Thailand Biomass and Thailand Biomass and Waste to Energy Overview Waste to Energy Overview Dr. Dr. Prasert Prasert Sinsukprasert Sinsukprasert Director of Planning Division Director of Planning Division Seminar: Italian Technologies on Renewable Energy “Italian innovative and best practices” Bangkok, Thailand 22 March 2012

Upload: vankhanh

Post on 09-Jul-2018

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Thailand Biomass and Waste to Energy Overview - ICEaretusa.ice.it/SchemaSite/images/UserImageDir/177/EN/Presentations... · Thailand Biomass and Waste to Energy Overview ... power

Thailand Biomass and Thailand Biomass and

Waste to Energy OverviewWaste to Energy Overview

Dr. Dr. PrasertPrasert SinsukprasertSinsukprasertDirector of Planning DivisionDirector of Planning Division

Seminar: Italian Technologies

on Renewable Energy

“Italian innovative and best practices”

Bangkok, Thailand

22 March 2012

Page 2: Thailand Biomass and Waste to Energy Overview - ICEaretusa.ice.it/SchemaSite/images/UserImageDir/177/EN/Presentations... · Thailand Biomass and Waste to Energy Overview ... power

Presentation Contents

� Thailand’s Renewable Energy Development

� Biomass

� Biogas from wastewater and animal waste

2

� Municipality Solid Waste (MSW)

� Measures for alternative energy promotion

Page 3: Thailand Biomass and Waste to Energy Overview - ICEaretusa.ice.it/SchemaSite/images/UserImageDir/177/EN/Presentations... · Thailand Biomass and Waste to Energy Overview ... power

Thailand’s Renewable Energy DevelopmentThailand’s Renewable Energy Development

Committed to the development of low-carbon society

Government Funding On R & DActivities

Encouraging Private-Led Investment

Alternative Energy Development Plan (AEDP : 2012-2021)

Target 25 % of RE in Total Energy Consumption By 2021

Solar

2,000 MW

100 ktoe(Heat)

Small + Mini Hydro

1608 MW

Bio Energy

Biomass Biogas MSW

3,630 MW 600 MW 160 MW

8,200 ktoe(Heat)

1,000 ktoe(Heat)

35 ktoe(Heat)

Biofuels

• Ethanol

9 Million l/d

• Biodiesel

5.97 Million l/d

• 2nd generation

biofuels

25 Million l/d

Wind

1,200 MW

Others

• Tidal wave

2 MW

• Geothermal

1 MW

Page 4: Thailand Biomass and Waste to Energy Overview - ICEaretusa.ice.it/SchemaSite/images/UserImageDir/177/EN/Presentations... · Thailand Biomass and Waste to Energy Overview ... power

4. Biomass

• Research & Demonstration Projects • focusing on community-based size/technologies• heat generation from for small scale industries

• Developing potential biomass data base • Research on increasing agriculture productivity• Research for non-food energy crops

� Important Projects

� Current Status

Target in 2022: Electricity 3,700 MW/Heat 6,760 Ktoe

4

� Current Status

� Next Steps

• Promoting High Pressure Boiler to enhance

power generation efficiency in sugar factories • Data survey on biomass potential

with geographical information system by provinces

• Setting up Promotion Zone to create the balance of

energy supply• Creating awareness and understanding to people in the communities

Submitted : 373 Projects 2,842 MW

• VSPP 341 Projects 2,207 MW• SPP 32 Projects 635 MW

Signed : 221 Projects 1,586 MW

• VSPP 219 Projects 1,560 MW• SPP 2 Projects 26 MW

Heat Generation 3,258.98 Ktoe

Page 5: Thailand Biomass and Waste to Energy Overview - ICEaretusa.ice.it/SchemaSite/images/UserImageDir/177/EN/Presentations... · Thailand Biomass and Waste to Energy Overview ... power

5. Biogas

• Biogas from animal dropping.

• Household biogas production system (Thailand-China’s cooperation)

• Pilot project on biogas production in the zoos• Biogas containers/high pressure biomethane• Safety manual for biogas production

� Important projects

� Current Status

•Major raw materials sources comes fromwaste water of theagro industries and agroprocessed factories

• In 2010, the power plant

installed capacity was 137.98 MW.

Target in 2022: Electricity 120 MW /Heat 600 Ktoe

Cassava* 18.86 14.90 33.76

Palm Oil 40.22 34.64 74.86

Ethanol 4.25 - 4.25

Domestic Animal Farm 4.22 19.48 23.70

Food - 1.00 1.00

Total 67.55 70.02 137.57

5

• Safety manual for biogas production

• Development of biogas quality system to be used

in vehicles (CBG)

� Next Steps

• Developing safety standard/regulations

• Developing technology and spare parts to lowerthe cost

*Production capacity of Cassava Factories alone is more than 300 tons/day.

Types of Factory

Heat (ktoe)

Cassava 259.75

Ethanol** 97.31

Food 11.67

Palm Oil 5.55

Livestocks 4.38

Total 378.66

** Only the Ethanol Factories that have production capacity more than150,000 liters/day.

Total 67.55 70.02 137.57

Page 6: Thailand Biomass and Waste to Energy Overview - ICEaretusa.ice.it/SchemaSite/images/UserImageDir/177/EN/Presentations... · Thailand Biomass and Waste to Energy Overview ... power

• Pilot Projects on community-based biomas• Developing and promoting the Biogas Fermented Tank frominstant organic wastes in education institutions, military camps, and localities in 540 places

• Demonstration Projects and Promotion of RDF. • Cooperation with municipalities to promote waste-to-energy projects

� Important projects

6. Waste to Energy

Target in 2022 : Electricity 160 MW /Heat 35 Ktoe

6

� Current status of Electricity sales

� Next movement

•Researching, developing, and promoting the process of wastes to petrol

•Supporting policy on financial measures•Modifying/improving regulations for investors’facilitation

Submitted :34 Projects (455 MW)• VSPP 29 projects 125 Mw• SPP 5 projects 330 Mw

Signed : 19 projects (103 MW)• All are VSPP projects

On grid : 14 projects

Capacity 13.45 MW

Page 7: Thailand Biomass and Waste to Energy Overview - ICEaretusa.ice.it/SchemaSite/images/UserImageDir/177/EN/Presentations... · Thailand Biomass and Waste to Energy Overview ... power

Measures for alternative energy promotion

Fuel typeAdder

(Baht/kWh)

Periods

(years)

1. Biomass

- Install capacity <= 1 MW 0.50 7

- Install capacity > 1 MW 0.30 7

2. Biogas

Adder cost to be a supplement of normal purchasing tariff

of electricity to the national grid

Adder cost to be a supplement of normal purchasing tariff

of electricity to the national grid

7

- Install capacity <= 1 MW 0.50 7

- Install capacity > 1 MW 0.30 7

3. Municipal waste

- Fermentation or Landfill 2.50 7

- Thermal Process 3.50 7

4. Wind

- Install capacity <= 50 MW 4.50 10

- Install capacity > 50 MW 3.50 10

5. Mini Hydro

- Install capacity 50 kW - <200 kW 0.80 7

- Install capacity < 50 kW 1.50 7

6. Solar 8.00 10

Page 8: Thailand Biomass and Waste to Energy Overview - ICEaretusa.ice.it/SchemaSite/images/UserImageDir/177/EN/Presentations... · Thailand Biomass and Waste to Energy Overview ... power

Measures for alternative energy promotion

BOI Privilege

- The investors will receive the exemption of

8

- The investors will receive the exemption of imported duty of equipment or machines

- Any income-corporate taxes resulting form selling RE or saving energy will be exempted for a certain periods to maximum 8 years

Page 9: Thailand Biomass and Waste to Energy Overview - ICEaretusa.ice.it/SchemaSite/images/UserImageDir/177/EN/Presentations... · Thailand Biomass and Waste to Energy Overview ... power

DISTRIBUTED GREEN GENERATION : DGG

� Conceptual Framework

•Implementation and management by the community•Benefits to the community•Consume local materials/fuel available •Promotion and cooperation through Government and Private sectors

Price Price Price Price

GuaranteeGuaranteeGuaranteeGuarantee

Price Price Price Price

GuaranteeGuaranteeGuaranteeGuarantee Biomass Power Plant

AddAddAddAdd

erererer

AddAddAddAdd

erererer

Financing Model

� Promotional roles

•Providing credit/co-investment/ investment subsidy•Developing the CDMProgram•Developing human resource and community•Supporting equipment producers, RE and EE spareparts manufacturers in the country

9

Upgrade and Compressing System

Cooperative/Community enterprises

Cooperative/Community enterprises

Promotion through government, private sectors, and International

Organizations

GuaranteeGuaranteeGuaranteeGuaranteeGuaranteeGuaranteeGuaranteeGuarantee

FuelRaw materials

CBG

AddAddAddAdd

erererer

AddAddAddAdd

erererer

Plant

erererererererer

Electricity

Heat

AddAddAddAdd

erererer

AddAddAddAdd

ererererFuel

Biogas

Page 10: Thailand Biomass and Waste to Energy Overview - ICEaretusa.ice.it/SchemaSite/images/UserImageDir/177/EN/Presentations... · Thailand Biomass and Waste to Energy Overview ... power

Measures for alternative energy promotion

Project feature: set up to joint capital promote investment inenergy conservation and renewable energydevelopment projects

ESCO Venture Capital

Equity Investment

Investor

Investor

Investor

Investment Committee

ESCO FundESCO Fund

Consider and approve

return

10

Technical Assistance

Credit Guarantee Facility

Carbon Credit (CDM)

Equipment LeasingInvestor

Investor

control

Fund ManagerFund Manager

Financial support

return

Page 11: Thailand Biomass and Waste to Energy Overview - ICEaretusa.ice.it/SchemaSite/images/UserImageDir/177/EN/Presentations... · Thailand Biomass and Waste to Energy Overview ... power

Thank youThank you

www.dede.go.th

Department of Alternative Energy Development and Efficiency (DEDE) Ministry of Energy