KOTA SUPER THERMALPOWER PLANT

KOTA

By : Aman Agrawal 09EVVME005 B.TECH. 4th Year Mechanical Engg. Vit (East), Jaipur

Page 2: kota Super Thermal Power Station training ppt
Page 3: kota Super Thermal Power Station training ppt

It was established in 1983.It is located at the left bank of the CHAMBAL River at the upstream of KOTA BAIRAJ.1st & 2nd units are of 110 MW each. 3rd ,4th &5th units are of 210 MW .6th & 7 unit of 195 MW.Total generation capacity (110+110+210+210+210+195+195) =1240 MWFavorable condition

Abundant quantity of clean cooling water.Good transport facility Concentration of load in Kota region due to large number

of industries.

INTRODUCTION OF THE THERMAL POWER PLANT

Page 4: kota Super Thermal Power Station training ppt

INSTALLED CAPACITY

Page 5: kota Super Thermal Power Station training ppt

Main Parts of Kota Super Thermal Power Station• Principle• Layout• Coal handling plant• Boiler• Super heater• Steam Turbine• Economizer• Generator• Water Treatment Plant• Ash handling plant• Control Room

Page 6: kota Super Thermal Power Station training ppt
Page 7: kota Super Thermal Power Station training ppt

TECHNICAL LAYOUT OF KSTPS

Page 8: kota Super Thermal Power Station training ppt

Coal Handling Plant

Coal handling plant section

• Wagon unloading system• Crushing system• Conveying system

Page 9: kota Super Thermal Power Station training ppt

Wagon unloading systemUnload the coal

from wagon to hopper with the help of wagon Tripler.

Hopper allows to pass coal pieces ≤ 200mm

From hopper coal fall on vibrator which is supported by roller.

Page 10: kota Super Thermal Power Station training ppt

Conveying systemBelt are used to convey

coal from coal handling plant to furnace.

Specification:-Belt width : 1400mmSpeed : 2.2m/secTotal install power :

360kw Capacity : 1350/750

ton/hrNo. of conveyor: 38

Page 11: kota Super Thermal Power Station training ppt

Crushing systemCRUSHER HOUSE:- It

consists of crushers which are used to crush the coal to 20 mm size.

Two typesPrimary crusher

o Rail crushero Rotary breaker

Secondary crusher

Page 12: kota Super Thermal Power Station training ppt

BoilerIt is a closed vessel in which water under

pressure is converted into steam.Hot water or steam used to transfer heat to a

process.A boiler is always designed to absorb

maximum amount of heat released in process of combustion.

Furnace:- It is primary part of boiler where the fuel is burnt to liberate the heat energy.

Chemical Energy of

fuel

Thermal Energy by combustio

n

Page 13: kota Super Thermal Power Station training ppt

Figure Boiler

Page 14: kota Super Thermal Power Station training ppt

Super heaterSuper heater consists group of tubes.

The tubes are heated by the heat of combustion gases during their passage from furnace to chimney, so the temperature increased.

Super heater remove the moisture from the steam leaving from the boiler tubes.

Page 15: kota Super Thermal Power Station training ppt

Steam TurbineIt is a machine in

which a shaft is rotated steadily by reaction of steam, air upon blades of a wheel.

When Steam is used then it is called steam turbine.

It works on Modified Rankine cycle.Kinetic

Energy

Mechanical Energy

Page 16: kota Super Thermal Power Station training ppt

EconomizerEconomizer is a device which recover the heat from the flue gases on their way to chimney.

It increases the 10-12% efficiency of the plant.

Page 17: kota Super Thermal Power Station training ppt

•An electrical generator is a machine which converts mechanical energy into electrical energy through electro mechanical energy conversion .

•The generator is driven by directly coupled steam turbine at a speed of 3000 r.p.m.

Electrical Energy

Mechanical Energy

GENERATOR

Page 18: kota Super Thermal Power Station training ppt

Water Treatment PlantPressure filter removes

undisclosed impurities from raw water.Carbon filter removes excess

chlorine from clarified water.D.M. plant removes dissolved

impurities from clarified water.Conductivity ,pH & silica

content of this water must be checked time to time.D.M. water must be in the ratio of 1:8

Page 19: kota Super Thermal Power Station training ppt

Ash Handling PlantIn thermal plants

25% is furnace bottom ash and 75% is pulverized fuel ash.

Electrostatic Precipitator is used in ash handling plant to remove fly ash.

Page 20: kota Super Thermal Power Station training ppt

water

wet ash

To coal millTo furnace

PA Fan

FD Fan

APH

ESP

ID Fan

Boiler

ASH HANDLING

Dry Ash

Fly Ash

Page 21: kota Super Thermal Power Station training ppt

Control Room

Page 22: kota Super Thermal Power Station training ppt