TOWARD ZERO DEATHS: TSMO AND HIGHWAY SAFETY
PROGRAM UPDATES FROM ODOT DISTRICT 8ITE/ITS MIDWEST FALL WORKSHOP • SEPT 16, 2020
2 |
SUMMARY FOR TODAY
o ODOT Updates
o Reducing crashes Towards Zero Deaths
o TSMO Applications in D8
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
3 |
ODOT UPDATES
4 |
REVENUE: ACTUAL VS. ESTIMATED
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
$2,723
$1,654
$962
$2,484
$1,500
$881
($239) ($154) ($81)
($500)
$0
$500
$1,000
$1,500
$2,000
$2,500
$3,000
Available for Distribution ODOT Share Local Share
FY20 Actual vs. Estimated MFT Revenue
2020 Original Estimate 2020 Actuals (COVID) 2020 Actual vs. Estimate
Ohio Department of Transportation
Revenue based on 7/1/2020 Rate Increase (Gasoline: $0.385/gallon & Diesel: $0.47/gallon)
*Actuals based on 11 month return data, 12th month estimated with 30% reduction
5 |
TSMO IS MORE IMPORTANT THEN EVER
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
6.4
6.4 6.4
6.5
6.66.5
6.56.5
6.5
6.3
6.3
6.46.4
6.3
6.4
6.5
6.6
6.7
6.8 6.8
6.3
6.0
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.92000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Due to COVID-19 pandemic, FY2020 consumption retraced to FY2009 & FY2010 levels. levels
6 |
TSMO IS MORE IMPORTANT THEN EVER
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
7 |
NEW ODOT D8 MULTI-YEAR WORK PLAN WEBSITE
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
http://www.dot.state.oh.us/districts/D08/Pages/District-8-Multi-Year-Work-Plan.aspx
8 |
ACTIVE AND PENDING CONSTRUCTION MAP
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
http://gis3.dot.state.oh.us/d08/ActivePendingConstruction/
9 |
GET THE LATEST UPDATES
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
Construction updates by email Traffic Advisories on the web and social media
OHGO updates on your phone or computer
10 |
ODOT HIGHWAY SAFETY
PROGRAM OVERVIEW
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
11 |
SAMPLE SLIDE TITLE DARK ORANGE HEADER
o Sample Text
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020ODOT Updates, Colerain Township, 1/14/2020
1,068816
12 |
CRASH TRENDS IN OHIO
53%
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
Traffic deaths on local
roads (2015-2019)
62%Serious injuries on local
roads (2015-2019)
40%Serious injuries and
fatalities on city/village
roads (2015-2019)
13 |
DIG INTO THE DATA
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
http://www.dot.state.oh.us/Divisions/Planning/ProgramManagement/HighwaySafety/HSIP/Pages/Safety_Dash
board.aspx
14 |
SAFETY UPDATES
o Distracted Driver Corridors
o Governor Top 150 projects
o $10M for Pedestrian Crashes
o Fall Safety applicationso No 100% safety funding
o 90/10 local match is required
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
15 |
FOCUS ON PROVEN FIXES
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
https://safety.fhwa.dot.gov/provencountermeasures
16 |
HOW TO APPLY
1. Prioritize a locationo Start with ODOT’s HSIP Priority List
o Check if the location is on a local priority list by contacting the local maintaining agency and by contacting
MVRPC
2. Check crash datao Review crash records for the site to determine if there are any crash trends. ODOT has developed an
excellent tool to streamline this process using the TIMS application (https://gis.dot.state.oh.us/tims/).
3. Call ODOT D8o Typically, sites need to have a minimum of 10 crashes in a three-year period to be eligible for safety funding.
o For projects under $500k, there are opportunities to pursue funding throughout the year.
o For higher cost projects, safety applications are due in April and September.
o Sign off from the District 8 Safety Review Team (DSRT) is required before safety applications can be
submitted.
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
17 |
TSMO PROJECTS IN D8
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
18 |
D8 EXAMPLE #1: SIGNAL TIMING SCOPE
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
Signal Timing Scope available at: www.dot.state.oh.us/Divisions/Operations/Traffic/miscellaneous/Pages/Signal-Timing-Scope.aspx
o ODOT Signal Timing
Scope and other docs
are available improve
signal corridors:
19 |
SIGNAL TIMING STUDY
o Step 1: Inspect existing signals
o Step 2: Conduct traffic counts
o Step 3: Optimize Signal timing
o Step 4: Implement and evaluate
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
One signal was
out of sync by
59 minutes
20 |
US 50 CORRIDOR LIMITS
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
21 |
2015-2017 AVERAGE MONTHLY TRAVEL TIME
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
Source: www.streetlightdata.com
Legend:
22 |
COLLABORATION
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
23 |
SIGNAL TIMING RESULTS
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
24 |
STREETLIGHT COMPARISON
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
25 |
EASTERN CORRIDOR STUDY SUMMARY
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
22 Advisory
Committee/public
meetings in 2018
60 for
$60m
o 60 of 69 concepts are estimated at
less than $5.5m, with 33 under $1m.
o These 60 concepts total about $60m
in construction costs.
18 bike/ped concepts connecting:
o LMR Trail
o Wasson Way
o Lunken
o Five Mile Trail
o Murray Trail
o And more!
Project website: http://easterncorridor.org/
26 |
D8 EXAMPLE #2: COLERAIN TSMO PILOT
o 2020: TSMO Pilot (PID 110279)o New software will constantly seek to optimize
signal timing
o Galbraith to Struble
o Estimate of about $440,000
o Under construction now
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
27 |
D8 EXAMPLE #3: HAM-275 SMART LANE
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
Project website: http://www.dot.state.oh.us/districts/D08/Pages/Interstate-275-SmartLane.aspx
o Design-build (PID 94256)
o Sale: 2nd Quarter of FY22
(Oct-Dec of CY2021)
o Loveland Madeira to Reed
Hartman
o Westbound direction only
28 |
D8 EXAMPLE #3: HAM-275 SMART LANE
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
o ODOT is planning a lower
build compared with
Columbus system
o Total project estimate
$18-$20m, including
resurfacing
NOTE: images are
from I-670 project; I-
275 project will
utilize cantilever
signs over the smart
lane only
29 |
WHAT COULD THE FUTURE BRING?
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020
o ODOT is also working with a team
led by UC to study the benefits of
providing non-freeway travel times
(PID 107307)
o In June of 2020, USDOT awarded
Ohio $4.4m for I-70 truck
automation project (total project
cost is $8.9m)
30 |
?
QUESTIONS
Last updated 9/16/2020
ODOT D8 Updates, ITE/ITS Midwest Fall Workshop • Sept 16, 2020