TE-MPE-EMBudget Structure

Betty Magnin

29/11/2012 1

Page 2: TE-MPE-EM Budget Structure Betty Magnin 29/11/2012 1

Summary

The principle of financial functioning The budget structure Resources paid by the CERN budget

229/11/2012

Page 3: TE-MPE-EM Budget Structure Betty Magnin 29/11/2012 1

The principle of financial functioning

As aground rule the MPE-EM unit is auto financed, except for: the staff members, general services not directly related to the

users jobs unexpected load/request.

It invoices the users to cover its labour, material and amortization expenses.

29/11/2012 3

Page 4: TE-MPE-EM Budget Structure Betty Magnin 29/11/2012 1

The principle of financial functioning

Typically, the customer should be charged with the Production Costs, whereas in the majority of cases, in order to be competitive with commercial firms worldwide, only the Factory Costs or the Prime Cost is billed to the user.

This results in a negative balance of the finances of the section at the end of the yearly exercise, which is covered by the CERN budget.

TE meeting29/11/2012 4

Page 5: TE-MPE-EM Budget Structure Betty Magnin 29/11/2012 1

Budget Structure

TE meeting

Recurrent

/Non-

rec.Sub-PPA Budget Code Description

EM Budget Code

R TEN-OPE Fonctmt general DEM 89501

R FHC-OPE Fonctmt BE Electronique DEM - Librairie & Support CAO 89511

R FHC-OPE Fonctmt BE Electronique DEM - Admin Sous-Traitance 89512

R TEN-OPE Fonctmt atelier cablage DEM - Maintenance 89521

R EHC-OPE Fonctmt atelier circuits imp. DEM - Maintenance 89561

R EHC-OPE Fonctmtatelier circuits imp. DEM - R&D MPGD 89563

N RTT-EXT GEM Services 35450

N FGE-PROJ Machines in the Fine Pitch Photolithography Workshop 51000

N FGE-PROJFonctionnement atelier cablage DEM - Renouv machines 89522

N FGE-PROJ Fct atelier circuits imprimes DEM - Renouv machines 89562N CIB-PRJ Bldg 867 Displacement costs TE-MPE-EM 96442

T TEN-TRAN Transitoire BE Electronique 89509

T TEN-TRAN Transitoire - sous-traitance DEM 89519

T TEN-TRAN Transitoire Atelier Cablage 89529

T TEN-TRAN Transitoire Circuits Imprimes 89569

T TEN-TRAN TE-MPE-EM Transitory Code (TE30, TE40) 89585

T TEN-TRAN Transitoire FSU-TS04 Fabrication circuits imprimes 89595

29/11/2012 5

Page 6: TE-MPE-EM Budget Structure Betty Magnin 29/11/2012 1

Recurrent (operational) Codes(November 2012)

TE meeting

Recurrent

/Non-

rec.Sub-PPA Budget Code Description

EM Budget Code

Payment Budget (CHF)

Commitments incl.

Pipeline (CHF)

R TEN-OPE Fonctmt general DEM 89501 28,000 96,184

R FHC-OPE Fonctmt BE Electronique DEM - Librairie & Support CAO 89511 135,000 158,892

R FHC-OPE Fonctmt BE Electronique DEM - Admin Sous-Traitance 89512 90,000 163,776

R TEN-OPE Fonctmt atelier cablage DEM - Maintenance 89521 23,000 18,459

R EHC-OPE Fonctmt atelier circuits imp. DEM - Maintenance 89561 250,000 262,644

R EHC-OPE Fonctmtatelier circuits imp. DEM - R&D MPGD 89563 92,000 109,045

Sub-total for OPE codes 618,000 809,000

29/11/2012 6

Page 7: TE-MPE-EM Budget Structure Betty Magnin 29/11/2012 1

Non-recurrent (project) Codes(November 2012)

TE meeting

Recurrent

/Non-

rec. Sub-PPA Budget Code Description

EM Budget Code

Payment Budget (CHF)

Commitments incl.

Pipeline (CHF)

N RTT-EXT GEM Services 35450 70,000 39,926

N FGE-PROJ Machines in the Fine Pitch Photolithography Workshop 51000 382,000 397,129

N FGE-PROJ Fonctionnement atelier cablage DEM - Renouv machines 89522 33,000 26,438

N FGE-PROJ Fct atelier circuits imprimes DEM - Renouv machines 89562 200,000 107,615

Sub-total for Project codes 615,000 531,182 N CIB-PRJ Bldg 867 Displacement costs TE-MPE-EM 96442 20,000 5,735

29/11/2012 7

Page 8: TE-MPE-EM Budget Structure Betty Magnin 29/11/2012 1

Transitory Codes

TE meeting

Recurrent

/Non-

rec. Sub-PPA Budget Code Description

EM Budget Code

Payment Budget (CHF)

Commitments incl.

Pipeline (CHF)

T TEN-TRAN Transitoire BE Electronique 89509 n/a n/a

T TEN-TRAN Transitoire - sous-traitance DEM 89519 n/a n/a

T TEN-TRAN Transitoire Atelier Cablage 89529 n/a n/a

T TEN-TRAN Transitoire Circuits Imprimes 89569 n/a n/a

T TEN-TRAN TE-MPE-EM Transitory Code (TE30, TE40) 89585 n/a n/a

T TEN-TRAN Transitoire FSU-TS04 Fabrication circuits imprimes 89595 n/a n/a Sub-total for Transitory codes ??? ???

29/11/2012 8

Page 9: TE-MPE-EM Budget Structure Betty Magnin 29/11/2012 1

Workload

2008 2009 2010 2011 2012 (11m)

0

50

100

150

200

250

300

350

400

2008 2009 2010 2011 2012 (11m)

0

50

100

150

200

250

300

PCB Assembly

2008 2009 2010 2011 2012 (11m)

0100200300400500600700800

PCB Assembly

Design office

Internal production facilities

Outsourcing

29/11/2012 9

Page 10: TE-MPE-EM Budget Structure Betty Magnin 29/11/2012 1

Resources

 

2000 2009 01.11.2012

StaffContra

ct Labour

Total Staff & Fellow

Contract

LabourTotal Staff &

Fellow

Contract

LabourTotal

Management 1 0 1 1 0 1 2 0 2

Design Office and Subcontracting 9 14 23 2.5 9 11.5 2 12 14

Fine-pitch Photolithography

Facility6 12 18 8.5 11 19.5 10 12 22

Assembly Workshop 4 6 10 4 3 7 4 0 4

Total 20 32 52 15 23 39 18 24 42

29/11/2012 10

Page 11: TE-MPE-EM Budget Structure Betty Magnin 29/11/2012 1

TE meeting

Any question?