FEATURES AND BENEFITS:
Spectrum TrafficLine is a fast drying, high-build road marking and delineation paint that can be used for almost all line marking
applications. TrafficLine is ideal for use on hard surfaces such as roads, car parks, distribution centres, airports and docks.
TrafficLine is an epoxy product, which means that it is lower in solvent content than other products such as chlorinated rubber
and very resistant to fuels and oils.
TrafficLine can be applied by roller, brush or spray methods and comes in a choice of colours. TrafficLine comes packaged in
the innovative EnviraPac liner system, which allows maximum usage of product, recycling of clean metal tins and most
importantly considerable reduction of waste costs.
Revision Date: 04/11/2016
Line - SINGLE-PACK EPOXY LINEMARKING PAINTTraffic
● Approved for use on airfields
● Can be manufactured to any RAL colour, with short lead times
● Hard-wearing product, well proven in demanding locations
● Excellent adhesion to concrete and asphalt surfaces; this includes
traditionally difficult surfaces such as blocks and pavers
● EnviraPac liner to allow recycling of tin and reduced disposal costs
WhiteTraffic Yellow BlackTraffic RedRAL3020
Sky BlueRAL5015
Grass GreenRAL6010
Page 2
MEON UK
TEL:
EMAIL:
WEB:
+44 (0)808 118 1922
[email protected] meonuk.com
MEON IRELAND
TEL:
EMAIL:
WEB:
01 840 7647
Technical Data Sheet: TrafficLine
PREPARATION:
AFTERCARE AND MAINTENANCE:
TECHNICAL:
STORAGE:
HEALTH AND SAFETY:
MIXING:
APPLICATION cont:
APPLICATION:
CURING:
We recommend the use of airless spray equipment for best finish;
if applying with roller or brush, product may need to be thinned
with Meon Type 2 Thinners, to retard drying times and reduce
premature hardening on roller or brush.
Do not apply when the air or surface temperature is below 5°C or
less than 3°C above dew point, or if this is likely to occur during the
curing period.
Do not apply when there is rain, mist, fog, or snow imminent; when
humidity is high or the surface is wet with condensation or likely to
be during the drying period.
Touch dry: 10 minutes @ 15⁰C.
Walk on time: 15 minutes @ 15⁰C.
Traffic time: 30 minutes @ 15⁰C.
Full cure: 90 minutes @ 15⁰CRecoat: 1-2 hours @ 15⁰C.
PRACTICAL COVERAGE:
Area: 2.4m² per kg
Linear: 24m of 100mm line per kg
FILM THICKNESS:
DFT: 150 microns
Use Meon Type 2 thinners to clean uncured TrafficLine from tools
and equipment.
Lines can be maintained by cleaning with clean water or mild detergent
solution.
STORAGE CONDITIONS:
Storage area should be dry, protected from direct sunlight and
extremes of temperature - i.e. between 5 and 20⁰C.
SHELF LIFE:
6 months when stored under cover, in original unopened containers,
in accordance with Storage Condition guidelines listed above.
SIZES AVAILABLE:
Available in both 7kg and 20kg tins.
MIXING INSTRUCTIONS:
Stir thoroughly before use.
THINNING:
This product is supplied ready to use and need not be thinned.
If thinning is required, Meon Type 2 Thinners may be used, up
to 20% by volume.
SURFACE PREPARATION:
The application surface should be sound and clean, free from grease,
oil, rust, scale, dirt, or any other soiling that might affect adhesion or
performance. In any case, but especially in the case of overcoating
existing line markings, it is further recommended that test areas be
coated to ensure good adhesion and/or compatibility with the
substrate.
Asphalt - weathered - It is recommended that asphalt and other
similar surfaces be allowed to thoroughly harden for up to 6 months
before painting. Test trials should be carried out in the first instance
on a small area.
Concrete and other cementitious surfaces - including powerfloat,
tamped or brushed concrete, monoblocks and pavers - Ensure
surface is sound, clean and free from laitance - we recommend a
preparation method suitable for the specific location and surface is
carried out before application of product, to ensure surface is properly
prepared back to clean and sound substrate. Examples of preparation
methods that may be suitable are captive shot blasting, diamond
grinding, scabbling or planing. It is critical that utmost attention is
paid to cleanliness and good workmanship, whatever preparation
method is used, as the presence of any loose material, dust, soiling or
previous coatings are likely to reduce adhesion of new coatings.
New concrete should be left to harden before coating, as the curing
process and residual moisture content can lead to product delamination
if coated too early.
PRIMERS:
Asphalt and tarmacadam - no primer required
External concrete, pavers and monoblocks - use Meon FP Line Primer
Internal powerfloated concrete - use Meon FP Line Primer
Familiarise yourself with the material safety data sheets before
using this product. If you need a copy please call our technical team
on 023 9220 0606.