toec profile 2010the company has been established in 1960 by eng. medhat aboukhater eng. haitham...
TRANSCRIPT
T.O.E.C
Since 1960 Technical Office for Engineering and Contracting
Engs. ABOUKHATER & AKHRASS
Since 1960
Your Construction Partner
Since 1960
T.O.E.C is one of the leading engineering, contracting, construction, industrial and trading companies in Syria, Algeria and Saudi Arabia. The company has been established in 1960 by Eng. Medhat Aboukhater Eng. Haitham Akhrass, Eng. Sadek Akhrass and Mr. Hikmat Aboukhater. T.O.E.C core activity is the construction of large scale civil, mechanical, electrical and instrumentation project in different aspects of the construction industries from luxury buildings and villas to high ways and rail ways including oil and gas projects, power plants, revamping of industrial projects, harbors and irrigation canals.
Our yearly turnover in this sector is around 100,000,000 U.S $. We adhere to our clients' requirements in terms of quality and time by depending on our highly capable staff who has extensive experience and expertise to handle and execute all aspects of construction . T.O.E.C always care to train its staff to ensure that they are skilled enough to handle their job efficiently and cost effectively . T.O.E.C Staff long term of management guarantees the customer with high quality, low cost, prompt and professional procurement services.
Since 1960
Your Construction Partner
Since 1960
Your Construction Partner
Some of T.O.E.C Clients
Since 1960
Your Construction Partner
Head Office at HOMS: Tel: + 963 31 275 52 52 Fax: + 963 31 275 00 46 P.O. Box: 392, Damascus highway, Behind 8 Azar Forest. Homs – Syria Web: www.toec-int.com E-Mail:[email protected] Persons in Contact: BSC Civil Eng. EMBA Managing Partner Eng. Mamdouh ABOUKHATER [email protected] Mobile:+963 933 223 228
Damascus Office Tel: + 963 11 333 98 76 Fax: + 963 11 333 82 06 P.O. Box: 184, Abou-Romanneh District, Al-Nijmah Square. Damascus - Syria E-Mail Address: [email protected] Person in Contact: Commercial Director: Eng. Aref AKHRASS [email protected] Mobile: +963 944 30 88 44
Algeria Branch: S.P.A T.O.E.C ALGERIE Tel: + 213 21 48 40 15/18 Fax: + 213 21 48 34 00 Address: Nº 04-Appt. Nº 08G-VAL D'Hyrda, Chabani-Lotissement. Algiers - Algeria E-Mail Address: [email protected] Person in Contact: General Manager: Eng. Wael Al Hussan. [email protected] Mobile : +213 550 111115
Saudi Arabia Branch: CEMCCO Civil and Elector Mechanical Construction Co. Tel: +966 2 284 84 41/ 0 Fax: +966 2 284 84 42 P.O.BOX: 122615 Jeddah 21322 Al Tahlia Str., Hasan Al Tijari Center Building. Jeddah – Saudi Arabia E-Mail Address: [email protected] Person in Contact: General Manager: Eng. Salem AKHRASS [email protected] Mobile:+966 505 624 655
Since 1960
Your Construction Partner
HSE Health, Safety and Environment
Since the 80s T.O.E.C paid attention to the safety of its personnel and applied " Safety First" as major in the detailed daily construction activity. Our clients issued many safety awards which we are appreciate to obtain
T.O.E.C also got the international OHSAS 18001
Since 1960
Your Construction Partner
QA/ QC Quality Assurance/ Quality Control
T.O.E.C. gives the QA/ QC the first priority in all its projects. T.O.E.C. follows all the international standards and codes in executing each project .
T.O.E.C. has successfully obtained ISO 9001:2008
T.O.E.C. has successfully obtained ISO 14001:2004
Since 1960
Your Construction Partner
Main Equipments List T.O.E.C. policy is to own the main construction equipment, and ready always to rely on trusted rental companies when it
is needed in the peak time. T.O.E.C equipments are always updated with new ones and are varied to cover most construction needs such as cranes, side booms , bulldozers, concrete pumps and trucks…..etc T.O.E.C also use German PERI form work system the world Leader in this Job, which guarantee the best quality of concrete work to be achieved in our projects.
Bulldozer CAT 6
Excavator CAT- Poclain 19
Pay loader CAT 18
Pay loader small size Case- Bobcat 22
Dump truck Mercedes 16
Roller 13 Plate compactor 12
Since 1960
Your Construction Partner
Side boom (pipe layer) Cat 9
Fork Lift Hyster-Cat 10
Air Compressor Atlas Copco 11
Generating Set CAT-SCANIA 41
Trencher Parson 3
Concrete truck mixer Stetter on Mercedes 19
Concrete pump Schwing on Mercedes 7
Stationary concrete pump Schwing 1
Con. Batching Plant with silos 9
Cement silo truck 7
Since 1960
Your Construction Partner
Tower cranes Potain 6
Form work Peri
Trailer Flat bed-Loader 10
Truck mounted crane Grove-Libher 11
Piles breaker 1
Pipes bending machine 2
Twin Arc CAT 3
Welding machine 58
Pick-up Toyota-Hyundai 30
Truck Tractor MAN-Mercedes 7
Since 1960
Your Construction Partner
T.O.E.C Projects In Syria, Saudi Arabia And Algeria
Throughout the50 years of operation T.O.E.C has successfully executed projects in different areas of Syria, Saudi Arabia and Algeria whether it is Power Plants, Oil and Gas projects, Commercial and residential buildings, Water Marin, Irrigation, Infrastructure, Highway and Railway or Industrial projects, all with international specifications and technical requirements. We recognize the need for strong diverse teams offering construction industry specific expertise to each area of operations.
Since 1960
Your Construction Partner
Oil & Gas Projects Since T.O.E.C was established, many Oil & Gas projects have been executed including Refineries rehabilitation, Gas stations, pipelines, also this kind of works can be found in almost all projects such as power plants, factories, with all related auxiliaries as main contractor in some projects, and sub-contractor for others.
No Project Owner Main Contractor Location Year 1 Uplifting capacity of KARATCHOUK-
TARTOUS P/L (18” ~ 24“) from 8.5 ~ 14.5 million m3/y.
SCOT, Syrian Company for Oil Transportation T.O.E.C. KARATCHOUK-
TARTOUS 1974-1975
2 Survey operation (linalog) of HOMS- BANIAS P/L.
SPC, Syrian Petroleum Company T.O.E.C. HOMS- BANIAS 1986
3 Replacing sections of 30” P/L between PALMYRA and Iraqi Border. (mechanical works)
SPC, Syrian Petroleum Company T.O.E.C. PALMYRA- IRAQI
Border. 1986
4 OMAR field- TESHREEN Power Station P/L Project (260 KM). (mechanical works)
AFPC, Al-Furat Petroleum Company
Military Housing Establishment
OMAR field- TESHREEN Plant 1991-1992
5 Providing Facilities, Maintenance and Repair Services for the Oil Fields (Civil and Electromechanical works).
AFPC, Al-Furat Petroleum Company T.O.E.C. DEIR EZ-ZOR 1991-1993
6 PALMYRA gas gathering and compression station (NAJEEB) including 50 KM 12” P/L and 18 KM 5” Flow-lines.
SPC, Syrian Petroleum Company SPC NAJEEB,
PALMYRA 1998-2000
7 Implementation of Crude Distillation Unit 101. (during shutdown) BANIAS Refinery Co. Technoexport, Czech
Republic BANIAS 2003
8 Repairing of Atmospheric Unit Column 101 in BANIAS Refinery. BANIAS Refinery Co. Technoexport, Czech
Republic BANIAS 2003
9 Revamping of Vacuum Distillation unit 102 BANIAS Refinery During Shut Down.
BANIAS Refinery Co. Technoexport, Czech Republic BANIAS 2007
10 Storage tanks and feeding line for plane fuel ALGIERS Air Plant ALGERIA 2007
Since 1960
Your Construction Partner
Power Plants Projects
No Project Owner Main Contractor Location Year
1 QATTINE Power Plant. PEE, Public Establishment for
Electricity T.O.E.C. HOMS 1961
2 Conversion of MEHARDEH Power Station from fuel to gas.
PEE, Public Establishment for
Electricity FORNEY Intl. USA HAMA 1992-
1993
3
JANDAR C/C Power Plant (660 MW)
PEE, Public
Establishment for Electricity
Mitsubishi Heavy
Industries Co. Ltd., JAPAN
JANDAR,
1993-1996
4 AL-ZARA Thermal Power Plant Project (660MW)
PEEGT,(Public Establishment of
Electricity Generation and Transmission)
Mitsubishi Heavy Industries Co. Ltd.,
JAPAN AL-ZARA, 1997-
2001
5 Rehabilitation and Lining the stacks of3rd&4thUnits. BANIAS Power Plant T.O.E.C. BANIAS 2002
6 Checking the Stacks of 1st & 2nd Units at BANIAS Power Plant. BANIAS Power Plant T.O.E.C. BANIAS 2003
7 Aleppo and Baramkeh Substations PEEGT Areva, France DAMASCUS and ALEPPO
2005-2006
8 Zayzoun Combined Cycle Power Plant PEEGT Koch-Siemens
Germany ZAYZOUN 2005- 2007
9 Banias Gas Turbine Power Plant PEEGT
TOEC &
TurboCare ,Italy BANIAS 2008-
2010
10 YANBU Diesel Power plant MAN DIESEL MAN DIESEL
YANBOU SAUDI
ARABIA 2010
Since 1960
Your Construction Partner
Commercial And Residential Projects
No Project Owner Main Contractor Location Year
1 Commercial and residential buildings. Miscellaneous Owners T.O.E.C. HOMS Center 1987-
1996 2
154 Units Housing Complex For JANDAR C/C Power Plant
PEE, Public
Establishment for Electricity
Mitsubishi Heavy
Industries Co. Ltd., JAPAN
JANDAR
1993-1996
3 200 Units Housing Complex for AL-ZARA Thermal Power Plant
PEEGT,(Public Establishment of
Electricity Generation and Transmission)
Mitsubishi Heavy Industries Co. Ltd.,
JAPAN AL-ZARA 1997-
2001
4 Al Wadi German Syrian University Al Wadi Company TOEC HOMS 2006- 2009
5 165 Unit Housing Complex with all related facilities in Zayzoun Power plant.
PEEGT Koch-Siemens Germany ZAYZOUN 2005-
2007
6 Homs Fairground Homs Fairground Co. T.O.E.C HOMS 2007-2010
7 Base de vie Project(EPC) Sonatrach T.O.E.C ALGERIA 2007-2010
8 AL Qaser Development Project Residential Complex of Building.
Dar Al Arkan Real Estate Development
Company T.O.E.C RIYADH 2007-
2010
9 MARRIOTT Hotel and complex Trust Real Estate T.O.E.C ALGERIA 2010 -Now
Since 1960
Your Construction Partner
Industrial Projects
No Project Owner Main Contractor Location Year
1 HOMS Dairy Factory. Ministry of Industry T.O.E.C. HOMS 1960 2 Asbestos Cement Factory. General Establishment
for Chemistry T.O.E.C. DAMASCUS 1965
3 Onion Factory. Ministry of Industry T.O.E.C. HAMA 1969 4 Steel structures for Triple Super
Phosphate Factory (8,500 t). General Establishment
for Chemistry Industrialexport,
Romania HOMS 1976-1978
5 MESKENE Sugar Factory. General Establishment for Sugar T.O.E.C. DEIR EZ-ZOR 1976-
1979 6 ABOUKHATER & AKHRASS
Marble Factory. T.O.E.C. T.O.E.C. HOMS 1978
7 HAMA Tire Plant. Ministry of Industry Technoexport, Czechoslovakia HAMA 1977-
1979 8 Al-Ahliah Vegetable Oil Co. E. S.
A. (AVOCO) Project AVOCO N.V. DE SMET S.A.
Engineers & Contractors BELGIUM
HAMA 1998-2000
9 Supply and Delivery of Ready Mixed Concrete for HAMA New Cement Plant Project.
G.O.C. General Organization for Cement
IDR Construction Co. IRAN HAMA 2003-
2006
10 Construction of an integrated Oil Seeds Crushing Plant. Oil Seeds Crushing Co.
De Smet Engineers&
Contractors S.A YANBU 2008
11 Arab Tank Project. Emirates National Oil Co.LTD
Belleli Energy S.P.A Italy YANBU 2006-
2009
12 JOTUN Tank Farm JOTUN T.O.E.C YANBU 2007-2009
13 Air Craft hangars. Ministry of Defense T.O.E.C. DIFFERENT LOCATIONS
1969-1970
14 Revamping of Hama steel factory Hama steel factory Apollo HOMS 2010-Now
Since 1960
Your Construction Partner
Highway And Railway Projects
No Project Owner Main Contractor Location Year
1 LATTAKIA- KAMISHLY railway (46 KM).
The General Company of The Railway
Construction T.O.E.C. LATTAKIA-
KAMISHLY 1965-1967
2 ALEPPO- SARAKEB highway (54 KM) under the supervision of SAUTI Overseas Anstalt
Ministry of Transportation T.O.E.C. ALEPPO-
SARAKEB 1964-1967
3 ALEPPO- JISR EL SHOUGHOUR Highway (30 KM) under the supervision of SAUTI Overseas Anstalt
Ministry of Transportation T.O.E.C.
ALEPPO- JISR EL
SHOUGHOUR
1964-1967
4 HOMS- Phosphate Mines (121 KM) Highway under the supervision of SAUTI Overseas Anstalt
Ministry of Transportation T.O.E.C. HOMS-
PALMYRA 1964-1967
5 SARAKEB- ARIHA Highway (20 KM) under the supervision of SAUTI Overseas Anstalt.
Ministry of Transportation T.O.E.C. SARAKEB-
ARIHA 1964-1967
6 BAB ALHAWA- IDLIB Highway (15 KM) under the supervision of SAUTI Overseas Anstalt
Ministry of Transportation T.O.E.C.
BAB ALHAWA-
IDLIB
1964-1967
7 SARAKEB- IDLIB Highway (26 KM) under the supervision of SAUTI Overseas Anstalt
Ministry of Transportation T.O.E.C. SARAKEB-
IDLIB 1964-1967
8 KANTARI- TAL TAMR Highway (112 KM).
Ministry of Transportation T.O.E.C. RAQQA-
HASSAKEH 1980
Since 1960
Your Construction Partner
Infrastructure Projects
No Project Owner Main Contractor Location Year
1 Project of Renovation and Extension of Sewerage Network.
Water and Sewage Department of
MAKKAH AL-MUKKARAMAH
Region
CEPCO Heavy
Construction, Daughter of
T.O.E.C
MINA,MAKKAH AL-
MUKKARAMAH,KSA
2003-2009
3 King ABDULLAH Economic city Industrial Area 1 A Infrastructure Emmar CEMCCO
(TOEC) RABEGH 2008-Now
4 King ABDULLAH Economic City Resort Cove Package A Infrastructure. Emmar CEMCCO
(TOEC) RABEGH 2008-Now
Water Marine And Irrigation Projects
No Project Owner Main Contractor Location Year
1 Water supply for BANIAS Refinery. BRC.Banias Refinery Company T.O.E.C. BANIAS 1975-
1977 2 Extension of LATTAKIA Harbor. The General
Establishment for The Grand Projects
T.O.E.C. LATTAKIA 1980-1985
3 TISHREEN Dam on Euphrates river /Hydro Power Plant Ministry of Irrigation
General Company for Land
Reclamation MANBEJ 1994-
1997
5 Pumping Station of Orontes River Water to the Irrigation Canal.
Directorate of Orontes Basin T.O.E.C. HOMS 1960
Since 1960
Your Construction Partner
Special Projects Executed by TOEC
Client: Mitsubishi Heavy Industries LTD.
AL-ZARA Thermal Power Plant Project
(660MW) : Consists Of
3 Steam Turbines 3 Boilers'. 3 Stacks 150M conical shape 3 Cooling Towers 125M height In addition to the other buildings tanks and structure needed for the Plant.
The 3 conical concrete chimney; each of them is 150 m Height, Bottom diameter 12 m , Upper diameter 10 m, TOEC used especial slip form for construct these chimney. TOEC has achieved pouring 2200 m³concrete for each chimney foundation, since the total quantity of the concrete for the project was 110,000 m³ poured within 16 months. More over TOEC completed Steel Structure Erection of 3 Cooling Towers , each of them is 125 m height, Bottom diameter 120m, Weight 3,500 ton. TOEC was full responsible for the complete erection including supervision, drawings revision, Quality Control…etc.
Since 1960
Your Construction Partner
Client: Siemens-Koch.
Zayzoun Combined Cycle Power Plant extension: T.O.E.C did the civil and electro mechanical works for Zayzoun Combined Cycle.
T.O.E.C has erected steel structure for one cooling tower with 135 m height and 106 m Bottom Diameter. �
Consist of: 3 boilers 1 gas turbine 1 Cooling Tower Other structures and tanks
Since 1960
Your Construction Partner
Client: Banias Refinery Company
Banias Refinery:
repairing of atmospheric column 101 (during
shutdown) with height of 60M; including replacing all the internals and welding of upper roof with very special welding procedure for MONEL steel material.
TOEC stand working twenty four hours during
shutdown to keep the time schedule.
Since 1960
Your Construction Partner
Client: Banias Refinery Company
Banias Refinery Rehabilitation: Unit 102 in 2007
revamping of Vacuum distillation During Shutdown including Heaters Revamping with P5 and P9 pipes welding.
T.O.E.C stand working twenty four hours during
shutdown.
Since 1960
Your Construction Partner
Uplifting capacity of KARATCHOUK- TARTOUS P/L
(Turnkey job)
OMAR- TESHREEN P/L Project
Since 1960
Your Construction Partner
PALMYRA Gas Gathering Station, NAJEEB
Since 1960
Your Construction Partner
JANDAR C/C Power Plant (660 MW)
Conversion of MEHARDEH Power Station from Fuel to Gas
Since 1960
Your Construction Partner
Chimney Slip form Works at AL-ZARA Thermal Power Plant (660 MW)
Power Plants
Since 1960
Your Construction Partner
Industrial Factories Construction Projects
Steel structures for Triple Super Phosphate Factory
MESKENE Sugar Factory
Since 1960
Your Construction Partner
Irrigation Projects
Water Supply for BANIAS Refinery
Since 1960
Your Construction Partner
Since 1960
Your Construction Partner
TESHREEN Dam/ Hydro Power Plant
The Second Largest Dam On Euphrates River
Since 1960
Your Construction Partner
Miscellaneous scaffolding system
Since 1960
Your Construction Partner
Project of Renovation and Extension of Sewerage Network, MINA, MAKKAH AL-MUKKARAMAH, KINGDOM OF SAUDI ARABIA 4.5 Km Tunnel
Since 1960
Your Construction Partner
Marine Projects
Extension of LATTAKIA Harbor
Since 1960
Your Construction Partner
ALWADI UNIVERSITY
Since 1960
Your Construction Partner
Housing complex of JANDAR Housing complex of AL-ZARA
Al Khayam Building - Homs
Zayzoun, complex Housing
Since 1960
Your Construction Partner
Base de Vie Houd El Hamra – Algeria
Since 1960
Your Construction Partner
Highways and Roads
Parts II & IV of LATTAKIA- KAMESHLIEH Railway
KANTARI- TAL TAMR Highway (112 KM)
ALEPPO- JISR EL SHOUGHOUR highway
Since 1960
Your Construction Partner
Since 1960
Your Construction Partner