Thursday, 17 Oct.2013Marudhar Engineering College, Bikaner 1
ASEMINAR REPORT
ON SUMMER TRAINING
FROMSURATGARH SUPER THERMAL POWER STATION
SUBMITTED TO:HEMANT KAUSHIKSEMINAR INCHARGE
SUBMITTED BY:MANISH SAHU
Electrical engineering
2Thursday, 17 Oct.2013Marudhar Engineering College, Bikaner
CONTENTS
Introduction Installed capacity of S.S.T.P.S Selection of site for thermal power plant Basic structure of thermal power plant Layout of thermal power plant Main units of thermal power plant Plant familiarization Thermal power plant auxiliaries Switch yard Control room Efficiency Super critical technology Ultra super critical technology Advantages Disadvantages Conclusion Reference
INTRODUCTION
Suratgarh thermal power station is the first super thermal power Station of Rajasthan with total installed capacity of 1500 MW.
Suratgarh super thermal power station is located 27 km away from Suratgarh town in Sri Ganganagar Distt. on the left bank of IGNP at Up Stream of Suratgarh Barrage.
This station is operated and maintained by RajasthanVidhyt Utpadan Nigam Limited. Thursday, 17 Oct.2013Marudhar Engineering College, Bikaner 3
S.S.T.P.S. is designed in six stagesSTAGE I - 1x250 MWSTAGE II - 1x250 MWSTAGE III - 1x250 MWSTAGE IV - 1x250 MWSTAGE V - 1x250 MWSTAGE VI - 1x250 MWSTAGE VII - 1x660MW(Under construction)STAGE VIII - 1x660MW(Under construction)Total Power Generation - 1500 MW
Thursday, 17 Oct.2013Marudhar Engineering College, Bikaner 4
INSTALLED CAPACITY OF S.S.T.P.S.
Thursday, 17 Oct.2013Marudhar Engineering College, Bikaner 5
Supply of Water Requirement of Land Labour Supplies Transportation Facility Ash Disposal Distance form Populated Area Near to the Load Centre Magnitude and nature of load to be
handled
SELECTION OF SITE FOR THERMAL POWER PLANT
Exhaust Steam
Thursday, 17 Oct.2013Marudhar Engineering College, Bikaner 6
BoilerWater
Fuel
Air
Waste Gases
Steam
Stea
m
Turb
ine
Alternator
Bus-Bars
Three Phase Transmission Line
BASIC STRUCTURE OF THERMAL POWER PLANT
Step-Up Transformer
Thursday, 17 Oct.2013Marudhar Engineering College, Bikaner 7
LAYOUT OF THERMAL POWER PLANT
Thursday, 17 Oct.2013Marudhar Engineering College, Bikaner 8
Coal Handling Plant (C.H.P)
Water Treatment Plant (W.T.P)
Boiler Maintenance Division (B.M.D)
Turbine Maintenance Division (T.M.D)
Generator Division (G.D)
MAIN UNITS OF THERMAL POWER PLANT
Raw coal from bharat coal ltd. Dhanbad &
bilaspur(MP)To SSTPS from Birdwal via a
single railway track
Wagon Tippler
HoppersCrusher HouseBunkers
Raw coal feeders
Coal mills(pulverization)
Boiler furnace
Thursday, 17 Oct.2013Marudhar Engineering College, Bikaner 9
OVER VIEW OF COAL HANDLIG PLANT
Thursday, 17 Oct.2013Marudhar Engineering College, Bikaner 10
PLANT FAMILIARIZATIONBOILER
In boiler heat energy is released from the combustion of fossils fuel and heat is transferred to different fluids in the system.The boiler installed in S.T.P.S. are single drum, tangential fired water tube naturally circulated over hanged, pulverizing coal firing with a max. Continuous steam output of 375 tons/hour at 138 kg/cm2 pressure and 5400C temperature.
Marudhar Engineering College, Bikaner 11
SUPER HEATER
A super heater is a device in a steam engine that heats the steam generated by the boiler again, increasing its thermal energy. Super heater eliminates the formulation of condensate during transporting of steam in pipelines and inside the early stages of turbine, which is harmful to the turbine blades and pipelines
Thursday, 17 Oct.2013
12Marudhar Engineering College, Bikaner Thursday, 17 Oct.2013
ECONOMIEER
Economizer is device which recover the heat from the flue gases on their way to chimney.
Flue gases coming out of the boiler carry lot of heat.
An economizer extracts a part of this heat from flue gases and uses it for heating feed water.
This use of economizer results in saving coal consumption and higher boiler efficiency .
Marudhar Engineering College, Bikaner 13
Air Pre-heater is a heat exchanger in which preheating of air done by transferring heat from the flue gas before supplying to the combustion chamber. The preheating of air results:1.Improved combustion2.Saving in fuel consumption3.Thermal efficiency.
AIR PRE-HEATER
Thursday, 17 Oct.2013
Thursday, 17 Oct.2013Marudhar Engineering College, Bikaner 14
Steam after rotating steam turbine comes to the condenser. The purpose of condenser is to condense the outlet steam from steam turbine to get the condensed steam in the form of pure water.
This water is then Pumped back to the boiler.
CONDENSER
Thursday, 17 Oct.2013Marudhar Engineering College, Bikaner 15
These heaters are used to heat the feed water by means of bled steam before it is supplied to the boiler. Necessity of heating feed water before feeding it back to the boiler arises due to the following reasons:Overall power plant efficiency is improved.Thermal stresses due to cold water entering the drum of boiler are avoided.Increase in the quantity of steam produced by the boiler.Boiler corrosion are removed in the feed water heaters.
FEED WATER HEATER
16Marudhar Engineering College, Bikaner
The condensate (water) formed in the condenser after condensation is initially at high temperature. This hot water is passed to cooling towers.
It is a tower- or building-like structure in which atmospheric air circulates in direct or indirect contact with warmer water and the water is thereby cooled.
COOLING TOWER
Thursday, 17 Oct.2013
Thursday, 17 Oct.2013 17Marudhar Engineering College, Bikaner
A steam generating boiler requires that the boiler feed water should be devoid of air and other dissolved gases, particularly corrosive ones. In order to avoid corrosion of the metal, power station uses a Deaerator, for the removal of air and other dissolved gases from the boiler feed water.A deaerator has a vertical, domed deaeration section mounted on top of a horizontal cylindrical vessel which serves as a deaerated boiler feed water storage tank.
DEAERATOR
Marudhar Engineering College, Bikaner 18
TURBINE
Turbine is rotating device that converts the energy of a moving stream of water, steam, or gas into mechanical energy. The basic element in a turbine is a wheel or rotor. This mechanical energy is then transferred through a drive shaft to operate an alternator.
Thursday, 17 Oct.2013
Thursday, 17 Oct.2013Marudhar Engineering College, Bikaner 19
ALTERNATOR
An alternator is a device which convert mechanical energy to electrical energy.
Turbo-alternators are high speed machines (3,000 or 5,000RPM) for 50 Hz systems. Alternator have horizontal configurations and smooth cylindrical (or non salient pole) type field structure wound usually for 2 or 4 poles.
Thursday, 17 Oct.2013Marudhar Engineering College, Bikaner 20
Thermal station use coal as the main fuel.
Raw coal is transported by railway trains.
The supply of coal is from MP, Jharkhand by rail. About 18000 tonne coal required per day for whole unit and each unit consumes 150tonnes coal per day.
COAL HANDLING
Thursday, 17 Oct.2013Marudhar Engineering College, Bikaner 21
FEED WATER
The system coming out the turbine is condensed and the condensate is feedback to the boiler as feed water. Some water may be lost due to blow-down, leakage etc. and to make up these losses additional water, called the make-up water, is required to be fed to the boiler. The make-up water in a modern thermal plant is about 1-4%.The heating of feed water :-
i. Improves the overall efficiency of the plant ii. Removes dissolved oxygen and carbon-die-oxide iii.Causes precipitation of other impurities carried by steam and
condensate outside the boileriv. Avoids thermal stresses owing to entry of cold water into the
boiler.
22Marudhar Engineering College, Bikaner Thursday, 17 Oct.2013
ASH HANDLING PLANT
The percentage of ash in coal is 5% in good quality coal & about 40% in poor quality coal. Power plants generally use poor quality of coal , thus amount of ash produced by it is quite large. A modern 1000MW plant produces about 4800 tons of ash daily. The stations use some conveyor arrangement to carry ash to dump sites.
Thursday, 17 Oct.2013 23Marudhar Engineering College, Bikaner
DRAUGHT SYSTEM
The circulation of air is caused by a difference in pressure, known as draught. In a boiler the combustions of the fuel requires supply of sufficient quantity of air and removal of exhaust gases and this is achieved by draught system. There are two types of drought system
i. Natural Draught : - The natural draught is provided by the action of chimney or stack and is used only in small boilers. Its intensity depends upon the average temperature (difference between the flue gases within the chimney and the outside air (the gases within the chimney are at as higher temperature than that of the surrounding air) and also on the height of the chimney above the level of the furnace grate.
ii. Mechanical Draught: - Artificial or mechanical draught is provided when the natural draught caused by a chimney is not sufficient or where a certain draught is required to be maintained irrespective of weather conditions or boiler operating conditions.
Thursday, 17 Oct.2013 24Marudhar Engineering College, Bikaner
THERMAL POWER PLANT AUXILIARIES
The equipments which help in the proper functioning of the plant are called plant auxiliaries.
Boiler make-up water treatment plant and storage Fuel preparation system Barring gear Oil system Generator cooling Generator high-voltage system Monitoring and alarm system
25Marudhar Engineering College, Bikaner Thursday, 17 Oct.2013
SWITCH YARD
Place where switching operation of power distribution is performed is known as Switch Yard.
Main Components of Switch Yard:1. Circuit breaker2. Isolator3. Lightening arrester4. Bus bar5. Current Transformer6. Potential Transformer
26Marudhar Engineering College, Bikaner Thursday, 17 Oct.2013
SWITCH YARD
27Marudhar Engineering College, Bikaner
These are used for automatic switching during normal or abnormal conditions .
Thursday, 17 Oct.2013
CIRCUIT BREAKER
Specification:
Manufacturer ABB Limited
Type of Circuit Breaker SF6
Rated Voltage 245 KV
Rated Current
Under Site Condition of 40 0C
Under Site Condition of 50 0C
4000 A
2000 A
Rated Frequency 50 Hz
28Marudhar Engineering College, Bikaner
These are used to disconnect transmission line under no-load condition for safety, isolation and maintenance.
Thursday, 17 Oct.2013
ISOLATOR
Specification:
Rated current for site conditions
2000 A
Rated Voltage 245 KV
Rated Frequency 50 Hz
Operating time of Isolator Less than 12 sec.
29Marudhar Engineering College, Bikaner
These are used to discharge lightning over voltages and switching over voltages to earth.
Thursday, 17 Oct.2013
LIGHTENING ARRESTOR
Specification:
Manufacturer Crompton Greaves Ltd, Nasik
Model No. ZLA X 25 C
Ref. Standard IEC 99 – 4. 1991
Rated Frequency 50 Hz
Max. Leakage Current 5 mA
30Marudhar Engineering College, Bikaner
The conductors to which several incoming and outgoing lines are connected.
They are made up of Cu & Al,
The incoming and outgoing cables are provided for metering purpose.
Thursday, 17 Oct.2013
BUS BAR
31Marudhar Engineering College, Bikaner
These are used to step-down currents for measurement,
control & protection.
Current transformers are used extensively for measuring
current and monitoring the operation of the power grid.
Thursday, 17 Oct.2013
CURRENT TRANSFORMER
32Marudhar Engineering College, Bikaner
VT measure voltage and this parameter used for protection of system.
For high voltage CVT (capacitive voltage transformer) is used instead of VT and capacitors play divider role.
We can also use these capacitors for PLC system.
Thursday, 17 Oct.2013
VOLTAGE TRANFORMER
Thursday, 17 Oct.2013 33Marudhar Engineering College, Bikaner
CONTROL ROOM
The control room is the nerve centre of a power station. The various controls performed from here
1. Voltages adjustment2. Load control3. Emergency tripping of turbines4. The equipment and instruments housed in a control room
are synchronising equipment and are controlled form control room like as voltages regulators, relays, ammeters, voltmeters, wattmeters, kWh meters, kVARh meters etc.
5. Temperature gauges6. Water level indicators and other appliances7. As well as a mimic diagram and suitable indicating
equipment to show the opened or closed position of circuit breakers, isolators etc.
Thursday, 17 Oct.2013 34Marudhar Engineering College, Bikaner
CONTROL ROOM
Thursday, 17 Oct.2013 35Marudhar Engineering College, Bikaner
EFFICIENCY OF THERMAL POWER PLANT
Installed Plant Capacity Average Overall Thermal Efficiency
Up to 1MW 4%
1MW to 10MW 12%
10MW to 50MW 16%
50MW to 100MW 24%
above 100MW 27%
Thursday, 17 Oct.2013 36Marudhar Engineering College, Bikaner
SUPER CRICTICAL TECHNOLOAGY
At a temperature of about 600 degree centigrade and pressure of 30N/mm2, water enters a supercritical phase and has properties between those of liquid and gas. Water in supercritical stage can dissolve a number of organic compounds and gases and on addition of hydrogen peroxide and liquid oxygen combustion process starts. The steam power plants operating on this principle are called supercritical plats. Advantages
1. Low grade fossil fuels (e.g. lignite) can be used2. NO2 emissions are completely eliminated3. SO2 emission are reduced 4. complete burning of coal occurs.5. need of desulphurisation and equipment and soot collector.6. The cost of processing flue gas emissions (electrostatic precipitator etc.) is
eliminated7. cooling water requirements are also reduced, 8. more economical and efficient.9. Supercritical power plants, these days have an overall efficiency of just over
40%.
Thursday, 17 Oct.2013 37Marudhar Engineering College, Bikaner
ULTRA SUPER CRITICAL TECHNOLOGY
Temperature around 700 degree centigrade is known as ultra supercritical technology.
Efficiency of the power plant may be improved to around 50%.
Thursday, 17 Oct.2013 38Marudhar Engineering College, Bikaner
ADVANTAGES
They can respond to rapidly changing loads without difficulty A portion of the steam generated can be used as a process steam in different industries Steam engines and turbines can work under 25 % of overload continuously Fuel used is cheaper Cheaper in production cost in comparison with that of diesel power stations
Thursday, 17 Oct.2013 39Marudhar Engineering College, Bikaner
Maintenance and operating costs are high Long time required for erection and putting into action A large quantity of water is required Great difficulty experienced in coal handling Presence of troubles due to smoke and heat in the plant Unavailability of good quality coal Maximum of heat energy lost Problem of ash removing
DISADVANTAGES
40Marudhar Engineering College, Bikaner Thursday, 17 Oct.2013
CONCLUSION
Thermal power plants haves low efficiency and these are releases large amount of harmful gases in environment and large amount of ash in the form of wastage. To use renewable energy source to save environment.
Save EnergySave Environment
Thursday, 17 Oct.2013 41Marudhar Engineering College, Bikaner
REFERENCE
"Suratgarh Super Thermal Power Station" Rajasthan Rajya Vidyut Utpadan Nigam Ltd
A course in Electrical Power By J.B.Gupta
Babcock & Wilcox Co. (2005). Steam: Its Generation and Use (41st edition ed.) ISBN 0-9634570-0-4
Thomas C. Elliott, Kao Chen, Robert Swanekamp (Co-author) (1997). Standard Handbook of Power plant Engineering (2nd edition ed.). McGraw-Hill Professional. ISBN 0-07-019435-1
Maury Klein, The Power Makers: Steam, Electricity, and the Men Who Invented Modern America Bloomsbury Publishing USA, 2009 ISBN 1-59691-677-X
J.C. Hensley (Editor) (2006). Cooling Tower Fundamentals (2nd Ed. ed.). SPX Cooling Technologies.
42Marudhar Engineering College, Bikaner Thursday, 17 Oct.2013
THANKYOU
43Marudhar Engineering College, Bikaner Thursday, 17 Oct.2013
Queries