The Work Breakdown Structure
![Page 2: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/2.jpg)
The Work Breakdown Structure
• The WBS: All the tasks that must be done to complete a project’s
deliverables
– Tasks are arranged in a hierarchy of broader categories of work down to specific
work tasks
![Page 3: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/3.jpg)
Work Breakdown Structure
(WBS)
• Illustrates project scope
• Describes project subcomponents as:
– Activities (verbs) – “install new plumbing”
or
– Deliverables (noun) – “new plumbing”
![Page 4: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/4.jpg)
Roles Played by the WBS
• Lays out the scope of project work
– All project tasks must be accounted
• Provides the foundation of all project estimates
– Times, costs, resource requirements, etc.
• Helps with the project’s organizational structure
– How tasks relate to one another, authority structure, etc.
![Page 5: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/5.jpg)
WBS: The Compliance ProjectCompliance Project
1.0 Administration 4.0 Medical Care2.0 Physical Therapy 3.0 Food / Nutrition
3.1 Review State Inspection Report
3.2 Review State Compliance Standards
3.3 Develop Policies and Procedures for State Compliance
3.4 Implement Evaluation and Correction Procedures for All Areas
3.3.2 Develop Maintenance SOPs
3.3.1 Develop Corrective Procedures
3.3.2.1 Planning
3.3.2.2 Preparation
3.3.2.3 Delivery
1.1 Review State Inspection Report
1.2 Review State Compliance Standards
1.3 Develop Policies and Procedures for State Compliance
1.4 Implement Evaluation and Correction Procedures for All Areas
1.3.2 Develop Maintenance SOPs :
1.3.1 Develop Corrective Procedures:
1.3.2.1 Planning
1.3.2.2 Financial
1.3.2.3 Supervision
![Page 6: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/6.jpg)
![Page 7: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/7.jpg)
WBS Inputs
• Project scope management plan
• Project scope statement
– Identifies deliverables
– Major steps required to complete the project
• Experience with similar past projects
• Organizational process assets
– Guidelines, organizational policies, procedures
![Page 8: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/8.jpg)
Producing a WBS: Breaking Down Project Work
• Envision a project deliverable
–List all major jobs needed to achieve the deliverable
–Break down major jobs into their smaller component tasks
–Continue until tasks can provide all the detail needed for resource, time, cost, and risk estimates
![Page 9: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/9.jpg)
WBS Techniques
• Decomposition participation includes:– Project team– Customers– Subject matter experts
• Major project deliverables identified
• Codes assigned to each WBS component– Level 0 - project itself– Level 1 - major deliverables– Level 2 - individual components of each deliverable– Etc.– Final level – work package
![Page 10: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/10.jpg)
Work Package
• Lowest level of WBS
• Should contain activities that are short in duration (1 or 2 weeks; 80 hour rule; and no longer than a reporting period).
• Work package activities can be completed by an individual or a small team
• All work packages should be similar in size or effort needed
• Provides input to scheduling and budget development
![Page 11: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/11.jpg)
WBS Numbering System
![Page 12: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/12.jpg)
Product Breakdown
• Helps
define
work
breakdown
![Page 13: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/13.jpg)
One more product breakdown
Windsor Chair
Seat Legs SpindlesSpreaders Back
1.1 flatten plank1.2 layout seat1.3 shape seat1.4 drill seat
2.1 prep blanks2.2 turn legs2.3 dry fit in seat
3.1 measure dry fit legs3.2 turn spreaders3.3 drill legs to fit spreaders
4.1 cut back slat4.2 bead slat4.3 steam bend4.4 shape end tenon4.5 drill seat to fit back4.6 dry fit back
5.1 cut blanks5.2 shape blanks5.3 drill back and seat to fit blanks5.4 dry fit
![Page 14: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/14.jpg)
Producing a WBS: Core and Support Tasks
• Core tasks
– All tasks needed to produce client deliverables
• Support tasks
– All tasks needed to support project work
– Project planning, project administration
– Commonly overlooked
• They will command attention sometime
• Best to consider them in planning
![Page 15: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/15.jpg)
Three Decomposition Approaches
• Top-Down – traditional method
• Bottom-up – used for unique projects
• Rolling Wave – greater decomposition occurs as project components
becomes more defined over time
![Page 16: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/16.jpg)
Methods of Estimating
• Top-down method (analogous method)
– Estimates based on a similar project
• Adjusted for current situation
• Advantages
– Benefits from hindsight
– Relatively quick and easy
• Disadvantages
– Lacks precision
– Can overlook important components of current project
![Page 17: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/17.jpg)
Methods of Estimating
• Bottom-up method
– Produce estimates for each component of each task
• Advantages
– Precision
– Estimating individual tasks often needed for project plans and project execution
• Disadvantages
– Time requirements
– Some costs are unanticipated, thus, overlooked
Leading Project Teams: The Basics of
Project Management and Team
Leadership, 2e by Anthony T. Cobb
©2011 SAGE Publications, Inc.
![Page 18: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/18.jpg)
Estimating Resources
• Human resources
– The project team
– Outside consultants, regulators, etc.
– The project leader
• Considerations
– Knowledge, skills, and abilities
– Availability: Other commitments
![Page 19: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/19.jpg)
Estimating Resources
• Equipment and materials
– Careful consideration to special requirements
– Scheduling flow to tasks when needed is a “mission critical” task
• Other resources
– Office equipment, work space, and supplies
– Information
– Authority
![Page 20: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/20.jpg)
Estimating Time Requirements
• Project time horizon often dictated by client
• Bottom-up time estimates still required
– Time estimates tied to each task or work cluster
• Develop best-guess, optimistic, and pessimistic estimates
• Consider lag time needs
– The need to let a job “rest”
![Page 21: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/21.jpg)
Estimating Costs
• Include cost estimates of resource needs for all tasks
• Attend to often overlooked items
– Time value of money (inflation adjustments)
– Travel, communications, fees, overhead charges
• Adjust cost estimates for risk
![Page 22: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/22.jpg)
Developing a Project Structure
• The work breakdown structure provides the foundation for the project’s
organizational structure
• Task arrangements through time produce project phases and its schedule
• Task arrangements from small to larger job clusters provide authority
structure
![Page 23: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/23.jpg)
WBS Tools
• Templates
• Software
– MS Visio – displays WBS in hierarchical form
– MS Project – WBS displayed in tabular format (Gantt Chart)
![Page 24: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/24.jpg)
Gantt Chart View
of Microsoft Project
![Page 25: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/25.jpg)
WBS Outputs
• WBS Dictionary
– Description of each component
– Who is responsible for development
– Statement of Work (SOW)
– Important milestones
– Estimate of costs and required resources
![Page 26: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/26.jpg)
Outcome of WBS Development
• Possible update of project scope statement and scope management plan
![Page 27: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/27.jpg)
Scope Baseline
• Purpose: to determine and measure any deviations during project
execution
• Components of Scope Baseline
– Project scope statement
– WBS
– WBS Dictionary
![Page 28: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/28.jpg)
Activity Definition
• Work packages broken down into discrete activities and attributes
required to produce project deliverables
• Activity Definition includes:
– Activity description
– Resource requirements
– Logical predecessor or successor activities
![Page 29: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/29.jpg)
How Much Activity Detail Is Required?
• Can be performed by one person or a well-defined group
• Has a single, clearly identifiable deliverable
• Has a known method or technique
• Has well-defined predecessor and successor steps
• Is measurable so that the level of completion can be determined
• Has a short duration – hours or days in length
![Page 30: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/30.jpg)
Activity Tools & Techniques
• Templates
• Documentation from similar past projects
• Rolling wave planning can be applied
![Page 31: The Work Breakdown Structure - Zied Zaierziedzaier.com/.../uploads/2017/06/The-Work-Breakdown-Structure.pdf · The Work Breakdown Structure •The WBS: All the tasks that must be](https://reader031.vdocuments.us/reader031/viewer/2022020412/5aedf65d7f8b9a903190630b/html5/thumbnails/31.jpg)
Activity Output
• Activity list
• Activity attributes– Description
– Assumptions and constraints
– Leads and lags
– Logical relationships
– Predecessor and successor activities
• Milestones
• Requested changes to project scope statement and WBS