UAV Radar Project Preliminary Design Review T eam B. Team Lead Kelly Rodriguez Design LeadBrittany Limones Construction LeadKenneth McChesney Test LeadNed Howard. Level 0 Block Diagram. Level 1 Block Diagram. Level 2 Block Diagram. Transmitter. Receiver. Test Procedure. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: UAV Radar Project Preliminary Design Review T eam B

ULTRASONIC TRANSMITTERAmanda Helberg, Brandon Ravenscroft, Jonathan Owen, and Kai Gustafson

Page 2: UAV Radar Project Preliminary Design Review T eam B

LEVEL 0: BEACON SYSTEM

Arduino Uno Programmable Oscillator

Buffer

Matching Network Transducer

Page 3: UAV Radar Project Preliminary Design Review T eam B

LEVEL 0: RADAR SYSTEM

Programmable Amplifier

Buffer Amplifier

ImpedanceMatching Network

Transducer

On-board RCVR

Ardu

ino

DUE DAC

ADC

Test Point

Echo from chirp

Output Chirp

Test Point

Page 4: UAV Radar Project Preliminary Design Review T eam B

SCHEMATIC: RADAR SYSTEM

Page 5: UAV Radar Project Preliminary Design Review T eam B

16-ELEMENT ULTRASONIC TRANSMITTER

Page 6: UAV Radar Project Preliminary Design Review T eam B

HOW TO ACCOMPLISH THIS

Page 7: UAV Radar Project Preliminary Design Review T eam B
Page 8: UAV Radar Project Preliminary Design Review T eam B

PROJECT MANAGEMENT

Page 9: UAV Radar Project Preliminary Design Review T eam B

PROGRESS

Page 10: UAV Radar Project Preliminary Design Review T eam B

RISKSInput Power to Arduino Due

Risk: The Arduino Due can only have an input of 3.3 V unlike the Arduino Uno having 5 V.

Mitigation: Zener diode limiter (clamping circuit.)Collaboration with Team Receiver

Risk: Improper co-location with Receiver Team. Mitigation: Keep in close contact with Receiver team upon design of final board.

Scheduling Risk: Not having the code and/or board complete by deadlines. Mitigation: Sticking to Gantt chart schedule to ensure project components are completed on time. Risk: Manufacturing company lead times being inaccurate. Mitigation: Board design submitted two weeks early in event of delay.

Test PointsRisk: Having a completed faulty board and no way to connect to certain areas to test. Mitigation: Insert appropriate test points in design.

Page 11: UAV Radar Project Preliminary Design Review T eam B

QUESTIONS?

Page 12: UAV Radar Project Preliminary Design Review T eam B

BACK UP SLIDE-ALLOCATIONS