tclda design status collimation upgrade specification meeting 18-09-2015 l. gentini

11
TCLDA Design status Collimation Upgrade Specification Meeting 18-09-2015 L. GENTINI

Upload: primrose-gray

Post on 17-Jan-2016

217 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: TCLDA Design status Collimation Upgrade Specification Meeting 18-09-2015 L. GENTINI

TCLDA Design status  

Collimation Upgrade Specification Meeting18-09-2015

L. GENTINI

Page 2: TCLDA Design status Collimation Upgrade Specification Meeting 18-09-2015 L. GENTINI

Luca Gentini EN/MME 18/09/2015 2/10

CONTENTS

• Overview• Design

• Jaws• Actuation system• Vacuum tank

• Lay-out• Status

Page 3: TCLDA Design status Collimation Upgrade Specification Meeting 18-09-2015 L. GENTINI

Luca Gentini EN/MME 18/09/2015 3/10

OVERVIEW

Actuation system

Collimator

“V” interconnection points.Collimator replacement

without realignment

Support assemblySupport assembly

“V” interconnection points.Collimator replacement

without realignment

Collimator

Actuation system

Page 4: TCLDA Design status Collimation Upgrade Specification Meeting 18-09-2015 L. GENTINI

Luca Gentini EN/MME 18/09/2015 4/10

JAWS

Completely new design never manufactured

General

- Active length 600 mm

- Brazed cooling circuit

- 3x screwed tungsten blocs each jaw (30x20x200 mm)Or solid block in Glidcop?

- Cantilever jaws

Cooling system

- 1x Square pipes (9 mm edge, CuNi)

- 3x cooling pipes in the central cross-section

Instrumentation

- 2x temperature probes (PT100) each jaw

- 2x Beam Position Monitor each jaw

RF system

- RF fingers + St. steel screens

600 mm

Page 5: TCLDA Design status Collimation Upgrade Specification Meeting 18-09-2015 L. GENTINI

Luca Gentini EN/MME 18/09/2015 5/10

JAWS

Tungsten blocs

RF fingers

RF screensSt. Steel

Bloc SupportGlidcop

Back stiffenerGlidcop

Tank axis

Cooling pipes CuNi

RF fingers

RF fingers

Page 6: TCLDA Design status Collimation Upgrade Specification Meeting 18-09-2015 L. GENTINI

Luca Gentini EN/MME 18/09/2015 6/10

JAWS

BPM

Tapering slope: 10°

RF screenSt. Steel

Tapering slope: 15°

Screen RF contactCuBe C17410

Extremity RF contactCuBe C17410

RF contactCuBe C17410Screen RF contact

CuBe C17410

Page 7: TCLDA Design status Collimation Upgrade Specification Meeting 18-09-2015 L. GENTINI

Luca Gentini EN/MME 18/09/2015 7/10

ACTUATION SYSTEM

Completely new design never manufactured

Movement

- Two step motors each jaw Jaw tilting

- Stroke: -5 25 mm

- Spring-back: in case of electrical short-cut the jaws must not go in beam direction

Instrumentation

- 3x LVDT each jaw: 2x absolute movement, 1x relative movement (anti-collision)

- 3x switch assemblies each jaw : 2x absolute movement, 1x relative movement (anti-collision)

Spring

Roller screw

Step motor

Axis

Movable table

LVDT

Switch

Page 8: TCLDA Design status Collimation Upgrade Specification Meeting 18-09-2015 L. GENTINI

Luca Gentini EN/MME 18/09/2015 8/10

TANK

Completely new design never manufactured

- Manufacturing process based on Ph.II tank.Electron Beam welded Stainless Steel.

- No cooling system

Fix RF fingers

Flexible RF fingers

NEW DESIGN OF THE EXTREMITIES

To gain longitudinal space, the bellows after and before the collimator will be integrated into the tank transitions.Longitudinal stroke: +5; -15 mm

Radial stroke: ±10 mm

Page 9: TCLDA Design status Collimation Upgrade Specification Meeting 18-09-2015 L. GENTINI

Luca Gentini EN/MME 18/09/2015 9/10

LAY-OUT

Vacuum Equipment

- 2x D-500-5 NEXTorr Pumps(integrated NEG Ion pump)

- 1x VVFMF DN 40 valve for mobile pumping

- 2x VGPB DN35 Penning pressure gauges

- 1x VGRB DN16 Pirani pressure gauge

This lay-out agree with VSC group allows to solve previews integration conflicts

VVFMF DN40 valve

NEG Ion pump

Penning gauge

Pirani gauge

BPM feedthrough

Page 10: TCLDA Design status Collimation Upgrade Specification Meeting 18-09-2015 L. GENTINI

Luca Gentini EN/MME 18/09/2015 10/10

STATUS

18-09-2015 3D modelsExpected by

Drawings Material order Manufacturing date

Collimator : JAWs, Tank, actuation system

End 09-2015 End 09-2015 Ready to go 1 prototype: to be discussed

2 collimators: To be discussed

Support End of 11- 2015

End of 11- 2015

End of 11- 2015 2 Supports : to be discussed

Page 11: TCLDA Design status Collimation Upgrade Specification Meeting 18-09-2015 L. GENTINI

Luca Gentini EN/MME 18/09/2015 11/10

Thank you for your attention!