task group 4 low rate wpans opening report
DESCRIPTION
Task Group 4 Low Rate WPANS Opening Report. Radisson Universal Orlando, FL May 14, 2001. Task Group 4 Low Rate WPANS. A Call for Intent was Issued for Proposals-9 responses received 8 CFAs reviewed at Monterey Meeting, Criteria Matrix developed - PowerPoint PPT PresentationTRANSCRIPT
May 2001
Robert F. HeileSlide 1
doc.: IEEE 802.15-01/213r0
Submission
Task Group 4 Low Rate WPANSOpening Report
Radisson Universal
Orlando, FL
May 14, 2001
May 2001
Robert F. HeileSlide 2
doc.: IEEE 802.15-01/213r0
Submission
Task Group 4 Low Rate WPANS
• A Call for Intent was Issued for Proposals-9 responses received
• 8 CFAs reviewed at Monterey Meeting, Criteria Matrix developed
• 7 Proposal overviews heard at the March meeting• Criteria Doc drafted at March meeting• Paper drafted and submitted in response to CFP from
IEEE Networking Magazine.
May 2001
Robert F. HeileSlide 3
doc.: IEEE 802.15-01/213r0
Submission
Task Group 4 Low Rate WPANS
TASK GROUP 4 OBJECTIVES FOR THIS MEETING:
1. PRESENT REMAINING CFPs
2. REVIEW/REVISE CRITERIA DOC AS NECESSARY
3. REVIEW PROGRESS ON LOW RATE ARTICLE
4. FINALIZE JULY SELECTION PROCESS
5. OBJECTIVES FOR JULY MEETING
May 2001
Robert F. HeileSlide 4
doc.: IEEE 802.15-01/213r0
Submission
Task Group 4 Low Rate WPANS
• TG4 AGERE MAC & PHY Proposal -Stevenson
• TG4 AMI/STS MAC Proposal -van Leeuwen• TG4 INVENSYS MAC & PHY Proposal -Kinney• TG4 MOTOROLA MAC & PHY Proposal-Callaway• TG4 NOKIA MAC & PHY Proposal -Salokannel• TG4 PHILIPS MAC & PHY Proposal-Jamieson/Moridi• TG4 RFWAVES PHY Proposal-Volinsky
Proposals Received for Review on Monday and Tuesday
May 2001
Robert F. HeileSlide 5
doc.: IEEE 802.15-01/213r0
Submission
Task Group 4 Low Rate WPANS
11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7
Press Release xCall for application created by 11/09/00 xCall for intent for proposal created by 12/1/00 xCall for proposal by 01/17/00 xSelection criteria doc created by 01/01 xStart decision process by 03/01. xPresent proposals 03/01 x x xWorking proposal selected by the 07/01 x
Low rate pocket guide (book). x x x x x x x x x =>Proposal draft completed by 11/01. x x x x x1st letter ballot completed by 01/02. x x xResolution of comments by 01/02. xRe-circulation completed by 03/02. x xSponsor ballot completed by 07/02. x x x x
2000 2001 2002
Project Timeline