status of bbc d esign and engineering : preliminary results g . maitrejean, l . gentini
DESCRIPTION
STATUS of BBC D ESIGN and ENGINEERING : PRELIMINARY RESULTS G . MAITREJEAN, L . GENTINI. Outline. B eam-Beam compensator: Decreasing the influence of a beam on the other using electrified wire in some TCTP collimators. Specifications: R e-use nearly 100% of existing TCTP design - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: STATUS of BBC D ESIGN and ENGINEERING : PRELIMINARY RESULTS G . MAITREJEAN, L . GENTINI](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815ab5550346895dc868a3/html5/thumbnails/1.jpg)
Engi
neer
ing
Depa
rtm
entEN
LR - BBC Pre-Study 116/08/2013
STATUS of BBC DESIGN and ENGINEERING : PRELIMINARY
RESULTS
G. MAITREJEAN, L. GENTINI
![Page 2: STATUS of BBC D ESIGN and ENGINEERING : PRELIMINARY RESULTS G . MAITREJEAN, L . GENTINI](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815ab5550346895dc868a3/html5/thumbnails/2.jpg)
Engi
neer
ing
Depa
rtm
entEN
LR - BBC Pre-Study 2
Outline
Specifications:
• Re-use nearly 100% of existing TCTP design
• Electrified wire as close as possible to the beam axis:distance the center of the wire - the surface of the jaw <3mm
• Maximum diameter of the copper 2mm
• Maximum input current: 350A DC
• If possible, 2 wires (1 working – 1 spare)
Beam-Beam compensator:
Decreasing the influence of a beam on the other using electrified wire in some TCTP collimators
16/08/2013
![Page 3: STATUS of BBC D ESIGN and ENGINEERING : PRELIMINARY RESULTS G . MAITREJEAN, L . GENTINI](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815ab5550346895dc868a3/html5/thumbnails/3.jpg)
Engi
neer
ing
Depa
rtm
entEN
LR - BBC Pre-Study 3
1 Wire DesignCooling Pipes (Cu Ni)
Tungsten Jaw (Inermet)
Glidcop Jaw (Glidcop)
Back-Stiffener (Glidcop)
3mm
17mm
16/08/2013
![Page 4: STATUS of BBC D ESIGN and ENGINEERING : PRELIMINARY RESULTS G . MAITREJEAN, L . GENTINI](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815ab5550346895dc868a3/html5/thumbnails/4.jpg)
Engi
neer
ing
Depa
rtm
entEN
LR - BBC Pre-Study 4
2 Wires DesignCooling Pipes (Cu Ni)
Tungsten Jaw (Inermet)
Glidcop Jaw (Glidcop)
Back-Stiffener (Glidcop)
3mm
11.4mm
16/08/2013
![Page 5: STATUS of BBC D ESIGN and ENGINEERING : PRELIMINARY RESULTS G . MAITREJEAN, L . GENTINI](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815ab5550346895dc868a3/html5/thumbnails/5.jpg)
Engi
neer
ing
Depa
rtm
entEN
5LR - BBC Pre-Study
1 Wire Design
16/08/2013
![Page 6: STATUS of BBC D ESIGN and ENGINEERING : PRELIMINARY RESULTS G . MAITREJEAN, L . GENTINI](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815ab5550346895dc868a3/html5/thumbnails/6.jpg)
Engi
neer
ing
Depa
rtm
entEN
6LR - BBC Pre-Study
2 Wires Design
16/08/2013
![Page 7: STATUS of BBC D ESIGN and ENGINEERING : PRELIMINARY RESULTS G . MAITREJEAN, L . GENTINI](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815ab5550346895dc868a3/html5/thumbnails/7.jpg)
Engi
neer
ing
Depa
rtm
entEN
LR - BBC Pre-Study 7
Wire
Thermocoax wire
3 LayersTotal diameter : 3.6mm
Electrical properties :
Magnesium Oxide layer perfect electrical insulatorCopper very good electrical conductor
Maximum admissible temperature (estimated by Thermocoax, not tested): ≈400ºC(under testing by A. Ravni)
Stainless Steel – Thickness 0.3mm
Magnesium oxide – Thickness 0.5mm
Copper – Diameter 2mm
16/08/2013
![Page 8: STATUS of BBC D ESIGN and ENGINEERING : PRELIMINARY RESULTS G . MAITREJEAN, L . GENTINI](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815ab5550346895dc868a3/html5/thumbnails/8.jpg)
Engi
neer
ing
Depa
rtm
entEN
8LR - BBC Pre-Study
TCTP Thermal Load
TCTP without BBC
1h Beam Life Time (8.6e8 p/s) on each Jaw : 418.4W
TCTP with BBC
Heat generation due to Joule effect in the wire with 350 A :2.11e8 W/m³ (at 300ºK)
Total thermal power dissipation:
1 Wire design at 300ºK : 940 W + 418W from beam
2 Wires design at 300ºK : 986 W + 418W from beam
BBC : adds more than twice the 1h BLT thermal loadoptimisticaly assuming RT Cu electric resistivity
16/08/2013
![Page 9: STATUS of BBC D ESIGN and ENGINEERING : PRELIMINARY RESULTS G . MAITREJEAN, L . GENTINI](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815ab5550346895dc868a3/html5/thumbnails/9.jpg)
Engi
neer
ing
Depa
rtm
entEN
LR - BBC Pre-Study 9
Thermal simulation : wire cooled only in JawCalculation for both designs: 1 and 2 wiresOnly electric load considered: 350A DC current
To achieve numerical convergence, electric load applied through internal heat generation
Power calculated from Joule heating 350A DC at 27ºC = 2.11e8 W/m³
9000 W/(m²K)
18000 W/(m²K)
2100 W/(m²K)
6500 W/(m²K)
Thermal interfaces
Heat sink : convection inside cooling pipes 13000 W/(m²K)
16/08/2013
![Page 10: STATUS of BBC D ESIGN and ENGINEERING : PRELIMINARY RESULTS G . MAITREJEAN, L . GENTINI](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815ab5550346895dc868a3/html5/thumbnails/10.jpg)
Engi
neer
ing
Depa
rtm
entEN
10LR - BBC Pre-Study
1 Wire
Temperature max• Inermet Jaw: 101.1ºC • Wire: 15800ºC
Average temperature• Inermet Jaw : 34ºC• Glidcop Jaw : 31.4ºC
16/08/2013
![Page 11: STATUS of BBC D ESIGN and ENGINEERING : PRELIMINARY RESULTS G . MAITREJEAN, L . GENTINI](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815ab5550346895dc868a3/html5/thumbnails/11.jpg)
Engi
neer
ing
Depa
rtm
entEN
LR - BBC Pre-Study 11
2 Wires
Temperature max• Jaw: 116.8ºC • Wire: 19600ºC
Average temperature• Inermet Jaw : 36.6ºC• Glidcop Jaw : 31ºC
16/08/2013
![Page 12: STATUS of BBC D ESIGN and ENGINEERING : PRELIMINARY RESULTS G . MAITREJEAN, L . GENTINI](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815ab5550346895dc868a3/html5/thumbnails/12.jpg)
Engi
neer
ing
Depa
rtm
entEN
LR - BBC Pre-Study 12
Additional thermal bridge system
Glidcop
Stainless Steel
16/08/2013
![Page 13: STATUS of BBC D ESIGN and ENGINEERING : PRELIMINARY RESULTS G . MAITREJEAN, L . GENTINI](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815ab5550346895dc868a3/html5/thumbnails/13.jpg)
Engi
neer
ing
Depa
rtm
entEN
LR - BBC Pre-Study 13
1 Wire – Optimized Cooling system
Temperature max• Tungsten Jaw: 42.1ºC • Wire: 440ºC
Average temperature• Inermet Jaw : 32.5ºC• Glidcop Jaw : 30ºC
16/08/2013
![Page 14: STATUS of BBC D ESIGN and ENGINEERING : PRELIMINARY RESULTS G . MAITREJEAN, L . GENTINI](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815ab5550346895dc868a3/html5/thumbnails/14.jpg)
Engi
neer
ing
Depa
rtm
entEN
LR - BBC Pre-Study 14
2 Wires - Optimized Cooling system
Temperature max• Tungsten Jaw: 49.2ºC • Wire: 431ºC
Average temperature• Inermet Jaw : 34.6ºC• Glidcop Jaw : 29.7ºC
350A DC not compatible with present design
16/08/2013
![Page 15: STATUS of BBC D ESIGN and ENGINEERING : PRELIMINARY RESULTS G . MAITREJEAN, L . GENTINI](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815ab5550346895dc868a3/html5/thumbnails/15.jpg)
Engi
neer
ing
Depa
rtm
entEN
LR - BBC Pre-Study 15
Thermal issues
Electric resistivity not constant over temperature : the hotter, the higher the heat generation
-200 0 200 400 600 800 1000 12000.00E+00
2.00E-08
4.00E-08
6.00E-08
8.00E-08
1.00E-07
1.20E-07
Copper
Temperature (°C)
Ele
ctri
c re
sist
ivit
y (
m)
Ω
1.7e-8
4.3e-8
Electric resistivity at 400ºC = 2.5 times the one at 27ºC
Temperatures reached are clearly underestimated
16/08/2013
![Page 16: STATUS of BBC D ESIGN and ENGINEERING : PRELIMINARY RESULTS G . MAITREJEAN, L . GENTINI](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815ab5550346895dc868a3/html5/thumbnails/16.jpg)
Engi
neer
ing
Depa
rtm
entEN
LR - BBC Pre-Study 16
Preliminary conclusion : Thermal issues
Both designs not acceptable (yet !)
Challenge: must cool the wires in the hottest zones!
50mm
20ºC
20ºC
350 A
350 A DC with constant electric resistivity at RT
350 A DC with T-dependant electric resistivity
Taking into account dependency in T :Strong increase of the final temperature
16/08/2013
![Page 17: STATUS of BBC D ESIGN and ENGINEERING : PRELIMINARY RESULTS G . MAITREJEAN, L . GENTINI](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815ab5550346895dc868a3/html5/thumbnails/17.jpg)
Engi
neer
ing
Depa
rtm
entEN
LR - BBC Pre-Study 17
Back-up slide
16/08/2013
![Page 18: STATUS of BBC D ESIGN and ENGINEERING : PRELIMINARY RESULTS G . MAITREJEAN, L . GENTINI](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815ab5550346895dc868a3/html5/thumbnails/18.jpg)
Engi
neer
ing
Depa
rtm
entEN
LR - BBC Pre-Study 18
Back-up slide
2 Wires design - Thermal load: 350 A with constant electric resistivity (at 400ºC)
16/08/2013
![Page 19: STATUS of BBC D ESIGN and ENGINEERING : PRELIMINARY RESULTS G . MAITREJEAN, L . GENTINI](https://reader035.vdocuments.us/reader035/viewer/2022062410/56815ab5550346895dc868a3/html5/thumbnails/19.jpg)
Engi
neer
ing
Depa
rtm
entEN
LR - BBC Pre-Study 1916/08/2013
Back-up slide
2 Wires design - Thermal load: 300 A with constant electric resistivity (at 27ºC)