    Doc No: 256324-500-RQ-MEC-013 Rev: B Page 1 of 26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    TECHNICAL SPECIFICATIONFOR

    EFFLUENT TREATMENT PLANT(ETP)

    Hindustan Petroleum Corporation Ltd

    Viskaha Dispatch Station

    VR-ATP Area, Naval Base Post

    Visakhapatnam - 530 014

    Andhra Pradesh

    Mott MacDonald Consultants (India) Pvt. Ltd.

    Kothari House, CTS No. 185

    Off Andheri - Kurla Road

    Andheri (East)

    Mumbai 400 059

  • 7/30/2019 Tech Specs for ETP

    2/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: B Page 2 of 26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    TECHNICAL SPECIFICATION

    FOR

    EFFLUENT TREATMENT PLANT(ETP)

    Client HINDUSTAN PETROLEUM CORPORATION LTD.

    MMCI Project No. 256324

    Issue and Revision Record:

    Rev Date Originator Checked Approved Description

    A 30.07.09 SPW SVJ PJC Issued for Comments

    B 15.02.10 ASA SM PJC Issued for Tender

    C

    Group Disclaimer

    "This document has been prepared for the titled project or named part thereof and should not be relied upon or

    used for any other project without an independent check being carried out as to its suitability and prior written

    authority of Mott MacDonald being obtained. Mott MacDonald accepts no responsibility or liability for the

    consequences of this document being used for a purpose other than the purposes for which it was commissioned.

    Any person using or relying on the document for such other purpose agrees, and will by such use or reliance be

    taken to confirm his agreement, to indemnify Mott MacDonald for all loss or damage resulting there from. Mott

    MacDonald accepts no responsibility or liability for this document to any party other than the person by whom it

    was commissioned.

  • 7/30/2019 Tech Specs for ETP

    3/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: B Page 3 of 26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    List of Content Page No

    1 Introduction 5

    2 Location and Environmental Conditions 6

    3 Scope of Supply 6

    3.1 Process Description 6

    3.2 Equipment and Materials 7

    3.3 Engineering Services 9

    3.4 Exclusions 10

    4 Applicable Codes, Specifications and Standards 10

    4.1 General 10

    4.2 Codes and Standards 10

    4.3 Other Specifications and Standards 11

    4.4 Conflicting Requirements 11

    5 Design Requirements 11

    5.1 Mechanical Requirements 11

    5.2 Civil Requirements 11

    5.3 Instrumentation Requirements 11

    5.4 Electrical Requirements 17

    6 Quality Assurance 18

    7 Inspection and Testing 18

    7.1 Factory Inspection & Testing 18

    7.2 Vendor Requirements 19

    7.3 Performance Guarantee 19

    7.4 Works Inspection and Notification 20

    8 Vendor Documentation 20

    8.1 Documents/ Information to be supplied with offer 20

    8.2 Document/ Information to be supplied After Award of Contract 20

    9 Manufacturing Schedule 21

    10 Spares and Special Tools 21

    10.1 Spares 21

    10.2 Special Tools 21

  • 7/30/2019 Tech Specs for ETP

    4/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: B Page 4 of 26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    11 Packing and Shipping 21

    12 Installation and Commissioning 21

    Appendix A: Attachments 22

    Appendix B: Water Quality 23

    Appendix C: Requisition of Engineering Documents (Red Form) 24

    Appendix D: Table of Compliance 25

  • 7/30/2019 Tech Specs for ETP

    5/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: B Page 5 of 26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    1 Introduction

    1.1 This specification covers the minimum requirements for the design, engineering, materialprocurement, civil construction, fabrication, painting, assembly, Inspection, supply, shipment,

    erection and commissioning of Effluent Treatment Package (ETP) for Re-sitement ofIntegrated Marketing Facility at Vishakhapatnam LPG Terminal.

    Definitions:

    Company/End User/ Owner : Hindustan Petroleum Corporation Ltd (HPCL)

    Purchaser : Hindustan Petroleum Corporation Ltd (HPCL)

    Engineer / Consultant : Mott MacDonald Consultants (India) Pvt. Ltd.

    Vendor : Supplier of Effluent Treatment Package (ETP).

    Shall : This is to be understood as a mandatory in relation to therequirements of this document.

    Should : This is to be understood as a strong recommendation tocomply with the requirements of this document

    The ETP is as follows:

    Sr.

    No.Tag No. Quantity Description

    1 500ETP-001 ONE Effluent Treatment Plant 10 m3/d (8 hours)

    1.2 The Vendor shall be responsible for the design, engineering, construction, fabrication,assembly, inspection, co-ordination, testing, delivery and proper performance of the ETP.

    1.3 The Vendor shall ensure that the design complies with the requirements of this requisition andits referenced specifications and standards. The data sheets, which form part of thisspecification, shall be completed by the Vendor. The Vendor shall highlight any non-

    compliance at the offer stage in the Table of Compliance, Appendix D. The Table ofCompliance and filled in data sheets shall form a part of the offer. Not providing completed

    compliance table and data sheets can cause rejection of the offer. Failure to clearly identifyspecific deviations shall be assumed by the Purchaser to be total compliance with the

    requisition.

    Only those deviations that are specifically agreed to, by the Purchaser prior to award of the

    order will be incorporated into the purchase order. Deviations to the specification will not be

    allowed after award of order. Unless referred to in the Table of Compliance (Appendix D), itwill be assumed that all specifications are adhered to and that they do not have implications

    with respect to cost, delivery and integrity of the equipment.

    1.4 The Vendor shall procure third party material from vendors listed in the approved Vendor Listonly, unless the particular type of material is not covered by the list, and a special dispensation

    to deviate from the list has been granted in writing by the Purchaser. Company will reject any

    materials found at any stage to be out of the approved VENDOR or sub Vendor list.

    1.5 Note that lead times will not be considered by the COMPANY as a justifiable reason forusing alternate VENDOR.

  • 7/30/2019 Tech Specs for ETP

    6/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: B Page 6 of 26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    1.6 This requisition shall in no way relieve the Vendor from final guarantee as to materials,apparatus, workmanship and performance of the equipment and services supplied.

    1.7 All correspondence and documentation shall be in English. All measurements and units shallbe in SI units.

    Where necessary for a specific application, alternative units may be indicated in bracketsbehind the SI units.

    1.8 The VENDOR shall guarantee the equipment and all component parts against defectiveworkmanship and improper materials for the agreed period following the date of delivery of

    the equipment or from commencement of operation as agreed. The VENDOR shall replace or

    repair (the carrying out of all work including uncovering, removal, procurement andreinstallation and construction as may be necessary) the components that are defective at their

    own cost during the guarantee period at a suitable time to the COMPANY. Guarantee period

    shall be as per the Contract and to be covered in commercial documentation.

    2 Location and Environmental Conditions

    For local conditions refer Document no. 256324-500-SP-GEN-001.

    3 Scope of Supply

    3.1 Process Description

    The waste water effluent shall be subjected to physio-chemical treatment so that the treated

    effluent shall meet the stipulations laid down by the Central Pollution Control Board.

    The following steps shall form the process of treatment:

    a) The untreated effluent from various locations like Cylinder washing, Water test bath,Hydrotesting, soap water trays, etc of the LPG terminal shall reach the ETP through surfacedrains by HDPE pipes, after passing through vapour seals. The effluent generated by these

    streams shall be approx. 6 m3/day.

    b) The caustic soda stream from the paint booth in the cylinder testing shed is neutralized with10% Sulphuric acid in the Neutralization tank. The Transfer pumps shall also be used for

    mixing acid in the caustic by recirculation. Once the pH in the range of 7.5 to 8.5 is sensed bythe pH meter, the recirculation will be stopped and effluent is pumped to main ETP through

    Pressure Sand Filter (PSF).The quantity of effluent generated by this stream is 2000 litres/day.

    Provision for backwash with service water shall be provided to the pressure sand filter.

    c) The water requirement for the cylinder degassing is 50m3/day (1000 cylinders degassed perday). At a time not more than 6 cylinders are degassed at a time i.e. the water requirement per

    batch is approximately 300 liters. This water is pumped from the underground tank (5 m3

    capacity) to the empty cylinder degassing via filter. After degassing the water is recycled backto the underground tank and reused. The underground water is replenished by a continuous

    supply of service water at the rate of 250 litres/ hour. The overflow from the underground tankis taken to main ETP by surface drain, which is approximately 2 m3/day.

    d) The main ETP shall be designed to treat 10 m3 of effluent generated in 8 hours shift from allsources listed from (a) to (c) above.

    (i) After passing through the bar screen, all free floating matters in the effluent streamincluding the oil and grease shall be collected in the oil and grease trap. This collected

    oil and grease is removed manually by hand-rack from time to time.

  • 7/30/2019 Tech Specs for ETP

    7/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: B Page 7 of 26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    (ii) The effluent, after passing through the Oil and grease trap, is collected in theunderground equalization tank after passing through the coarse and fine screens to arrest

    the larger and smaller particles respectively.

    (iii) The effluent is made homogeneous in the equalization tank. Homogeneous effluentfrom the equalization tank is pumped to the reaction tank.

    (iv) In the reaction tank, agitator shall be provided for mixing the dosing chemicals with theeffluent. The chemical dosing results in the precipitation, which entraps the colloidalthings thus results in the removal of dissolved matter. The conversion of micro flocs

    into macro flocs is facilitated by the addition of poly-electrolyte dosing in the reactiontank.

    (v) From reaction tank, the effluent overflows to the settling tank. Here the macro flocssettle down as the chemical sludge. The Backwash water of the Pressure Sand Filter

    (Cylinder wash Area) and Dual Media Filter is also collected in the settling tank forfurther treatment.

    (vi) The effluent from the settling tank overflows to the buffer tank.(vii) From the buffer tank, the effluent is pumped and discharged through a dual media filter.

    The treated water shall be sent for horticulture purpose to the nearby green belt.

    (viii) The sludge collected at the bottom of the settling tank is taken to the sludge drying bedsfor drying. After drying, the dried sludge cake is removed manually from the sludgedrying beds. These filled bags are to be stored in the covered hazardous waste pit.

    e) Effluent from cylinder washing and cylinder degassing shall be collected in main ETP locatedas shown in attached part drawing (256324-500-PIP-A0-3000-1/2) and schematics (256324-500-SKT-MEC-002).

    f) The sequence of the above treatment process is indicated in the Treatment Scheme (256324-500-SKT-MEC-002 (2 sheets)) is attached with this requisition. The equipments shall bedesigned such that the entire effluent generated per day shall be treated in 8 hours shift.

    g) Vendor can propose an alternate scheme to minimise total hardware required, if possible, asan option to the basic scheme. The Vendor shall make every effort to optimise the scheme.

    h) Vendor shall carry out the Hazardous Area Classification for the proposed ETP and shallensure the instruments and electrical components suitable for the Area Classification, as per

    IS: 5572 (1994).

    i) Vendor to note that the control panel shall be located in a safe area near the ETP. All thesignals required to monitor the operation of the plant shall be repeated and made available to

    be connected by others, though a serial link (soft signals) to the central control panel.

    Necessary interface to connect the above cables shall be provided by the control panel vendor.

    3.2 Equipment and Materials

    Scope of supply of Effluent Treatment Plant shall include but not necessarily be limited to

    following. Any additional equipment required to achieve treated water quality shall beincluded by the Vendor in their scope of supply and shall mention the details of the same in the

    bid document.

    A. Equipments and Materials for ETP section of Cylinder washing area.

    Dilution tank suitable for diluting H2SO4 to 10% from 98%. Preferable Material ofconstruction is CS tank with lead lining or PTFE lining. Diaphragm dosing Pumps(1W+1S) with FLP motors, pulsation dampner, Piping and Valves for dosing 10% H2SO4

  • 7/30/2019 Tech Specs for ETP

    8/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: B Page 8 of 26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    in the neutralizing tank. The tank and Dosing Pumps shall be skid mounted with to

    facilitate quick erection & interconnection at site.

    Neutralizing tank of 3 m3 capacity for collection of effluent with caustic soda.

    Pressure Sand filter complete with frontal Piping, Valves, Media, Interconnecting Pipingand Internals. Filter design shall be as per ASME Section VIII Div. I, latest edition.

    Filter feed/ Transfer Pumps with FLP Motors (1W+1S) mounted on common base platecomplete with flexible spacer type couplings, non-sparking coupling guards, suction and

    discharge piping and valves. The head of this pump shall be sufficient to transferneutralised and filtered water to Main ETP.

    All Civil work (excluding Piling), Interconnecting Piping & Pipe supports, Ladders,Crossovers, Power cabling, Control Cabling, Instrumentation, Earthing, etc. within thisETP area and interconnection with main ETP.

    B. Equipments and Materials for ETP Section of Degassing shed.

    Underground storage sump for water storage of 5 m3 capacity. With suitable overflowarrangement for transfer of water to main ETP. Water transfer pumps of capacity 10 m3/hr with FLP Motors (1W+1S) mounted on

    common base plate complete with flexible spacer type couplings, non-sparking couplingguards, suction and discharge piping and valves. The head of this pump shall be sufficient

    to transfer water from pit up to empty cylinder filling via filter.

    Filter (Basket type or Cartridge) to remove suspended particles from the water being filledin empty cylinders for degassing.

    All Civil work (excluding Piling), Interconnecting Piping & Pipe supports, Ladders,Crossovers, Power cabling, Control Cabling, Instrumentation, Earthing, etc. within this

    ETP area and interconnection with main ETP.

    A Rotameter that will ensure continuous flow of 0.25 m3/hr to the underground storagesump.

    C. Equipments and Materials for Main ETP.

    Bar Screen at the inlet Oil and Grease trap. Design and Construction of Oil & Grease Trap, Equalisation tank, Reaction tank, Dosing

    Tanks, Settling tank, Buffer tank, Treated water tank, Sludge drying beds and Hazardous

    waste pit.

    Effluent transfer pumps with FLP motors (1W+1S) mounted on common base platecomplete with flexible spacer type couplings, non-sparking coupling guards, suction and

    discharge piping with valves. These pumps are for transfer of equalised effluent fromequalisation tank to reaction tank. The Effluent flows by gravity from reaction tank to

    Settling tank to Buffer tank.

    Filter Feed Pumps with FLP Motors (1W+1S) mounted on common base plate completewith flexible spacer type couplings, non-sparking coupling guards, suction and dischargepiping and valves. Suction of these pumps shall be taken from Buffer tank.

    Dual Media filter complete with frontal Piping, Valves, Media, Interconnecting Piping andInternals. Filter design shall be as per ASME Section VIII Div. I, latest edition.

  • 7/30/2019 Tech Specs for ETP

    9/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: B Page 9 of 26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    Filter Backwash Pumps with FLP Motors (1W+1S) mounted on common base platecomplete with flexible spacer type couplings, non-sparking coupling guards, suction and

    discharge piping and valves. Suction of backwash pump shall be taken from Treated watertank.

    Treated Water Pumps for Gardening with FLP Motors (1W+1S) mounted on common baseplate complete with flexible spacer type couplings, non-sparking coupling guards, suction

    and discharge piping and valves. The discharge pressure of the pump shall be 5 kg/cm2g.

    Complete Civil design and Construction of Sumps, Pits, Equipment foundations andControl room. Piling for Pits & foundations, as required, by others.

    All necessary interconnecting piping/tubing and valves within the battery limit of thepackage.

    Purchaser will provide one point Instrument air supply within battery limit. Vendor toprovide the estimated Instrument Air Supply requirement.

    Instrumentation as required complete with control panel for control and monitoring thequality of treated water.

    Motor Control Centre (MCC), Local Control Panel, Supply of cables within the batterylimit and termination in the control panel/ MCC located in safe area near the ETPPurchaser shall provide one point power supply in the MCC Incomer.

    Interfacing with the ETP of cylinder washing area & ETP of degassing shed includingrequired piping, cables, civil works etc.

    D. Equipments and Materials Common for all ETP areas and Main ETP.

    Lifting & Earthing lugs for packaged unit, Vessels and Pump sets. Anchor bolts, fixing bolts, jack screw bolts, shims, etc. First fill of lubricants to be supplied separately along with the pump sets. Commissioning & Start-up Spares. Spares for two years trouble free operation. Vendor to furnish the list for the same. Inspection and testing as specified. Submission of documents as specified in this document. Painting, preservation, preparation for shipment and delivery at site. Special tools if required (Bidder to provide list in the bid). Construction, Installation & Commissioning.

    3.3 Engineering Services

    The Vendor shall provide engineering services, which shall include, but not necessarily be

    limited to, the following:

    Providing/Coordinating detailed design of all equipment and components within the scopeof supply.

    Preparing Civil foundation design and drawings for construction at site. Resolving engineering queries related to the equipment and components within the scope

    of supply.

  • 7/30/2019 Tech Specs for ETP

    10/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: BPage 10 of

    26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    Performing and coordinating all aspects of design. Providing progress reports etc. Providing expediting services for all sub-vendors. Providing quality assurance including all sub-vendors with respect to ISO 9000 or

    equivalent.

    Erection & Commissioning to be quoted separately. Attendance of kick-off meetings, coordination meetings, Design reviews meetings in the

    Consultants/Purchasers office.

    Resolve/incorporate all action points from Design reviews, HAZOP, etc. Any technical document if required by Purchaser for statutory approval shall be furnished

    by vendor.

    3.4 Exclusions

    The following are excluded from the Vendor's scope and will be provided by others:

    Piping/ trenches up to collection tank and beyond the outlet nozzle of last equipment in thetreatment scheme.

    Service water will be provided for Backwash of Pressure Sand Filters in the CylinderWashing Area at one point.

    Interconnecting power cabling and cable trays to vendor supplied MCC of ETP andPurchasers PMCC.

    Instrument air connection piping up to battery limit. Cable between Vendors Control panel and Purchasers Control room. Piling required for Pits & Equipment foundations.

    4 Applicable Codes, Specifications and Standards

    4.1 General

    The design, fabrication, assembly, inspection, testing, painting, packing and shipment of

    equipment shall be in accordance with the latest edition of the codes, specifications and

    standards (including standards / specifications mentioned therein) listed in this requisition.

    The Vendor shall provide an itemized list of any comments or exceptions to the specificationand its attachments. Only those comments / exceptions that are accepted by Purchaser will be

    incorporated into the requisition at the time of the order.

    4.2 Codes and Standards

    ASME Section VIII Div. I Rules for Construction of Unfired Pressure vessels

    ASME B 16.5 (2003) Pipe Flanges and Flanged Fittings.

    ISO 9000 (2005) Quality Management and Quality Assurance Standards.

    ISO 10474 (1991) Inspection Documents

    ISO 5199: 2002 Technical Specification for Centrifugal Pumps Class II

  • 7/30/2019 Tech Specs for ETP

    11/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: BPage 11 of

    26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    4.3 Other Specifications and Standards

    Refer Appendix-A for other specifications & standards.

    4.4 Conflicting Requirements

    In case of conflict between documents relating to the enquiry or purchase order, the following

    priority of documents shall apply:

    First priority : Purchase order and variations thereto

    Second priority : Data sheets and drawings

    Third priority : This requisition

    Fourth priority : Other Specifications

    Fifth Priority : Referred Codes & Standards

    Note: Should any conflict arise either before or after order placement of order, the

    Vendor shall immediately inform the Purchaser for technical resolution of the conflict.

    5 Design Requirements

    5.1 Mechanical Requirements

    5.1.1 Pumps shall be supplied as per the requirements of Specification for Non-API CentrifugalPumps (Doc. No. 256324-500-SP-MEC-004) Pump set (Pump and Motor) shall be mounted oncommon base plate.

    5.1.2 The internals of the Oil & Grease Trap, Reaction tank and settling tank unit shall be FRP forcorrosion protection.

    5.1.3 Skid mounted Filter Vessels with internals, media, piping and valves. Material of constructionfor vessels shall be suitable for the effluent characteristics specified.

    5.1.4 Skid mounted Duel Filter Vessels with internals, piping and valves. Material of constructionfor vessels shall be Carbon steel with suitable coating on the inside to avoid corrosion.External surfaces shall be painted as per the specification for painting.

    5.1.5 Auto valves, if required shall be pneumatically operated type only.

    5.2 Civil Requirements

    5.2.1 All RCC shall be of Grade M30.5.2.2 The reinforcement shall be of Grade 500.5.2.3

    All foundations & Underground tanks shall rest on Pile foundation.

    5.2.4 Slag cement shall be used for construction.

    5.3 Instrumentation Requirements

    5.3.1 The Instruments shall be supplied as mentioned in the scope of supply for effective control andmonitoring of the system.

  • 7/30/2019 Tech Specs for ETP

    12/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: BPage 12 of

    26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    5.3.2 All the Instruments shall be suitable for Zone 1, Gas Group IIA/IIB.5.3.3 Instrument air supply if required, is available. The pressure range is 4.5 to 7.0 kg/cm2.

    Purchaser will provide one point Instrument air supply within the battery limit of the bidder.

    5.3.4

    Controls shall be PLC based and all soft signals covering for dynamic graphic information ofETP shall be made available for connection (By Others) to Owners control room.

    5.3.5 Control Panel, if Electrical panel not combined with Automation with suitable partition, shallbe supplied by vendor. The Control Panel shall be fabricated from cold rolled MS sheets ofminimum 2mm thickness for load bearing members, 1.6mm for non load bearing members an

    3mm for gland plates. Panel shall be rated for IP-55, weather protection.

    5.3.6 All Instruments, Junction boxes, cables, control panels etc. shall be supplied and hooked up inthe skid. All on-skid cabling shall be terminated in skid mounted Local panels by the vendor.

    5.3.7 All Instruments/PLC supplied in the package shall be from approved vendor list. Bidder shalltake the approval from MMCI for instruments not found in the approved list. Local panel shallbe provided with sunshade.

    5.3.8

    ETP shall be provided with its own PLC (if necessary) to control, monitor and safeguard thesystem. The PLCs shall be mounted in a local control panel (LCP) provided with necessaryindications.

    5.3.9 Controls, sequencing logic and safe guarding of the complete ETP shall be biddersresponsibility. Vendor shall furnish the control and safeguarding logic of the package forreview and approval.

    5.3.10 Clean & dirty earthing shall be made available inside LCP and separated accordingly5.3.11 Vendor shall inform the total consumption of Instrument air.5.3.12 All instruments to be visible from grade level otherwise platform shall be provided.5.3.13 Vendor shall include in their offer, spares for Critical solenoids.5.3.14

    Instrument data sheets shall be completed by the vendor for all instruments supplied in theformat provided to the bidder.

    5.3.15 The identifying tag number shall be neatly & clearly marked on each instrument.5.3.16 Dial size of Pressure shall be 150 mm & Temperature Gauge shall be 100mm. Dial size of

    Receiver Gauge shall be 50mm. The scale plates shall be aluminium or laminated plastic withwhite face & black figures.

    5.3.17 Pressure gauge & Temperature gauge range shall be within middle third of the instrumentrange in normal operating condition. Pressure Gauge exposed to vacuum shall be capable ofwithstanding full vacuum.

    5.3.18 Instruments shall meet the minimum requirements of IP 65 for ingress protection inaccordance with IEC 60529.

    5.3.19 All instruments shall be individually valved by block and bleed valve at the tap off to allowdepressurization, in-place testing and maintenance of the instrument without shutting down the

    equipment/package unit.

    5.3.20 Cable entry to all instruments shall be inch NPT. Spare cable entries shall be suitablyplugged with stopping plugs.

    5.3.21 Materials of construction for instrument equipment shall be compatible to the corrosionresistance, pressure and temperature conditions of the process fluids handled. Generally, all

    instrument wetted parts, in contact with the process fluid shall be SS316 (minimum), or of a

    material equal to or better than that of the related vessel or line.

  • 7/30/2019 Tech Specs for ETP

    13/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: BPage 13 of

    26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    5.3.22 List of approved vendors1. PROGRAMMABLE LOGIC CONTROLLER

    SR.NO. NAME OF VENDOR

    1. ALLEN BRADLEY (Rockwell Automation India Pvt Ltd)

    2. GE FANUC SYSTEMS PVT LTD

    3. SCHNEIDER MODICON

    4. SIEMENS

    5. HONEYWELL

    2. ELECTRONIC TRANSMITTERS (PT, DPT, LT, TT)SR.NO. NAME OF VENDOR

    1. EMERSON PROCESS MANAGMENT

    2. ENDRESS & HAUSER

    3. YOKAGAWA

    4. HONEYWELL

    3. pH INSTRUMENTSR.NO. NAME OF VENDOR

    1. ZWELLEGER

    2. FORBES POLYMETRON PVT LTD

    3. ABB

    4. EMERSON

    4. ROTAMETERSR.NO. NAME OF VENDOR

    1. CHEMTROLS

    2. EMERSON

    3. KROHNE

    5. PNEUMATIC VALVE ACTUATORSSR.NO. NAME OF VENDOR

    1. ADAMS

    2. BETIS

  • 7/30/2019 Tech Specs for ETP

    14/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: BPage 14 of

    26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    3. VIRGO

    4. VELAN

    5. ORTON

    6. TYCO BIFI

    7. ELOMATIC

    6. CONTROL VALVESR.NO. NAME OF VENDOR

    1. FISHER XOMOX2. MASONEILAN3. TYCO4. FLOWSERVE INDIA5. SAMSON CONTROLS6. INSTRUMENTATION LTD.7. METSO AUTOMATION

    7. PRESSURE SAFETY/RELIEF, THERMAL SAFETY/RELIEF VALVESR.NO. NAME OF VENDOR

    1. ANDERSON & GREENWOOD

    2. L&T3. TYCO

    4. INSTRUMENTATION LTD.

    5. FAINGER LASER

    8. PRESSURE, TEMPERATURE GAUGE, D.P. GAUGESR.NO. NAME OF VENDOR

    1. WIKA INSTRUMENTS2. ASHCROFT3. GENERAL INSTRUMENTS CONSORTIUM

    9. LEVEL GAUGESR.NO. NAME OF VENDOR

    1. JERGUSON

    2. K-TEK

  • 7/30/2019 Tech Specs for ETP

    15/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: BPage 15 of

    26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    3. MAGNETROL

    10. RTDSR.NO. NAME OF VENDOR

    1. GENERAL INSTRUMENTS CONSORTIUM2. WAAREE INSTRUMENTS LTD.3. ALTOP INDUSTRIES4. PYRO ELECTRIC & ALLIED INSTRUMENTS PVT. LTD.

    11. RELAY & RELAY BOARDSSR.NO. NAME OF VENDOR

    1. OMRON AUTOMATION PVT LTD2. TELEMECHANIQUE3. P&F4. PHEONIX5. HONEYWELL6. SIEMENS

    12. SOLENOID VALVESR.NO. NAME OF VENDOR

    1. ASCO

    2. HERION

    3. NORGREN

    13. PUSHBUTTONSSR.NO. NAME OF VENDOR

    1. TEKNIC2. L&T3. SIEMENS4. MERLIN GERIN-TELEMECHANIQUE SCHNEIDER ELECTRIC5. CONTROL & SWITCHGEAR-CANDS

  • 7/30/2019 Tech Specs for ETP

    16/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: BPage 16 of

    26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    14. MCBSR.NO. NAME OF VENDOR

    1. MDS

    2. MERLIN GERIN-SCHNEIDER ELECTRIC

    3. SIEMENS

    4. L&T

    15. CABLESSR.NO. NAME OF VENDOR

    1. ASSOCIATED CABLES PVT. LTD.

    2. UNIVERSAL CABLES

    3. ICON CABLES (KERPEN)

    4. LAPP

    5. CORDS CABLES

    6. KEI INDUSTRIES LIMITED

    16. RTD CABLESSR.NO. NAME OF VENDOR

    1. LAPP

    2. DELTON

    3. UNIVERSAL CABLES

    4. UNIFLEX CABLES Ltd

    5. ASSOCIATED CABLES PVT. LTD.

    17. POWER CABLESSR.NO. NAME OF VENDOR

    1. CCI

    2. ASSOCIATED CABLES PVT. LTD.

    3. UNIVERSAL CABLES

    4. FINOLEX

    5. LAPP

  • 7/30/2019 Tech Specs for ETP

    17/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: BPage 17 of

    26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    18. TUBE AND TUBE FITTINGSSR.NO. NAME OF VENDOR

    1. SWAGELOK

    2. PARKAR HANNIFEN INDIA PVT LTD

    03. ASTEC INSTRUMENTS PVT. LTD

    5.4 Electrical Requirements

    5.4.1 Motors shall be supplied as per attached Motor specification no. 256324-500-SP-ELE-010.5.4.2 Vendor shall submit the Motor Datasheet with all the data filled by the Motor Manufacturer.5.4.3 Purchaser shall provide one point power supply within the battery limit of the package vendor.

    Further distribution & control shall be in the scope of packaged vendor.

    5.4.4 Local control panel shall have all necessary standard features viz. Motor ON/OFF push buttons Process interlocking provisions Auto / Manual selection position Motor ON/OFF indication

    5.4.5 Local control panel shall be suitable for Safe location near ETP.5.4.6 Normal 240 volts single phase (non UPS) power supply shall be derived from ETP MCC to

    Local control panel.

    5.4.7 Electrical PanelPurchaser shall provide 415V, 3phase, 50Hz, power supply to ETP MCC and it shall belocated near ETP in safe area. Vendor shall decide exact location of ETP MCC panel suitably

    in safe area. The auxiliary power requirements at various voltage levels (AC and/or DC) and

    to the control panel shall be derived within the panel by providing necessary transformers,rectifiers, fuses, etc. by the Vendor.

    The Electrical Panel shall be fabricated from cold rolled MS sheets of minimum 2mm

    thickness for load bearing members, 1.6mm for non load bearing members an 3mm for glandplates. Panel shall be suitable for outdoor installation with IP-55 ingress protection.

    The Electrical panel shall also house the starter and breaker units for the drive motors and

    these feeders shall be fixed type. Motor starter feeder shall be chosen to provide Type-2 co-

    ordination. Motors rated upto 15KW shall be started direct on line (DOL starter) and 15KW

    and above shall have Star-Delta starter. Supply for Motor space heater shall be derived fromthis panel. Suitable power feeders shall be provided for control panel.

    Electrical Panel shall have Start, Stop Push buttons and Indication provision for all drives.

    5.4.8 Local Control Station for each drive shall be provided near the drive.5.4.9 LV Cables

    All Power and Control cables shall be 1.1kv grade, XLPE insulated, multi standard conductor,

    single/multi core, steel armoured, extruded PVC inner shealthed and extruded FRLS PVC

  • 7/30/2019 Tech Specs for ETP

    18/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: BPage 18 of

    26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    outer shealthed. Cable of size 6 sq.mm and below shall be of copper conductor. Cable of Size

    10 sq.mm and above shall be aluminium conductor confirming to IS 7098 (Part-1).

    6 Quality Assurance

    The Vendor shall maintain and use a Quality System which is based on ISO 9000 to controlthe work. If the Vendor elects to sub-contract part of the work he shall ensure that only those

    sub-contractors or suppliers are used who can demonstrate that they operate Quality Systemsbased on ISO 9001 or ISO 9002 as applicable.

    The Vendor shall give his sub-contractors or suppliers assistance in attaining the required

    standard, if necessary. This shall not relieve the Vendor of his responsibility for the quality ofthe finished work. The Company / Consultant reserve the right to audit the Vendors Quality

    System.

    The Vendor shall assign sufficient full time personnel to the project to ensure the Quality

    Assurance / Quality Control System, documented in a Quality Assurance / Control Manual, is

    maintained and kept up-to-date throughout the duration of any purchase order. The VendorsQuality Assurance / Control System shall become an integral part of any purchase order.

    Vendor shall organize a prefabrication / inspection meeting with the Company / Consultant.

    Vendor shall submit QA plan/Inspection test plan for Purchasers/Consultants review and

    approval within 2 weeks from the date of Purchase Order/LOI/FOI.

    7 Inspection and Testing

    7.1 Factory Inspection & Testing

    The responsibility for inspection, certification, etc. of all materials, parts lies with the Vendor.

    The Vendor shall specify all of the inspection and testing requirements in the QualityAssurance plan (QAP)/ Inspection Test plan (ITP) which shall identify the activities requiring

    the Company / Consultant's approval, review, witnessing etc.

    Inspection and testing requirements shall be in accordance with the applicable standards as

    listed in this requisition and the data sheets and Vendors Quality Assurance Plan/ Inspection

    test plan approved by Purchaser/ Consultant.

    All equipment shall be inspected for compliance with:

    Requirements of the Company/Consultants specifications, data sheets and correspondencethereafter.

    Applicable Codes, standards and specifications, which shall also include sub-referencedstandards therein.

    QAP/ ITPs produced by the Vendor duly approved by Purchaser/ Consultant.Purchasers/ Consultants Inspectors have the right to request additional inspections or tests to

    ensure that the equipment complies with this specification and all relevant codes andstandards.

    All equipment shall be presented for inspection in an unpainted state except for the finalinspection. All instruments and other equipment necessary for testing shall be supplied by the

    Vendor and the same shall be checked and certified by the Company / Consultants inspector.

  • 7/30/2019 Tech Specs for ETP

    19/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: BPage 19 of

    26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    Any defects found by the Company / Consultants appointed Inspector shall be rectified in his

    presence. Where this is not possible or practical, check lists shall be prepared and signed by

    the Inspector stating all pending items. Copies of these lists shall be sent to the

    Company/Purchaser to enable their subsequent checking.

    Mill and shop inspection shall not relieve the Vendor from his contractual responsibility forreplacing any defective material and for repairing any defective workmanship that may be

    discovered in the field.

    The Vendor shall be responsible for co-coordinating the inspection and testing of sub-vendor

    supplied equipment, and for ensuring that the Company / Consultants representatives are

    given the necessary access for inspection, and adequate warning of inspection and tests.

    The Vendor (and all sub-Vendors) shall give the Company and its representatives, without

    charge, all reasonable facilities and access for the purpose of inspecting the equipment toensure that it is manufactured in accordance with the Specification.

    All spare parts shall be subjected to the same inspection standards and full materialcertification as the main order.

    The equipment shall not leave the Vendors factory before all discovered defects have beenrectified and without the written permission of the Company/Consultant.

    Materials for all pressure retaining components & wetted components shall be certified in

    accordance with ISO 10474 - 3.1B and that for non-pressure retaining components likestructural components, platforms, ladders, shall be certified in accordance with ISO 10474 -

    2.2.

    Final hydro test pressure shall be held for a minimum period of 30 minutes. Chloride contents

    of water used for hydro test shall not exceed 20 ppm for stainless steel and chloride contentmay be permitted up to 250 ppm for carbon steel.

    7.2 Vendor Requirements

    Any acceptance or release of equipment following an inspection or test activity shall in no wayrelieve the Vendor of his responsibility to provide guarantees as to the suitability of the

    materials, workmanship and performance of the equipment in accordance with thisRequisition.

    7.3 Performance Guarantee

    Unless otherwise agreed, all equipment shall be guaranteed as follows:

    All equipment shall perform satisfactorily under the operating conditions and provide treated

    water quality as per Appendix B of this requisition and shall be fit for the purpose intended.

    The Vendor shall guarantee following as a minimum at site conditions:

    Sustained operation at the conditions outlined in this specification and relevant documents. Consumption of utilities like Water, Chemicals and Electrical power.

  • 7/30/2019 Tech Specs for ETP

    20/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: BPage 20 of

    26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    The mechanical and structural integrity, workmanship and the materials of constructionused.

    7.4 Works Inspection and Notification

    The supplier shall send inspection notification at least 2 weeks in advance and shall send a

    minimum of fifteen (15) working days notice prior to carrying out the Factory Acceptance Test(FAT). The notification shall contain as a minimum the following information:

    Project Title, MMCI Project number. Manufacturers full address, contact name, telex / telefax / telephone numbers. Purchase Order reference Date of inspection Details of equipment to be tested / inspected and the status of the equipment (whether it is

    complete).

    8 Vendor Documentation

    8.1 Documents/ Information to be supplied with offer

    The Vendor shall provide the Consultant with the following information as a minimum along

    with the offer. These documents shall include, but not be limited to the following:

    a. The completed Table of Compliance (Appendix D).b. Equipment Data sheets for Vessels and Pumps under scope of supply.c. Piping and Instrumentation Diagram with description of Interlocks.d. A detailed scope of supply that fully describes the equipments offered & treatment

    scheme.

    e. Pump performance curves.f. General arrangement drawings with complete layout, dimensions, Termination details and

    Load data for foundation design.

    g. Commissioning Spare parts list.h. 2-Years operation spare part list.i. Complete list of special tools required, if any.j. All utility consumptions such as power requirement, utility water requirement and

    Chemical consumption.

    k. Instrument Datasheets giving details of Manufacturer, Model number, Type of Instrument,etc.

    8.2 Document/ Information to be supplied After Award of Contract

    Vendor shall provide Purchaser/Consultant with documents and drawings as described in the'General Conditions of Contract'. However, document requirements as specified in the

    'Requisition for Engineering Documents (RED)' attached with Appendix C shall be followedas a minimum requirement.

  • 7/30/2019 Tech Specs for ETP

    21/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: BPage 21 of

    26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    9 Manufacturing Schedule

    Within 2 weeks of the receipt of the Purchase Order/ LOI the manufacturer shall submit detailbar chart schedule showing the dates for the following milestone activities, as minimum:

    i) Issue of vendor drawings.

    a. Issue for comments/approval

    b. Issue of final drawings

    c. Issue of O&M Manuals

    ii) Equipment available for Testing.

    iii) Completion of packing and readiness for dispatch.

    10 Spares and Special Tools

    10.1 Spares

    As a minimum spares following shall be included:

    The supply of spares for start-up and commissioning Vendor to recommend two years operation spares and furnish separate price in the offer.The Vendor shall also provide all consumables during erection up to commissioning and

    reliability testing. In case of any additional spares if required during commissioning stage, thesame shall be supplied by Vendor free of cost.

    The Vendor shall complete and submit SPIR forms 8 weeks after Vendors acceptance of the

    Purchase Order. Spare parts for the normal operation shall be selected by the End User fromthe electronic version of Spare Parts Lists and Interchange ability Record (SPIR).

    10.2 Special Tools

    The Vendor shall supply a set of any special tools, which are required for the installation,

    commissioning, operation and maintenance of the equipment being supplied. A list of specialtools shall be supplied along with the offer.

    11 Packing and Shipping

    For Packaging, Shipping and delivery of equipment at site and unloading requirements,'Agreed Conditions of Contract' shall be referred.

    12 Installation and Commissioning

    Vendor shall provide qualified personnel for the civil construction, installation, testing, pre-

    commissioning and commissioning of the Effluent treatment plant.

  • 7/30/2019 Tech Specs for ETP

    22/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: BPage 22 of

    26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    Appendix A: Attachments

    Document No. Rev. Description

    256324-500-SP-ELE- 010 ASpecification for Electric Motors (Electric

    Motor Datasheet)

    256324-500-SP-MEC-004 BSpecification for Non-API Centrifugal pumps

    for general services.

    256324-500-SKT-MEC-002 B ETP Treatment Schematics

    256324-500-PIP-A0-3000 (Sheet 1/2) 0 Part Drawing of Overall Plot Plan

    256324-500-SP-GEN-001 B Local Conditions

    Blank Instrument Datasheets

    Data sheet for Differential PressureTransmitter

    Data Sheet for Level Switch - High High /Low Low(Displacer Type)

    Data Sheet For Pressure Safety Valve(PSV)

    Data Sheet For Temperature Gauge Data Sheet For Pressure Gauge

  • 7/30/2019 Tech Specs for ETP

    23/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: BPage 23 of

    26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    Appendix B: Water Quality

    Effluent Inlet Characteristics:

    Temperature : 20- 40o

    C

    Colour : Muddy

    pH : 5 to 8

    Oil & Grease : 2 to 5 mg/l

    TSS : 150-200 mg/l

    TDS : 1000 1200 mg/l

    BOD : 50-100 mg/l (3 days @ 27oC)

    COD : 150-250 mg/l

    Detergent : 0.01 mg/l

    Note: Oil shall be free oil, no emulsified oil to be considered.

    Treated Effluent Characteristics:

    The treated effluent characteristics shall be as per Ministry of Environment and Forest notification dated18

    thMarch, 2008.

    pH : 6.0 to 8.5

    Oil & Grease :

  • 7/30/2019 Tech Specs for ETP

    24/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: BPage 24 of

    26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    Appendix C: Requisition of Engineering Documents (Red Form)

    Owner/Purchasers Office Consultants Office

    HINDUSTAN PETROLEUM CORPORATION LTD.

    Krishna Shree, 2nd Floor, Gandhi Nagar, 1st Main Road-Adyar,

    Chennai 600 020

    Mott MacDonald Consultants (India) Pvt. Ltd

    Kothari House, CTS No. 185 Off Andheri Kurla Road, Andheri (East)

    Mumbai 400 059, India ; Tel 09122 3083 5000

    DRAWINGS Required number for TIMING FOR SUBMITTAL

    Approval Final issue - for approval 2 weeks after order date

    Approval drawings / Final drawings to be submittedunder cover of an ADS form / FDS form respectively Transpa

    rencies

    Prints Disk Prints - final issue 2 weeks after approval dateDocuments shall be submitted to:

    Vendor Doc. Schedule 4 1 3

    General arrangement 4 1 3

    Piping & Instrumentation Diagram 4 1 3

    Piping Layout with Termination details 4 1 3

    Civil design, Civil drawings, Foundation loading and

    bolt location plan

    4 1 3

    Cross section drawing with BOM and MOC 4 1 3

    Completed Pump, Motor data sheets 4 1 3

    Performance curves for Pumps and motors 4 1 3

    Motor Datasheet,GA drawing & Terminal BoxDrawing

    4 1 3

    GA and Control Schematic drawings for Local ControlPanel, Instrument hook-up diagram, loop diagram,

    layout, Termination details, MTO, etc. MCC in

    vendors scope.

    4 1 3

    Production Schedule 4

    Progress Report 4 Monthly Once.Performance Test Procedure including FAT, NDT

    Procedures

    4 1 3

    Quality plan satisfying ISO 9000 requirements 4 1 3

    Manufacturing, Inspection & testing sequence plan/

    QAP

    4

    SPARE PARTS DOCUMENTS 1 3

    ESPIR forms including 1 transparency 1 3

    Lubrication schedules 1 3

    TEST AND INSPECTION DOCUMENTS PrintsDocuments to be submitted under transmittal Documents shall be submitted to:

    Manufacturing report 1 3

    Material certificates to: ISO 10474 - 3.1B 1 3

    Electrical certificates to Cenelec / Baseefa/ATEX Compliance/CMRI 1 3

    Static / dynamic balancing certificates 1 3 Purchasing Office via courier service within 4 weeks

    Performance test Report & Performance Curves 1 3 of relevant test / inspection.

    Heat treatment graphs

    Calibration certificates of Instruments 1 3

    OPERATING DOCUMENTS Purchasing Office via courier service not later than

    time of dispatch of equipment.

    Installation instructions 1 3

    Operating instructions 1 3 Combine into one manual

    Maintenance instructions 1 3

    ADDITIONAL REQUIREMENTS:

    1. Referenced standards / codes shall be the latest issue unless otherwise stated.

    Invoice must certify that the drawings and engineering documents specified

    above have been dispatched to all parties concerned.Any deviation from the timing for submittal of documents shall be notified to

    the Approval / Distribution Offices by fax or E mail.

    Shop fabrication shall not be started before the required approval drawingshave been released for construction by the party concerned, unless otherwise

    stated on the "Approval Drawing Specification".

    Each document shall bear the item / tag and order reference number and bedispatched by air mail, unless other instructions are stated on the RED.

    Units / dimensions to be used on Engineering documents shall be SI.

    The documents shall be in English. Description on drawings and similardocuments may be in other languages provided English translations are

    also given.

    Drawings and documents shall be suitable for microfilming and complywith accepted national or international standards for the preparation of

    technical drawings. Only the following standard sizes should be used: A4,

    A3, A2, A1.

  • 7/30/2019 Tech Specs for ETP

    25/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: BPage 25 of

    26

    P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-Tech Specs for ETP.doc

    Appendix D: Table of Compliance

    The Vendor shall confirm below their acceptance of all the clauses contained in the specification or

    otherwise make clarifications or exceptions that shall be noted below:-

    CLIENT: HINDUSTAN PETROLEUM

    CORPORATION LTD.

    VENDOR REF. NO.

    REF. NO.: 256324-500-RQ-MEC-013 Rev. B

    CLAUSE

    NO.

    CONFORMS

    Y/N

    ALTERNATIVE

    Y/N

    CLARIFICATION

    1.0

    1.1

    1.2

    1.3

    1.4

    1.5

    1.6

    1.7

    1.8

    2.0

    3.0

    3.1

    3.2

    3.3

    3.4

    4.0

    4.1

    4.2

    4.3

    4.4

    5.0

    5.1

    5.2

    5.3

    5.4

    6.0

    7.0

    7.1

    7.2

    7.3

    7.4

    8.0

  • 7/30/2019 Tech Specs for ETP

    26/26

    VISAKH MARKETING INSTALLATION RESITEMENT

    PROJECT LPG TERMINAL

    Doc No: 256324-500-RQ-MEC-013 Rev: BPage 26 of

    26

    CLIENT: HINDUSTAN PETROLEUM

    CORPORATION LTD.

    VENDOR REF. NO.

    REF. NO.: 256324-500-RQ-MEC-013 Rev. B

    CLAUSE

    NO.

    CONFORMS

    Y/N

    ALTERNATIVE

    Y/N

    CLARIFICATION

    8.1

    8.2

    9.0

    10.0

    10.1

    10.2

    11.0

    12.0

    Appendix A

    Appendix BAppendix C

    Appendix D