Download - TIE-IN

Transcript

DAKHNI

PROCESS FLOW DIAGRAM

NM0313/01

DATE ENG CAD FORM NO. DESCRIPTION

A

B

C

D

E

F

G

H

I

2 3 4 5 6 7 8 9

ORDER No.

CUSTOMER REFERENCE.

SYMBOLS USED IN THIS SCHEMATIC DIAGRAM ARE, WHERE APPLICABLE, IN ACCORDANCE

WITH ISA-S5.1, ISA-S5.3 & ANSI.

TITLE.

DRAWING No.

1

ASK

IF IN DOUBT

LATEST ISSUECANCELS ALL

PREVIOUS ISSUES.

DATE

ISS.

1

ENGINEER

C.A.D.

CHECKED

EXAMINED

234

678910

5

This drawing is the property of Siemens Industrial Turbomachinery Ltd. ("the Company") and contains confidential and proprietary information of the Company. The drawing must not be used for purposes otherthan that for which it is supplied by the Company and information contained in it must not be copied or disclosed, wholly or in part, without the prior written authority of the Company.

1 2 3 4 5 6 7 8 9COMPRISES SHEETS AT ISSUEDRAWING

ISSUE DATE APPROVED A,C OR GFORM

C2013

Copyright Siemens Industrial Turbomachinery Ltd.

UNLESS OTHERWISE INDICATED, ALL INSTRUMENT AIR PIPEWORK IS3/8" OD 16 SWG.

GENERAL NOTES.

E.

F. FOR INFORMATION ON PART NUMBERS, TAG DEFINITIONS,ABBREVIATIONS AND FUNCTION DEFINITION, REFER TO THE P&IDPARTS LIST:-

A. NO OR NC NOTATION ASSOCIATED WITH AUTOMATIC VALVES RELATES TO THE VALVE IN ITS DE-ENERGISED STATE.

WITH RESPECT TO CLIENT PIPING TO THE PACKAGE, THIS P&ID MUST BE READ IN CONJUNCTION WITH THE 'PIPING DESIGN SPECIFICATION AND TIE IN SCHEDULE' DOCUMENT NUMBER

B.

C. FLUID TO BE SUPPLIED IN ACCORDANCE WITH COMPANY FLUIDS SPECIFICATION 65/0027.

D. THE CONTROL SYSTEM IS REPRESENTED IN A SIMPLIFIED FORMAT. THE CONTROL FUNCTIONS INDICATED ARE DEPENDENT ON ENGINE STATUS. VALVE POSITION ERROR MAY RESULT IN SHUTDOWN OR START INHIBIT.

NM0313/C01/034

G.ISOLATION AND CALIBRATION VALVE CORRECT POSITIONS AREINDICATED ON THE GENERIC LEGEND SHEET :- NM0313/C01/025

NM0313/C04/001.

17/06/13 SL

17th JUNE 2013

DRAWING ISSUEDE011048SL

S.LOUTH

S.LOUTH

S.DELPH

S.DELPH

E011048 11 17/06/13 SGD

SGT100-1S GAS FUELVENT, DRAIN & TIE IN SCHEDULE

CT48131N / C04/ 001SHEET 6

CP

c

Fc

Gc

4"N

PS

3"N

PS

GCc

2"N

PS

AGXc

OIL COOLER

DEc DDc

LUB. OIL RETURN

FZcEc

CDcCO

MB

US

TIO

NA

IR IN

L ET

ACc

Dc

AUc

BWc

GAS FUEL VENT AREA

OIL SYSTEM BREATHER OUTLETS

GAS TURBINEFIRE AND GAS

SYSTEM

2"NPS1 1/2"NPS

1"N

PS

1"NPS

1/2"

NP

S

BASEPLATE DRAIN (NOTE 4.8, 4.9)

ENCLOSUREVENTILATIONAIR OUTLET

INSTRUMENT AIR

FROM CLIENT SUPPLY 1 1/2"NPS

FROM CLIENT SUPPLY

NOTE 2.3 & 2.17

NO

TE

4.1

5, 4

.17

- 18

NO

TE

4.1

0

NOTE 4.1, 4.15

NOTE 2.4

TURBINE ROOF MOUNTED MODULE

NOTE 2.12

NOTE 2.1, 2.7, 2.9, 2.10

VENT FROM GAS VENT VALVE

CT

BE

AR

ING

BR

EA

TH

ER

3"N

PS

3/4" OD 16 SWG

TO CONDENSATEDRAIN

ATHc1" OD 16 SWG COMPRESSED AIR SUPPLY

TO DAMPERS

NOTE 2.13

DB

c1

FLAMETRAP

FLAMETRAP

GDcAJKc

NOTE 2.17, 2.19

LUB. OIL SUPPLY

COMPRESSOR WASH MODULELOW PRESSURE

FNcBKc

BZc

BLOCKAND

VENTVALVESNOTE 2.1, 2.9

& 2.10

CBcCAc

2"NPSFUEL GAS

TREATMENTPACKAGE

NOTE 2.18

LOW PRESSUREWASH SYSTEM

ASDc

ASGc

ASEc

NOTE 4.1.4, 4.1.10, 4.16, 4.23

CCc2

NOTE 4.21

FILTER/ISOLATION

ASS'Y

CCc1

NO

TE

4.1

.4, 4

.1.1

0, 4

.14,

4.1

6, 4

.23

NO

TE

4.1

.4, 4

.1.6

, 4.

1.10

, 4.

232"

NP

S

ASFc

Hc LUB. OIL TANK DRAIN (NOTE 4.13)

BLc ON-SKID DRAIN TANK DRAIN (NOTE 4.2 - 7, 4.20)

GENERATORNOTE 2.16

Nc

LUB. OIL TANK FILLER

INDICATES SKID EDGE/ACOUSTIC ENCLOSURE

BYcAWJc

BAc

LUB. OIL TANK FILLER

TO WHRU

AYBc

GAS FUEL

CONDENSATE

INSTRUMENTAIR

COMPRESSOR

VE

NT

ILA

TIO

NA

IR IN

L ET

AYUc

HP FUEL GAS

3/4"NPS

3"NPS

3/8" OD

16 SWG

4"N

PS

COALESCER

ATVc

NOTES 2.4 & 4.15

Mc

AD

Rc

1" O

D 1

6 S

WG

ATTc

ATXc

ATWc

INSTRUMENT AIR SUPPLYTO WASH MODULE

AWKc ATMOSPHERIC BALANCE LINE9

1

1" OD 16 SWG

NOTE 2.13

AYZc

AZBc

AZAc

AZCc

ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
TP-15
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
805-IA-017-2"-A5
ENAR Process
Notes
806-BD-004-3"-A1
ENAR Process
Notes
2310-PB-2057
ENAR Process
Notes
ENAR Process
Notes
ENAR/OGDCL
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
ENAR Process
Notes
SIEMENS / VENDOR
zohaib.farooq
Note
Unmarked set by zohaib.farooq
zohaib.farooq
Text Box
TP-02
zohaib.farooq
Text Box
TP-04
zohaib.farooq
Text Box
TP-03
zohaib.farooq
Text Box
TP-14
zohaib.farooq
Text Box
TP-15
zohaib.farooq
Text Box
TP-16
zohaib.farooq
Text Box
TP-01
zohaib.farooq
Text Box
TP-18
zohaib.farooq
Text Box
TP-11
zohaib.farooq
Text Box
TP-05
zohaib.farooq
Text Box
TP-06
zohaib.farooq
Text Box
TP-12
zohaib.farooq
Text Box
TP-17
zohaib.farooq
Text Box
TP-09
zohaib.farooq
Text Box
TP-07
zohaib.farooq
Text Box
TP-08
zohaib.farooq
Text Box
TP-10
zohaib.farooq
Text Box
TP-13
zohaib.farooq
Stamp
ENAR Process
Notes
zohaib.farooq
Text Box
2310-PB-2080

Top Related