    Taylor Road Resurfacing Project

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    2/25

    2

    General Inform ation:

    Contractor: Perk Company, Inc.

    Awarded: July 28, 2011

    Signed Contract: August 25, 2011

    Project Bid Price: $3,600,000

    Project Length: 1.5 miles

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    3/25

    3

    General Inform ation:

    Project Limits: Euclid HeightsBlvd. and Bayreuth Road

    Project Administration:

    ODOT District 12 ODOT Project Engineer:

    Al Yost

    ODOT Area Engineer:

    Patrick McCafferty

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    4/25

    4

    W or k Schedule

    Scheduled Start Date: April 2012

    Scheduled Completion Date:September 30, 2012

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    5/25

    5

    W or k Schedule

    Work will generally be from 7 a.m. - 3:30 p.m.

    No night work

    Weekend work only if needed to keep theproject on schedule

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    6/25

    6

    W or k Description

    Repair the concrete base and resurfacewith asphalt from Euclid Heights Blvd toBayreuth Road

    All of the existing asphalt will be removed Extensive concrete slab repair and

    replacement from Euclid Heights Blvd to

    Mayfield Road

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    7/25

    7

    W or k Description Additional concrete base repairs as

    needed from Mayfield Road to BayreuthRoad

    Resurface with approximately 5 inches

    of asphalt

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    8/25

    8

    Eastern most lane (the

    lane nearest to theshopping center) fromEuclid Heights Blvd to

    Mayfield Road will beremoved

    Road will be 5 lanes widein this area when work is

    complete

    New curbs and drainageinlets will be installed

    W or k Description

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    9/25

    9

    W or k Description

    Replace damaged portions of curb

    throughout the project Approximately 40 driveway aprons will be

    replaced (at locations marked for curb

    replacement)

    Upgrade curb ramps to ADA requirements

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    10/25

    10

    Traffic signals at Severance CenterAccess and Hollister Road will be removedpermanently

    W or k Description

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    11/25

    11

    Phase 1

    Shift all traffic to the East half of the road

    and make repairs to the West half

    Maintain both Northbound and Southboundtraffic

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    12/25

    12

    On Taylor Roadbetween Euclid

    Heights Blvd andMayfield Road

    1 Southbound lane

    2 Northbound lanes

    Phase 1

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    13/25

    13

    Phase 1

    On Taylor Roadbetween MayfieldRoad and

    Monticello Blvd1 Southbound lane

    1 Northbound lane

    1 Center turn lane

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    14/25

    14

    On Taylor Roadbetween Monticello

    Blvd and BayreuthRoad

    1 Southbound lane

    1 Northbound lane

    Phase 1

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    15/25

    15

    Phase 1 - Inter sections

    Euclid Heights Blvd / Taylor RoadLeft turn lane for Northbound traffic

    Left turn lane for Southbound traffic

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    16/25

    16

    Mayfield Road / Taylor Road

    Right turn lane for Northbound trafficLeft turn lane for Southbound traffic

    Lanes on Mayfield Road not changed

    Phase 1 - Inter sections

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    17/25

    17

    Monticello Blvd. / Taylor Road

    Left turn lane for Northbound traffic

    Phase 1 - Inter sections

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    18/25

    18

    Phase 2

    Shift all traffic to the West half of the roadand make repairs to the East half

    Maintain both Northbound and

    Southbound traffic

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    19/25

    19

    On Taylor Roadbetween EuclidHeights Blvd and

    Mayfield Road1 Northbound lane

    1 Southbound lane

    1 Center turn lane

    Phase 2

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    20/25

    20

    On Taylor Roadbetween MayfieldRoad and Bayreuth

    Road1 Northbound lane

    1 Southbound lane

    Phase 2

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    21/25

    21

    Phase 2 - Inter sections

    Euclid Heights Blvd / Taylor RoadRight turn lane for Northbound traffic

    Left turn lane for Southbound traffic

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    22/25

    22

    Mayfield Road / Taylor RoadLeft turn lane for Northbound traffic

    Lanes on Mayfield Road not changed

    Phase 2 - Inter sections

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    23/25

    23

    Project Notes Please watch for construction

    personnel and equipment whiletravelling through the work zones.

    ODOT and City staff will work with you

    to mitigate any concerns which willarise during the reconstruction.

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    24/25

    24

    Contact Us

    City of Cleveland Heights: (216) 691-7311

    ODOT Public Information Office:

    (216) 584-2005 ODOT Construction Office:

    (216) 584-2152

    Al Yost & Pat McCafferty

    Taylor Road Resurfacing

  • 8/3/2019 Taylor Rd Public Meeting Presentation

    25/25

    25

    Thank Y ou