  • 8/18/2019 Trestle foundations-TR-9 raft

    1/15

    Project  

    Doc Title  

    ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT

    STAGE-I & II, WARANGAL.

    GENERAL DATA

    DESIGN OF FOUNDATIONS FOR CONV BCN 31

  • 8/18/2019 Trestle foundations-TR-9 raft

    2/15

    Project 

    R KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.  

    Doc Title  

    For Footing design: Reactions from TR9f-frameStd

      Horizontal Vertical Horizontal Moment

    Node L/C Force-X Mto Force-Y Mton Force-Z Mt Momen Moment-Moment-Z MTon-m

    5 201 -3 39.5 -3.9 -15.6 0 12

    202 -13.9 -26.4 -9.4 -37.6 0 55.8

    203 -13.4 -18.6 -8.5 -34.1 0 53.5

    204 7.2 78.2 -7.5 -29.9 0 -29

    205 -13.1 85.9 -8.3 -33.1 0 52.6

    206 -5.1 0.7 -12.7 -50.7 0 20.6

    207 -4.6 8.6 -11.9 -47.5 0 18.3208 -4 53.7 -10.9 -43.7 0 16.1

    209 -4.6 61.5 -11.8 -47.2 0 18.3

    210 -7.1 66.3 -6.4 -25.8 0 28.6

    211 -7.1 3.6 -6.4 -25.8 0 28.6

    212 -3.9 47.1 -6 -23.8 0 15.4

    213 -3.9 22.8 -6 -23.8 0 15.4

    214 -15.4 -59.8 -9.2 -36.8 0 61.6

    215 -14.7 -50.1 -8.1 -32.4 0 58.8216 11 70.9 -6.8 -27.2 0 -44

    217 -14.4 80.6 -7.8 -31.2 0 57.6

    218 -4.4 -25.9 -13.3 -53.2 0 17.6

    219 -3.7 -16.1 -12.3 -49.2 0 14.8

    220 -3 40.3 -11.1 -44.4 0 12

    221 -3.7 50.1 -12.2 -48.8 0 14.8

    222 -6.9 56.1 -5.5 -22 0 27.6

    223 -6.9 -22.3 -5.5 -22 0 27.6

    224 2 8 32 1 4 9 19 6 0 11 2

    DESIGN OF FOUNDATIONS FOR CONV BCN 30

  • 8/18/2019 Trestle foundations-TR-9 raft

    3/15

    Project 

    R KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.  

    Doc Title  DESIGN OF FOUNDATIONS FOR CONV BCN 30

    219 -3.7 51.7 -13.1 -52.4 0 14.8

    220 -3 -6.7 -11.9 -47.6 0 12

    221 -3.7 -16.8 -13 -52 0 14.8

    222 -6.9 56.9 -6 -24 0 27.6

    223 -6.9 -21.5 -6 -24 0 27.6

    224 -2.3 32.9 -5.9 -23.6 0 9.2

    225 -2.3 2.5 -5.9 -23.6 0 9.2

    226 -13.5 69.2 -7 -27.9 0 53.9

    227 -14.2 79.5 -8.1 -32.3 0 56.7

    228 12.9 -61.1 -9.5 -37.9 0 -52

    229 -14.6 -51.1 -8.4 -33.5 0 58.3

    230 -4.3 60.5 -14 -55.9 0 17.1231 -3.6 49.9 -12.9 -51.5 0 14.3

    232 -2.9 -8.5 -11.7 -46.7 0 11.5

    233 -3.6 -18.6 -12.8 -51.1 0 14.3

    234 -6.8 55.1 -5.8 -23.1 0 27.1

    235 -6.8 -23.3 -5.8 -23.1 0 27.1

    236 -2.2 31.1 -5.7 -22.7 0 8.7

    237 -2.2 0.7 -5.7 -22.7 0 8.7

    These reactions are considered F9

  • 8/18/2019 Trestle foundations-TR-9 raft

    4/15

    Project 

    ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.

    Doc Title

    3.7.4.1 COMBINED FOOTING F8 for TR9

    Y

      Pedestal & Footing Data X

    Height of Pedestal above GL 0.50 m

    Depth of Foundation 4.00 m Z   L= 14.00

      Thickness of footing at edge 0.45 m

    Thickness of footing at face of Ped. 0.45 m

    Width of footing along X axis 14.00 m   3 8 3.000

    Width of footing along Y axis 3.25 m

    Total height of pedestal 4.50 m

    density of conc 2.50 t/m3

    soil den 1.80   /m3   Node=   5 6

           B  

    Pedestal sizes

     Alongx Along Z Ht Sw

    5 0.7 0.7   4.50 5.51  

    16 0.7 0.7   4.50 5.51

    11.03 t

    F.G.L.  

    Sw of footing 51.19 tSoil weight between GL&FFL   32.76 t

    soil wt 284.48 t

    Total SW 368.43 t

    Excluding pedestal 368.43 T

    Allowable bearing pressure = 22 t/m2

    LOAD

    COMBINATIONS

    CO MBINAT IONS Pmax Net SBC Pmin Al lOWABLE

    BEARING

    CAPACITY

    DL+LL  201

    11.41 4.21 8.35 22.1

    DL+WL/SL 214 to 225 17.44 10.24 0.13 22.1

    226 to 237

    DL+LL+WL/SL 202 to213 17.32 10.12 1.92 27.625

     

    Node X,Z Cordinates of Pedestals from the CG of Footing  

    5   X1 = 4 Z1 = 0

    6 X2 = -4 Z2 = 0

     Area =   14.00*3.25   45.5 m2

    Zx = ROUND(+14.00*3.25^2/6,2) = 24.65   m3

    Zz = ROUND(+14.00^2*3.25/6,2) = 106.17   m3

    DESIGN OF FOUNDATIONS FOR CONV BCN 30

           3  .       2

           5

    pls maintain same foundinglevel as existing foundationas per desein comments(3m)

    pls restrict to 3m

    15 m

    pls consider pedestal wt also, either in staad or in sheet

  • 8/18/2019 Trestle foundations-TR-9 raft

    5/15

    Project 

    ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.

    Doc Title DESIGN OF FOUNDATIONS FOR CONV BCN 30

     Addl Mom due to Eccn Max /Min ax /Min

    Node L/C Fy Mx Mz Mx = Fy * z Mz = Fy * x Total V Total Mx Total Mz P/A MX/ZX MZ/ZZ BR Pr BR Pr  

    5 201 39.5 -15.6 12 0 158 449.5303 -34 15.6 9.879787 -1.37931 0.14693 11.41   8.354

    16 201 41.6 -18.4 12 0 -166.4

    5 202 -26.4 -37.6 55.8 0 -105.6 421.5303 -69.8 -317.8 9.264402 -2.831643 -2.99331 15.09   3.439

    16 202 79.5 -32.2 50 0 -318

    5 203 -18.6 -34.1 53.5 0 -74.4 437.5303 -69.9 -319.5 9.616051 -2.8357 -3.00932 15.46   3.771

    16 203 87.7 -35.8 52.2 0 -350.8

    5 204 78.2 -29.9 -28.7 0 312.8 421.8303 -70.1 348.8 9.270996 -2.843813 3.2853 15.40   3.142

    16 204 -24.8 -40.2 -34.5 0 99.2

    5 205 85.9 -33.1 52.6 0 343.6 437.5303 -69.8 516.9 9.616051 -2.831643 4.86861 17.32   1.916

    16 205 -16.8 -36.7 53.5 0 67.2

    5 206 0.7 -50.7 20.6 0 2.8 441.6303 -105.3 -246 9.70616 -4.271805 -2.31704 16.30   3.117

    16 206 72.5 -54.6 20.6 0 -290

    5 207 8.6 -47.5 18.3 0 34.4 441.0303 -98.6 -185 9.692974 -4 -1.74249 15.44   3.95

    16 207 64 -51.1 18.3 0 -256

    5 208 53.7 -43.7 16.1 0 214.8 439.4303 -91 177.8 9.657809 -3.691684 1.67467 15.02   4.291

    16 208 17.3 -47.3 16.1 0 -69.2

    5 209 61.5 -47.2 18.3 0 246 439.1303 -98 245.8 9.651215 -3.975659 2.31515 15.94   3.36

    16 209 9.2 -50.8 18.3 0 -36.8

    5 210 66.3 -25.8 28.6 0 265.2 502.9303 -54.2 49.6 11.05341 -2.198783 0.46718 13.72   8.387

    16 210 68.2 -28.4 28.6 0 -272.8

    5 211 3.6 -25.8 28.6 0 14.4 377.5303 -54.2 49.6 8.297369 -2.198783 0.46718 10.96   5.631

    16 211 5.5 -28.4 28.6 0 -22

    5 212 47.1 -23.8 15.4 0 188.4 464.5303 -51.9 21.6 10.20946 -2.105477 0.20345 12.52   7.901

    16 212 49 -28.1 13.8 0 -196

    5 213 22.8 -23.8 15.4 0 91.2 415.9303 -51.9 21.6 9.141325 -2.105477 0.20345 11.45   6.832

    16 213 24.7 -28.1 13.8 0 -98.8

    5 214 -59.8 -36.8 61.6 0 -239.2 379.6303 -65.6 -407.2 8.343523 -2.661258 -3.83536 14.84   1.847

    16 214 71 -28.8 54.4 0 -284

  • 8/18/2019 Trestle foundations-TR-9 raft

    6/15

    Project 

    ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.

    Doc Title DESIGN OF FOUNDATIONS FOR CONV BCN 30

    5 215 -50.1 -32.4 58.8 0 -200.4 399.6303 -65.6 -409.6 8.783084 -2.661258 -3.85796 15.30   2.264

    16 215 81.3 -33.2 57.2 0 -325.2

    5 216 70.9 -27.2 -44 0 283.6 380.0303 -66 425.6 8.352314 -2.677485 4.00867 15.04   1.666

    16 216 -59.3 -38.8 -51.2 0 237.2

    5 217 80.6 -31.2 57.6 0 322.4 399.7303 -65.6 636 8.785281 -2.661258 5.99039 17.44   0.134

    16 217 -49.3 -34.4 58.8 0 197.2

    5 218 -25.9 -53.2 17.6 0 -103.6 404.8303 -110 -317.6 8.897369 -4.462475 -2.99143 16.35   1.44316 218 62.3 -56.8 17.6 0 -249.2

    5 219 -16.1 -49.2 14.8 0 -64.4 404.0303 -101.6 -241.6 8.879787 -4.121704 -2.2756 15.28   2.482

    16 219 51.7 -52.4 14.8 0 -206.8

    5 220 40.3 -44.4 12 0 161.2 402.0303 -92 212 8.835831 -3.732252 1.9968 14.56   3.107

    16 220 -6.7 -47.6 12 0 26.8

    5 221 50.1 -48.8 14.8 0 200.4 401.7303 -100.8 297.2 8.829237 -4.089249 2.79928 15.72   1.941

    16 221 -16.8 -52 14.8 0 67.2

    5 222 56.1 -22 27.6 0 224.4 481.4303 -46 52 10.58089 -1.866126 0.48978 12.94   8.225

    16 222 56.9 -24 27.6 0 -227.6

    5 223 -22.3 -22 27.6 0 -89.2 324.6303 -46 52 7.134732 -1.866126 0.48978 9 .49   4.779

    16 223 -21.5 -24 27.6 0 865 224 32.1 -19.6 11.2 0 128.4 433.4303 -43.2 17.2 9.525941 -1.752535 0.162 11.44   7.611

    16 224 32.9 -23.6 9.2 0 -131.6

    5 225 1.7 -19.6 11.2 0 6.8 372.6303 -43.2 17.2 8.189677 -1.752535 0.162 10.10   6.275

    16 225 2.5 -23.6 9.2 0 -10

    5 226 -61.5 -36.1 61.1 0 -246 376.1303 -64 -407.8 8.2666 -2.596349 -3.84101 14.70   1.829

    16 226 69.2 -27.9 53.9 0 -276.8

    5 227 -51.8 -31.7 58.3 0 -207.2 396.1303 -64 -410.2 8.70616 -2.596349 -3.86361 15.17   2.246

    16 227 79.5 -32.3 56.7 0 -318

    5 228 69.2 -26.5 -44.5 0 276.8 376.5303 -64.4 425 8.275391 -2.612576 4.00301 14.89   1.66

    16 228 -61.1 -37.9 -51.7 0 244.4

    5 229 78.9 -30.5 57.1 0 315.6 396.2303 -64 635.4 8.708358 -2.596349 5.98474 17.29   0.12716 229 -51.1 -33.5 58.3 0 204.4

  • 8/18/2019 Trestle foundations-TR-9 raft

    7/15

    Project 

    ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.

    Doc Title DESIGN OF FOUNDATIONS FOR CONV BCN 30

    5 230 -27.6 -52.5 17.1 0 -110.4 401.3303 -108.4 -318.2 8.820446 -4.397566 -2.99708 16.22   1.426

    16 230 60.5 -55.9 17.1 0 -242

    5 231 -17.8 -48.5 14.3 0 -71.2 400.5303 -100 -242.2 8.802864 -4.056795 -2.28125 15.14   2.465

    16 231 49.9 -51.5 14.3 0 -199.6

    5 232 38.6 -43.7 11.5 0 154.4 398.5303 -90.4 211.4 8.758908 -3.667343 1.99115 14.42   3.1

    16 232 -8.5 -46.7 11.5 0 34

    5 233 48.4 -48.1 14.3 0 193.6 398.2303 -99.2 296.6 8.752314 -4.024341 2.79363 15.57   1.93416 233 -18.6 -51.1 14.3 0 74.4

    5 234 54.4 -21.3 27.1 0 217.6 477.9303 -44.4 51.4 10.50396 -1.801217 0.48413 12.79   8.219

    16 234 55.1 -23.1 27.1 0 -220.4

    5 235 -24 -21.3 27.1 0 -96 321.1303 -44.4 51.4 7.057809 -1.801217 0.48413 9.34   4.772

    16 235 -23.3 -23.1 27.1 0 93.2

    5 236 30.4 -18.9 10.7 0 121.6 429.9303 -41.6 16.6 9.449018 -1.687627 0.15635 11.29   7.605

    16 236 31.1 -22.7 8.7 0 -124.4

    5 237 0 -18.9 10.7 0 0 369.1303 -41.6 16.6 8.112754 -1.687627 0.15635 9.96   6.269

    16 237 0.7 -22.7 8.7 0 -2.8

  • 8/18/2019 Trestle foundations-TR-9 raft

    8/15

    Project 

    ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.

    Doc Title

    3.7.4.1

    Y

      Pedestal & Footing Data X

    Height of Pedestal above GL 0.50 m

    Depth of Foundation 4.00 m Z   L= 14.00

      Thickness of footing at edge 0.50 m

    Thickness of footing at face of Ped. 0.50 m

    Width of footing along X axis 14.00 m   3 8 3.000

    Width of footing along Y axis 3.25 m

    Total height of pedestal 4.50 m

    density of conc 2.50 t/m3

    soil den 1.80   /m3   Node=   5 6

           B  

    Pedestal sizes

     Alongx Along Z Ht Sw

    5 0.7 0.7   4.50 5.51  

    16 0.7 0.7   4.50 5.51

    11.03 t

    F.G.L.  

    Sw of footing 56.88 tSoil weight between GL&FFL   32.76 t

    soil wt 280.48 t

    Total SW 370.11 t

    Excluding pedestal 370.11 T

    Allowable bearing pressure = 22 t/m2

    LOAD

    COMBINATIONS

    CO MBINAT IONS Pmax Net SBC Pmin Al lOWABLE

    BEARING

    CAPACITY

    DL+LL  201

    11.44 4.24 8.39 22.1

    DL+WL/SL 214 to 225 17.47 10.27 0.16 22.1

    226 to 237

    DL+LL+WL/SL 202 to213 17.35 10.15 1.95 27.625

     

    Node X,Z Cordinates of Pedestals from the CG of Footing  

    5   X1 = 4 Z1 = 0

    6 X2 = -4 Z2 = 0

     Area =   14.00*3.25   45.5 m2

    Zx = ROUND(+14.00*3.25^2/6,2) = 24.65   m3

    Zz = ROUND(+14.00^2*3.25/6,2) = 106.17   m3

    DESIGN OF FOUNDATIONS FOR CONV BCN 30

           3  .       2

           5

  • 8/18/2019 Trestle foundations-TR-9 raft

    9/15

    Project 

    ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.

    Doc Title DESIGN OF FOUNDATIONS FOR CONV BCN 30

     Addl Mom due to Eccn Max /Min ax /Min

    Node L/C Fy Mx Mz Mx = Fy * z Mz = Fy * x Total V Total Mx Total Mz P/A MX/ZX MZ/ZZ BR Pr BR Pr  

    5 201 39.5 -15.6 12 0 158 451.211 -34 15.6 9.916725 -1.37931 0.14693 11.44   8.39

    16 201 41.6 -18.4 12 0 -166.4

    5 202 -26.4 -37.6 55.8 0 -105.6 423.211 -69.8 -317.8 9.301341 -2.831643 -2.99331 15.13   3.476

    16 202 79.5 -32.2 50 0 -318

    5 203 -18.6 -34.1 53.5 0 -74.4 439.211 -69.9 -319.5 9.652989 -2.8357 -3.00932 15.50   3.808

    16 203 87.7 -35.8 52.2 0 -350.8

    5 204 78.2 -29.9 -28.7 0 312.8 423.511 -70.1 348.8 9.307934 -2.843813 3.2853 15.44   3.179

    16 204 -24.8 -40.2 -34.5 0 99.2

    5 205 85.9 -33.1 52.6 0 343.6 439.211 -69.8 516.9 9.652989 -2.831643 4.86861 17.35   1.953

    16 205 -16.8 -36.7 53.5 0 67.2

    5 206 0.7 -50.7 20.6 0 2.8 443.311 -105.3 -246 9.743099 -4.271805 -2.31704 16.33   3.154

    16 206 72.5 -54.6 20.6 0 -290

    5 207 8.6 -47.5 18.3 0 34.4 442.711 -98.6 -185 9.729912 -4 -1.74249 15.47   3.987

    16 207 64 -51.1 18.3 0 -256

    5 208 53.7 -43.7 16.1 0 214.8 441.111 -91 177.8 9.694747 -3.691684 1.67467 15.06   4.328

    16 208 17.3 -47.3 16.1 0 -69.2

    5 209 61.5 -47.2 18.3 0 246 440.811 -98 245.8 9.688154 -3.975659 2.31515 15.98   3.397

    16 209 9.2 -50.8 18.3 0 -36.8

    5 210 66.3 -25.8 28.6 0 265.2 504.611 -54.2 49.6 11.09035 -2.198783 0.46718 13.76   8.424

    16 210 68.2 -28.4 28.6 0 -272.8

    5 211 3.6 -25.8 28.6 0 14.4 379.211 -54.2 49.6 8.334308 -2.198783 0.46718 11.00   5.668

    16 211 5.5 -28.4 28.6 0 -22

    5 212 47.1 -23.8 15.4 0 188.4 466.211 -51.9 21.6 10.2464 -2.105477 0.20345 12.56   7.937

    16 212 49 -28.1 13.8 0 -196

    5 213 22.8 -23.8 15.4 0 91.2 417.611 -51.9 21.6 9.178264 -2.105477 0.20345 11.49   6.869

    16 213 24.7 -28.1 13.8 0 -98.8

    5 214 -59.8 -36.8 61.6 0 -239.2 381.311 -65.6 -407.2 8.380462 -2.661258 -3.83536 14.88   1.884

    16 214 71 -28.8 54.4 0 -284

  • 8/18/2019 Trestle foundations-TR-9 raft

    10/15

    Project 

    ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.

    Doc Title DESIGN OF FOUNDATIONS FOR CONV BCN 30

    5 215 -50.1 -32.4 58.8 0 -200.4 401.311 -65.6 -409.6 8.820022 -2.661258 -3.85796 15.34   2.301

    16 215 81.3 -33.2 57.2 0 -325.2

    5 216 70.9 -27.2 -44 0 283.6 381.711 -66 425.6 8.389253 -2.677485 4.00867 15.08   1.703

    16 216 -59.3 -38.8 -51.2 0 237.2

    5 217 80.6 -31.2 57.6 0 322.4 401.411 -65.6 636 8.82222 -2.661258 5.99039 17.47   0.171

    16 217 -49.3 -34.4 58.8 0 197.2

    5 218 -25.9 -53.2 17.6 0 -103.6 406.511 -110 -317.6 8.934308 -4.462475 -2.99143 16.39   1.4816 218 62.3 -56.8 17.6 0 -249.2

    5 219 -16.1 -49.2 14.8 0 -64.4 405.711 -101.6 -241.6 8.916725 -4.121704 -2.2756 15.31   2.519

    16 219 51.7 -52.4 14.8 0 -206.8

    5 220 40.3 -44.4 12 0 161.2 403.711 -92 212 8.872769 -3.732252 1.9968 14.60   3.144

    16 220 -6.7 -47.6 12 0 26.8

    5 221 50.1 -48.8 14.8 0 200.4 403.411 -100.8 297.2 8.866176 -4.089249 2.79928 15.75   1.978

    16 221 -16.8 -52 14.8 0 67.2

    5 222 56.1 -22 27.6 0 224.4 483.111 -46 52 10.61782 -1.866126 0.48978 12.97   8.262

    16 222 56.9 -24 27.6 0 -227.6

    5 223 -22.3 -22 27.6 0 -89.2 326.311 -46 52 7.17167 -1.866126 0.48978 9.53   4.816

    16 223 -21.5 -24 27.6 0 865 224 32.1 -19.6 11.2 0 128.4 435.111 -43.2 17.2 9.562879 -1.752535 0.162 11.48   7.648

    16 224 32.9 -23.6 9.2 0 -131.6

    5 225 1.7 -19.6 11.2 0 6.8 374.311 -43.2 17.2 8.226615 -1.752535 0.162 10.14   6.312

    16 225 2.5 -23.6 9.2 0 -10

    5 226 -61.5 -36.1 61.1 0 -246 377.811 -64 -407.8 8.303538 -2.596349 -3.84101 14.74   1.866

    16 226 69.2 -27.9 53.9 0 -276.8

    5 227 -51.8 -31.7 58.3 0 -207.2 397.811 -64 -410.2 8.743099 -2.596349 -3.86361 15.20   2.283

    16 227 79.5 -32.3 56.7 0 -318

    5 228 69.2 -26.5 -44.5 0 276.8 378.211 -64.4 425 8.31233 -2.612576 4.00301 14.93   1.697

    16 228 -61.1 -37.9 -51.7 0 244.4

    5 229 78.9 -30.5 57.1 0 315.6 397.911 -64 635.4 8.745297 -2.596349 5.98474 17.33   0.16416 229 -51.1 -33.5 58.3 0 204.4

  • 8/18/2019 Trestle foundations-TR-9 raft

    11/15

    Project 

    ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.

    Doc Title DESIGN OF FOUNDATIONS FOR CONV BCN 30

    5 230 -27.6 -52.5 17.1 0 -110.4 403.011 -108.4 -318.2 8.857385 -4.397566 -2.99708 16.25   1.463

    16 230 60.5 -55.9 17.1 0 -242

    5 231 -17.8 -48.5 14.3 0 -71.2 402.211 -100 -242.2 8.839802 -4.056795 -2.28125 15.18   2.502

    16 231 49.9 -51.5 14.3 0 -199.6

    5 232 38.6 -43.7 11.5 0 154.4 400.211 -90.4 211.4 8.795846 -3.667343 1.99115 14.45   3.137

    16 232 -8.5 -46.7 11.5 0 34

    5 233 48.4 -48.1 14.3 0 193.6 399.911 -99.2 296.6 8.789253 -4.024341 2.79363 15.61   1.97116 233 -18.6 -51.1 14.3 0 74.4

    5 234 54.4 -21.3 27.1 0 217.6 479.611 -44.4 51.4 10.5409 -1.801217 0.48413 12.83   8.256

    16 234 55.1 -23.1 27.1 0 -220.4

    5 235 -24 -21.3 27.1 0 -96 322.811 -44.4 51.4 7.094747 -1.801217 0.48413 9.38   4.809

    16 235 -23.3 -23.1 27.1 0 93.2

    5 236 30.4 -18.9 10.7 0 121.6 431.611 -41.6 16.6 9.485956 -1.687627 0.15635 11.33   7.642

    16 236 31.1 -22.7 8.7 0 -124.4

    5 237 0 -18.9 10.7 0 0 370.811 -41.6 16.6 8.149692 -1.687627 0.15635 9.99   6.306

    16 237 0.7 -22.7 8.7 0 -2.8

  • 8/18/2019 Trestle foundations-TR-9 raft

    12/15

    Project ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.  

    Doc Title  

    3.7.4.2

    FOOTING F8 Refer staad analysis results ( with Invert beam with plate elements)

    DESIGN OF RAFT

    Plate L/C SQX MPa SQY MPa MX MTon-m/ MY MTon-m/MXY MTon-m/m Y

    105 128 -0.465 0.328 11.4 5 -1.4 X

    110 118 -0.509 -0.313 -13.8 -5.2 -1.213 129 -50.8 -34.5 11.6 10.5 2.5

    98 117 -61.3 -44.2 -14 -12.3 -2.5 

    DESIGN OF RAFT

    Conc 25  

    fy 500  

    Details Design

    BM ™

    M/bd2 pt Ast Provided

     Ast

    D d As /bd

    Design of Raft along x

    on earth face 15.0 0.5656 0.134 688 1339.73 600 515 0.003  Y 16 @ 150

    away from e/ f  12.8 0.4826 0.114 585 904.32 600 515 0.002  Y 12 @ 125

     

    Design of Raft along y

    on earth face 14.8 0.558 0.132 679 904.32 600 515 0.002  Y 12 @ 125

    away from e/ f  13.0 0.4901 0.115 594 904.32 600 515 0.002  Y 12 @ 125 

    Shear Design Critical elements  

    plate L/c Tv Ast pt b Tc

    Max. Shear stres   109 106 0.345 1339.733 0.26014 11.158341 0.37

    Shear Check :

    Element No 109 L/c 106

    Shear Stress @ deff ( from Stadd) = 0.345 n/mm2 ( at a dist d from face of pedestal)

    Shear stress for D/d = 0.40 n/mm2

    pt = 0.26 %

    Tc = = 0.37 n/mm2

    Punching Shear  ( Not critical) 0.7 x

    Vu = 129 t  

    b0 = 3302.8 mm 900

    Tv = 0.74 n/mm2

    Tc = 1.25

    Provided reinforcement

     

    FOR TR 9

    DESIGN OF FOUNDATIONS FOR CONV BCN 30

    Hence need not to provide shear reinforcement

    0.7

    Pls remove soil wt applied in staad file since footing is designedfor net pressure.

    Pls consider moment and shear for slab design at face of beam

    and d (depth of slab) away from face of beam respectively. Pls assignmoment and shear groups in staad accordingly.

  • 8/18/2019 Trestle foundations-TR-9 raft

    13/15

    Project ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.  

    Doc Title  DESIGN OF FOUNDATIONS FOR CONV BCN 30

    size (mm) 700 x 900  deff. = 840 min Ast 1235 E/F

    BM on top 67 Mu/bd2 1.356 pt 0.3273  Ast 1925 8-Y20 away from E/f 

    ( refer staad analysis results) BM bottom 78 Mu/bd2 1.579 pt 0.3843  Ast 2260 8-Y20 4-Y12

    SF (t) 35 Tv 0.60 beta 10.57 Tc 0.449 S/F

    Vus/d = 1.021 provide  Y10-2L-150

    beam design

    pls chk

  • 8/18/2019 Trestle foundations-TR-9 raft

    14/15

    Project ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.

    Doc Title

    3.6.2 FOOTING

    FOR TR 9  

    Design of combined Footings

     

    Pedestal & Footing Data

    Height of Pedestal above GL 0.50 m

    Depth of Foundation 4.00 m Z L= 14.00

    Thickness of footing at edge 0.45 m

    Thickness of footing at face of Ped. 0.45 mWidth of footing along X axis 14.00 m 3 8 3.00

    Width of f ooting along Y axis 3.25 m

    Total height of pedestal 4.50 m

    density of conc 2.50 /m3

    soil de 1.80 t/m3 Node=  

           B     =  

    pedestal sizes  

     Alongx Along Z Ht Sw

    0.7 0.7 4.50 5.51

      0.7 0.7 4.50 5.51

             #       #       #

     

    Sw of footing 51.19 t

      t

    soil wt 284.48 t   #       #       #

    Total SW 335.67 t

    Excluding pedestal 335.67 T   #       #       #

     

    Node X,Z Cordinates of Pedestals from the EDGE of Footing

    14.00 x 3.25

    5 X2 = 3.00 Z2 = -1.625

    6 X1 = 11.00 Z1 = -1.6250.4

           3  .       2

           5

    Sw of pedesta l ( Included )

    DESIGN OF FOUNDATIONS FOR CONV BCN 30

     =

  • 8/18/2019 Trestle foundations-TR-9 raft

    15/15

    Project ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.

    Doc Title DESIGN OF FOUNDATIONS FOR CONV BCN 30

    COMBINED FOOTING F5 ( CHECKING OVERTURNING & SLIDING ) Check ForSliding

    FOS =

    Node L/C FX FY FZ Mx Mz Mx =

    Fy * z

    Mz = Fy

    * x

    Total V

    swof

    footing 

    +Soil

    wt 

    SM Mx due

    to SW &

    SOILWT

    SM Mz

    due to

    SW &

    SOILWT

    Mz 

    Over

    turning

    momen

    t ∑ Mx

    Total

    Stabilizin

    g

    moment

    FOS(>1.4) Over

    turnin

    g

    mom

    ent ∑

    Mz

    Total

    Stabili

    zing

    mome

    nt

    FOS(>1.4) 

    V/Hmax(>

    1.4)

    5 226 -15.3 -61.5 -9 -36.1 61.1 99.94 -184.5 343.37 -545.46 2349.7 64.001 557.98 8.72 115 2926.4 25.45 4.77

    16 226 -13.5 69.2 -7 -27.9 53.9 -112.5 761.2

    5 227 -14.6 -51.8 -7.9 -31.7 58.3 84.18 -155.4 363.37 -545.46 2349.7 64 590.48 9.23 115 3068.8 26.69 5.05

    16 227 -14.2 79.5 -8.1 -32.3 56.7 -129.2 874.5

    5 228 11.1 69.2 -6.6 -26.5 -44.5 -112.5 207.6 343.77 -545.46 2349.7 64.41 558.63 8.67 96.21 1885.2 19.60 5.73

    16 228 12.9 -61.1 -9.5 -37.9 -51.7 99.29 -672.1

    5 229 -14.3 78.9 -7.6 -30.5 57.1 -128.2 236.7 363.47 -545.46 2349.7 64.01 590.64 9.23 115.4 2024.3 17.54 5.03

    16 229 -14.6 -51.1 -8.4 -33.5 58.3 83.04 -562.1

    5 230 -4.3 -27.6 -13.1 -52.5 17.1 44.85 -82.8 368.57 -545.46 2349.7 108.41 598.93 5.53 34.21 2932.4 85.72 5.44

    16 230 -4.3 60.5 -14 -55.9 17.1 -98.31 665.5

    5 231 -3.6 -17.8 -12.1 -48.5 14.3 28.93 -53.4 367.77 -545.46 2349.7 100.01 597.63 5.98 28.61 2845.2 99.45 5.88

    16 231 -3.6 49.9 -12.9 -51.5 14.3 -81.09 548.9

    5 232 -2.9 38.6 -10.9 -43.7 11.5 -62.73 115.8 365.77 -545.46 2349.7 90.41 594.38 6.57 23.01 2372 103.09 6.47

    16 232 -2.9 -8.5 -11.7 -46.7 11.5 13.81 -93.5

    5 233 -3.6 48.4 -12 -48.1 14.3 -78.65 145.2 365.47 -545.46 2349.7 99.21 593.89 5.99 28.61 2290.3 80.05 5.89

    16 233 -3.6 -18.6 -12.8 -51.1 14.3 30.23 -204.6

    5 234 -6.79 54.4 -5.3 -21.3 27.11 -88.4 163.2 445.17 -545.46 2349.7 44.41 723.40 16.29 54.22 3119 57.53 13.10

    16 234 -6.8 55.1 -5.8 -23.1 27.1 -89.54 606.1

    5 235 -6.799 -24 -5.3 -21.3 27.1 39 -72 288.37 -545.46 2349.7 44.41 468.60 10.55 54.21 2021.4 37.29 8.48

    16 235 -6.8 -23.3 -5.8 -23.1 27.1 37.86 -256.3

    5 236 -2.699 30.4 -4.7 -18.9 10.7 -49.4 91.2 397.17 -545.46 2349.7 41.61 645.40 15.51 19.41 2783 143.38 15.28

    16 236 -2.2 31.1 -5.7 -22.7 8.7 -50.54 342.1

    5 237 -2.699 0 -4.7 -18.9 10.7 0 0 335.67 -545.46 2349.7 18.91 545.46 28.85 10.71 2349.7 219.39 28.57

    0 0 0 0 0 0 0 0 0

    Check For Overturning, FOS = SO/OM

    Stabilizing

    Moment due

    to Vert load

     Along X Along Z