Page 1: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

TOD in Hubli-Dharwad: Possibilities and Challenges

Directorate of Urban Land Transport

Page 2: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

�Twin cities

�Single municipal body w.e.f 1962.

�Distinct development:� Hubli: business and industrial hubof the region� Dharwad: educational centre:Karnataka University and Agriculturaluniversity.

Dharwad

�Population : 0.96 million in 2011,�Expected: 1.5 million by 2031.

�Rate of population growth- 1.69 % to 2%CAGR (low population growth in last twodecades1981-2011)

�Density: 4678 persons per sq.km.

Hubli

Page 3: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

�Current developed area: 95.18 sq.km out of 202.3 sq.km corporation area.

� Developed area: 45 sq.km in 1986.

� 50 sq.km proposed to be developed in the next decade.

� Navanagar township formed in 1979.

Page 4: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

TRANSIT SCENARIO:

� Average trip length, includingwalking : 5.1 km.

� Average trip length of motorised trips: 8.6 km

� PT carries ~ 2.5 lakh passengersevery day.

�Public Transport: LoS 2Organized PT exists; Service coverage and frequency need improvements.

� Pedestrian facilities: LoS 3Need considerable improvements.

� NMT: LoS 4�Between Hubli and Dharwad: 1.7lakhs.

�Expected demand by 2031: 12000pphdt. ~ 4 lakhs.

� NMT: LoS 4The city lacks adequate NMT facilities.

� Road safety: LoS 4Fatality rate per lakh population : 9.54.40% fatalities include pedestrians and cyclists.

Page 5: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

Dharwad CBT

Karnataka University

NWKRTC terminal

PROPOSED BRT CORRIDOR: 22.25 Km.

FEEDER SERVICE: 19.7 km

Dedicated Corridor:21.35 KmMixed Traffic: 0.9 km

Hubli CBT

Hubli Rly Station

Airp

ort

TarihalIndustrial area

BRT Phase 1

Terminal

LEGE

ND

N Gopankoppa

Electricity Grid

FEEDER

Page 6: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

BRTS- an opportunity to leverage a high-profile project to propel change.

�Master plan revision on the anvil.

�Improvement to last-mile connectivity to transit.

�Route rationalization/trunk-feeder integration.

�Concerned stakeholders on the board of directors of SPV.

Re-imagining Hubli-Dharwad.

�Preparation of master plan under technical assistance ofSUTP.

�EMBARQ study: SHAPING HUBLI-DHARWAD AS A“CONNECTED CITY“-Navanagar as a demonstration project.

Page 7: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

NAVANAGAR DEMONSTRATION PROJECT

Dharwad

Navanagar

Navanagar Location of Navanagar / Study Area

Area- 200 haHubli

Navanagar

Page 8: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

�Complete Streets�Cultural Landscapes�Public spaces�Compact Development�Transit Supportive Uses�Integrated Transport�TDM

Page 9: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

Existing Road Network COMPLETE STREETS

�Incomplete road stretches.

�Inconsistent road widths.

�No interconnecting network.

�No clear distribution of road hierarchies in existing network.

�Large block sizes need to be broken into smaller sections

using NMT paths.

�No allocation of road space for NMT.

Page 10: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

Proposed Complete Streets Proposed Road Hierarchies

3.m wide lane

6.m wide road (Local roads)

9.m wide road (Local roads)

12.m wide road (Neighbourhood Collector)

16.m wide road (Neighbourhood Collector)

18.m wide road (Collector)

24.m wide road (Collector)

30.m wide road (Collector)

44.m wide road (BRT)

Page 11: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

A 12m wide neighborhood collector

Page 12: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

A 16m wide neighborhood collector

Page 13: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

Prohibited zone

Regulated zone

CULTURAL LANDSCAPES

1120 AD

According to the Ancient Monuments and Archaeological Sites and Remains(Amendment and Validation) Act- 2010,

�Prohibited zone- 100m from the protected ASI monument. No constructions can bemade. The 100m area in Amargol about 50% of the old village.

�Regulated Zone- 200 m from the prohibited area. Constructions can be made withthe permission of GOI.

This implies that any construction/ modification/ development activities to becarried out in the entire village have to be approved by the ASI.

Guidelines for Historic Settlement of Amargol-

AMARGOL village

Page 14: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

Current Issues-

�Predominantly agricultural.�The Station Road through the village connects the NH4 to theAmargol Railway station and many of the other villages beyond.

�Increased traffic and commercial activity

� Household activities including marriages spill out to thestreet and backyards.

� simultaneous rapid development and modernization atone end and severely limited change and growth at theother.

Master Plan, 2021-

�in the Master Plan: Commercial use along the main road(proposed at 24mts) and the interior roads (proposed at12mts).

� Existing road network or plotting within the extents of thevillage ignored: many structures will have to be demolishedto implement the Master Plan.

Page 15: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

Proposed Public SpacesExisting Public Spaces

PUBLIC SPACES

Total Open Space- 11.1 ha(parks, natural lakes and a cemetery)

Current Issues-�A very small percentage of the Public Open spaces is usable by the public while the majority of the parks and green areas areneglected.�The strips of land around the lakes, which must be preserved as Riparian areas, are not protected, and hence any development inthis zone will threaten the lakes.�On street informal activities intrude into the pedestrians domain competing for space.

Page 16: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

Current Issues-

�Only about 50 % of the plots have been builtupon. The government agencies have largeplots and hence the ratio of built to un-built ontheir properties is very low.

�Most buildings in Navanagar are ground and

COMPACT DEVELOPMENT & TRANSIT SUPPORTIVE USES

Master Plan, 2021-

�Master Plan- FSI is determined byLand Use and width of access road.

1.5 for residential plot on a 9 meteraccess road.2.5 for commercial plot on a 15 meter�Most buildings in Navanagar are ground and

ground plus one (G and G+1) structures.

�Underutilized FSI- Most of the roads are 9 mwide.

�Single commercial axis.

�Lack of mixed use in other areas.

2.5 for commercial plot on a 15 meterroad.

Page 17: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

2min

5min

10min

TOD development zones

0 to 100 m zone: High density, highcommercial mixed use development

100 to 250 m zone: Medium density,balanced mixed use development

250 to 500 m zone: Low density, highresidential mixed use development

Identified zone for TOD development

Page 18: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

Medium Density ZoneLow Density Zone

Proposed FSI map; EMBARQProposed FSI map; Master Plan 2021

Page 19: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

Existing Land Use

Page 20: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

High Density Zone

Public

Commercial

Open spaces

Water bodies

Residential

Proposed Land use map; Master Plan 2021 Proposed Land use map; EMBARQ

Page 21: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

Create visually attractive building thatenhances the pedestrian environment

Existing typologies

Mixed use-Mid rise –High ground cover

ReferenceImages

• Facing Collector street ( x to y m)• Midrise ( G to g+2)( FSI 2-3)• Mixed-use ( commercial residential)• High ground cover ( 70 to 100%)• Peripherally located vertical access• Single units each floor• Front end open to street

Variations• Larger share of commercial use• Both peripheral and central vertical

access• Mixed use ( commercial –office)• Mixed use ( commercial –office)

Analysis• Good Density achieved (g:300-350,j:

200)• Good mix of land use ( 50-50 to 60-40)• Live edges achieved due to commercial

mix• Variations 1 & 2 achieve job densities of

400 +

Limitations• Light and ventilation is an issue• Ground coverage can be reduced by

modifying setbacks

• Reduce allowable ground coverto 50 %

• Front set back of 2m, Back setback of minimum 5m

• FSI: 2

• Segregated access for residentialand commercial

Page 22: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

Navanagar Main road 100 ft. road as a ‘Green Way’

INTEGRATED TRANSPORT

100 ft. road as a ‘Green Way’

Public plaza at Navanagar Bus Stop

Scope for Improvements-

�Improving the feeder network.

�Integrating NMT, IPT facilities with BRT stops.

Page 23: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

Existing route 1 (bus)

Proposed feeder routes – 20.1 km

Existing feeder routes

Bus Stop

Existing Bus stop

Feeder Network

BRT corridor

Existing route 2 (bus)

Existing Bus stop

Page 24: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

TRAVEL DEMAND MANAGEMENT

Current issues

�Most of the private vehicles are parked on-street.(both designated and non-designated). No regulationof on-street parking.

�No special provisions made for parking of goodsvehicles, rickshaws and bicycles.

�No parking place for non-motorised transport.

�Paid parking is applicable at only one road of

Master Plan, 2021

�DCR mention the minimum parking requirement based on theusage type and road width.

�Specifies 1 /5 of the total parking area to be reserved for twowheelers and cycles.

�Cycle provision is optional as it is clubbed with twoWheelers

�Paid parking is applicable at only one road oflength 500m in entire city.

Scope for Improvements-

�Designate on street and off street parking areas.

�Maximum limit should be mentioned in the DCR instead of minimum parking requirements alongthe corridor.

�Parking pricing to be introduced for the twin cities.

Page 25: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

Interventions Complete Streets

Integrated Transport

Public Space Cultural Landscapes

Compact Development

TransitSupportive Uses

Travel Demand Management

Project �Completion of DP roads�Design and implementation of NMT networks

�Provision of pedestrian paths between transit stations.�Design of public plazas.

�Design and provision of public space based on topographic features.�Design and implement safe and easy access.

�formulation of guidelines�OperationalizeHeritage cell to address special issues.

�Propose guidelines for special areas in TOD zone.�Develop framework for pedestrian responsive Built-form.

�Develop and implement Rational for mixed land use.�Integration of community facilities in neighborhood as part of TOD.

�Parking norms

Planning �Incorporating �Incorporation �Integrate �Identification of �Incorporate �Provision for �Develop Planning �Incorporating TOD, NMT, BRT in MP.�Formulation of Local Area plans for major TOD zones

�Incorporation of integration of multiple modes, pedestrian zones and pedestrian priority areas within MP.�Formulation of DCRs to support and enable pedestrian zones.

�Integrate public spaces and NMT network.�Legal provision for compensation of open spaces used for TOD development.

�Identification of special heritage areas and inclusion in the MP.�Construction incentives like density bonus, land assembly, remediation, transit integration etc.

�Incorporate new density zones and DCRs for TOD.�Incorporate regulations to encourage subdivisions.�Identification of special areas.�Introduction of Form-Based DCRs in MP.

�Provision for introducing mixed use as a Land use category.

�Develop provisions to support bicycles and pedestrian mobility through enabling strategies in DCRs of TOD zones identified in the MP.

Policy �Legal provision for heritage cell

�Streamlining development approvals/

Page 26: TOD in Hubli-Dharwad: Possibilities and Challenges in Hubli-Dharwad: Possibilities and Challenges ... Public plaza at Navanagar Bus Stop ... Design and implementation of NMT

Thank YouThank You