Utility Extension Program• Design Commencement: 2000
• 19 Design WA’s
• Over $30M in Design
• Construction Commencement: 2002
• 11 Construction WA’s
• Over $375M in Construction
• Safety Milestones:
• Over 1.9M hours worked without lost time incident
• Over 4 years worked without lost time incident
• Zero public safety incidents
• MH Worked To Date: 3.2M hours