traffic advisory - ring road · speed limit: 50 km/h from 60 km/h other information: cps pay duty...
TRANSCRIPT
![Page 1: Traffic Advisory - Ring Road · Speed limit: 50 km/h from 60 km/h Other information: CPS Pay Duty Officers will be present along the roadways during the Full Closure of Glenmore Trail](https://reader035.vdocuments.us/reader035/viewer/2022070916/5fb6abfded7f443d3c4b4b76/html5/thumbnails/1.jpg)
Traffic Advisory
January 27, 2020
Traffic Closure – Glenmore Trail at 37th ST SW
Bridge Demolition
Location: Glenmore Trail and 37th ST SW – Old overpass will be demolished Impact:
• Traffic control personnel directing vehicles
• Closure of Glenmore Trail at 37th ST SW for the demolition of the existing overpass
• Occasional traffic stoppages to allow the transition and opening of the new roadway
• CPS Pay Duty Officers will be present to help traffic navigate through the detour routing
• Lane Closures on Glenmore Trail for six nights
• Full Closure of Glenmore Trail for six nights
• Detour routing will be provided with Variable Message Boards and Detour Signage Reason: Demolition of the old overpass at 37th ST SW and Glenmore Trail Implementation date: February 2, 2020 – Work hours:
403-212-0565 [email protected] www.SWCRRproject.com
February 19, 2020
![Page 2: Traffic Advisory - Ring Road · Speed limit: 50 km/h from 60 km/h Other information: CPS Pay Duty Officers will be present along the roadways during the Full Closure of Glenmore Trail](https://reader035.vdocuments.us/reader035/viewer/2022070916/5fb6abfded7f443d3c4b4b76/html5/thumbnails/2.jpg)
Speed limit: 50 km/h from 60 km/h Other information: CPS Pay Duty Officers will be present along the roadways during the Full Closure
of Glenmore Trail to help traffic navigate through the detour routing.
The Grey Eagle Resort and Casino will remain open during the demolition of the 37th ST SW and
Glenmore Trail overpass.
Construction work will be taking place overnight to minimize impacts to traffic.
For your safety, please obey all construction signs when travelling through the area. KGL would like to thank you for your patience during this period of construction.
February 2, 2020 – 9:00PM – 5:00AM – Lane Closures on Glenmore Trail February 3, 2020 – 9:00PM – 5:00AM - Lane Closures on Glenmore TrailFebruary 4, 2020 – 9:00PM – 5:00AM - Lane Closures on Glenmore TrailFebruary 5, 2020 – 9:00PM – 5:00AM - Full Closure of Glenmore TrailFebruary 6, 2020 – 9:00PM – 5:00AM -Full Closure of Glenmore TrailFebruary 7, 2020 – 11:00PM – 8:00AM -Full Closure of Glenmore TrailFebruary 8, 2020 – 10:00PM – 9:00AM -Full Closure of Glenmore Trail
February 9 – February 13, 2020 – No Work Planned
February 14, 2020 – 11:00PM – 8:00AM – Full Closure of Glenmore TrailFebruary 15, 2020 – 10:00PM – 9:00AM – Full Closure of Glenmore TrailFebruary 16, 2020 – No Work PlannedFebruary 17, 2020 – 9:00PM – 5:00AM – Lane Closures on Glenmore TrailFebruary 18, 2020 – 9:00PM – 5:00AM – Lane Closures on Glenmore TrailFebruary 19, 2020 – 9:00PM – 5:00AM – Lane Closures on Glenmore Trail
![Page 3: Traffic Advisory - Ring Road · Speed limit: 50 km/h from 60 km/h Other information: CPS Pay Duty Officers will be present along the roadways during the Full Closure of Glenmore Trail](https://reader035.vdocuments.us/reader035/viewer/2022070916/5fb6abfded7f443d3c4b4b76/html5/thumbnails/3.jpg)
KGL 37th ST SW Bridge Removal – Traffic Accommodation Schedule
Updated
Date Type of Closure Travel to Casino Impact
Sunday
February 2nd, 2020
EB Glenmore Trail Closed – Median crossover
closure implemented
(9:00PM to 1:00AM)
Switch during the night (1:00am) to:
WB Glenmore Trail Closed – Median crossover
closure implemented
(1:00AM to 5:00AM)
None
WB Glenmore Traffic Detoured through
Richard Road. (1-3 min impact, 4 hours)
Monday
February 3rd, 2020
EB Glenmore Trail Closed – Median crossover
closure implemented
(9:00PM to 1:00AM)
Switch during the night (1:00am) to:
WB Glenmore Trail Closed – Median crossover
closure implemented
(1:00AM to 5:00AM)
None
WB Glenmore Traffic Detoured through
Richard Road. (1-3 min impact, 4 hours)
Tuesday
February 4th, 2020
WB Glenmore Trail Closed – Median crossover
closure implemented
(9:00PM to 5:00AM)
WB Glenmore Traffic Detoured through
Richard Road. (1-3 min impact)
Wednesday
February 5th, 2020
Glenmore Trail Closed – Full closure
(9:00PM to 5:00AM)
WB Glenmore Traffic Detoured through
Richard Road. (1-3 min impact)
Thursday
February 6th, 2020
Glenmore Trail Closed – Full closure
(9:00PM to 5:00AM)
WB Glenmore Traffic Detoured through
Richard Road. (1-3 min impact)
Friday
February 7th, 2020
Glenmore Trail Closed – Full closure
(11:00PM to 8:00AM)
WB Glenmore Traffic Detoured through
Richard Road. (1-3 min impact)
Saturday
February 8th, 2020
Glenmore Trail Closed – Full closure WB Glenmore Traffic Detoured through
Richard Road. (1-3 min impact)
Sunday to Thursday
February 9th to 13th, 2020
No closures Scheduled None
Friday
February 14th, 2020
Glenmore Trail Closed – Full closure
(11:00PM to 8:00AM)
WB Glenmore Traffic Detoured through
Richard Road. (1-3 min impact)
Saturday
February 15th, 2020
Glenmore Trail Closed – Full closure
WB Glenmore Traffic Detoured through
Richard Road. (1-3 min impact)
Monday
February 17th, 2020
EB Glenmore Trail Closed – Median crossover
closure implemented
(9:00PM to 5:00AM)
None
Tuesday
February 18th, 2020
EB Glenmore Trail Closed – Median crossover
closure implemented
(9:00PM to 1:00AM)
Switch during the night (1:00am) to:
WB Glenmore Trail Closed – Median crossover
closure implemented
(1:00AM to 5:00AM)
None
WB Glenmore Traffic Detoured through
Richard Road. (1-3 min impact, 4 hours)
Wednesday
February 19th, 2020
WB Glenmore Trail Closed – Median crossover
closure implemented
(9:00PM to 5:00AM)
WB Glenmore Traffic Detoured through
Richard Road. (1-3 min impact)
(10:00PM to 9:00AM)
(10:00PM to 9:00AM)
2020-01-27
![Page 4: Traffic Advisory - Ring Road · Speed limit: 50 km/h from 60 km/h Other information: CPS Pay Duty Officers will be present along the roadways during the Full Closure of Glenmore Trail](https://reader035.vdocuments.us/reader035/viewer/2022070916/5fb6abfded7f443d3c4b4b76/html5/thumbnails/4.jpg)
Map data ©2020 Google 200 m
typically 8 - 10 min
Drive 5.2 km, 8 - 10 min1350 Crowchild Trail SW, Calgary, AB to 3777 Grey Eagle Dr, Calgary, AB T3E 3X8
Westbound Glenmore TrailDetour Route
variable
message
board
GLENMORETRAILCLOSED
BRIDGE DEMOAHEAD
FOLLOW DETOURSIGNS
variable
message
board
GLENMORETRAILCLOSED
FOLLOW DETOURSIGNS
USERICHARDRD --->
variable
message
board
WBGLENMORE----->
GREY EAGLE
STRAIGHT
RESORT & CASINOAHEAD
CPS ControlledClosure Point
CPSControlledIntersection
Detour Route Traffic Impact/Road Closed
![Page 5: Traffic Advisory - Ring Road · Speed limit: 50 km/h from 60 km/h Other information: CPS Pay Duty Officers will be present along the roadways during the Full Closure of Glenmore Trail](https://reader035.vdocuments.us/reader035/viewer/2022070916/5fb6abfded7f443d3c4b4b76/html5/thumbnails/5.jpg)
Map data ©2020 Google 200 m
typically 9 - 14 min
Eastbound Glenmore Trail DetourRoute
variablemessageboard
GREY EAGLEOPEN
RESORT &CASINO OPEN
FOLLOWDETOURSIGNS
variablemessageboard
EBGLENMORE----->
GRY EAGLERESORT &CASINO
FOLLOWDETOURSIGNS
variable
message
board
variable
message
board
EBGLENMORECLOSED
GREYEAGLE OPEN
FOLLOWDETOURSIGNS
EBGLENMOREDETOUR
USERICHMONDRD ---->
FOLLOWDETOURSIGNS
variable
message
board
EBGLENMORECLOSED
FOLLOWDETOURSIGNS
USERICHMOND
ROAD
variablemessageboard
WBGLENMORECLOSED
USE33RD AVE---->
FOLLOWDETOURSIGNS
CPSControlledIntersection
Detour Route Traffic Impact/Road Closed
![Page 6: Traffic Advisory - Ring Road · Speed limit: 50 km/h from 60 km/h Other information: CPS Pay Duty Officers will be present along the roadways during the Full Closure of Glenmore Trail](https://reader035.vdocuments.us/reader035/viewer/2022070916/5fb6abfded7f443d3c4b4b76/html5/thumbnails/6.jpg)
Map data ©2020 Google 200 m
typically 6 min
Casino Detour Route viaLakeview (66th Ave)
variable
message
board
variable
message
board
GREYEAGLEOPEN
RESORT &CASINOOPEN
USE CRWCHILDTRAIL
GLENMORETRAILCLOSED
BRIDGE DEMOAHEAD
FOLLOW DETOURSIGNS
variablemessageboard
GREY EAGLEOPEN
RESORT &CASINO OPEN
FOLLOWDETOURSIGNS
variable
message
board
EBGLENMORECLOSED
FOLLOWDETOURSIGNS
variablemessageboard
EBGLENMORE----->
GRY EAGLERESORT &CASINO
FOLLOWDETOURSIGNS
CPSControlledIntersection
Detour Route Traffic Impact/Road Closed