the impact of the syrian crisis on the lebanese power sector and … · 2017-03-01 · part 1....
TRANSCRIPT
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority Recommendations: Part 1. Survey & Methodology
Ministry of Energy and WaterEnergy Sector WorkshopTuesday February 21, 2017
Presented by Mohamad Naim
2
SITE SURVEY
A representative survey to 350 Syrian families and 60 institutions across thecountry was undertaken in July 2016.
Survey samples were selected based on the number of registered displacedSyrians in each village as per the UNHCR data as of June 30, 2016.
The survey concentrated on collecting information related to the No. of familiesand persons living in each shelter unit (Non IS and IS) and the available householdappliances in each shelter unit.
Region Population % of Total No. of Samples
Beirut & ML 298,702 28.50% 110
Bekaa 375,312 35.80% 100
North 255,194 24.34% 80
South 119,059 11.36% 60
Total 1,048,267 100% 350
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority RecommendationsI. - Survey II. Methodology
3
Two scientific approaches are adopted to calculate the power consumption of
the displaced Syrians in Lebanon:
Through sampling/survey data to calculate the power consumption of each
shelter unit based on the available household appliances irrespective of the
number of persons living in each shelter unit.
Through analysis of the load profile of EDL MV feeders supplying each
region during the period 2012 – 2016, taking year 2012 as the base year, and
correlating the increase in load on each MV feeders with the number of
displaced Syrians in the region supplied by the particular feeders.
METHODOLOGY OF THE STUDY - ADOPTED APPROACHES
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority RecommendationsI. - Survey II. Methodology
4
METHODOLOGY OF THE STUDY - SAMPLING/ SURVEY DATA APPROACH
Calculated the Total Connected Load (TCL) of the available household
appliances in each shelter unit as per the survey data.
Calculated the Average Connected Load per shelter unit.
Calculated the Average Power Consumption per shelter unit.
For Non IS shelter units, a factor of 0.5 (Demand Factor * Diversity Factor)
is applied to calculate the Average Power Consumption per shelter unit.
For Non IS shelter units, the number of families is converted to number of
shelter units using the survey data.
The Total Power Consumption is calculated by multiplying the Average
Power Consumption per shelter unit * NR of units for each shelter type.
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority RecommendationsI. - Survey II. Methodology
5
SURVEY DATA
Average Power Consumption of Displaced Syrians in Lebanon as per Survey Data
Survey Data
RegionShelter
Type
No. of Visited
Shelters
Total No. of Units in Visited
Shelters
% of Total No. of
Units in Visited
Shelters
No. of Persons in
Visited Shelter Units
No. of Families in
Visited Shelter Units
Average No. of
Persons/ Family
Total Connected
Load of Household Appliances of Visited
Shelter Units (kW)
Average Connected
Load of Household Appliances
/ Shelter Unit (kW)
Average Power
Consumption/
Shelter Unit (kW)
Average No. of Supply
Hours/ Day
Beirut & ML
Non IS 83 148 64% 428 91 4.70 230.450 2.777 1.388 8
IS 27 85 36% 185 38 4.87 17.850 0.661 0.661 6
Total 110 233 100% 613 129 4.75 248.300
Bekaa
Non IS 38 130 11% 226 58 3.90 78.750 2.072 1.036 12
IS 62 1,002 89% 484 72 6.72 68.150 1.099 1.099 15
Total 100 1,132 100% 710 130 5.46 146.900
North
Non IS 56 580 48% 427 76 5.62 106.850 1.908 0.954 9
IS 24 623 52% 169 37 4.57 18.400 0.767 0.767 8
Total 80 1,203 100% 596 113 5.27 125.250
South
Non IS 31 143 69% 162 31 5.23 81.050 2.615 1.307 6
IS 29 64 31% 154 31 4.97 54.050 1.864 1.864 5
Total 60 207 100% 316 62 5.10 135.100
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority RecommendationsI. - Survey II. Methodology
6
METHODOLOGY OF THE STUDY - ANALYSIS OF EDL DATA APPROACH
1. Econometrics and forecasting techniques are employed to validatethe monthly power consumption calculated using EDL data takinginto consideration the seasonal variation in power consumption.
2. Taking the South region as a sample, the Average Peak PowerConsumption per Family is shown in the table below.
Column 1
Year
Column 2
Average
Loads
(AMP)
Column 3
Population
Growth
Column 4
Estimated
Loads
Base Year
2012
(AMP)
Column 5
Load
Growth
Base Year
2012
(AMP)
Column 6
Adjusted
Average
Loads
Per
Quarter
(AMP)
Column 7
Change
in
Adjusted
Average
Annual
Loads
(AMP)
Column 8
Change
in
Adjusted
Average
Annual
Load
(KW)
Column 9
Change in
Number of
Families
(Base
Year 2012)
Column 10
Average
Consumption
per Family
(KW with
Base Year
2012)
2012 20,427 20,427 0 20,427
2013 23,686 1.222% 20,676 250 23,437 3,010 62,558 21,462 2.915
2014 23,291 1.180% 20,920 494 22,797 2,371 49,269 30,263 1.628
2015 21,757 1.182% 21,301 874 20,882 455 9,466 27,949 0.339
2016 23,741 1.182% 21,689 1,262 22,479 2,052 42,654 26,457 1.612
Average 1.623
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority RecommendationsI. - Survey II. Methodology
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority Recommendations: Part 2. Study Results, Recommendations & Prioritization of Interventions
Ministry of Energy and WaterEnergy Sector WorkshopTuesday February 21, 2017
Presented by Robert Sfairy, PMPSenior Energy Consultant - MoEW
8
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority RecommendationsI. - Study Results II. Recommendations III. Prioritization of Interventions
I. STUDY RESULTS
II. RECOMMENDATIONS
III. PRIORITIZATION OF INTERVENTIONS
9
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority RecommendationsI. - Study Results II. Recommendations III. Prioritization of Interventions
STUDY RESULTS
10
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority RecommendationsI. - Study Results II. Recommendations III. Prioritization of Interventions
STUDY RESULTS
• As per the survey results, the direct average electricity consumption of the Displaced Syrians was determined per type of shelter unit and per region with an overall average of 1.16KW/shelter
• The survey results were validated by comparing to actual EDL historical data for the south region
• Transmission and distribution technical losses were considered to obtain the overall impact
11
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority RecommendationsI. - Study Results II. Recommendations III. Prioritization of Interventions
STUDY RESULTS• Indirect electricity consumption of the Displaced
Syrians was also noticed as follows:
- In Schools hosting Syrian students having to work additional 4-hour shift, knowing that there are 85,487 displaced students in 238 schools across Lebanon
- In Municipalities/Water Establishments having to operate water pumps for longer hours to cover the increase in water demand in each area
12
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority RecommendationsI. - Study Results II. Recommendations III. Prioritization of Interventions
STUDY RESULTS
• The study considered different scenarios based on two variables:
1. Number of Displaced Syrians(Spread over 84% of the villages in Lebanon)
• UNHCR data as of June 30, 2016 -1,048,267• DGGS data – 1,500,000 (+10% to +23%)
2. Number of supply hours per day per region• Survey data (average 9 hours)• EDL data (average 14 hours)
13
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority RecommendationsI. - Study Results II. Recommendations III. Prioritization of Interventions
STUDY RESULTS
Scenario 4 - DGGS Data (1,500,000 D.S.)
MW GWHr / Year
Direct Impact 447 2,310
Indirect Impact 39 25
Schools 2.724 2.833
Hospitals - -
Municipalities 36.297 22.650
Total 486* 2,335**
* Around 30% of EDL power generation** Around 19% of EDL energy production per year
14
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority RecommendationsI. - Study Results II. Recommendations III. Prioritization of Interventions
STUDY RESULTS
Beirut & ML, 163, 37%
Bekaa, 140, 31%
North, 87, 19%
South, 57, 13%
Regional Distribution of Direct Power Consumption
15
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority RecommendationsI. - Study Results II. Recommendations III. Prioritization of Interventions
STUDY RESULTS
0
50,000
100,000
150,000
200,000
250,000
300,000
Aley Baabda Beirut Chouf El Meten Jbeil Kesrwane Total
26,645
40,341
13,666
21,750 28,039
3,1528,411
142,003
No. of Persons
No. of Families
No. of Shelter Units
Power Consumption (KW)
Power Consumption of Displaced Syrians in Lebanon per Caza (DGGS Data) - Beirut & ML Region
0
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
Baalbak El Hermel Rachaya West Bekaa Zahle Total
42,513
1,714 2,98520,118
54,168
121,498
No. of Persons
No. of Families
No. of Shelter Units
Power Consumption (KW)
Power Consumption of Displaced Syrians in Lebanon per Caza (DGGS Data) - Bekaa Region
0
50,000
100,000
150,000
200,000
250,000
300,000
Akkar Bcharre El Batroun El Dennie El Koura Tripoli Zgharta Total
30,285
7453,850 16,496
4,61716,368
3,455
75,816
No. of Persons
No. of Families
No. of Shelter Units
Power Consumption (KW)
Power Consumption of Displaced Syrians in Lebanon per Caza (DGGS Data) - North Region
0
20,000
40,000
60,000
80,000
100,000
120,000
Bent Jbeil El Nabatieh Hasbaya Jezzine Marjeyoun Saida Sour Total
3,0009,848
2,649 1,2223,310
18,468 11,189
49,686
No. of Persons
No. of Families
No. of Shelter Units
Power Consumption (KW)
Power Consumption of Displaced Syrians in Lebanon per Caza (DGGS Data) - South Region
Demand was obtained at the governorate level as well at the caza level
16
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority RecommendationsI. - Study Results II. Recommendations III. Prioritization of Interventions
STUDY RESULTS
1. Most of the shelter units do not have basic household appliances (fridge/washing machine) due to insufficient power capacity and quality, so power demand is expected to increase if power quality and capacity are improved
2. An average of 45% of the surveyed shelters do not have metered electricity connections (range from 36% in the North to 82% in Beirut & ML), which increases the grid non-technical losses
17
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority RecommendationsI. - Study Results II. Recommendations III. Prioritization of Interventions
STUDY RESULTS
3. Increased demand, causes an additional burden on the already weak electricity network by damaging distribution transformers, cables, fuses, breakers, etc…
4. Weakens quality of the supplied power in some areas where private diesel generators are turned ON even during EDL supply hours due to high voltage drop
5. Increases further the already high grid technical losses
18
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority RecommendationsI. - Study Results II. Recommendations III. Prioritization of Interventions
RECOMMENDATIONS
19
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority RecommendationsI. - Study Results II. Recommendations III. Prioritization of Interventions
RECOMMENDATIONS
Short Term
• Energy Saving Bulbs• Solar Water Heaters• Solar Kits up to 2.5 KW• Net-metering (Bulk Industrial/Commercial
Customers)• Upgrade & Rehabilitate the MV/LV Distribution
Network
Demand Side Management
20
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority RecommendationsI. - Study Results II. Recommendations III. Prioritization of Interventions
RECOMMENDATIONS
Medium Term (5 years)
• Distributed Generation Sources (DER) in areas with power demand up to 10 MW
• Street Lighting Retrofit (Sodium lamps to LED)• Grid connected PV plants• Wind Turbines/Farms (West Bekaa and Akkar)• Hydro Plants (Refurbishment/New)• PV Direct Water Pumping Technology (Irrigation &
Water Distribution)• Upgrade & Rehabilitate the Transmission Network
21
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority RecommendationsI. - Study Results II. Recommendations III. Prioritization of Interventions
RECOMMENDATIONS
Region
Caza Information Specific Recommendations
Caza NameTotal No. of
Persons
Total Power
Consumption
(KW)
Energy
Saving
Bulbs
Solar
Water
Heaters
Replace
Street
Lights
Solar
Water
Pumps
Solar Kits
Distributed
Generation
Resource
(DER)
Grid-
Connected PV
Plant
Reinforcement
of EDL Network
Refurbishment
of Hydro Plants
Beirut & ML
Aley 84,876 26,645 X X X X X
Baabda 126,741 40,341 X X X X
Beirut 36,656 13,666 X X X X
Chouf 72,275 21,750 X X X X X
El Meten 74,278 28,039 X X X X
Jbeil 9,237 3,152 X X X X
Kesrwane 23,361 8,411 X X X X
Bekaa
Baalbak 177,276 42,513 X X X X X X X
El Hermel 8,669 1,714 X X X X X
Rachaya 14,189 2,985 X X X X X
West Bekaa 92,098 20,118 X X X X X X X
Zahle 244,814 54,168 X X X X X X
North
Akkar 144,444 30,285 X X X X X X X
Bcharre 3,883 745 X X X X
El Batroun 20,020 3,850 X X X X
El Dennie 81,398 16,496 X X X X X X
El Koura 22,901 4,617 X X X X X
Tripoli 74,906 16,368 X X X X X X
Zgharta 17,611 3,455 X X X X
South
Bent Jbeil 11,133 3,000 X X X X X
El Nabatieh 35,606 9,848 X X X X X
Hasbaya 7,956 2,649 X X X X X
Jezzine 4,302 1,223 X X X X X
Marjeyoun 10,536 3,311 X X X X X
Saida 61,822 18,469 X X X X X
Sour 39,010 11,189 X X X X X
22
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority RecommendationsI. - Study Results II. Recommendations III. Prioritization of Interventions
PRIORITIZATION OF INTERVENTIONS
23
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority RecommendationsI. - Study Results II. Recommendations III. Prioritization of Interventions
PRIORITIZATION OF INTERVENTIONS
• Areas where there is no EDL grid or insufficient capacity to operate basic household appliances: Akkar, West Bekaa, Dennie
• Areas of high settlements concentration: Baalbak, West Bekaa, Akkar, Tripoli, Dennie, Saida
• Areas where PV solar kits and solar water heaters are easy to install: Baalbak, Hermel, Rachaya, West Bekaa, Zahle, Akkar, Dennie, Tripoli, Nabatieh, Saida, Sour
24
The Impact of the Syrian Crisis on the Lebanese Power Sector and Priority RecommendationsI. - Study Results II. Recommendations III. Prioritization of Interventions
Robert Sfairy, PMPSenior Energy Consultant - MoEW