Page 1: Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment

Tagger and Vacuum Chamber Assembly Procedure

Page 2: Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment

Outline.

•Assembly procedure for tagger and vacuum chamber.

•Support stands.

•Alignment.

Page 3: Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment

Assembly procedure.

1. Place bottom yokes on support stands.

Page 4: Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment

2. Attach bottom pole shoes to bottom yokes.

Page 5: Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment

3. a) Attach brackets, for supporting the weights of the lower coils, to the lower pole shoes.b) Attach fittings, which take the O-ring compression rods, to the lower pole shoes.

Page 6: Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment

4. a) Place lower coils round lower pole shoes.b) Attach brackets, which counteract magnetic forces on lower coils, to the lower pole shoes.c) Position O-rings on top of lower pole shoes.d) Attach O-ring compression spacers to the top of lower pole shoes. [ The spacers are aluminum strips- 7mm(height) *5 mm*5mm screwed to the pole shoe vacuum seal lip.]

Page 7: Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment

5. a) Attach vacuum O-ring compression rods and fittings to lower surface and side walls of vacuum chamber. b) Position vacuum chamber around the bottom pole shoes. c) Tighten vacuum O-ring compression rods until O-ring compression is defined by the O-ring compression spacer.

Page 8: Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment

6. Place magnet gap spacers on top of lower pole shoes.

Page 9: Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment

7. a) Attach O-rings to upper pole shoes. b) Attach O-ring compression spacers to upper pole shoes. c) Position upper pole shoes on magnet gap spacers.

Page 10: Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment

8. a) Attach O-ring compression rods and fittings to upper surface and side walls of vacuum chamber. b) Attach fittings, which take the O-ring compression rods, to the upper pole shoes.c) Attach brackets, which support weights of upper coils and counteract magnet forces on upper coils, to upper pole shoes.d) Tighten O-ring compression rods until O-ring compression is defined by O-ring compression spacers.

Page 11: Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment

9. Place upper coils around upper pole shoes.

Page 12: Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment

10. Attach back yokes to bottom yokes.

Page 13: Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment

11. Attach top yokes to back yokes.

Page 14: Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment

12. a) Install the upper and lower vacuum chamber support arms. b) Remove spacers between pole shoes.

The chamber is now ready for vacuum testing.

Page 15: Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment

Support Stands.

13. Side view of the support stand for one of the dipole magnets.

Page 16: Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment

14. Top view of the support stand for one of the dipole magnets.

Page 17: Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment

15. Top view showing lay-out of support stands for both dipole magnets.

Page 18: Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment

16. Complete assembly.

Page 19: Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment

Alignment.

17. Template for defining relative position of the two dipole magnets.

Page 20: Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment

18. Alignment marks for defining the absolute position of the dipole magnets in the Tagger hall. Red - incoming beam (first magnet).Grey -2 GeV electrons.Blue - main beam exit from first magnet, and its extension to the second magnet.Green-7 GeV electrons.Magenta- Main beam exit.

Page 21: Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment

19. Top view of alignment trajectories showing alignment points on both dipole pole shoes and the floor of tagger building.

Page 22: Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment

The tagging spectrometer has been designed so that the complete system can be assembled on the support stands, at the manufacturer’s, where magnetic field and vacuum tests should be carried out. The vacuum tests should use a blanking flange on the tagger exit window.

The spectrometer should then be taken apart, transported to Jlab and re-assembled. The magnetic field and vacuum tests should then be repeated firstly with the blanking flange and then with the proper window.