trestle foundations-tr-9 raft
TRANSCRIPT
-
8/18/2019 Trestle foundations-TR-9 raft
1/15
Project
Doc Title
ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT
STAGE-I & II, WARANGAL.
GENERAL DATA
DESIGN OF FOUNDATIONS FOR CONV BCN 31
-
8/18/2019 Trestle foundations-TR-9 raft
2/15
Project
R KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.
Doc Title
For Footing design: Reactions from TR9f-frameStd
Horizontal Vertical Horizontal Moment
Node L/C Force-X Mto Force-Y Mton Force-Z Mt Momen Moment-Moment-Z MTon-m
5 201 -3 39.5 -3.9 -15.6 0 12
202 -13.9 -26.4 -9.4 -37.6 0 55.8
203 -13.4 -18.6 -8.5 -34.1 0 53.5
204 7.2 78.2 -7.5 -29.9 0 -29
205 -13.1 85.9 -8.3 -33.1 0 52.6
206 -5.1 0.7 -12.7 -50.7 0 20.6
207 -4.6 8.6 -11.9 -47.5 0 18.3208 -4 53.7 -10.9 -43.7 0 16.1
209 -4.6 61.5 -11.8 -47.2 0 18.3
210 -7.1 66.3 -6.4 -25.8 0 28.6
211 -7.1 3.6 -6.4 -25.8 0 28.6
212 -3.9 47.1 -6 -23.8 0 15.4
213 -3.9 22.8 -6 -23.8 0 15.4
214 -15.4 -59.8 -9.2 -36.8 0 61.6
215 -14.7 -50.1 -8.1 -32.4 0 58.8216 11 70.9 -6.8 -27.2 0 -44
217 -14.4 80.6 -7.8 -31.2 0 57.6
218 -4.4 -25.9 -13.3 -53.2 0 17.6
219 -3.7 -16.1 -12.3 -49.2 0 14.8
220 -3 40.3 -11.1 -44.4 0 12
221 -3.7 50.1 -12.2 -48.8 0 14.8
222 -6.9 56.1 -5.5 -22 0 27.6
223 -6.9 -22.3 -5.5 -22 0 27.6
224 2 8 32 1 4 9 19 6 0 11 2
DESIGN OF FOUNDATIONS FOR CONV BCN 30
-
8/18/2019 Trestle foundations-TR-9 raft
3/15
Project
R KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.
Doc Title DESIGN OF FOUNDATIONS FOR CONV BCN 30
219 -3.7 51.7 -13.1 -52.4 0 14.8
220 -3 -6.7 -11.9 -47.6 0 12
221 -3.7 -16.8 -13 -52 0 14.8
222 -6.9 56.9 -6 -24 0 27.6
223 -6.9 -21.5 -6 -24 0 27.6
224 -2.3 32.9 -5.9 -23.6 0 9.2
225 -2.3 2.5 -5.9 -23.6 0 9.2
226 -13.5 69.2 -7 -27.9 0 53.9
227 -14.2 79.5 -8.1 -32.3 0 56.7
228 12.9 -61.1 -9.5 -37.9 0 -52
229 -14.6 -51.1 -8.4 -33.5 0 58.3
230 -4.3 60.5 -14 -55.9 0 17.1231 -3.6 49.9 -12.9 -51.5 0 14.3
232 -2.9 -8.5 -11.7 -46.7 0 11.5
233 -3.6 -18.6 -12.8 -51.1 0 14.3
234 -6.8 55.1 -5.8 -23.1 0 27.1
235 -6.8 -23.3 -5.8 -23.1 0 27.1
236 -2.2 31.1 -5.7 -22.7 0 8.7
237 -2.2 0.7 -5.7 -22.7 0 8.7
These reactions are considered F9
-
8/18/2019 Trestle foundations-TR-9 raft
4/15
Project
ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.
Doc Title
3.7.4.1 COMBINED FOOTING F8 for TR9
Y
Pedestal & Footing Data X
Height of Pedestal above GL 0.50 m
Depth of Foundation 4.00 m Z L= 14.00
Thickness of footing at edge 0.45 m
Thickness of footing at face of Ped. 0.45 m
Width of footing along X axis 14.00 m 3 8 3.000
Width of footing along Y axis 3.25 m
Total height of pedestal 4.50 m
density of conc 2.50 t/m3
soil den 1.80 /m3 Node= 5 6
B
Pedestal sizes
Alongx Along Z Ht Sw
5 0.7 0.7 4.50 5.51
16 0.7 0.7 4.50 5.51
11.03 t
F.G.L.
Sw of footing 51.19 tSoil weight between GL&FFL 32.76 t
soil wt 284.48 t
Total SW 368.43 t
Excluding pedestal 368.43 T
Allowable bearing pressure = 22 t/m2
LOAD
COMBINATIONS
CO MBINAT IONS Pmax Net SBC Pmin Al lOWABLE
BEARING
CAPACITY
DL+LL 201
11.41 4.21 8.35 22.1
DL+WL/SL 214 to 225 17.44 10.24 0.13 22.1
226 to 237
DL+LL+WL/SL 202 to213 17.32 10.12 1.92 27.625
Node X,Z Cordinates of Pedestals from the CG of Footing
5 X1 = 4 Z1 = 0
6 X2 = -4 Z2 = 0
Area = 14.00*3.25 45.5 m2
Zx = ROUND(+14.00*3.25^2/6,2) = 24.65 m3
Zz = ROUND(+14.00^2*3.25/6,2) = 106.17 m3
DESIGN OF FOUNDATIONS FOR CONV BCN 30
3 . 2
5
pls maintain same foundinglevel as existing foundationas per desein comments(3m)
pls restrict to 3m
15 m
pls consider pedestal wt also, either in staad or in sheet
-
8/18/2019 Trestle foundations-TR-9 raft
5/15
Project
ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.
Doc Title DESIGN OF FOUNDATIONS FOR CONV BCN 30
Addl Mom due to Eccn Max /Min ax /Min
Node L/C Fy Mx Mz Mx = Fy * z Mz = Fy * x Total V Total Mx Total Mz P/A MX/ZX MZ/ZZ BR Pr BR Pr
5 201 39.5 -15.6 12 0 158 449.5303 -34 15.6 9.879787 -1.37931 0.14693 11.41 8.354
16 201 41.6 -18.4 12 0 -166.4
5 202 -26.4 -37.6 55.8 0 -105.6 421.5303 -69.8 -317.8 9.264402 -2.831643 -2.99331 15.09 3.439
16 202 79.5 -32.2 50 0 -318
5 203 -18.6 -34.1 53.5 0 -74.4 437.5303 -69.9 -319.5 9.616051 -2.8357 -3.00932 15.46 3.771
16 203 87.7 -35.8 52.2 0 -350.8
5 204 78.2 -29.9 -28.7 0 312.8 421.8303 -70.1 348.8 9.270996 -2.843813 3.2853 15.40 3.142
16 204 -24.8 -40.2 -34.5 0 99.2
5 205 85.9 -33.1 52.6 0 343.6 437.5303 -69.8 516.9 9.616051 -2.831643 4.86861 17.32 1.916
16 205 -16.8 -36.7 53.5 0 67.2
5 206 0.7 -50.7 20.6 0 2.8 441.6303 -105.3 -246 9.70616 -4.271805 -2.31704 16.30 3.117
16 206 72.5 -54.6 20.6 0 -290
5 207 8.6 -47.5 18.3 0 34.4 441.0303 -98.6 -185 9.692974 -4 -1.74249 15.44 3.95
16 207 64 -51.1 18.3 0 -256
5 208 53.7 -43.7 16.1 0 214.8 439.4303 -91 177.8 9.657809 -3.691684 1.67467 15.02 4.291
16 208 17.3 -47.3 16.1 0 -69.2
5 209 61.5 -47.2 18.3 0 246 439.1303 -98 245.8 9.651215 -3.975659 2.31515 15.94 3.36
16 209 9.2 -50.8 18.3 0 -36.8
5 210 66.3 -25.8 28.6 0 265.2 502.9303 -54.2 49.6 11.05341 -2.198783 0.46718 13.72 8.387
16 210 68.2 -28.4 28.6 0 -272.8
5 211 3.6 -25.8 28.6 0 14.4 377.5303 -54.2 49.6 8.297369 -2.198783 0.46718 10.96 5.631
16 211 5.5 -28.4 28.6 0 -22
5 212 47.1 -23.8 15.4 0 188.4 464.5303 -51.9 21.6 10.20946 -2.105477 0.20345 12.52 7.901
16 212 49 -28.1 13.8 0 -196
5 213 22.8 -23.8 15.4 0 91.2 415.9303 -51.9 21.6 9.141325 -2.105477 0.20345 11.45 6.832
16 213 24.7 -28.1 13.8 0 -98.8
5 214 -59.8 -36.8 61.6 0 -239.2 379.6303 -65.6 -407.2 8.343523 -2.661258 -3.83536 14.84 1.847
16 214 71 -28.8 54.4 0 -284
-
8/18/2019 Trestle foundations-TR-9 raft
6/15
Project
ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.
Doc Title DESIGN OF FOUNDATIONS FOR CONV BCN 30
5 215 -50.1 -32.4 58.8 0 -200.4 399.6303 -65.6 -409.6 8.783084 -2.661258 -3.85796 15.30 2.264
16 215 81.3 -33.2 57.2 0 -325.2
5 216 70.9 -27.2 -44 0 283.6 380.0303 -66 425.6 8.352314 -2.677485 4.00867 15.04 1.666
16 216 -59.3 -38.8 -51.2 0 237.2
5 217 80.6 -31.2 57.6 0 322.4 399.7303 -65.6 636 8.785281 -2.661258 5.99039 17.44 0.134
16 217 -49.3 -34.4 58.8 0 197.2
5 218 -25.9 -53.2 17.6 0 -103.6 404.8303 -110 -317.6 8.897369 -4.462475 -2.99143 16.35 1.44316 218 62.3 -56.8 17.6 0 -249.2
5 219 -16.1 -49.2 14.8 0 -64.4 404.0303 -101.6 -241.6 8.879787 -4.121704 -2.2756 15.28 2.482
16 219 51.7 -52.4 14.8 0 -206.8
5 220 40.3 -44.4 12 0 161.2 402.0303 -92 212 8.835831 -3.732252 1.9968 14.56 3.107
16 220 -6.7 -47.6 12 0 26.8
5 221 50.1 -48.8 14.8 0 200.4 401.7303 -100.8 297.2 8.829237 -4.089249 2.79928 15.72 1.941
16 221 -16.8 -52 14.8 0 67.2
5 222 56.1 -22 27.6 0 224.4 481.4303 -46 52 10.58089 -1.866126 0.48978 12.94 8.225
16 222 56.9 -24 27.6 0 -227.6
5 223 -22.3 -22 27.6 0 -89.2 324.6303 -46 52 7.134732 -1.866126 0.48978 9 .49 4.779
16 223 -21.5 -24 27.6 0 865 224 32.1 -19.6 11.2 0 128.4 433.4303 -43.2 17.2 9.525941 -1.752535 0.162 11.44 7.611
16 224 32.9 -23.6 9.2 0 -131.6
5 225 1.7 -19.6 11.2 0 6.8 372.6303 -43.2 17.2 8.189677 -1.752535 0.162 10.10 6.275
16 225 2.5 -23.6 9.2 0 -10
5 226 -61.5 -36.1 61.1 0 -246 376.1303 -64 -407.8 8.2666 -2.596349 -3.84101 14.70 1.829
16 226 69.2 -27.9 53.9 0 -276.8
5 227 -51.8 -31.7 58.3 0 -207.2 396.1303 -64 -410.2 8.70616 -2.596349 -3.86361 15.17 2.246
16 227 79.5 -32.3 56.7 0 -318
5 228 69.2 -26.5 -44.5 0 276.8 376.5303 -64.4 425 8.275391 -2.612576 4.00301 14.89 1.66
16 228 -61.1 -37.9 -51.7 0 244.4
5 229 78.9 -30.5 57.1 0 315.6 396.2303 -64 635.4 8.708358 -2.596349 5.98474 17.29 0.12716 229 -51.1 -33.5 58.3 0 204.4
-
8/18/2019 Trestle foundations-TR-9 raft
7/15
Project
ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.
Doc Title DESIGN OF FOUNDATIONS FOR CONV BCN 30
5 230 -27.6 -52.5 17.1 0 -110.4 401.3303 -108.4 -318.2 8.820446 -4.397566 -2.99708 16.22 1.426
16 230 60.5 -55.9 17.1 0 -242
5 231 -17.8 -48.5 14.3 0 -71.2 400.5303 -100 -242.2 8.802864 -4.056795 -2.28125 15.14 2.465
16 231 49.9 -51.5 14.3 0 -199.6
5 232 38.6 -43.7 11.5 0 154.4 398.5303 -90.4 211.4 8.758908 -3.667343 1.99115 14.42 3.1
16 232 -8.5 -46.7 11.5 0 34
5 233 48.4 -48.1 14.3 0 193.6 398.2303 -99.2 296.6 8.752314 -4.024341 2.79363 15.57 1.93416 233 -18.6 -51.1 14.3 0 74.4
5 234 54.4 -21.3 27.1 0 217.6 477.9303 -44.4 51.4 10.50396 -1.801217 0.48413 12.79 8.219
16 234 55.1 -23.1 27.1 0 -220.4
5 235 -24 -21.3 27.1 0 -96 321.1303 -44.4 51.4 7.057809 -1.801217 0.48413 9.34 4.772
16 235 -23.3 -23.1 27.1 0 93.2
5 236 30.4 -18.9 10.7 0 121.6 429.9303 -41.6 16.6 9.449018 -1.687627 0.15635 11.29 7.605
16 236 31.1 -22.7 8.7 0 -124.4
5 237 0 -18.9 10.7 0 0 369.1303 -41.6 16.6 8.112754 -1.687627 0.15635 9.96 6.269
16 237 0.7 -22.7 8.7 0 -2.8
-
8/18/2019 Trestle foundations-TR-9 raft
8/15
Project
ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.
Doc Title
3.7.4.1
Y
Pedestal & Footing Data X
Height of Pedestal above GL 0.50 m
Depth of Foundation 4.00 m Z L= 14.00
Thickness of footing at edge 0.50 m
Thickness of footing at face of Ped. 0.50 m
Width of footing along X axis 14.00 m 3 8 3.000
Width of footing along Y axis 3.25 m
Total height of pedestal 4.50 m
density of conc 2.50 t/m3
soil den 1.80 /m3 Node= 5 6
B
Pedestal sizes
Alongx Along Z Ht Sw
5 0.7 0.7 4.50 5.51
16 0.7 0.7 4.50 5.51
11.03 t
F.G.L.
Sw of footing 56.88 tSoil weight between GL&FFL 32.76 t
soil wt 280.48 t
Total SW 370.11 t
Excluding pedestal 370.11 T
Allowable bearing pressure = 22 t/m2
LOAD
COMBINATIONS
CO MBINAT IONS Pmax Net SBC Pmin Al lOWABLE
BEARING
CAPACITY
DL+LL 201
11.44 4.24 8.39 22.1
DL+WL/SL 214 to 225 17.47 10.27 0.16 22.1
226 to 237
DL+LL+WL/SL 202 to213 17.35 10.15 1.95 27.625
Node X,Z Cordinates of Pedestals from the CG of Footing
5 X1 = 4 Z1 = 0
6 X2 = -4 Z2 = 0
Area = 14.00*3.25 45.5 m2
Zx = ROUND(+14.00*3.25^2/6,2) = 24.65 m3
Zz = ROUND(+14.00^2*3.25/6,2) = 106.17 m3
DESIGN OF FOUNDATIONS FOR CONV BCN 30
3 . 2
5
-
8/18/2019 Trestle foundations-TR-9 raft
9/15
Project
ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.
Doc Title DESIGN OF FOUNDATIONS FOR CONV BCN 30
Addl Mom due to Eccn Max /Min ax /Min
Node L/C Fy Mx Mz Mx = Fy * z Mz = Fy * x Total V Total Mx Total Mz P/A MX/ZX MZ/ZZ BR Pr BR Pr
5 201 39.5 -15.6 12 0 158 451.211 -34 15.6 9.916725 -1.37931 0.14693 11.44 8.39
16 201 41.6 -18.4 12 0 -166.4
5 202 -26.4 -37.6 55.8 0 -105.6 423.211 -69.8 -317.8 9.301341 -2.831643 -2.99331 15.13 3.476
16 202 79.5 -32.2 50 0 -318
5 203 -18.6 -34.1 53.5 0 -74.4 439.211 -69.9 -319.5 9.652989 -2.8357 -3.00932 15.50 3.808
16 203 87.7 -35.8 52.2 0 -350.8
5 204 78.2 -29.9 -28.7 0 312.8 423.511 -70.1 348.8 9.307934 -2.843813 3.2853 15.44 3.179
16 204 -24.8 -40.2 -34.5 0 99.2
5 205 85.9 -33.1 52.6 0 343.6 439.211 -69.8 516.9 9.652989 -2.831643 4.86861 17.35 1.953
16 205 -16.8 -36.7 53.5 0 67.2
5 206 0.7 -50.7 20.6 0 2.8 443.311 -105.3 -246 9.743099 -4.271805 -2.31704 16.33 3.154
16 206 72.5 -54.6 20.6 0 -290
5 207 8.6 -47.5 18.3 0 34.4 442.711 -98.6 -185 9.729912 -4 -1.74249 15.47 3.987
16 207 64 -51.1 18.3 0 -256
5 208 53.7 -43.7 16.1 0 214.8 441.111 -91 177.8 9.694747 -3.691684 1.67467 15.06 4.328
16 208 17.3 -47.3 16.1 0 -69.2
5 209 61.5 -47.2 18.3 0 246 440.811 -98 245.8 9.688154 -3.975659 2.31515 15.98 3.397
16 209 9.2 -50.8 18.3 0 -36.8
5 210 66.3 -25.8 28.6 0 265.2 504.611 -54.2 49.6 11.09035 -2.198783 0.46718 13.76 8.424
16 210 68.2 -28.4 28.6 0 -272.8
5 211 3.6 -25.8 28.6 0 14.4 379.211 -54.2 49.6 8.334308 -2.198783 0.46718 11.00 5.668
16 211 5.5 -28.4 28.6 0 -22
5 212 47.1 -23.8 15.4 0 188.4 466.211 -51.9 21.6 10.2464 -2.105477 0.20345 12.56 7.937
16 212 49 -28.1 13.8 0 -196
5 213 22.8 -23.8 15.4 0 91.2 417.611 -51.9 21.6 9.178264 -2.105477 0.20345 11.49 6.869
16 213 24.7 -28.1 13.8 0 -98.8
5 214 -59.8 -36.8 61.6 0 -239.2 381.311 -65.6 -407.2 8.380462 -2.661258 -3.83536 14.88 1.884
16 214 71 -28.8 54.4 0 -284
-
8/18/2019 Trestle foundations-TR-9 raft
10/15
Project
ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.
Doc Title DESIGN OF FOUNDATIONS FOR CONV BCN 30
5 215 -50.1 -32.4 58.8 0 -200.4 401.311 -65.6 -409.6 8.820022 -2.661258 -3.85796 15.34 2.301
16 215 81.3 -33.2 57.2 0 -325.2
5 216 70.9 -27.2 -44 0 283.6 381.711 -66 425.6 8.389253 -2.677485 4.00867 15.08 1.703
16 216 -59.3 -38.8 -51.2 0 237.2
5 217 80.6 -31.2 57.6 0 322.4 401.411 -65.6 636 8.82222 -2.661258 5.99039 17.47 0.171
16 217 -49.3 -34.4 58.8 0 197.2
5 218 -25.9 -53.2 17.6 0 -103.6 406.511 -110 -317.6 8.934308 -4.462475 -2.99143 16.39 1.4816 218 62.3 -56.8 17.6 0 -249.2
5 219 -16.1 -49.2 14.8 0 -64.4 405.711 -101.6 -241.6 8.916725 -4.121704 -2.2756 15.31 2.519
16 219 51.7 -52.4 14.8 0 -206.8
5 220 40.3 -44.4 12 0 161.2 403.711 -92 212 8.872769 -3.732252 1.9968 14.60 3.144
16 220 -6.7 -47.6 12 0 26.8
5 221 50.1 -48.8 14.8 0 200.4 403.411 -100.8 297.2 8.866176 -4.089249 2.79928 15.75 1.978
16 221 -16.8 -52 14.8 0 67.2
5 222 56.1 -22 27.6 0 224.4 483.111 -46 52 10.61782 -1.866126 0.48978 12.97 8.262
16 222 56.9 -24 27.6 0 -227.6
5 223 -22.3 -22 27.6 0 -89.2 326.311 -46 52 7.17167 -1.866126 0.48978 9.53 4.816
16 223 -21.5 -24 27.6 0 865 224 32.1 -19.6 11.2 0 128.4 435.111 -43.2 17.2 9.562879 -1.752535 0.162 11.48 7.648
16 224 32.9 -23.6 9.2 0 -131.6
5 225 1.7 -19.6 11.2 0 6.8 374.311 -43.2 17.2 8.226615 -1.752535 0.162 10.14 6.312
16 225 2.5 -23.6 9.2 0 -10
5 226 -61.5 -36.1 61.1 0 -246 377.811 -64 -407.8 8.303538 -2.596349 -3.84101 14.74 1.866
16 226 69.2 -27.9 53.9 0 -276.8
5 227 -51.8 -31.7 58.3 0 -207.2 397.811 -64 -410.2 8.743099 -2.596349 -3.86361 15.20 2.283
16 227 79.5 -32.3 56.7 0 -318
5 228 69.2 -26.5 -44.5 0 276.8 378.211 -64.4 425 8.31233 -2.612576 4.00301 14.93 1.697
16 228 -61.1 -37.9 -51.7 0 244.4
5 229 78.9 -30.5 57.1 0 315.6 397.911 -64 635.4 8.745297 -2.596349 5.98474 17.33 0.16416 229 -51.1 -33.5 58.3 0 204.4
-
8/18/2019 Trestle foundations-TR-9 raft
11/15
Project
ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.
Doc Title DESIGN OF FOUNDATIONS FOR CONV BCN 30
5 230 -27.6 -52.5 17.1 0 -110.4 403.011 -108.4 -318.2 8.857385 -4.397566 -2.99708 16.25 1.463
16 230 60.5 -55.9 17.1 0 -242
5 231 -17.8 -48.5 14.3 0 -71.2 402.211 -100 -242.2 8.839802 -4.056795 -2.28125 15.18 2.502
16 231 49.9 -51.5 14.3 0 -199.6
5 232 38.6 -43.7 11.5 0 154.4 400.211 -90.4 211.4 8.795846 -3.667343 1.99115 14.45 3.137
16 232 -8.5 -46.7 11.5 0 34
5 233 48.4 -48.1 14.3 0 193.6 399.911 -99.2 296.6 8.789253 -4.024341 2.79363 15.61 1.97116 233 -18.6 -51.1 14.3 0 74.4
5 234 54.4 -21.3 27.1 0 217.6 479.611 -44.4 51.4 10.5409 -1.801217 0.48413 12.83 8.256
16 234 55.1 -23.1 27.1 0 -220.4
5 235 -24 -21.3 27.1 0 -96 322.811 -44.4 51.4 7.094747 -1.801217 0.48413 9.38 4.809
16 235 -23.3 -23.1 27.1 0 93.2
5 236 30.4 -18.9 10.7 0 121.6 431.611 -41.6 16.6 9.485956 -1.687627 0.15635 11.33 7.642
16 236 31.1 -22.7 8.7 0 -124.4
5 237 0 -18.9 10.7 0 0 370.811 -41.6 16.6 8.149692 -1.687627 0.15635 9.99 6.306
16 237 0.7 -22.7 8.7 0 -2.8
-
8/18/2019 Trestle foundations-TR-9 raft
12/15
Project ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.
Doc Title
3.7.4.2
FOOTING F8 Refer staad analysis results ( with Invert beam with plate elements)
DESIGN OF RAFT
Plate L/C SQX MPa SQY MPa MX MTon-m/ MY MTon-m/MXY MTon-m/m Y
105 128 -0.465 0.328 11.4 5 -1.4 X
110 118 -0.509 -0.313 -13.8 -5.2 -1.213 129 -50.8 -34.5 11.6 10.5 2.5
98 117 -61.3 -44.2 -14 -12.3 -2.5
DESIGN OF RAFT
Conc 25
fy 500
Details Design
BM ™
M/bd2 pt Ast Provided
Ast
D d As /bd
Design of Raft along x
on earth face 15.0 0.5656 0.134 688 1339.73 600 515 0.003 Y 16 @ 150
away from e/ f 12.8 0.4826 0.114 585 904.32 600 515 0.002 Y 12 @ 125
Design of Raft along y
on earth face 14.8 0.558 0.132 679 904.32 600 515 0.002 Y 12 @ 125
away from e/ f 13.0 0.4901 0.115 594 904.32 600 515 0.002 Y 12 @ 125
Shear Design Critical elements
plate L/c Tv Ast pt b Tc
Max. Shear stres 109 106 0.345 1339.733 0.26014 11.158341 0.37
Shear Check :
Element No 109 L/c 106
Shear Stress @ deff ( from Stadd) = 0.345 n/mm2 ( at a dist d from face of pedestal)
Shear stress for D/d = 0.40 n/mm2
pt = 0.26 %
Tc = = 0.37 n/mm2
Punching Shear ( Not critical) 0.7 x
Vu = 129 t
b0 = 3302.8 mm 900
Tv = 0.74 n/mm2
Tc = 1.25
Provided reinforcement
FOR TR 9
DESIGN OF FOUNDATIONS FOR CONV BCN 30
Hence need not to provide shear reinforcement
0.7
Pls remove soil wt applied in staad file since footing is designedfor net pressure.
Pls consider moment and shear for slab design at face of beam
and d (depth of slab) away from face of beam respectively. Pls assignmoment and shear groups in staad accordingly.
-
8/18/2019 Trestle foundations-TR-9 raft
13/15
Project ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.
Doc Title DESIGN OF FOUNDATIONS FOR CONV BCN 30
size (mm) 700 x 900 deff. = 840 min Ast 1235 E/F
BM on top 67 Mu/bd2 1.356 pt 0.3273 Ast 1925 8-Y20 away from E/f
( refer staad analysis results) BM bottom 78 Mu/bd2 1.579 pt 0.3843 Ast 2260 8-Y20 4-Y12
SF (t) 35 Tv 0.60 beta 10.57 Tc 0.449 S/F
Vus/d = 1.021 provide Y10-2L-150
beam design
pls chk
-
8/18/2019 Trestle foundations-TR-9 raft
14/15
Project ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.
Doc Title
3.6.2 FOOTING
FOR TR 9
Design of combined Footings
Pedestal & Footing Data
Height of Pedestal above GL 0.50 m
Depth of Foundation 4.00 m Z L= 14.00
Thickness of footing at edge 0.45 m
Thickness of footing at face of Ped. 0.45 mWidth of footing along X axis 14.00 m 3 8 3.00
Width of f ooting along Y axis 3.25 m
Total height of pedestal 4.50 m
density of conc 2.50 /m3
soil de 1.80 t/m3 Node=
B =
pedestal sizes
Alongx Along Z Ht Sw
0.7 0.7 4.50 5.51
0.7 0.7 4.50 5.51
# # #
Sw of footing 51.19 t
t
soil wt 284.48 t # # #
Total SW 335.67 t
Excluding pedestal 335.67 T # # #
Node X,Z Cordinates of Pedestals from the EDGE of Footing
14.00 x 3.25
5 X2 = 3.00 Z2 = -1.625
6 X1 = 11.00 Z1 = -1.6250.4
3 . 2
5
Sw of pedesta l ( Included )
DESIGN OF FOUNDATIONS FOR CONV BCN 30
=
-
8/18/2019 Trestle foundations-TR-9 raft
15/15
Project ADITIONAL COAL HANDLING PLANT FOR KAKATIYA THERMAL POWER PROJECT STAGE-I & II, WARANGAL.
Doc Title DESIGN OF FOUNDATIONS FOR CONV BCN 30
COMBINED FOOTING F5 ( CHECKING OVERTURNING & SLIDING ) Check ForSliding
FOS =
Node L/C FX FY FZ Mx Mz Mx =
Fy * z
Mz = Fy
* x
Total V
swof
footing
+Soil
wt
SM Mx due
to SW &
SOILWT
SM Mz
due to
SW &
SOILWT
Mz
Over
turning
momen
t ∑ Mx
Total
Stabilizin
g
moment
FOS(>1.4) Over
turnin
g
mom
ent ∑
Mz
Total
Stabili
zing
mome
nt
FOS(>1.4)
V/Hmax(>
1.4)
5 226 -15.3 -61.5 -9 -36.1 61.1 99.94 -184.5 343.37 -545.46 2349.7 64.001 557.98 8.72 115 2926.4 25.45 4.77
16 226 -13.5 69.2 -7 -27.9 53.9 -112.5 761.2
5 227 -14.6 -51.8 -7.9 -31.7 58.3 84.18 -155.4 363.37 -545.46 2349.7 64 590.48 9.23 115 3068.8 26.69 5.05
16 227 -14.2 79.5 -8.1 -32.3 56.7 -129.2 874.5
5 228 11.1 69.2 -6.6 -26.5 -44.5 -112.5 207.6 343.77 -545.46 2349.7 64.41 558.63 8.67 96.21 1885.2 19.60 5.73
16 228 12.9 -61.1 -9.5 -37.9 -51.7 99.29 -672.1
5 229 -14.3 78.9 -7.6 -30.5 57.1 -128.2 236.7 363.47 -545.46 2349.7 64.01 590.64 9.23 115.4 2024.3 17.54 5.03
16 229 -14.6 -51.1 -8.4 -33.5 58.3 83.04 -562.1
5 230 -4.3 -27.6 -13.1 -52.5 17.1 44.85 -82.8 368.57 -545.46 2349.7 108.41 598.93 5.53 34.21 2932.4 85.72 5.44
16 230 -4.3 60.5 -14 -55.9 17.1 -98.31 665.5
5 231 -3.6 -17.8 -12.1 -48.5 14.3 28.93 -53.4 367.77 -545.46 2349.7 100.01 597.63 5.98 28.61 2845.2 99.45 5.88
16 231 -3.6 49.9 -12.9 -51.5 14.3 -81.09 548.9
5 232 -2.9 38.6 -10.9 -43.7 11.5 -62.73 115.8 365.77 -545.46 2349.7 90.41 594.38 6.57 23.01 2372 103.09 6.47
16 232 -2.9 -8.5 -11.7 -46.7 11.5 13.81 -93.5
5 233 -3.6 48.4 -12 -48.1 14.3 -78.65 145.2 365.47 -545.46 2349.7 99.21 593.89 5.99 28.61 2290.3 80.05 5.89
16 233 -3.6 -18.6 -12.8 -51.1 14.3 30.23 -204.6
5 234 -6.79 54.4 -5.3 -21.3 27.11 -88.4 163.2 445.17 -545.46 2349.7 44.41 723.40 16.29 54.22 3119 57.53 13.10
16 234 -6.8 55.1 -5.8 -23.1 27.1 -89.54 606.1
5 235 -6.799 -24 -5.3 -21.3 27.1 39 -72 288.37 -545.46 2349.7 44.41 468.60 10.55 54.21 2021.4 37.29 8.48
16 235 -6.8 -23.3 -5.8 -23.1 27.1 37.86 -256.3
5 236 -2.699 30.4 -4.7 -18.9 10.7 -49.4 91.2 397.17 -545.46 2349.7 41.61 645.40 15.51 19.41 2783 143.38 15.28
16 236 -2.2 31.1 -5.7 -22.7 8.7 -50.54 342.1
5 237 -2.699 0 -4.7 -18.9 10.7 0 0 335.67 -545.46 2349.7 18.91 545.46 28.85 10.71 2349.7 219.39 28.57
0 0 0 0 0 0 0 0 0
Check For Overturning, FOS = SO/OM
Stabilizing
Moment due
to Vert load
Along X Along Z