Team 14: GRE-cycleStatus Update
12/1/14
![Page 2: Team 14: GRE-cycle Status Update 12/1/14. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen](https://reader033.vdocuments.us/reader033/viewer/2022051516/56649f2f5503460f94c48c88/html5/thumbnails/2.jpg)
The Team
Cole Walker Ben Guilfoyle Hannah Albers Melanie Thelen
![Page 3: Team 14: GRE-cycle Status Update 12/1/14. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen](https://reader033.vdocuments.us/reader033/viewer/2022051516/56649f2f5503460f94c48c88/html5/thumbnails/3.jpg)
The Problem The Project Design Norms Pre-treatment Reactor Post-treatment Obstacles
The Problem
• Restaurant grease is a waste
• Often recycled back into clean grease
• Potential for greater use
http://www.energy4me.org/images2010/source_petroleum.jpg
![Page 4: Team 14: GRE-cycle Status Update 12/1/14. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen](https://reader033.vdocuments.us/reader033/viewer/2022051516/56649f2f5503460f94c48c88/html5/thumbnails/4.jpg)
The Problem The Project Design Norms Pre-treatment Reactor Post-treatment Obstacles
Our Project• Biodiesel Production Plant
• Feed: Restaurant Grease
• Customer: Diesel Distributors
Slide 3/6
http://www.scielo.br/scielo.php?pid=S0103-50532013000100004&script=sci_arttext
![Page 5: Team 14: GRE-cycle Status Update 12/1/14. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen](https://reader033.vdocuments.us/reader033/viewer/2022051516/56649f2f5503460f94c48c88/html5/thumbnails/5.jpg)
The Problem The Project Design Norms Pre-treatment Reactor Post-treatment Obstacles
Resources
Industrial Consultant: Randy ElenbaasSam StrongPast Senior Design Teams• FAME :full scale plant• Rinnova and Diesel Crew: lab-scale
![Page 6: Team 14: GRE-cycle Status Update 12/1/14. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen](https://reader033.vdocuments.us/reader033/viewer/2022051516/56649f2f5503460f94c48c88/html5/thumbnails/6.jpg)
The Problem The Project Design Norms Pre-treatment Reactor Post-treatment Obstacles
Design Norms
• Stewardship
• Transparency
• Caringhttp://www.biodieselmagazine.com/uploads/posts/web/2011/01/12948046006374.JPG
![Page 7: Team 14: GRE-cycle Status Update 12/1/14. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen](https://reader033.vdocuments.us/reader033/viewer/2022051516/56649f2f5503460f94c48c88/html5/thumbnails/7.jpg)
The Problem The Project Design Norms Pre-treatment Reactor Post-treatment Obstacles
Pretreatment
Filter Alternatives • Centrifuge
-Good for solid/liquid separation-Commonly used Biodiesel production applications-Heterogeneous liquid
• Vertical Pressure Leaf Filter-Used for low solid content applications-Homogeneous liquid
Design Decision: Vertical Pressure Leaf Filter
![Page 8: Team 14: GRE-cycle Status Update 12/1/14. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen](https://reader033.vdocuments.us/reader033/viewer/2022051516/56649f2f5503460f94c48c88/html5/thumbnails/8.jpg)
The Problem The Project Design Norms Pre-treatment Reactor Post-treatment Obstacles
Pretreatment
Acid Treatment• Methanol• Sulfuric acid catalyst
• Less than 1% FFA content in product
![Page 9: Team 14: GRE-cycle Status Update 12/1/14. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen](https://reader033.vdocuments.us/reader033/viewer/2022051516/56649f2f5503460f94c48c88/html5/thumbnails/9.jpg)
The Problem The Project Design Norms Pre-treatment Reactor Post-treatment Obstacles
Transesterification ReactorKey Alternatives• Batch
• Microwave
• Oscillatory Baffled
• Inexpensive• Long residence time
• High conversion• Difficulty in scaling up
• High conversion• Ease of separation
http://en.wikipedia.org/wiki/Batch_reactor
![Page 10: Team 14: GRE-cycle Status Update 12/1/14. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen](https://reader033.vdocuments.us/reader033/viewer/2022051516/56649f2f5503460f94c48c88/html5/thumbnails/10.jpg)
The Problem The Project Design Norms Pre-treatment Reactor Post-treatment Obstacles
Reaction Catalyst
Key Alternatives• Homogeneous
• Heterogeneous
• Inexpensive• Easy to use
• Easier separation• Regeneration
http://www.evoqua.com/en/products/activated_carbon/granular_activated_carbon_gac/Pages/aquacarb_product_%20page.aspx
![Page 11: Team 14: GRE-cycle Status Update 12/1/14. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen](https://reader033.vdocuments.us/reader033/viewer/2022051516/56649f2f5503460f94c48c88/html5/thumbnails/11.jpg)
The Problem The Project Design Norms Pre-treatment Reactor Post-treatment Obstacles
Separation
Glycerol Separation• Filtration• Settling Tank
Methanol Recovery• Distillation• Pervaporation
https://controls.engin.umich.edu/wiki/index.php/DistillationModel
![Page 12: Team 14: GRE-cycle Status Update 12/1/14. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen](https://reader033.vdocuments.us/reader033/viewer/2022051516/56649f2f5503460f94c48c88/html5/thumbnails/12.jpg)
The Problem The Project Design Norms Pre-treatment Reactor Post-treatment Obstacles
Obstacles Overcome
• Thorough literature search• Initial cost estimate: plant is feasible• Lab work to determine grease
composition
![Page 13: Team 14: GRE-cycle Status Update 12/1/14. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen](https://reader033.vdocuments.us/reader033/viewer/2022051516/56649f2f5503460f94c48c88/html5/thumbnails/13.jpg)
Questions?