tie-in

1
DAKHNI PROCESS FLOW DIAGRAM NM0313/01 DATE ENG CAD FORM NO. DESCRIPTION A B C D E F G H I 2 3 4 5 6 7 8 9 ORDER No. CUSTOMER REFERENCE. SYMBOLS USED IN THIS SCHEMATIC DIAGRAM ARE, WHERE APPLICABLE, IN ACCORDANCE WITH ISA-S5.1, ISA-S5.3 & ANSI. TITLE. DRAWING No. 1 ASK IF IN DOUBT LATEST ISSUE CANCELS ALL PREVIOUS ISSUES. DATE ISS. 1 ENGINEER C.A.D. CHECKED EXAMINED 2 3 4 6 7 8 9 10 5 This drawing is the property of Siemens Industrial Turbomachinery Ltd. ("the Company") and contains confidential and proprietary information of the Company. The drawing must not be used for purposes other than that for which it is supplied by the Company and information contained in it must not be copied or disclosed, wholly or in part, without the prior written authority of the Company. 1 2 3 4 5 6 7 8 9 COMPRISES SHEETS AT ISSUE DRAWING ISSUE DATE APPROVED A,C OR G FORM C 2013 Copyright Siemens Industrial Turbomachinery Ltd. UNLESS OTHERWISE INDICATED, ALL INSTRUMENT AIR PIPEWORK IS 3/8" OD 16 SWG. GENERAL NOTES. E. F. FOR INFORMATION ON PART NUMBERS, TAG DEFINITIONS, ABBREVIATIONS AND FUNCTION DEFINITION, REFER TO THE P&ID PARTS LIST:- A. NO OR NC NOTATION ASSOCIATED WITH AUTOMATIC VALVES RELATES TO THE VALVE IN ITS DE-ENERGISED STATE. WITH RESPECT TO CLIENT PIPING TO THE PACKAGE, THIS P&ID MUST BE READ IN CONJUNCTION WITH THE 'PIPING DESIGN SPECIFICATION AND TIE IN SCHEDULE' DOCUMENT NUMBER B. C. FLUID TO BE SUPPLIED IN ACCORDANCE WITH COMPANY FLUIDS SPECIFICATION 65/0027. D. THE CONTROL SYSTEM IS REPRESENTED IN A SIMPLIFIED FORMAT. THE CONTROL FUNCTIONS INDICATED ARE DEPENDENT ON ENGINE STATUS. VALVE POSITION ERROR MAY RESULT IN SHUTDOWN OR START INHIBIT. NM0313/C01/034 G. ISOLATION AND CALIBRATION VALVE CORRECT POSITIONS ARE INDICATED ON THE GENERIC LEGEND SHEET :- NM0313/C01/025 NM0313/C04/001. 17/06/13 SL 17th JUNE 2013 DRAWING ISSUED E011048 SL S.LOUTH S.LOUTH S.DELPH S.DELPH E011048 1 1 17/06/13 SGD SGT100-1S GAS FUEL VENT, DRAIN & TIE IN SCHEDULE CT48131N / C04/ 001 SHEET 6 CPc Fc Gc 4"NPS 3"NPS GCc 2"NPS AGXc OIL COOLER DEc DDc LUB. OIL RETURN FZc Ec CDc COMBU STION AIR INL ET ACc Dc AUc BWc GAS FUEL VENT AREA OIL SYSTEM BREATHER OUTLETS GAS TURBINE FIRE AND GAS SYSTEM 2"NPS 1 1/2"NPS 1"NPS 1"NPS 1/2"NPS BASEPLATE DRAIN (NOTE 4.8, 4.9) ENCLOSURE VENTILATION AIR OUTLET INSTRUMENT AIR FROM CLIENT SUPPLY 1 1/2"NPS FROM CLIENT SUPPLY NOTE 2.3 & 2.17 NOTE 4.15, 4 .17 - 18 NOTE 4.10 NOTE 4.1, 4.15 NOTE 2.4 TURBINE ROOF MOUNTED MODULE NOTE 2.12 NOTE 2.1, 2.7, 2.9, 2.10 VENT FROM GAS VENT VALVE CT BEARING BREATHER 3"NPS 3/4" OD 16 SWG TO CONDENSATE DRAIN ATHc 1" OD 16 SWG COMPRESSED AIR SUPPLY TO DAMPERS NOTE 2.13 DBc1 FLAME TRAP FLAME TRAP GDc AJKc NOTE 2.17, 2.19 LUB. OIL SUPPLY COMPRESSOR WASH MODULE LOW PRESSURE FNc BKc BZc BLOCK AND VENT VALVES NOTE 2.1, 2.9 & 2.10 CBc CAc 2"NPS FUEL GAS TREATMENT PACKAGE NOTE 2.18 LOW PRESSURE WASH SYSTEM ASDc ASGc ASEc NOTE 4.1.4, 4.1.10, 4.16, 4.23 CCc2 NOTE 4.21 FILTER/ ISOLATION ASS'Y CCc1 NOTE 4.1.4, 4 .1.10, 4.14, 4.16, 4.23 NOTE 4.1.4, 4 .1.6, 4.1.10, 4.23 2" NPS ASFc Hc LUB. OIL TANK DRAIN (NOTE 4.13) BLc ON-SKID DRAIN TANK DRAIN (NOTE 4.2 - 7, 4.20) GENERATOR NOTE 2.16 Nc LUB. OIL TANK FILLER INDICATES SKID EDGE/ ACOUSTIC ENCLOSURE BYc AWJc BAc LUB. OIL TANK FILLER TO WHRU AYBc GAS FUEL CONDENSATE INSTRUMENT AIR COMPRESSOR VENTIL ATION AIR INL ET AYUc HP FUEL GAS 3/4"NPS 3"NPS 3/8" OD 16 SWG 4"NPS COALESCER ATVc NOTES 2.4 & 4.15 Mc ADRc 1" OD 16 SW G ATTc ATXc ATWc INSTRUMENT AIR SUPPLY TO WASH MODULE AWKc ATMOSPHERIC BALANCE LINE 9 1 1" OD 16 SWG NOTE 2.13 AYZc AZBc AZAc AZCc

Upload: zohaibfarooq

Post on 27-Oct-2015

39 views

Category:

Documents


3 download

DESCRIPTION

tie-in planing

TRANSCRIPT

DAKHNI

PROCESS FLOW DIAGRAM

NM0313/01

DATE ENG CAD FORM NO. DESCRIPTION

A

B

C

D

E

F

G

H

I

2 3 4 5 6 7 8 9

ORDER No.

CUSTOMER REFERENCE.

SYMBOLS USED IN THIS SCHEMATIC DIAGRAM ARE, WHERE APPLICABLE, IN ACCORDANCE

WITH ISA-S5.1, ISA-S5.3 & ANSI.

TITLE.

DRAWING No.

1

ASK

IF IN DOUBT

LATEST ISSUECANCELS ALL

PREVIOUS ISSUES.

DATE

ISS.

1

ENGINEER

C.A.D.

CHECKED

EXAMINED

234

678910

5

This drawing is the property of Siemens Industrial Turbomachinery Ltd. ("the Company") and contains confidential and proprietary information of the Company. The drawing must not be used for purposes otherthan that for which it is supplied by the Company and information contained in it must not be copied or disclosed, wholly or in part, without the prior written authority of the Company.

1 2 3 4 5 6 7 8 9COMPRISES SHEETS AT ISSUEDRAWING

ISSUE DATE APPROVED A,C OR GFORM

C2013

Copyright Siemens Industrial Turbomachinery Ltd.

UNLESS OTHERWISE INDICATED, ALL INSTRUMENT AIR PIPEWORK IS3/8" OD 16 SWG.

GENERAL NOTES.

E.

F. FOR INFORMATION ON PART NUMBERS, TAG DEFINITIONS,ABBREVIATIONS AND FUNCTION DEFINITION, REFER TO THE P&IDPARTS LIST:-

A. NO OR NC NOTATION ASSOCIATED WITH AUTOMATIC VALVES RELATES TO THE VALVE IN ITS DE-ENERGISED STATE.

WITH RESPECT TO CLIENT PIPING TO THE PACKAGE, THIS P&ID MUST BE READ IN CONJUNCTION WITH THE 'PIPING DESIGN SPECIFICATION AND TIE IN SCHEDULE' DOCUMENT NUMBER

B.

C. FLUID TO BE SUPPLIED IN ACCORDANCE WITH COMPANY FLUIDS SPECIFICATION 65/0027.

D. THE CONTROL SYSTEM IS REPRESENTED IN A SIMPLIFIED FORMAT. THE CONTROL FUNCTIONS INDICATED ARE DEPENDENT ON ENGINE STATUS. VALVE POSITION ERROR MAY RESULT IN SHUTDOWN OR START INHIBIT.

NM0313/C01/034

G.ISOLATION AND CALIBRATION VALVE CORRECT POSITIONS AREINDICATED ON THE GENERIC LEGEND SHEET :- NM0313/C01/025

NM0313/C04/001.

17/06/13 SL

17th JUNE 2013

DRAWING ISSUEDE011048SL

S.LOUTH

S.LOUTH

S.DELPH

S.DELPH

E011048 11 17/06/13 SGD

SGT100-1S GAS FUELVENT, DRAIN & TIE IN SCHEDULE

CT48131N / C04/ 001SHEET 6

CP

c

Fc

Gc

4"N

PS

3"N

PS

GCc

2"N

PS

AGXc

OIL COOLER

DEc DDc

LUB. OIL RETURN

FZcEc

CDcCO

MB

US

TIO

NA

IR IN

L ET

ACc

Dc

AUc

BWc

GAS FUEL VENT AREA

OIL SYSTEM BREATHER OUTLETS

GAS TURBINEFIRE AND GAS

SYSTEM

2"NPS1 1/2"NPS

1"N

PS

1"NPS

1/2"

NP

S

BASEPLATE DRAIN (NOTE 4.8, 4.9)

ENCLOSUREVENTILATIONAIR OUTLET

INSTRUMENT AIR

FROM CLIENT SUPPLY 1 1/2"NPS

FROM CLIENT SUPPLY

NOTE 2.3 & 2.17

NO

TE

4.1

5, 4

.17

- 18

NO

TE

4.1

0

NOTE 4.1, 4.15

NOTE 2.4

TURBINE ROOF MOUNTED MODULE

NOTE 2.12

NOTE 2.1, 2.7, 2.9, 2.10

VENT FROM GAS VENT VALVE

CT

BE

AR

ING

BR

EA

TH

ER

3"N

PS

3/4" OD 16 SWG

TO CONDENSATEDRAIN

ATHc1" OD 16 SWG COMPRESSED AIR SUPPLY

TO DAMPERS

NOTE 2.13

DB

c1

FLAMETRAP

FLAMETRAP

GDcAJKc

NOTE 2.17, 2.19

LUB. OIL SUPPLY

COMPRESSOR WASH MODULELOW PRESSURE

FNcBKc

BZc

BLOCKAND

VENTVALVESNOTE 2.1, 2.9

& 2.10

CBcCAc

2"NPSFUEL GAS

TREATMENTPACKAGE

NOTE 2.18

LOW PRESSUREWASH SYSTEM

ASDc

ASGc

ASEc

NOTE 4.1.4, 4.1.10, 4.16, 4.23

CCc2

NOTE 4.21

FILTER/ISOLATION

ASS'Y

CCc1

NO

TE

4.1

.4, 4

.1.1

0, 4

.14,

4.1

6, 4

.23

NO

TE

4.1

.4, 4

.1.6

, 4.

1.10

, 4.

232"

NP

S

ASFc

Hc LUB. OIL TANK DRAIN (NOTE 4.13)

BLc ON-SKID DRAIN TANK DRAIN (NOTE 4.2 - 7, 4.20)

GENERATORNOTE 2.16

Nc

LUB. OIL TANK FILLER

INDICATES SKID EDGE/ACOUSTIC ENCLOSURE

BYcAWJc

BAc

LUB. OIL TANK FILLER

TO WHRU

AYBc

GAS FUEL

CONDENSATE

INSTRUMENTAIR

COMPRESSOR

VE

NT

ILA

TIO

NA

IR IN

L ET

AYUc

HP FUEL GAS

3/4"NPS

3"NPS

3/8" OD

16 SWG

4"N

PS

COALESCER

ATVc

NOTES 2.4 & 4.15

Mc

AD

Rc

1" O

D 1

6 S

WG

ATTc

ATXc

ATWc

INSTRUMENT AIR SUPPLYTO WASH MODULE

AWKc ATMOSPHERIC BALANCE LINE9

1

1" OD 16 SWG

NOTE 2.13

AYZc

AZBc

AZAc

AZCc

ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
TP-15
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
805-IA-017-2"-A5
ENAR Process
Notes
806-BD-004-3"-A1
ENAR Process
Notes
2310-PB-2057
ENAR Process
Notes
ENAR Process
Notes
ENAR/OGDCL
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
SIEMENS / VENDOR
zohaib.farooq
Note
Unmarked set by zohaib.farooq
zohaib.farooq
Text Box
TP-02
zohaib.farooq
Text Box
TP-04
zohaib.farooq
Text Box
TP-03
zohaib.farooq
Text Box
TP-14
zohaib.farooq
Text Box
TP-15
zohaib.farooq
Text Box
TP-16
zohaib.farooq
Text Box
TP-01
zohaib.farooq
Text Box
TP-18
zohaib.farooq
Text Box
TP-11
zohaib.farooq
Text Box
TP-05
zohaib.farooq
Text Box
TP-06
zohaib.farooq
Text Box
TP-12
zohaib.farooq
Text Box
TP-17
zohaib.farooq
Text Box
TP-09
zohaib.farooq
Text Box
TP-07
zohaib.farooq
Text Box
TP-08
zohaib.farooq
Text Box
TP-10
zohaib.farooq
Text Box
TP-13
zohaib.farooq
Stamp
ENAR Process
Notes
zohaib.farooq
Text Box
2310-PB-2080