IS USED. VAV BOXES WITH SINGLE DIFFUSERS ARE NOTREQUIRED TO HAVE A BALANCING DAMPER UNLESS SHOWN.
17. ALL NEW DUCTWORK SIZES SHOWN ON PLANS ARE CLEAR INSIDE DIMENSIONS. CONTRACTOR SHALL ADJUST SHEET METAL SIZES AS NECESSARY TO ACCOMMODATEINTERNAL DUCT LINER, IF SPECIFIED.
18. COORDINATE WITH OWNER'S REPRESENTATIVE TO VERIFY ALL EXISTING OWNER SALVAGED AND OWNER REMOVED CONTROLS WORK IS COMPLETE. ALL EXISTINGTEMPERATURE CONTROLS THAT ARE BEING DEMOLISHED OR DISABLED AS WORK OF THIS CONTRACT SHALL BE COMPLETELY REMOVED FROM THIS PROJECT WORKAREA. REMOVE ALL EXISTING CONTROL WIRING, PNEUMATIC TUBING AND RELATED CONTROLS AND ALL ACCESSORIES MADE OBSOLETE BY THE WORK OF THIS PROJECT.PROVIDE A BRASS COMPRESSION CAP TYPE FITTING AT ALL UNUSED PNEUMATIC TUBING TERMINATIONS. DO NOT PINCH- OFF TUBING.
19. THE CONTRACTOR SHALL CONNECT THE NEW HVAC SYSTEM TO THE OWNER'S EXISTING BUILDING CONTROL SYSTEM. REFER TO THE SPECIFICATIONS FOR ADDITIONALREQUIREMENTS.
20. THE WORK OF SECTION 230900 SHALL INCLUDE THE FOLLOWING ELECTRICAL WORK, COMPLYING WITH REQUIREMENTS OF DIVISION 26 SECTIONS:A. CONTROL WIRING BETWEEN FIELD-INSTALLED CONTROLS, INDICATING DEVICES, AND UNIT CONTROL PANELS.B. INTERLOCK WIRING BETWEEN ELECTRONICALLY OPERATED EQUIPMENT UNITS AND BETWEEN EQUIPMENT AND FIELD-INSTALLED CONTROL DEVICES.C. POWER SUPPLY WIRING FROM POWER SOURCES TO POWER CONNECTION ON CONTROLS AND/OR UNIT CONTROL PANELS, INCLUDING, BUT NOT LIMITED TO, AIR TERMINAL UNIT CONTROLLERS, DDC PANELS, DAMPER ACTUATORS, AND VALVE ACTUATORS.
21. IT SHOULD BE NOTED THAT SOME SYSTEMS (I.E. GENERAL AND ISOLATION EXHAUST) ARE REQUIRED TO BE BALANCED MORE THAN ONCE TO ASSURE DESIGNAIRFLOWS ARE PROVIDED.
22. ALL EXISTING SYSTEM (EQUIPMENT) SHUTDOWNS SHALL BE COORDINATED WITH OWNER'S REPRESENTATIVE A MINIMUM SEVEN (7) DAYS IN ADVANCE.
23. THE SCOPE OF WORK FOR THIS PROJECT IS LOCATED ON THE FIRST FLOOR AND ROOF OF THE MEDICAL SCIENCE BUILDING. IT IS STRONGLY ENCOURAGED THAT THECONTRACTOR VISITS THE SITE PRIOR TO SUBMITTING HIS OR HER BIDS. CONTRACTOR SHALL INCLUDE IN HIS OR HER BID ALL COSTS TO DISASSEMBLE AND REASSEMBLENEW EQUIPMENT IN ORDER TO MOVE IT INTO PLACE. COSTS SHALL INCLUDE MANUFACTURER SUPERVISION THAT IS REQUIRED TO MAINTAIN EQUIPMENT WARRANTIES INFULL. EQUIPMENT IS NOT ALLOWED TO BE CUT TO BE BROUGHT INTO PLACE.
24. CONTRACTOR SHALL FIELD VERIFY SERVICE ACCESS. REFER TO ARCHITECTURAL PLANS FOR PROJECT CONSTRUCTION ACCESS. THE CONTRACTOR SHALL NOTIFY THEOWNER'S REPRESENTATIVE A MINIMUM OF 72 HOURS PRIOR TO THE BEGINNING OF WORK THAT INVOLVES ACTIVITIY INTO THE CONSTRUCTION AREA. THE CONTRACTOR AND THEOWNER'S REPRESENTATIVE SHALL INSPECT THE AREAS INTO AND OUT OF CONSTRUCTION WORK AREA AND DOCUMENT THE CONDITION OF THE SPACES IN WRITTING AND/ORPHOTOGRAPHS PRIOR TO STARTING ANY WORK IN THE FIRST FLOOR AREA. ACCESS INTO AND OUT OF THE CONSTRUCTION AREA IS THROUGH FIRST FLOOR CORRIDORS THATSHALL REMAIN ACCESSIBLE TO PEDESTRIAN USE THROUGH THE ENTIRE PROJECT CONSTRUCTION PERIOD. CONTRACTOR SHALL INCLUDE IN HIS OR HER BID ALL ASSOCIATEDCOSTS FOR SPACE PROTECTION ACCESSING THE CONSTRUCTION WORK AREA INCLUDING BUT NOT LIMITED TO BRING IN AND REMOVE CONSTRUCTION DEBRIS, TOOLS,EQUIPMENT AND ALL OTHER NECESSITIES TO COMPLETE THE CONTRACT DOCUMENTS. CONTRACTOR SHALL FULLY PROTECT THE INTERIOR OF EACH SPACE, INCLUDING BUT NOTLIMIITED TO THE FLOOR, WALLS, CEILING AND ANY EQUIPMENT LOCATED IN THE SPACES TO AND FROM CONSTRUCTION AREA. THE CONTRACTOR SHALL PROTECT THE EXISTINGFLOOR DURING ALL CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL PLACE ONE LAYER OF 1/2 INCH CONSTRUCTION GRADE PLYWOOD OVER 1/2 INCH FOAM BOARD WITHOVERLAPPED JOINTS ON THE CORRIDOR FLOORS. THE CONTRACTOR SHALL ADVISE THE OWNER'S REPRESENTATIVE WHEN THE WORK IS COMPLETE AND THE PROTECTIONBOARDS HAVE BEEN REMOVED. THE CONTRACTOR AND THE OWNER'S REPRESENTATIVE SHALL EXAMINE ALL SURFACES WHERE WORK HAS OCCURED AND CONTRACTOR SHALLREPAIR ALL DEFECTS NOT PREVIOUSLY DOCUMENTED.
25. ALL PIPING AND DUCT WALL PENETRATIONS SHALL BE SEALED AIRTIGHT TO MAINTAIN ROOM AIR PRESSURE RELATIONSHIP TO ADJACENT ROOM.
26. ALL OPENINGS THROUGH WALLS MUST BE PATCHED AND SEALED AIR TIGHT TO MEET THE RATING OF THE WALL AND TO MAINTAIN AIR PRESSURE RELATIONSHIPS TOADJACENT SPACES.
27. DI-ELECTRIC PIPE FITTINGS ARE NOT ALLOWED. REFER TO SPECIFICATION SECTION 232113 3.3 T FOR REQUIREMENTS OF JOINING DISSIMILAR METALS.
GENERAL NOTES (THESE APPLY TO ALL M-SERIES SHEETS):
CONSTRUCTION PHASING NOTES
THIS PROJECT CONSISTS OF TWO (2) CONTRUCTION PHASES. THISCONTRACTOR SHALL COORDINATE WITH OWNERS REPRESENTATIVEFOR OUTAGES OF ALL SYSTEMS PRIOR TO STARTING ANDCOMPLETING EACH CONSTRUCTION PHASE. THE CONSTRUCTIONAREA OF THIS PROJECT IS ADJACENT AND BELOW AREAS OF THISBUILDING WHICH SHALL REMAIN FULLY FUNCTIONAL ANDOPERATIONAL THROUGHOUT ALL PHASES OF THIS PROJECT.SYSTEMS THAT SERVE OTHER AREAS OF THIS BUILDING CURRENTLYARE ROUTED THROUGH THIS PROJECT CONSTRUCTION BOUNDRIESANDOR ORGINATE IN THIS PROJECT CONSTRUCTION BOUNDRIES. ALLSYSTEM SHUT DOWNS SHALL BE COORDINATED WITH THE OWNERSREPRESENTATIVE A MINIMUM OF SEVEN (7) DAYS IN ADVANCE.
GROSS ANATOMY M148 SHALL REMAIN FULLY FUNCTIONAL DURINGPHASE 1 OF THIS PROJECT. NO DEMOLITION OF EXISTING SYSTEMSAND/OR EQUIPMENT SHALL NOT OCCUR UNTIL NEW WORK OF PHASE1 HAS BEEN COMPLETED, TESTED AND BALANCED. NEW SYSTEMSSHALL BE FULLY FUNCTIONAL. THE NEW 18X12 STAINLESS STEELEXHAUST DUCT AND NEW EXHAUST AIR VALVES (GEV 1-04, EAV 1-138AND EAV 1-139) SERVING ROOM ANATOMY CADAVER LAB SHALL BEINSTALLED AND FUNCTIONAL TO HAVE NEW WORK OF PHASE 1COMPLETE. THE NEW 18X12 EXHAUST AIR DUCT SHALL CONNECT THETHE EXISTING EXHAUST RISER LOCATED IN EXISTING GROSS ANATOMYM148.
THE LOW PRESSURE STEAM SHUT DOWNS SHALL ONLY BE ALLOWEDWHEN OUTSIDE AIR TEMPERATURES ARE TO BE ABOVE 65 DEGREESF FOR SEVEN (7) CONSECUTIVE DAYS UNLESS APPROVEDOTHERWISE BY OWNERS REPRESTATIVE.
HEATING HOT WATER AND CHILLED WATER SHUT DOWNS SHALL ONLYBE ALLOWED AFTER HOURS OR WEEKENDS AND MUST BEAPPROVED BY OWNERS REPRESENTATIVE A MINIMUM OF SEVEN (7)DAYS IN ADVANCE.
THE EXISTING FC BUS (2-PIPE) AND N2 (AHU) CONTROL SYSTEMLOCATED IN THE EXISTING M112 MECHANICAL ROOM SHALL BECOMPLETELY FUNCTIONAL AND MAINTAINED DURING DEMOLITION ANDCONSTRUCTION. OWNER SHALL SALVAGE ANY CONTROLS FROMEQUIPMENT IN MECHANICAL ROOM M112 PRIOR TO CONTRACTORDEMOLITION OF (2-PIPE SYSTEM AND AHU).
EXISTING TWO-PIPE CHILLED WATER, STEAM TO HEATING HOTSYSTEM LOCATED IN EXISTNG MECHANICAL ROOM M112 AND ALLPIPING, CONTROLS AND ACCESSORIES SERVES SPACES LOCATEDON THE SECOND FLOOR. THIS ENTIRE SYSTEM SHALL REMAIN FULLYFUNCTIONAL UNTIL A SCHEDULED WEEKEND ONLY (FRIDAY EVEN AT6PM UNTIL MONDAY MORNING AT 3AM) TRANSITION TO THE NEWSYSTEM. NEW HEATING HOT WATER AND CHILLED WATER SYSTEMSHALL BE FULLY FUNTIONAL AND TESTED PRIOR TO SCHEDULEDTRANSITION. SCHEDULED TRANSITION SHALL BE SCHEDULED WITHOWNERS REPRESENTATIVE A MINIMUM OF SEVEN (7) DAYS INADVANCE.
EXISTING AIR HANDLING UNIT LOCATED IN EXISTING MECHANICALROOM M120 SERVES ROOMS LOCATED WITHIN THIS CONSTRUCTIONAREA AND OTHER AREAS OUTSIDE THIS CONSTRUCTION ZONE. SHUTDOWN AND TEMPORARY CAPPING AND/OR TYING INTO EXISTINGUTILITIES ASSOCIATED WITH THIS AIR HANDLING UNIT SHALL OCCURONLY AFTER 5PM OR ON WEEKENDS AND MUST BE SCHEDULED WITHOWNERS REPRESENTATIVE A MINIMUM OF SEVEN (7) DAYS INADVANCE. ALL SHUT DOWN ARE ALLOWED FOR A 12 HOUR PERIODUNLESS APPROVED BY THE OWNERS REPRESENTATIVE IN ADVANCE.
THE EXISTING EXHAUST AIR SYSTEM (EXHAUST RISERS) WITHIN THISBUILDING TIE TOGETHER ON THE ROOF TO GANGED FAN SYSTEM.SHUT DOWN AND TEMPORARY CAPPING AND/OR TYING INTO ANEXISTING EXHAUST RISER SHALL OCCUR AFTER 5PM OR ONWEEKENDS AND MUST BE SCHEDULED WITH OWNERSREPRESENTATIVE A MINIMUM OF SEVEN (7) DAYS IN ADVANCE. ALLSHUT DOWN ARE ALLOWED FOR A 12 HOUR PERIOD UNLESSAPPROVED BY OWNERS REPRESENTATIVE IN ADVANCE.
1.
2.
3.
4.
5.
6.
7.
8.
CWR CHILLED WATER RETURN
CWS CHILLED WATER SUPPLY
A
B
C
D
E
6 5 4 3 2 1
1900 w.47th Place, #300, Westwood, KS 66205(913) 362-6500 www.PGAV.COM
DRAWN: CHECKED:
DATE:
PGAV # CLIENT #
SHEET #:
PECKHAM GUYTON ALBERS & VIETS, INC.
Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102
ANTELLA CONSULTING ENGINEERS, INC.
Plumbing, Mechanical & Fire Protection Engineers6 South Old OrchardSt Louis, MO 63119
ROSS & BARUZZINI, INC.
(314) 918-8383
(816) 421-0950
THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TOWHICH THEY ARE AFFIXED, AND EXPRESSLY DISCLAIM ANYRESPONSIBILITY FOR ALL OTHER PLANS, SPECIFICATIONS,
ESTIMATES, REPORTS, OR OTHER DOCUMENTS OR INSTRUMENTSRELATING TO OR INTENDED TO BE USED FOR ANY PART OR PARTS
OF THE ARCHITECTURAL OR ENGINEERING PROJECT.
PECKHAM GUYTON ALBERS & VIETS, INC.MO STATE CERTIFICATE OF AUTHORITY #000086
MO STATE CERTIFICATE OF AUTHORITY #E-2005013590
MO STATE CERTIFICATE OF AUTHORITY #000148
11/1
6/20
1 7 8
:33:
28 A
MC
:\Use
rs\r
diem
er\D
ocum
ents
\245
-32_
ME
CH
_CE
NT
RA
L_v1
6_rd
iem
er.r
vt
1 Hospital Drive, Columbia, MO65212
M000
11/06/2017
53474
MECHANICALSYMBOLS &
ABBREVIATIONS
NLP
BID DOCUMENTS
University of Missouri -Columbia
NLP
CP171091
RJD
Medical ScienceFirst FloorResearch
LaboratoryRenovation
AC AIR CONDITIONING UNIT
ACC AIR COOLED CONDENSER
ACU AIR CONDITIONING UNIT
AF AIR FILTER
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
B BOILER
BCU BLOWER COIL UNIT
CAV CONSTANT AIR VOLUME
CB CHILLED BEAM
CC COOLING COIL
CFP CHEMICAL FEED PUMP
CH CHILLER
CP CONDENSER WATER PUMP
CRAC COMPUTER ROOM AIR CONDITIONING UNIT
CRP CONDENSATE RETURN PUMP
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CTF COOLING TOWER FILTER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CVR CONVECTOR
CWP CHILLED WATER PUMP
DFH DEAERATING FEEDWATER HEATER
EAV EXHAUST AIR VALVE
EF EXHAUST FAN
EJ EXPANSION JOINT
ERU ENERGY RECOVERY UNIT
ET EXPANSION TANK
EVC EVAPORATIVE COOLER
F FAN
FAV FUME AIR VALVE
FC FLUID COOLER
FCU FAN COIL UNIT
FD FIRE DAMPER
FSD COMBINATION FIRE/SMOKE DAMPER
FT FLASH TANK
FTR FIN-TUBE RADIATION
FTU FAN TERMINAL UNIT
GP GLYCOL PUMP
GV GRAVITY VENTILATOR
H HUMIDIFIER
HC HEATING COIL
HEV HOOD EXHAUST VALVE
HPU HEAT PUMP UNIT
HRU HEAT RECOVERY UNIT
HWP HEATING WATER PUMP
HX HEAT EXCHANGER
L LOUVER
MAU MAKE-UP AIR UNIT
MD MOTORIZED DAMPER
P PUMP
PAC PACKAGED AIR CONDITIONING UNIT
PCWP PRIMARY CHILLED WATER PUMP
PG PIPE GUIDE
PHWP PRIMARY HEATING WATER PUMP
PHX PLATE HEAT EXCHANGER
PRV PRESSURE REGULATING VALVE
RF RETURN FAN
RHC TERMINAL REHEAT COIL
RP RADIANT PANEL
RTU ROOFTOP UNIT
SAV SUPPLY AIR VALVE
SCWP SECONDARY CHILLED WATER PUMP
SD SMOKE DAMPER
SF SUPPLY FAN
SHWP SECONDARY HEATING WATER PUMP
ST STEAM TRAP
T TANK
UH UNIT HEATER
VAV VARIABLE AIR VOLUME BOX
WCC WATER COOLED CONDENSER
ISP INTERNAL STATIC PRESSURE
JS JOIST SPACE
KW KILOWATTS
L LENGTH
LAT LEAVING AIR TEMPERATURE
LB(S) POUNDS
LF LINEAR FEET
LRA LOCKED ROTOR AMPS
LS LIGHT SPACE
LVL LEVEL
LWT LEAVING WATER TEMPERATURE
MAN MANUAL
MANU MANUFACTURER
MAX MAXIMUM
MBH THOUSAND BRITISH THERMAL UNITS PER HOUR
MCA MINIMUM CIRCUIT AMPS
MCC MOTOR CONTROL CENTER
MECH MECHANICAL
MERV MINIMUM EFFICIENCY REPORTING VALUE (ASHRAE 52.2)
MFR MANUFACTURER
MIN MINIMUM OR MINUTE (PER CONTEXT)
MTD MOUNTED
MTL METAL
MV MANUAL VENT
NC NORMALLY CLOSED OR NOISE CRITERIA (PER CONTEXT)
NIC NOT IN CONTRACT
NO NORMALLY OPEN OR NUMBER (PER CONTEXT)
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
OC ON CENTER
OD OUTSIDE DIAMETER
OT OIL TRAP
PA PIPE ANCHOR
PBD PARALLEL BLADE DAMPER
PD PRESSURE DROP
PENT PENTHOUSE
PH PHASE
PHC PREHEAT COIL
PLBG PLUMBING
PNEU PNEUMATIC
PPH POUNDS PER HOUR
PRESS PRESSURE
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
QTY QUANTITY
RA RETURN AIR
RAD RADIATED
RD ROOF DRAIN
REFR REFRIGERANT
REQ REQUIRED
RH RELATIVE HUMIDITY
RLA RUNNING LOAD AMPS
RM ROOM
RND ROUND
RPM REVOLUTIONS PER MINUTE
SA SUPPLY AIR
SAN SANITARY
SEC'N SECTION
SEER SEASONAL ENERGY EFFICIENCY RATIO
SENS SENSIBLE
SF SQUARE FOOT
SH SENSIBLE HEAT
SHT SHEET
SND SOUND
SOL SOLENOID
SP STATIC PRESSURE
SPD STATIC PRESSURE DIFFERENTIAL
SPT STATIC PRESSURE TRANSMITTER
SQ SQUARE
SST STAINLESS STEEL
STL STEEL
STM STEAM
T&P TEMPERATURE AND PRESSURE
TC TEMPERATURE CONTROL
TD THERMODYNAMIC OR TEMPERATURE DIFFERENTIAL (PER CONTEXT)
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TOT TOTAL
TPD TOTAL PRESSURE DROP
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
UC UNDERCUT DOOR
UG UNDERGROUND
UNO UNLESS NOTED OTHERWISE
V VOLTS
VAC VACUUM
VD VOLUME DAMPER (MANUAL)
VEL VELOCITY
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
VTR VENT THRU ROOF
W WATT OR WIDTH (PER CONTEXT)
W/ WITH
W/O WITHOUT
WB WET BULB
WC WATER COLUMN
WG WATER GAUGE
WPD WATER PRESSURE DIFFERENTIAL
WT WEIGHT
A AIR OR AMP (PER CONTEXT)
ACC ACCESSORIES
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AFS AIR FLOW SWITCH
AHRI AIR CONDITIONING, HEATING, AND REFRIGERATION INSTITUTE
AI ANALOG SIGNAL INPUT
AMB AMBIENT
AO ANALOG SIGNAL OUTPUT
AP ACCESS PANEL
APD AIR PRESSURE DROP
APLV APPLICATION PART LOAD VALUE
APPROX APPROXIMATE
ARCH ARCHITECTURE/ARCHITECT
AUX AUXILIARY
AV AUTOMATIC VENT
AVG AVERAGE
BDD BACK DRAFT DAMPER
BFC BELOW FINISHED CEILING
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BI BINARY SIGNAL INPUT
BMS BUILDING MANAGEMENT SYSTEM
BO BINARY SIGNAL OUTPUT
BOB BOTTOM OF BEAM
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BS BEAM SPACE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNITS PER HOUR
BWE BAKED WHITE ENAMEL
CAP CAPACITY
CAV CONSTANT AIR VOLUME
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CLG COOLING DUCT (COLD DUCT)
CO CLEAN OUT
COMP COMPRESSOR
CONC CONCRETE
COND CONDENSATE
CONN CONNECTION
CORR CORRIDOR
CV CONTROL VALVE
D DEPTH
DB DRY BULB
DBA A-WEIGHTED DECIBELS
DEFL DEFLECTION
DEG DEGREES
DEG F DEGREES FAHRENHEIT
DES DESIGN
DIA DIAMETER
DIM DIMENSION
DISCH DISCHARGE
DIV DIVISION
DN DOWN
DP DIFFERENTIAL PRESSURE SENSOR
DPS DIFFERENTIAL PRESSURE SWITCH
DPT DIFFERENTIAL PRESSURE TRANSMITTER
DTL DETAIL
DWG(S) DRAWING(S)
EA EXHAUST AIR OR EACH (PER CONTEXT)
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENT RATIO
EFF EFFICIENCY
ELEC ELECTRIC
ELEV ELEVATION
EQ EQUAL
ESP EXTERNAL STATIC PRESSURE
EWB ENTERING AIR WET BULB TEMPERATURE
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXIST, EX EXISTING
EXT EXTERNAL
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FC FLEXIBLE CONNECTION
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FIN FINISHED
FLR FLOOR
FPF FINS PER FOOT
FPM FEET PER MINUTE
FS FLOW SWITCH
FT FEET
FT-HD HEAD IN FEET
GA GAUGE
GAL GALLONS
GALV GALVANIZED
GC GENERAL CONTRACTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
H HEIGHT
HD HEAD
HEV HOSE END VALVE
HORIZ HORIZONTAL
HP HORSEPOWER
HR HOUR
HTG HEATING DUCT (HOT DECK)
HVAC HEATING, VENTILATING & AIR CONDITIONING
HW HOT WATER
HZ HERTZ
IB INVERTED BUCKET
IE INVERT ELEVATION
IN INCH/INCHES
INDIC INDICATOR
IPLV INTEGRATED PART-LOAD VALUE
# DATE DESCRIPTION
1 11/16/17 ADDENDUM 1
1
MAXSERVICE
MAX FLOW(GPM/PPH) NOTES
UNITSERVED
NOTES:
(PSIG)PRESSURE DROP
CLOSE-OFFPRESSURE
(PSI)
CONTROL VALVE SCHEDULE
REFER TO APPROPRIATE SCHEDULE FOR FLOW INFORMATION.
MAXIMUM PRESSURE DROP AT FULL OPEN POSITION.
PRESSURE INDEPENDENT 2-WAY MODULATING CONTROL VALVE.
SEE SPEC 230900.
CHILLED WATER 5
HOT WATER 5VAV (ALL)
STEAM 3HUMIDIFIER
SEE SPEC
SEE SPEC
SEE SPEC
2-WAY MODULATING CONTROL VALVE.
2-WAY 2-POSITION CONTROL VALVE.
VALVE SHALL FAIL NORMALLY OPEN.
VALVE SHALL FAIL NORMALLY CLOSED.
HOT WATER 5AHU SEE SPEC
RHC-(ALL) HOT WATER 5 SEE SPEC
AHU
ALL CONTROL VALVE FLOW RATES SHALL BE
ADJUSTED TO MATCH EQUIPMENT SHOP DRAWING
SUBMITTAL VALUES.
NEW PNEUMATIC CONTROL VALVE.
CHILLED WATER (CONTROL VALVE) 5HX 1-01 SEE SPEC
HX 1-01 PROCESS WATER 5 SEE SPEC
2, 3, 7, 8
2, 4, 6, 8
2, 3, 7, 8
2, 3, 6, 8
2, 4, 7, 8
2, 3, 7, 8
2, 5, 7, 8
1.
2.
3.
4.
5.
6.
7.
8.
9.
KEYED NOTE 1
KEYED NOTE 1
KEYED NOTE 1
KEYED NOTE 1
KEYED NOTE 1
KEYED NOTE 1
KEYED NOTE 1
A
B
C
D
E
6 5 4 3 2 1
1900 w.47th Place, #300, Westwood, KS 66205(913) 362-6500 www.PGAV.COM
DRAWN: CHECKED:
DATE:
PGAV # CLIENT #
SHEET #:
PECKHAM GUYTON ALBERS & VIETS, INC.
Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102
ANTELLA CONSULTING ENGINEERS, INC.
Plumbing, Mechanical & Fire Protection Engineers6 South Old OrchardSt Louis, MO 63119
ROSS & BARUZZINI, INC.
(314) 918-8383
(816) 421-0950
THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TOWHICH THEY ARE AFFIXED, AND EXPRESSLY DISCLAIM ANYRESPONSIBILITY FOR ALL OTHER PLANS, SPECIFICATIONS,
ESTIMATES, REPORTS, OR OTHER DOCUMENTS OR INSTRUMENTSRELATING TO OR INTENDED TO BE USED FOR ANY PART OR PARTS
OF THE ARCHITECTURAL OR ENGINEERING PROJECT.
PECKHAM GUYTON ALBERS & VIETS, INC.MO STATE CERTIFICATE OF AUTHORITY #000086
MO STATE CERTIFICATE OF AUTHORITY #E-2005013590
MO STATE CERTIFICATE OF AUTHORITY #000148
11/1
6/20
1 7 7
:47:
48 A
MC
:\Use
rs\r
diem
er\D
ocum
ents
\245
-32_
ME
CH
_CE
NT
RA
L_v1
6_rd
iem
er.r
vt
1 Hospital Drive, Columbia, MO65212
M601
11/06/2017
53474
SCHEDULES
NLP
BID DOCUMENTS
University of Missouri -Columbia
NLP
CP171091
RJD
Medical ScienceFirst FloorResearch
LaboratoryRenovation
AIR HANDLING UNIT SCHEDULEPLAN MARK
MFR. MODEL TYPE LOCATION MIN. OA (CFM)
SUPPLY FAN HOT WATER COIL CHILLED WATER COIL
TOTALAIRFLOW
(CFM)
STATIC PRESSURE
TYPE DRIVEMOTOR HP /
BHPMAX FAN
SPEED (RPM)MOTOR
SPEED (RPM)MIN. FAN EFF.
(%)CAPACITY
(BTUH)MAX FACE
VELC. (FPM) EAT / LAT (°F)WATER FLOW
(GPM) EWT / LWT (°F) MIN ROWS
MAX PD CAPACITY (BTUH)MAX FACE
VELC. (FPM)
EAT / LATWATER FLOW
(GPM) EWT / LWT (°F) MIN ROWS
MAX PD
TSP (IN WC) ESP (IN WC) AIR (IN WC) WATER (FT) TOTAL SENS. DB (°F) WB (°F) AIR (IN WC) WATER (FT)
AHU 1-01 DAIKIN VISION CAH033GDHM CUSTOM MECHANICAL M130 15000 15000 5.36 2.50 (6) AF ECM 5 HP PER FAN 3230 3230 PREMIUM 1121992 500 0/68 53.00 180/138 2 0.17 3.1 1315362 688678 500 95/53 78/52.8 189.00 46/60 10 1.18 11.3
AIR HANDLING UNIT SCHEDULE CONT.PLAN MARK HUMIDIFIER FILTERS
AHU_SNDOCT 63
AHU_SND OCT125
AHU_SND OCT250
AHU_SND OCT500
AHU_SND OCT1000
AHU_SND OCT2000
AHU_SND OCT4000
AHU_SND OCT8000 NOTES
STEAMRATE
(LBS/HR)
STEAMPRESSURE
(PSIG) EAT (°F)% RH
(ENTER/LEAVE)
FACEVELOCITY
(FPM)MAX APD(IN WC)
PRE FINAL
TYPEDESIGN APD (IN
WC) TYPEDESIGN APD (IN
WC)
AHU 1-01 129 10 55 (0/50) 500 0.01 2" MERV 8 0.5 12" MERV 15 1 71 70 81 69 63 56 50 51 1, 2, 3, 4, 5, 6, 7, 8, 9, 10
BLOWER COIL UNIT SCHEDULEPLAN MARK
MFR. MODEL TYPE LOCATION SERVICE CFMEXT SP (IN
WC)
COOLING DATA ELECTRICAL DATA
NOTESSENS CAP
(MBH)TOTAL CAP
(MBH) EAT (°F) LAT (°F) EWT (°F) LWT (°F) FLOW (GPM) WPD (FT) COIL ROWS MOTOR HP
BCU 1-03 IEC HBD20 HORIZONTAL BELT DRIVE FREEZER STORAGE/SUPPORT M132 FREEZER STORAGE/SUPPORT M132 2200 0.5 65 72 75/63 56/55 46 60 14.3 1.4 4 2 1, 2, 3, 4
BCU 1-04 IEC HBD20 HORIZONTAL BELT DRIVE FREEZER STORAGE/SUPPORT M112 FREEZER STORAGE/SUPPORT M112 2200 0.5 65 72 75/63 56/55 46 60 14.3 1.4 4 2 1, 2, 3, 4
LOUVER SCHEDULEPLAN MARK
MFR. MODEL TYPE LOCATION UNIT FUNCTION OPENING SIZE MAX CFMFREE AREA
(SQ FT)FREE AREAVELOCITY
MAX APD (INWC) NOTES
L 1-01 RUSKIN ELF6375DX STATIONARY MECH ROOM M130 AHU 1-01 OUTSIDE AIR 100x66 15000 27.5 545 0.05 1, 2, 3, 4
L 1-02 RUSKIN ELF6375DX STATIONARY MECH ROOM M130 EF 1-01 EXHAUST 47x42 2200 7.63 288 0.01 1, 2, 3, 4
NOTES:
1. SEE EQUIPMENT DATA SCHEDULE FOR ELECTRICAL INFORMATION.2. SOUND POWER LEVEL RATINGS SHOWN IN DECIBELS, REFERRED TO 10(-12) WATTS CALCULATED PER AMCA STANDARD 301, VALUES ARE DISCHARGE/INLET/RADIATED.3. REFER TO DIV 23 MOTOR SPECIFICATION FOR MOTOR REQUIREMENTS.4. FILTER PRESSURE DROP INCLUDES DIRTY FILTER ALLOWANCE OF 0.75".5. PROVIDE SEPARATE POWER CONNECTION POINT FOR GFI RECEPTACLES AND LIGHTS IN UNIT.6. PROVIDE A MINIMUM 10" TALL BASE RAIL.7. MAXIMUM DIMENSIONS OF UNIT ARE AS FOLLOWS: WIDTH:66 INCHES; HEIGHT: 106 INCHES INCLUDING 10 INCH BASE RAIL; LENGTH:18 FEET-8 INCHES8. PROVIDE OPTIONAL MOTOR BLANK-OFF PANELS.9. EACH FAN SHALL HAVE AN ECM MOTOR. REFER TO ELECTRICAL DRAWINGS.10. UNIT SHALL BE BROUGHT INTO BUILDING THROUGH FIRST FLOOR CORRIDOR SPACE. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO SUBMITTING SHOP DRAWINGS. ALL
EXISTING BUILDING COMPONENTS (DOORS, CEILINGS, WALLS, WINDOWS) SHALL REMAIN IN PLACE UNLESS NOTED IN THESE CONSTRUCTION DOCUMENTS. IN ANY COMPONENT REQUIRESDISASSEMBLY TO MOVE INTO BUILDING, MANUFACTURER SHALL WITNESS DISASSEMBLY AND REASSEMBLY TO MAINTAIN MANUFACTURER'S WARRANTY AND SCHEDULED PERFORMANCES.
NOTES:1. SEE EQUIPMENT DATA SCHEDULE FOR ELECTRICAL INFORMATION.2. FRONT OUTLET DUCT COLLAR AND BACK INLET LOUVERS.3. SUSPEND FROM STRUCTURE WITH 1" SPRING ISOLATORS PER SPECIFICATION.4. MANUFACTURER SHALL PROVIDE PRE-WIRED DISCONNECT AND 24V CONTROL TRANSFORMER.
NOTES:1. ARCHITECT SHALL PICK COLOR AND FINISH DURING SHOP DRAWING REVIEW.2. FURNISH LOUVER WITH 1/2" ALUMINUM BIRD SCREEN.3. LOUVERS ARE SCHEDULED ONLY FOR PERFORMANCE OF THE REQUIRED FREE AREA. REFER TO ARCHITECTURAL PLANS FOR TYPE, MODEL, ELEVATIONS AND
SECTIONS FOR ROUGH OPENING SIZES, EXACT LOCATIONS AND MOUNTING HEIGHTS. CONTRACTOR SHALL CONFIRM SIZE AND OPENING PRIOR TO SUBMITTINGSHOP DRAWING REVIEW.
4. THE SIZE INDICATED IS THE REQUIRED MINIMUM FREE AREA SIZE. REFER TO ARCHITECT DRAWINGS FOR OVERALL LOUVER DIMENSIONS.
FAN SCHEDULEPLAN MARK
MFR. MODEL TYPE LOCATION SERVICE DRIVEAIRFLOW
(CFM) ESP (IN WC)MAX FAN
SPEED (RPM)MOTOR
SPEED (RPM)
ELECTRICAL DATA
NOTESHP/KW/AMPS V/PH/HZ
EF 1-01 COOK 135 SQN17D INLINE CENTRIFUGAL FREEZER STORAGE/SUPPORT M132 FREEZER STORAGE/SUPPORT M132 DIRECT WITH EC MOTOR 2200 0.5 1725 1725 3/4 115/1/60
EF 1-02 COOK 135 SQN17D INLINE CENTRIFUGAL FREEZER STORAGE/SUPPORT M112 FREEZER STORAGE/SUPPORT M112 DIRECT WITH EC MOTOR 2200 0.5 1725 1725 3/4 115/1/60
PUMP SCHEDULEPLAN MARK
MFR. MODEL TYPE LOCATION SERVICEWATER FLOW
(GPM) TDH (FT)
MIN INLET /OUTLET SIZES
(IN)MAX NPSHREQD (FT) MIN EFF (%)
MOTORSPEED (RPM)
ELECTRICAL DATA
NOTESHP
HWRP 1-01 BELL & GOSSETT SERIES E-80 2X2X7B INLINE MECH ROOM M130 AHU 1-01 HW COIL 53.00 GPM 30 2/2 4.78 57 1800 1.5
CWP 1-01 BELL & GOSSETT SERIES E-80 2x2x9.5C INLINE MECH ROOM M120 HX 1-01 90.00 GPM 50 2/2 7.71 57 1800 3
NOTES:SEE EQUIPMENT DATA SCHEDULE FOR ELECTRICAL INFORMATION.
NOTES:SEE EQUIPMENT DATA SCHEDULE FOR ELECTRICAL INFORMATION.
MOTORIZED DAMPER SCHEDULEMARK
MFR. MODEL LOCATION SERVICEBLADE
CONFIGURATIONFAIL
POSITIONSIZE WxH (IN) MOUNTING NOTES
ID #
MD 1-01 RUSKIN CD50 MECH 130 AHU 1-01 OA OPPOSED CLOSED 92x62 DUCT
HEAT EXCHANGER SCHEDULEMARK
MFR. TYPE LOCATION SERVICE CAPACITY(MBH)
SYSTEMWATER IN (°F)
SYSTEMWATER OUT
(°F)PROCESS
WATER IN (°F)
PROCESSWATER OUT
(°F) GPMMAX WATER
PD (FT)NOTES
HX 1-01 BELL & GOSSETT GPX PLATE & FRAME MECH M120 CHILLED WATER FOR SECOND FLOOR 632 46 60 62 48 90.00 GPM 15 1, 2, 3, 4
FAN TERMINAL UNIT SCHEDULE
MARK
MFR. MODEL & SIZE TYPE LOCATION SERVICEPRIMARY
INLET SIZE (IN)
PRIMARY AIRFLOW (CFM)DESIGN INLETSTATIC PRESS
(IN)
MAX PRESSDROP (IN)
OUTLET DUCTSIZE WxD (IN)
UNIT FAN REHEAT ELECTRICAL DATA
NOTESID # MAX MIN
AIRFLOW(CFM)
# OFFANS
HP(EA)
HEATINGAIRFLOW
(CFM)
CAPACITY(MBH)
EAT(ºF)
LAT(ºF)
MAXAPD
CONTROLVALVE
HP VOLTS PHASE
FTU 1-01 TITUS DTFS-C SERIES VESTIBULE VESTIBULE 10 300 180 1.0 0.5 14X11 700 1 1/3 700 22.3 56 87 0.15 2-WAY 1/3 120 1
NOTES:SEE EQUIPMENT DATA SCHEDULE FOR ELECTRICAL INFORMATION.
# DATE DESCRIPTION
1 11/16/17 ADDENDUM 1
NOTES:1. UNIT SHALL BE SIZED FOR A MAXIMUM 2.0 DEGREES F APPROACH.2. THE UNIT SHALL BE AHRI CERTIFIED FOR PERFORMANCE.3. THE UNIT SHALL BE ASME CERTIFIED AND HAVE ASME "U" STAMP AND INCLUDE THE U-1 DATA REPORTS.4. ALL SURFACES ON THE GUIDE CARRY BARS SHALL BE STAINLESS STEEL.
11
MR M130MR M120MR M112
METASYS (SF-C)
SUPPLY FAN CT
R3
METASYS (SF-S)
METASYS (LT-A)
METASYS (HS-A)
R5
R4
R3STATUSRELAY
R2RSF-C
R1RFA
CONTACTS R4
R5
R4HS
RELAY
HIGHSTATICSWITCH
R1R RUNENAB
SF ECM
(SF-O)
LT-A R5LT-A
RELAY
R2R
SAFETY
24 VAC
HTG
RELAY
CONTACTS
ON R3DMP
RELAY
2MA ECM START CIRCUITNO SCALE 3
FC BUS SCHEMATIC DIAGRAMNO SCALE
R1RR2RR3R4R5DMP RELAYHTG RELAY
24VAC RIB1UC24VAC RIB1UC24VAC CONTROL RELAY -2POLE24VAC CONTROL RELAY -2POLE24VAC CONTROL RELAY -2POLE24 VAC CONTROL RELAY -2POLE24 VAC CONTROL RELAY -2POLE
1.
2.
3.
4.
5.
KEEP ALL LOW VOLTAGE CONTROL WIRING
(UNDER 25V) AND LOW VOLTAGE POWER WIRING
(OVER 25V) SEPARATED. (RUN IN SEPARATE
CONDUIT.)
PROVIDE RELAYS WITH MULTIPLE CONTACTS AS
REQUIRED.
ANY DISCONNECT WITH AUX CONTACTS WILL BE
ADDED TO SAFETY CIRCUIT
CURRRENT TRANSFORMER REQUIRED FOR
STATUS
R1, R2, AND R4 MOUNTED ON/NEAR I/O PANEL.
COORDINATE WITH OWNER REPRESENTATIVE.
FC BUS TO BE CONTINUOUS DAISY CHAIN. SEE PLANS FOR QUANTITY
AND LOCATIONS OF VAV/FCU CONTROLLERS.
OWNER WILL MAKE TERMINATION CONNECTIONS AT PANELS. LOCATE
PANELS IN SAME ROOM AS EQUIPMENT SERVED.
FC COMMUNICATION BUS WIRE SHALL BE 22 AWG, PLENUM RATED,
TWISTED SHIELDED, 3 CONDUCTOR, WITH BLUE OUTER CASING,
DESCRIPTED AS 22-03 OAS STR PLNM NEON BLU JK DISTRIBUTED BY
WINDY CITY WIRE, CONSTRUCTED BY CABLE-TEK, OR APPROVED
EQUIVALENT.
COORDINATE FIELD ROUTING WITH OWNERS REPRESENTATIVE.
KEEP EXISTING FC BUS INTACT THROUGHOUT CONSTRUCTION.
1.
2.
3.
4.
5.
FIRST FLOOR
SECOND FLOOR
VAVVAV PHOENIX
RMIAH85
2PIPE
1
INSTALL J-BOX ABOVE CEILING IN ROOM M112 FOR FC BUS SPLICEWHERE EXISTING 2-PIPE SYSTEM CONTROLLER WAS REMOVED.
1
(SEE SPECS):DEVICES
GENERAL NOTES:
KEYED NOTES:
GENERAL NOTES:
113
SF
-S
ECM
M
115
HWS
HWR
NC
LT
-A
SMK
111
PH
T-O
M
118114
PH
P-S
PH
P-C
110
CLG
-O
CO
OL
ING
CWS
CWR
NC
CO
IL
35 F
102
PH
T-T
SF
-C
DM
109
SF
-O
FILTERS
117
PR
EH
EA
T
CO
IL
OUTSIDEAIR
116
HS
-A
DPS
SEE AHU START CIRCUIT DETAIL ON SHEET THIS SHEET.
LOCATE AS SHOWN ON MECHANICAL DRAWINGS.
1. SEE SPECIFICATIONS FOR DEVICE SPECIFICATIONS.
2.ANY DEVICE REQUIRING POWER MUST BE POWERED BY
CONTRACTOR.
GENERAL NOTES:
KEYED NOTES:1
1
1
112
ST
M-O
ST
EA
M
LPS
NC
HU
MID
IFIE
R
SF
108
SA
-PR
S
DPT
SUPPLY
AIR
2
103
CLG
-T
119
ST
M-I
SO
2
TAG #101102103104105106107108109110111112113114115116117118119
TYPEAIAIAIAIAIAIAIAIAOAOAOAOBIBIBIBIBOBOBO
POINT NAMEOA-TPHT-TCLG-TSA-TSA-RHZN-H1ZN-H2SA-PRSSF-OCLG-OPHT-OSTM-OSF-SPHP-SLT-AHS-ASF-CPHP-CSTM-ISO
DESCRIPTIONOUTSIDE AIR TEMPHEATING AIR TEMPCOOLING AIR TEMPSUPPLY AIR TEMPSUPPLY AIR HUMIDITYZONE AIR HUMIDITYZONE AIR HUMIDITYSUPPLY AIR STATIC PRESSURESUPPLY FAN SPEED OUTPUTCOOLING OUTPUTHEATING OUTPUTSTEAM OUTPUTSUPPLY FAN STATUSPREHEAT PUMP STATUSLOW TEMP ALARMHIGH STATIC ALARMSUPPLY FAN COMMANDPREHEAT PUMP COMMANDHUMIDIFIER ISOLATION VALVE
DEVICESOFTWARE INPUTRTD/DUCT AVERAGINGRTD/DUCT AVERAGINGRTD/DUCT AVERAGINGHUMIDITY SENSORHUMIDITY SENSORHUMIDITY SENSORDIFF PRESSURE TRANSMITTERECMELECT ACTUATOR W/SPRING RETURNELECT ACTUATOR W/SPRING RETURNELECT ACTUATOR W/SPRING RETURNCURRENT SWITCHCURRENT SWITCHFREEZE STATDIFF PRESS SWITCHCONTROL RELAYCONTROL RELAYELECT ACTUATOR W/SPRING RETURN
106
ZN
-H1
107
ZN
-H2
WALL MOUNTEDWALL MOUNTED
HUM
105
SA
-RH
104
SA
-T
117
SF
-C
ESHHL
1
1
NOTES
FRONT VIEW
DDC CONTROLLERS ARE SUPPLIED BY OWNER AND MOUNTED BY
CONTRACTOR.
KEEP ALL LOW VOLTAGE CONTROL WIRING ( UNDER 25V) AND LOW
VOLTAGE POWER WIRING (OVER 25V) SEPARATED. (RUN IN SEPARATE
CONDUIT).
PLYWOOD SIZE IS BASED ON THE NUMBER OF CONTROLLERS IN EACH
LOCATION. COORDINATE WITH OWNERS REPRESENTATIVE.
4/0 BOX WITH PULL CHAIN.18W LED LIGHT WITH GUARD.
4'x4'x3/4" PLYWOOD (MIN)(PAINT FRONT AND
ENDS MACHINE GRAY.)
1-1/2" UNISTRUTCHANNEL (2)
1.
2.
3.
6" x 6" WIRE TROUGH
FLOOR
3/4" CONDUIT
120 VAC INPUT POWER
DEDICATED 15A CIRCUIT
1" CONDUITMINIMUM
I/O
6"x6" WIRETROUGH
FLOOR
EXP. ANCHORS
1-1/2" UNISTRUTCHANNEL (2)
4'x4'x3/4" PLYWOOD (MIN)(PAINT FRONT AND ENDSMACHINE GRAY)
3/4" CONDUIT
4/0 BOX WITHPULL CHAIN. 18WLED WITH GUARD.
WA
LL
ASC ASC
BY DIVISION 16
2" MIN. CONDUIT (2)
3'-6
" T
YP
ICA
L
3' MIN DISTANCE
POSTBASE (2)
BRACEFITTING (2)
OPTIONAL FLOOR MOUNT
SIDE VIEW
A
B
C
D
E
6 5 4 3 2 1
1900 w.47th Place, #300, Westwood, KS 66205(913) 362-6500 www.PGAV.COM
DRAWN: CHECKED:
DATE:
PGAV # CLIENT #
SHEET #:
PECKHAM GUYTON ALBERS & VIETS, INC.
Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102
ANTELLA CONSULTING ENGINEERS, INC.
Plumbing, Mechanical & Fire Protection Engineers6 South Old OrchardSt Louis, MO 63119
ROSS & BARUZZINI, INC.
(314) 918-8383
(816) 421-0950
THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TOWHICH THEY ARE AFFIXED, AND EXPRESSLY DISCLAIM ANYRESPONSIBILITY FOR ALL OTHER PLANS, SPECIFICATIONS,
ESTIMATES, REPORTS, OR OTHER DOCUMENTS OR INSTRUMENTSRELATING TO OR INTENDED TO BE USED FOR ANY PART OR PARTS
OF THE ARCHITECTURAL OR ENGINEERING PROJECT.
PECKHAM GUYTON ALBERS & VIETS, INC.MO STATE CERTIFICATE OF AUTHORITY #000086
MO STATE CERTIFICATE OF AUTHORITY #E-2005013590
MO STATE CERTIFICATE OF AUTHORITY #000148
11/1
6/20
1 7 7
:47:
48 A
MC
:\Use
rs\r
diem
er\D
ocum
ents
\245
-32_
ME
CH
_CE
NT
RA
L_v1
6_rd
iem
er.r
vt
1 Hospital Drive, Columbia, MO65212
M702
11/06/2017
53474
CONTROLS
NLP
BID DOCUMENTS
University of Missouri -Columbia
NLP
CP171091
RJD
Medical ScienceFirst FloorResearch
LaboratoryRenovation
NTS1
AHU 1-01 CONTROL DIAGRAM
NTS4
ASC PANEL MOUNTING DETAIL1
# DATE DESCRIPTION
1 11/16/17 ADDENDUM 1