sovis work breakdown
TRANSCRIPT
-
8/17/2019 Sovis Work Breakdown
1/12
Sovis Work Breakdown
Jed Simpson
Ellie Baily-JonesThierry Jabbour
-
8/17/2019 Sovis Work Breakdown
2/12
Scene:
All of the reference and b
have been filmed by ThieBaily-Jones and Jed Simps
This scene has been comp
by Jed Simpson.
-
8/17/2019 Sovis Work Breakdown
3/12
Scene:
Scene e
Jed Sim
-
8/17/2019 Sovis Work Breakdown
4/12
Scene:
Scene E
Jed Simp
-
8/17/2019 Sovis Work Breakdown
5/12
Scene:In this scene, w
effort:
Train cleanup
Thierry Jabbou
Train deforma
animation and
Jones.
Animation on
-
8/17/2019 Sovis Work Breakdown
6/12
Scene:
This scene as w
work:
Train and face
video: Thierry
Background: E
Animation: Jed
-
8/17/2019 Sovis Work Breakdown
7/12
Scene:
Animation by
-
8/17/2019 Sovis Work Breakdown
8/12
Scene:
Animation b
-
8/17/2019 Sovis Work Breakdown
9/12
Scene:
Animation
-
8/17/2019 Sovis Work Breakdown
10/12
Scene:
Backgroun
Jones.
Character
Simpson.
-
8/17/2019 Sovis Work Breakdown
11/12
Scene:
Modelling and
Jabbour.
-
8/17/2019 Sovis Work Breakdown
12/12
Scene:
Conveyor Be
Texturing an
Jabbour.
Overall Anim
Ellie Jones.
The overall
project was Jones and T