Transportation Construction Market Update Alison Premo Black, PhD ARTBA Senior VP & Chief Economist September 25, 2018 Pennsylvania Highway Information Association Transportation Conference © 2018 ARTBA. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, without prior written permission of ARTBA. 1

Upload: others

Post on 10-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Transportation Construction Market Updatepahighwayinfo.org/PHIACONFERENCE/wp-content/... · Transportation Construction Market. Update. Alison Premo Black, PhD. ARTBA Senior VP &

Transportation Construction Market

UpdateAlison Premo Black, PhD

ARTBA Senior VP & Chief Economist

September 25, 2018Pennsylvania Highway Information

AssociationTransportation Conference

© 2018 ARTBA. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, without prior written permission of ARTBA.

1

Page 2: Transportation Construction Market Updatepahighwayinfo.org/PHIACONFERENCE/wp-content/... · Transportation Construction Market. Update. Alison Premo Black, PhD. ARTBA Senior VP &

Source: ARTBA analysis of Census Bureau’s U.S. Value of Construction Put in Place, adjusted for project costs. © 2018 ARTBA. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission of ARTBA.

Real Value of U.S. Highway & Street Construction Work – Rolling 12-month Totals

$70.5 (Dec 2009)

$53.9 (Nov 2013)

$60.3(July 2018)

$40

$45

$50

$55

$60

$65

$70

$75

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Billi

ons o

f 201

8$

Decreases in 2018:-5% from July 2017,-15% from 2009 peak

Real Market Decline: -24% peak to trough

2

Page 3: Transportation Construction Market Updatepahighwayinfo.org/PHIACONFERENCE/wp-content/... · Transportation Construction Market. Update. Alison Premo Black, PhD. ARTBA Senior VP &

Source: ARTBA analysis of Census Bureau’s U.S. Value of Construction Put in Place, adjusted for project costs. © 2018 ARTBA. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission of ARTBA.

Real Value of U.S. Bridge Construction Work – Rolling 12-month Totals

$31.9

$20

$22

$24

$26

$28

$30

$32

$34

$36

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Billi

ons o

f 201

7$

Small Contraction in 2018:-1% from July 2017

3

Page 4: Transportation Construction Market Updatepahighwayinfo.org/PHIACONFERENCE/wp-content/... · Transportation Construction Market. Update. Alison Premo Black, PhD. ARTBA Senior VP &

$7.9

$7$7$7$7$8$8$8$8$8

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

2014 2015 2016 2017 2018

Billi

ons o

f 201

8$Real Value of Transit Construction Work,

Rolling 12-month Totals

$11.4

$0$2$4$6$8

$10$12$14$16

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

2014 2015 2016 2017 2018

Billi

ons o

f 201

8$

Real Value of Railroad Construction Work, Rolling 12-month Totals

$20.6

$0

$5

$10

$15

$20

$25

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

2014 2015 2016 2017 2018

Billi

ons o

f 201

8$

Real Value of Airport Construction Work, Rolling 12-month Totals

$2.5

$0.0$0.5$1.0$1.5$2.0$2.5$3.0$3.5

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

Jan

May Sep

2014 2015 2016 2017 2018

Billi

ons o

f 201

8$

Real Value of Port & Waterway Construction Work, Rolling 12-month Totals

Source: ARTBA analysis of Census Bureau’s U.S. Value of Construction Put in Place, adjusted for project costs. Data through July 2018. © 2018 ARTBA. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission of ARTBA.

4

Page 5: Transportation Construction Market Updatepahighwayinfo.org/PHIACONFERENCE/wp-content/... · Transportation Construction Market. Update. Alison Premo Black, PhD. ARTBA Senior VP &

Federal Transportation Investment

Page 6: Transportation Construction Market Updatepahighwayinfo.org/PHIACONFERENCE/wp-content/... · Transportation Construction Market. Update. Alison Premo Black, PhD. ARTBA Senior VP &

$46.4

$40.3

$41.3

$42.0

$39

$40

$41

$42

$43

$44

$45

$46

$47

FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020

Billi

ons

Federal Aid Highway Program FAST Act Obligations

Nominal Obligations Adjusted for Project Costs Adjusted for Inflation

Source: ARTBA analysis of the FAST Act. Project costs are expected to grow in line with historical averages according to the ARTBA price index, which takes into account changes in material prices, industry wages and overall inflation. Inflation forecast of 2% from CBO's August 2015 report An Update to the Budget and Economic Outlook: 2015 to 2025.

Page 7: Transportation Construction Market Updatepahighwayinfo.org/PHIACONFERENCE/wp-content/... · Transportation Construction Market. Update. Alison Premo Black, PhD. ARTBA Senior VP &

$52.0 $53.0 $54.0 $55.0 $56.0 $57.0 $58.0 $58.0 $60.0 $61.0 $62.0

$41.0 $41.0 $41.0 $42.0 $42.0 $41.0 $41.0 $41.0 $41.0 $41.0 $40.0

$3.0

$19.0 $19.0$22.0 $22.0 $24.0

$0

$10

$20

$30

$40

$50

$60

$70

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026

Billi

ons o

f dol

lars

Total HTF outlays Proj. HTF revenues Shortfall after FAST Act transfers spent

Source: Congressional Budget Office Highway Trust Fund baseline, April 2018

Total may not add up due to rounding.

Highway Trust Fund Revenue Crisis Will Return

Page 8: Transportation Construction Market Updatepahighwayinfo.org/PHIACONFERENCE/wp-content/... · Transportation Construction Market. Update. Alison Premo Black, PhD. ARTBA Senior VP &

Developments in State & Local Funding

8

Page 9: Transportation Construction Market Updatepahighwayinfo.org/PHIACONFERENCE/wp-content/... · Transportation Construction Market. Update. Alison Premo Black, PhD. ARTBA Senior VP &

Pennsylvania State Highway & Bridge Program Revenue Mix Has Changed Over Time

39%Highway

User Fees, Tolls & Taxes, $3.9B

Other State

Revenues*, $1.8,

18%

Bonds, $2.4B, 24%

Federal Investment $1.9B,

19%

2016State Highway Program Revenues

*Other state revenues include the state General Fund, sales taxes, local government reimbursement and other imposts.Source: Federal Aid Highway Statistics, Table SF-1

Highway User Fees,

Tolls & Taxes,

$2.9B, 72%

Other State

Revenues*, $220M,

6%

Bonds, $2M, <1%

Federal Investment,

$900M, 22%

2000State Highway Program Revenues

Page 10: Transportation Construction Market Updatepahighwayinfo.org/PHIACONFERENCE/wp-content/... · Transportation Construction Market. Update. Alison Premo Black, PhD. ARTBA Senior VP &

Pennsylvania State Highway & Bridge Program Spending Mix Has Changed Over Time

Capital Outlay, $4.9B, 38%

Maintenance, $4.5B, 35%

Admin & Research, $0.5B, 4%

Law Enf., $0.8B, 6%

Grants, $0.4B, 3%

Bonds, $1.9B, 14%

2016

Source: Federal Aid Highway Statistics, Table SF-2

Capital Outlay, $2.3B, 55%Maintenance,

$1.1B, 27%

Admin & Research, $0.2B, 4%

Law Enf., $0.4B, 9%

Grants, $0.2B, 5%

2000

Page 11: Transportation Construction Market Updatepahighwayinfo.org/PHIACONFERENCE/wp-content/... · Transportation Construction Market. Update. Alison Premo Black, PhD. ARTBA Senior VP &

Pennsylvania State Highway & Bridge Capital Outlays

$1.9$2.3

$2.7 $2.6 $2.8

$1.9 $2.1 $2.3 $2.6 $2.7

$3.6

$4.6$5.1

$3.5 $3.2$3.9 $3.8

$4.9

$0

$1

$2

$3

$4

$5

$6

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

State Spending on Construction, Right of Way Purchases, Planning & Design

Source: ARTBA analysis of data from Highway Statistics table SF-2. © 2018 ARTBA. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, withoutprior written permission of ARTBA.

Billi

ons o

f $

11

Page 12: Transportation Construction Market Updatepahighwayinfo.org/PHIACONFERENCE/wp-content/... · Transportation Construction Market. Update. Alison Premo Black, PhD. ARTBA Senior VP &

31 States & DC Have Increased Motor Fuel Related Taxes 51 Times Since 1997

AK

WA

OR

CA

ID

MT

WY

NV

AZ

CO

NM

ND

SD

NE

KS

OK

TX

MN

IA

MO

WI

IL

MI

IN

KY

TN

MS AL

OH

NY

PA

VA

NC

GA

FL

ME

WV

AR

UT

HI

SC

VT

CTRI

DENJ

MDDC

NH

MA

LA

Approved 2013-2017 Approved Prior to 2013

Page 13: Transportation Construction Market Updatepahighwayinfo.org/PHIACONFERENCE/wp-content/... · Transportation Construction Market. Update. Alison Premo Black, PhD. ARTBA Senior VP &

Source: TIAC™ State Funding Initiatives Report, Sept. 2018

One Bill Approved

AK

WA

OR

CA

ID

MT

WY

NV

AZ

CO*

NM

ND

SD

NE

KS

OK

TX

MN

IA

MO*

WI

IL

MI

IN

KY

TN

MS AL

OH

NY

PA

VA

NC

GA

FL

ME*

WV

AR

UT

HI

SC

VT

CT*RI

DENJ

MDDC

NH

MA

LA*

States Approving Transportation Funding Legislation 2015-2018

Two Bills Approved

Includes transportation funding increases and legislation related to funding, including lockboxes, P3 authorizations, ending diversions, task force or study, pilot program, etc.

Three or More Bills Approved

* Measure pending voter approval

Page 14: Transportation Construction Market Updatepahighwayinfo.org/PHIACONFERENCE/wp-content/... · Transportation Construction Market. Update. Alison Premo Black, PhD. ARTBA Senior VP &

Voters Approve $4.25B in Transportation Funding – Nov. 7

#ARTBATIAC

Source: ARTBA TIACTM Research, Updated November 9, 2017.

Page 15: Transportation Construction Market Updatepahighwayinfo.org/PHIACONFERENCE/wp-content/... · Transportation Construction Market. Update. Alison Premo Black, PhD. ARTBA Senior VP &

#ARTBATIAC

Transportation Funding Ballot Measures Approved

Page 16: Transportation Construction Market Updatepahighwayinfo.org/PHIACONFERENCE/wp-content/... · Transportation Construction Market. Update. Alison Premo Black, PhD. ARTBA Senior VP &

Measures identified as of July 9, 2018

Statewide

AK

WA

OR

CA *

ID

MT

WY

NV

AZ

CO

NM

ND

SD

NE

KS

OK

TX

MN

IA

MO

WI

IL

MI

IN

KY

TN

MS AL

OH

NY

PA

VA

NC

GA

FL

ME

WV

AR

UT

HI

SC

VT

CTRI

DENJ

MDDC

NH

MA

LA *

2018 Transportation Funding Ballot Measures

Local

* Both statewide and local issues

Potential Measure

Page 17: Transportation Construction Market Updatepahighwayinfo.org/PHIACONFERENCE/wp-content/... · Transportation Construction Market. Update. Alison Premo Black, PhD. ARTBA Senior VP &

Number of States Making Mid-Year Budget Cuts

4139

19

811

8

14

1922

0

5

10

15

20

25

30

35

40

45

FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017

Source: National Association of State Budget Officers, Fall 2017

Page 18: Transportation Construction Market Updatepahighwayinfo.org/PHIACONFERENCE/wp-content/... · Transportation Construction Market. Update. Alison Premo Black, PhD. ARTBA Senior VP &

12-Month Rolling Totals – State & Local Contract Awards

$46.1$42.3

$44.0 $45.4

$54.8

$48.1$50.3

$54.1

$16.2 $16.4$18.7

$22.4 $20.5

$16.3$18.1

$21.1

$0

$10

$20

$30

$40

$50

$60

Aug 10-July 11

Aug 11-July 12

Aug 12-July 13

Aug 13-July 14

Aug 14-July 15

Aug 15-July 16

Aug 16-July 17

Aug 17-July 18

Aug 10-July 11

Aug 11-July 12

Aug 12-July 13

Aug 13-July 14

Aug 14-July 15

Aug 15-July 16

Aug 16-July 17

Aug 17-July 18

Highways Bridges

Source: ARTBA analysis of data from Dodge Data & Analytics, adjusted with the ARTBA Price Index for project costs. © 2018 ARTBA. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission of ARTBA.

Billi

ons o

f 201

7$

18

Page 19: Transportation Construction Market Updatepahighwayinfo.org/PHIACONFERENCE/wp-content/... · Transportation Construction Market. Update. Alison Premo Black, PhD. ARTBA Senior VP &

12-Month Rolling Totals – State & Local Contract Awards

$1,731

$2,267

$1,703

$2,096$2,137

$1,098$1,165$1,310

$1,496

$1,166

$63.2 $18.8 $67.4 $46.2 $14.3$0

$500

$1,000

$1,500

$2,000

$2,500

Aug 13-July 14

Aug 14-July 15

Aug 15-July 16

Aug 16-July 17

Aug 17-July 18

Aug 13-July 14

Aug 14-July 15

Aug 15-July 16

Aug 16-July 17

Aug 17-July 18

Aug 13-July 14

Aug 14-July 15

Aug 15-July 16

Aug 16-July 17

Aug 17-July 18

Pennsylvania

Highways Bridges Transit

Source: ARTBA analysis of data from Dodge Data & Analytics, adjusted with the ARTBA Price Index for project costs. © 2018 ARTBA. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission of ARTBA.

Billi

ons o

f 201

8$

19

Page 20: Transportation Construction Market Updatepahighwayinfo.org/PHIACONFERENCE/wp-content/... · Transportation Construction Market. Update. Alison Premo Black, PhD. ARTBA Senior VP &

Alison Black, PhDSenior Vice President & Chief Economist

[email protected]@APremoBlack