Page 1: The status and trend of the new Eurasian Land-bridge · 1992-2012 China- Kazakhstan rail border’s cargo throughput 3 New Eurasian Land-Bridge 0 200 400 600 800 1000 1200 1400 1600

The status and trend of the new Eurasian Land-bridge

GM of Land Transport Dept.

SINOTRANS & CSC HOLDINGS CO.,LTD

Zhang Zhao

Page 2: The status and trend of the new Eurasian Land-bridge · 1992-2012 China- Kazakhstan rail border’s cargo throughput 3 New Eurasian Land-Bridge 0 200 400 600 800 1000 1200 1400 1600

CONTENTS

※ Achievements of the past 20 years

1

※ Current status

※ Brilliant prospects

Page 3: The status and trend of the new Eurasian Land-bridge · 1992-2012 China- Kazakhstan rail border’s cargo throughput 3 New Eurasian Land-Bridge 0 200 400 600 800 1000 1200 1400 1600

Achievements of past 20 years 2

The new Eurasia Land-bridge launched the international multimodal transportation business since 1992. And it has become the most important lines from East Asia to Europe.

Page 4: The status and trend of the new Eurasian Land-bridge · 1992-2012 China- Kazakhstan rail border’s cargo throughput 3 New Eurasian Land-Bridge 0 200 400 600 800 1000 1200 1400 1600

1992-2012 China- Kazakhstan rail border’s cargo throughput

3

New Eurasian Land-Bridge

0

200

400

600

800

1000

1200

1400

1600

1800

92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12

IMPORT

EXPORT

TOTAL

Achievements of past 20 years

Page 5: The status and trend of the new Eurasian Land-bridge · 1992-2012 China- Kazakhstan rail border’s cargo throughput 3 New Eurasian Land-Bridge 0 200 400 600 800 1000 1200 1400 1600

1992-2012 China- Kazakhstan border’s container throughput

4

New Eurasian Land-Bridge

0

50000

100000

150000

200000

250000

300000

350000

91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12

IMPORT

EXPORT

TOTAL

Achievements of past 20 years

Page 6: The status and trend of the new Eurasian Land-bridge · 1992-2012 China- Kazakhstan rail border’s cargo throughput 3 New Eurasian Land-Bridge 0 200 400 600 800 1000 1200 1400 1600

5

Characteristic

1995

1993

1992

Transportation time reduced

Destination countries expands from Central Asia to Europe

Export & import was much more balanced than the start phase.

Cargo flow inclined to high value-added products

Great Improvement in service quality , especially in E-port, large-scale clearance and block train

2012

2009

2006

2003

2000

1997

1995

1993

1992

Achievements of past 20 years

Page 7: The status and trend of the new Eurasian Land-bridge · 1992-2012 China- Kazakhstan rail border’s cargo throughput 3 New Eurasian Land-Bridge 0 200 400 600 800 1000 1200 1400 1600

7

Coordinating multinational interests still has a lot of difficulty to carry on.

Far behind the

modern logistic

requirements.

Transport capacity shortage, especially in central Asia.

Technical obstacle

Achievements of past 20 years Some problems

1 2

3 4

6

Page 8: The status and trend of the new Eurasian Land-bridge · 1992-2012 China- Kazakhstan rail border’s cargo throughput 3 New Eurasian Land-Bridge 0 200 400 600 800 1000 1200 1400 1600

CONTENTS

※ Achievements of the past 20 years

7

※ Current status

※ Brilliant prospects

Page 9: The status and trend of the new Eurasian Land-bridge · 1992-2012 China- Kazakhstan rail border’s cargo throughput 3 New Eurasian Land-Bridge 0 200 400 600 800 1000 1200 1400 1600

TH

RO

UG

HP

UT

Volume of cargos via railway keeps going up under global economic recession

Current status

2012

8

Page 10: The status and trend of the new Eurasian Land-bridge · 1992-2012 China- Kazakhstan rail border’s cargo throughput 3 New Eurasian Land-Bridge 0 200 400 600 800 1000 1200 1400 1600

New Trends • New railway border opened.

• New block trains started.

Current status 9

New Characteristic • East boned cargos increased

Page 11: The status and trend of the new Eurasian Land-bridge · 1992-2012 China- Kazakhstan rail border’s cargo throughput 3 New Eurasian Land-Bridge 0 200 400 600 800 1000 1200 1400 1600

photo

Zhetygen – Korgas railway opened

photo

photo

photo

• Throughout is already up to

399000 tons from the end

of 2012 to May ,2013.

A New Traffic Hub

• Cater to Containers and

high-valued cargos to

Southern of Central Asia

10

Current status

Page 12: The status and trend of the new Eurasian Land-bridge · 1992-2012 China- Kazakhstan rail border’s cargo throughput 3 New Eurasian Land-Bridge 0 200 400 600 800 1000 1200 1400 1600

2008 2010 2011 2012 2004

Chongqing— Europe

2013

photo

Huhehaote—

Frankfurt

Current status

photo

Chengdu——Europe

photo

Wuhan——Czech

11

photo

Beijing —— Hamburg

photo photo

Suzhou—MZL—Europe

The block train between China and Europe continuous to develop

Page 13: The status and trend of the new Eurasian Land-bridge · 1992-2012 China- Kazakhstan rail border’s cargo throughput 3 New Eurasian Land-Bridge 0 200 400 600 800 1000 1200 1400 1600

在此录入标题

Chongqing, Western of China

Alashankou

Dostyk

Russia, Belarus, Poland

Duisburg, Germany

16 days

Current status The “Chongqing new European railway

” block train

Reload

Start

Arrive

12

Page 14: The status and trend of the new Eurasian Land-bridge · 1992-2012 China- Kazakhstan rail border’s cargo throughput 3 New Eurasian Land-Bridge 0 200 400 600 800 1000 1200 1400 1600

CONTENTS

※ Achievements of the past 20 years

13

※ Current status

※ Brilliant prospects

Page 15: The status and trend of the new Eurasian Land-bridge · 1992-2012 China- Kazakhstan rail border’s cargo throughput 3 New Eurasian Land-Bridge 0 200 400 600 800 1000 1200 1400 1600

14

Fast Railway expansion

Brilliant prospects

Page 16: The status and trend of the new Eurasian Land-bridge · 1992-2012 China- Kazakhstan rail border’s cargo throughput 3 New Eurasian Land-Bridge 0 200 400 600 800 1000 1200 1400 1600

Characteristic

15

As the railway reform continuous to pull the government functions away from enterprise

management , the transcontinental railway will have a sound operation in the future.

Brilliant prospects

Page 17: The status and trend of the new Eurasian Land-bridge · 1992-2012 China- Kazakhstan rail border’s cargo throughput 3 New Eurasian Land-Bridge 0 200 400 600 800 1000 1200 1400 1600

Trans-Asian Railway

Brilliant prospects 16

• Chinese section has been

put into operation.

• The whole construction

may be finished by 2020.

Page 18: The status and trend of the new Eurasian Land-bridge · 1992-2012 China- Kazakhstan rail border’s cargo throughput 3 New Eurasian Land-Bridge 0 200 400 600 800 1000 1200 1400 1600

As the infrastructure and external logistics continuous to make improvement, we believe the NELB is heading to more development .

17

Brilliant prospects

Page 19: The status and trend of the new Eurasian Land-bridge · 1992-2012 China- Kazakhstan rail border’s cargo throughput 3 New Eurasian Land-Bridge 0 200 400 600 800 1000 1200 1400 1600

Thank You!