Page 1: Task Group 4 Low Rate WPANS Opening Report

May 2001

Robert F. HeileSlide 1

doc.: IEEE 802.15-01/213r0

Submission

Task Group 4 Low Rate WPANSOpening Report

Radisson Universal

Orlando, FL

May 14, 2001

Page 2: Task Group 4 Low Rate WPANS Opening Report

May 2001

Robert F. HeileSlide 2

doc.: IEEE 802.15-01/213r0

Submission

Task Group 4 Low Rate WPANS

• A Call for Intent was Issued for Proposals-9 responses received

• 8 CFAs reviewed at Monterey Meeting, Criteria Matrix developed

• 7 Proposal overviews heard at the March meeting• Criteria Doc drafted at March meeting• Paper drafted and submitted in response to CFP from

IEEE Networking Magazine.

Page 3: Task Group 4 Low Rate WPANS Opening Report

May 2001

Robert F. HeileSlide 3

doc.: IEEE 802.15-01/213r0

Submission

Task Group 4 Low Rate WPANS

TASK GROUP 4 OBJECTIVES FOR THIS MEETING:

1. PRESENT REMAINING CFPs

2. REVIEW/REVISE CRITERIA DOC AS NECESSARY

3. REVIEW PROGRESS ON LOW RATE ARTICLE

4. FINALIZE JULY SELECTION PROCESS

5. OBJECTIVES FOR JULY MEETING

Page 4: Task Group 4 Low Rate WPANS Opening Report

May 2001

Robert F. HeileSlide 4

doc.: IEEE 802.15-01/213r0

Submission

Task Group 4 Low Rate WPANS

• TG4 AGERE MAC & PHY Proposal -Stevenson

• TG4 AMI/STS MAC Proposal -van Leeuwen• TG4 INVENSYS MAC & PHY Proposal -Kinney• TG4 MOTOROLA MAC & PHY Proposal-Callaway• TG4 NOKIA MAC & PHY Proposal -Salokannel• TG4 PHILIPS MAC & PHY Proposal-Jamieson/Moridi• TG4 RFWAVES PHY Proposal-Volinsky

Proposals Received for Review on Monday and Tuesday

Page 5: Task Group 4 Low Rate WPANS Opening Report

May 2001

Robert F. HeileSlide 5

doc.: IEEE 802.15-01/213r0

Submission

Task Group 4 Low Rate WPANS

11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7

Press Release xCall for application created by 11/09/00 xCall for intent for proposal created by 12/1/00 xCall for proposal by 01/17/00 xSelection criteria doc created by 01/01 xStart decision process by 03/01. xPresent proposals 03/01 x x xWorking proposal selected by the 07/01 x

Low rate pocket guide (book). x x x x x x x x x =>Proposal draft completed by 11/01. x x x x x1st letter ballot completed by 01/02. x x xResolution of comments by 01/02. xRe-circulation completed by 03/02. x xSponsor ballot completed by 07/02. x x x x

2000 2001 2002

Project Timeline