Utility Extension Program• Design Commencement: 2000

• 19 Design WA’s

• Over $30M in Design

• Construction Commencement: 2002

• 11 Construction WA’s

• Over $375M in Construction

• Safety Milestones:

• Over 1.9M hours worked without lost time incident

• Over 4 years worked without lost time incident

• Zero public safety incidents

• MH Worked To Date: 3.2M hours