www.foamtecintlwcc.com This Document For Reference Only BEFORE AFTER VACUUM CHAMBER PM TECHNIQUE AMAT DPS 200MM CHAMBER SCRUB OBJECTIVE : TO EFFECTIVELY PM THE AMAT DPS CHAMBER IN A TIMELY MANNER, WHILE SHOWING A SIGNIFICANT REDUCTION IN COST/PM BY ELIMINATING THE NEED FOR OUTSOURCED PART CLEANING VENDORS Vacuum Chamber: AMAT METAL ETCH Vacuum Chamber Process Residue : METAL ETCH DEPOSITION Vacuum Chamber Components : DPS CHAMBER Old Procedure: Remove DPS chamber from ETCH tool and replace with a clean DPS chamber. Use 15 to 20 wipes with DI water and IPA to wipe out the lower ETCH chamber and ASP chamber Recovery time: 4 to 6 Hours PROBLEM: DPS CHAMBER SENT TO OFF SITE TO BE CLEANED BY OUTSOURCED PARTS CLEANING VENDOR New Procedure : Remove DPS chamber from ETCH tool and replace with a clean DPS chamber. Use 15 to 20 wipes with DI water and IPA to wipe out the lower ETCH chamber and ASP chamber Recovery time: 4 to 6 Hours SOLUTION: DPS CHAMBER EASILY CLEANED ON SITE BY CUSTOMER USING FOAMTEC INTERNATIONAL’S PM TECHNIQUE SAVING LARGE COSTS AMAT DPS 200MM Chamber PM 121908.docx 1 Vacuum Chamber Products : AMAT DPS 200MM CHAMBER PM KIT PM Kit P/N: HT4500 – AMTDPS2 (2) HT4754 UltraSOLV ® Sponge (2) HT4580D-10 800 Grit Diamond ScrubPAD (1) HT179080D-1 800 Grit Diamond ScrubTIP ® (2) HT5790S-5 MiraWIPE ® Wipers (10pc) (2) HT1501FC-5 MiraSWAB ® Swabs (10pc)

Upload: others

Post on 21-Jun-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AMAT DPS 200mm Chamber Scrub Vacuum Chamber PM Technique · Step 2: If needed, use an approved fab vacuum and vacuum out the DPS Chamber to remove excessive flakes prior to performing

www.foamtecintlwcc.com This Document For Reference Only

BEFORE AFTER

VACUUM CHAMBER PM TECHNIQUE AMAT DPS 200MM CHAMBER SCRUB

OBJECTIVE:

TO EFFECTIVELY PM THE AMAT DPS CHAMBER IN A TIMELY MANNER, WHILE SHOWING A SIGNIFICANT REDUCTION IN COST/PM BY ELIMINATING THE NEED FOR OUTSOURCED PART

CLEANING VENDORS

Vacuum Chamber: AMAT METAL ETCH Vacuum Chamber Process Residue: METAL ETCH DEPOSITION Vacuum Chamber Components: DPS CHAMBER

Old Procedure: Remove DPS chamber from ETCH tool and replace with a clean

DPS chamber. Use 15 to 20 wipes with DI water and IPA to wipe out the lower ETCH chamber and ASP chamber

Recovery time: 4 to 6 Hours PROBLEM: DPS CHAMBER SENT TO OFF SITE TO BE

CLEANED BY OUTSOURCED PARTS CLEANING VENDOR New Procedure: Remove DPS chamber from ETCH tool and replace with a clean

DPS chamber. Use 15 to 20 wipes with DI water and IPA to wipe out the lower ETCH chamber and ASP chamber

Recovery time: 4 to 6 Hours SOLUTION: DPS CHAMBER EASILY CLEANED ON SITE BY

CUSTOMER USING FOAMTEC INTERNATIONAL’S PM TECHNIQUE SAVING LARGE COSTS

AMAT DPS 200MM Chamber PM 121908.docx 1

Vacuum Chamber Products: AMAT DPS 200MM CHAMBER PM KIT PM Kit P/N: HT4500 – AMTDPS2

• (2) HT4754 UltraSOLV® Sponge • (2) HT4580D-10 800 Grit Diamond ScrubPAD • (1) HT179080D-1 800 Grit Diamond ScrubTIP® • (2) HT5790S-5 MiraWIPE® Wipers (10pc) • (2) HT1501FC-5 MiraSWAB® Swabs (10pc)

Page 2: AMAT DPS 200mm Chamber Scrub Vacuum Chamber PM Technique · Step 2: If needed, use an approved fab vacuum and vacuum out the DPS Chamber to remove excessive flakes prior to performing

www.foamtecintlwcc.com This Document For Reference Only

AMAT DPS 200MM CHAMBER SCRUB PM PROCEDURE:

AMAT DPS 200MM Chamber PM 121908.docx 2

View “How to” instructional videos on http://www.foamtecintlwcc.com/flash/

Step 1: Using proper procedures and safety guidelines remove AMAT DPS Chamber from ETCH tool and stage for proper wet clean

Step 2: If needed, use an approved fab vacuum and vacuum out the DPS Chamber to

remove excessive flakes prior to performing wet clean Step 3: Fill a small container with 1/3 full of DI water and stage next to DPS Chamber (See

Fig 1) Step 4: Place HT4754 UltraSOLV® Sponge in container of DI water to moisten sponge Step 5: Using the dampened UltraSOLV® Sponge, begin wiping off deposition from the DPS

Chamber walls (See Fig 2 & 3)

Fig 1: Foamtec International products staged for source chamber clean

Fig 2 & 3: Dampened UltraSOLV® Sponge wiping off deposition from DPS Chamber

Page 3: AMAT DPS 200mm Chamber Scrub Vacuum Chamber PM Technique · Step 2: If needed, use an approved fab vacuum and vacuum out the DPS Chamber to remove excessive flakes prior to performing

www.foamtecintlwcc.com This Document For Reference Only

AMAT DPS 200MM CHAMBER SCRUB PM PROCEDURE:

AMAT DPS 200MM Chamber PM 121908.docx 3

Step 6: It is important to keep rinsing off the UltraSOLV® Sponge with DI water in order to

help clear the sponge free from deposition (See Fig 4 & 5) Step 7: Continue wiping the DPS chamber with the dampened UltraSOLV® Sponge and

rinsing off the sponge as necessary. It is important to keep the UltraSOLV Sponge moist as the DI water will react with the deposition on the DPS Chamber making it easier to remove

Step 8: Continue wiping the DPS Chamber for 30 to 45 minutes or until all of the heavier

deposition throughout the chamber has been removed Step 9: Poor the contaminated DI water in properly approved drain and refill the container

with fresh DI water Step 10: Place the 2nd UltraSOLV® Sponge and one of the 800 Grit Diamond ScrubPADS into

the container of DI water (See Fig 6)

Fig 4 & 5: Rinsing off the UltraSOLV® Sponge in DI water

Fig 6: Placing UltraSOLV® Sponge and Diamond Grit ScrubPAD in fresh DI water

Page 4: AMAT DPS 200mm Chamber Scrub Vacuum Chamber PM Technique · Step 2: If needed, use an approved fab vacuum and vacuum out the DPS Chamber to remove excessive flakes prior to performing

www.foamtecintlwcc.com This Document For Reference Only

AMAT DPS 200MM CHAMBER SCRUB PM PROCEDURE:

AMAT DPS 200MM Chamber PM 121908.docx 4

Step 11: In order to fully remove the remaining deposition accumulated on the DPS Chamber,

take the dampened 800 Grit Diamond ScrubPAD and begin scrubbing the chamber walls (See Fig 7)

Step 12: As the deposition begins to loosen on the chamber walls, take the dampened

UltraSOLV® sponge and wipe of the loose deposition Step 13: As the ScrubPAD loads up with deposition, pull across dampened UltraSOLV®

Sponge to unload ScrubPAD (See Fig 9, 10 & 11)

Fig 9: ScrubPAD loaded with deposition

Fig 10: Pull ScrubPAD across UltraSOLV® Sponge

Fig 7: Diamond ScrubPAD scrubbing off remaining deposition from DPS Chamber

Fig 8: UltraSOLV® Sponge removing loose deposition from DPS Chamber

Fig 11: Unloaded ScrubPAD

Page 5: AMAT DPS 200mm Chamber Scrub Vacuum Chamber PM Technique · Step 2: If needed, use an approved fab vacuum and vacuum out the DPS Chamber to remove excessive flakes prior to performing

www.foamtecintlwcc.com This Document For Reference Only

AMAT DPS 200MM CHAMBER SCRUB PM PROCEDURE:

AMAT DPS 200MM Chamber PM 121908.docx 5

Step 14: As UltraSOLV® Sponge becomes loaded with deposition, rinse in container of DI

water (See Fig 12 & 13) Step 15: Repeat steps 11 - 14, scrubbing the remaining areas of the DPS Chamber, ensuring

to rinse out UltraSOLV® Sponge and unload 800 Grit Diamond ScrubPAD as necessary

Step 16: After 20 – 30 minutes of scrubbing, take the 2nd 800 Grit Diamond ScrubPAD and

using the same technique described above, scrub the remaining areas of the DPS Chamber concentrating on the areas where heavy buildup may have accumulated (See Fig 14)

Step 17: Ensure to remove the corner access plates around the DPS Chamber (See Fig 15)

Fig 13: UltraSOLV® Sponge free of deposition after rinse in DI water

Fig 12: UltraSOLV® Sponge loaded with deposition

Fig 15: Removing access plates around DPS Chamber

Fig 14: Scrubbing remaining deposition from DPS Chamber

Page 6: AMAT DPS 200mm Chamber Scrub Vacuum Chamber PM Technique · Step 2: If needed, use an approved fab vacuum and vacuum out the DPS Chamber to remove excessive flakes prior to performing

www.foamtecintlwcc.com This Document For Reference Only

AMAT DPS 200MM CHAMBER SCRUB PM PROCEDURE:

AMAT DPS 200MM Chamber PM 121908.docx 6

Step 18: In order to effectively reach into the holes around the DPS Chamber, roll up the 800

Grit Diamond ScrubPAD. Insert the rolled up ScrubPAD and continue to twist while pulling the ScrubPAD in and out of the hole. This will help remove the accumulated deposition from within the holes (See Fig 16)

Step 19: If there is still some remaining deposition accumulated in any of the holes, take

the 800 Grit Diamond ScrubTIP® and insert into the holes and scrub deposition free (See Fig 17)

Step 20: In preparation for DPS Chamber Final Wipe, take an HT5790S MiraWIPE® and

saturate with DI water Step 21: With DI water saturated MiraWIPE® proceed to wipe down the entire DPS Chamber,

that includes all areas throughout the chamber walls and all areas outside of the DPS Chamber, including top and bottom of DPS Chamber (See Fig 18 & 19)

Fig 16: Rolled up Diamond ScrubPAD removing deposition from holes throughout DPS Chamber

Fig 17: 800 Grit Diamond ScrubTIP® used to scrub out deposition from within holes throughout DPS

Fig 18 & 19: DI water saturated MiraWIPE® wiping down entire DPS Chamber

Page 7: AMAT DPS 200mm Chamber Scrub Vacuum Chamber PM Technique · Step 2: If needed, use an approved fab vacuum and vacuum out the DPS Chamber to remove excessive flakes prior to performing

www.foamtecintlwcc.com This Document For Reference Only

AMAT DPS 200MM CHAMBER SCRUB PM PROCEDURE:

AMAT DPS 200MM Chamber PM 121908.docx 7

Step 22: Take a second MiraWIPE® and saturate with IPA and repeat step 21 using the IPA

saturated MiraWIPE®

FINAL WIPE PROCEDURE:

IMPORTANT NOTE

THE USE OF HT5790S MiraWIPES® DURING THE FINAL WIPE PROCEDURE IS A CRITICAL STEP TO EFFECTIVELY REMOVE PARTICLE DEFECTS FROM THE DPS

CHAMBER

NOTE: Figure below shows how much more deposition the Foamtec International

MiraWIPE® can remove from a critical surface compared to the standard fab wiper, making the MiraWIPE® FINAL WIPE PROCEDURE the most CRITICAL STEP of the PM procedure (See Fig 20a & 20b)

Fig 20a: Current fab wiper after completely wiping chamber

Fig 20b: Particles picked up using HT5790S MiraWIPES® after completely wiping chamber with current fab wiper

MiraWIPES® are the KEY STEP for DEFECT REDUCTION and IMPROVED TOOL RECOVERY

Step 23: As a good standard practice, ensure to replace gloves with a new set prior to

performing final wipe procedure Step 24: Saturate the HT5790S MiraWIPE® with IPA and proceed to wipe out all areas of the

DPS Chamber

Page 8: AMAT DPS 200mm Chamber Scrub Vacuum Chamber PM Technique · Step 2: If needed, use an approved fab vacuum and vacuum out the DPS Chamber to remove excessive flakes prior to performing

www.foamtecintlwcc.com This Document For Reference Only

AMAT DPS 200MM CHAMBER SCRUB PM PROCEDURE:

AMAT DPS 200MM Chamber PM 121908.docx 8

Step 25: Using the HT1511FC MiraSWABS® saturated with IPA effectively wipe out all the

hard to reach areas, including all o-ring areas throughout the DPS Chamber (See Fig 21)

Fig 21: MiraSWAB® wiping out o-ring area of DPS Chamber

Step 26: If bake oven is available and time allows, place DPS Chamber in oven for 4 to 6

hours prior to placing back into AMAT Centura ETCH tool