Kota thermal power station
KOTA SUPER THERMAL POWER STATION
RAJASTHAN VIDHYUT UTPADAN NIGAM
LIMITED
INTRODUCTION
KSTPS is first coal based power plant in Rajasthan.
It is located ideally on the left bank of CHAMBAL
River at the upstream of KOTA BARRAGE.
Its first unit of capacity 110 MW is commisioned on 17
jan 1983 and last one on 2009.
It is one of highest power generating plant with
installed capacity of 1240 MW.
STAGES
Unit 6 – 195 MW
Unit 1 – 110 MW
Unit 2 – 110 MW
Unit 3 – 210 MW
Unit 4 – 210 MW
Unit 5 – 210 MW
Unit 7 – 195 MW
Stage I
Stage II Stage III Stage IV
Stage V
DESIGN
110 + 110 + 210 + 210 + 210 + 195 +195 = 1240 MW
CONTENTS OF THE PRESENTATION
• GENERAL LAYOUT
• COAL HANDLING PLANT
• PROCESS OF STEAM GENERATION
• TURBINE
• GENERATOR
• WATER TREWATMENT PLANT
• SWITCHYARD
• CONTROL PANNEL
PLANT OVERVIEW
COAL HANDLING PLANT
• 20000 tons coal requirment per day.• The main coal sources are:
1. Coal India Ltd. (CIL)
2. South Estern Coalfield Ltd. (SECL)
3. Northern Coalfield Ltd. (NCL)
(coal comes from 1000 km distance)
• Everyday 3- 4 trains of coal are unloaded, each train consists 58 wagons.(approx 3500-3800 tons)
• Coal is unloaded from wagons by means of WAGON TRIPPLER
• Stock yard Capacity -5.0 lack tons• Secondary fuel :-oil (HSD/ LDO)
Bunkers Crusher house Hoppers
Row coal feeders
Coal mills(pulverization
)
BOILER FURNACETANGENTIAL FIRING OF PULVERISED COAL
OVERVIEW OF COAL HANDLING PLANT
Row coal from COAL INDIA LIMITED
To KSTPS from gurla via a single railway track
Wagon trippler
CONVEYING SYSTEM
Coal size reduced by 20 mm
TURBINE
Heat energy(steam)
Mechanical energy
BOILER & SUPERHEATER
I P TURBINE
H P TURBINE
L P TURBINE
REHEATER
STEAM AT 545 C
STEAM AT 545 C
STEAM AT 535 C
STEAM AT 535 C
STEAM TURBINE
TURBO GENERATOR
Designed for continuous operation at the rated output.
Directly coupled with steam turbine, rotated at high speed
of 3000 RPM.
Two major parts:-
STATOR AND ROTOR
Major parts of stator are Major parts of rotor areStator frame Rotor frameStator core Rotor WindingsStator barsStator windings
water treatment plant
• DM PLANT
Clariflocculator
tank• C.W. pump house• B.c.w. pump house
SWITCHYARD
The 220 KV Switch yard is the main part of the KTPS it has two buses arrangement with a bus coupled breaker.
There are 11 feeders connected at 220 KV switchyard
• TOTEL OUTGOING FEEDERS
PLACEs NO. SAKATPURA 4 SANGANER 1 PGCIL NANTA 2 HEERAPURA 1 GULABPURA 1 BEAWAR 1 MORAK 1
Main parts of Switchyard
• CIRCUIT BREAKER
• ISOLATOR
• CURRENT TRANSFORMER
• POTENTIAL TRANSFORMER
• LIGHTNING ARRESTOR
TYPES OF CIRCUITS BREAKER
MINIMUM OIL CIRCUIT BREAKER SF6 CIRCUIT BREAKER
In M.O.C.B separating contact of the breakers are made to separate within an insulating oil.
In SF6 separating contact of the breakers are made to separate within SF6 material.
ISOLATORS & ARRESTORS
• Isolators are device which disconnect the instruments from power supply, the isolators provided at 220 KV switchyard are motor operated.
• Lightening Arresters are used in switchyard for preventing from Lightening phenomena and are installed at entrance of switchyard.
C.T. & P.T.
Current Transformer
Rating:• 1000/1A or 1000/5A
Potential TransformerRating:• 220KV /110 V• May be Capacitive or
Inductive
CONTROL PANEL
CONTROL ROOM
Turbine desk
Fan control desk
Fuel control desk
Generator control desk
Steam pressure & control desk