substation automation systems · substation scada system for 154kv/34kv ss (abb microscada) optical...
TRANSCRIPT
E HAVE BIG IDEAS
S U B S T A T I O N S C A D A
INDUSTRIAL AUTOMATION
TELECOMMUNICAT ION
S E C O N D A R Y D E S I G N
PROTECTION SYSTEMS
C O N S U L T A N C Y
WE HAVE BIG IDEAS
Güzelkent Mahallesi731. Sokak. No:18
Etimesgut/ANKARATelefon : +90 312 281 01 78
Fax : +90 312 278 01 [email protected]
İDEA GRUBU ELEKTRİK OTOMASYON MÜHENDİSLİK İÇ VE DIŞ TİCARET A.Ş.
WE HAVE BIG IDEAS
SUBSTATION AUTOMATION SYSTEMS Reference List
2018
PROJECT NAME SCOPESupply, Design, Documentation, Software, Commissioning, FAT/SAT, etc.
Substation Scada System (GE DS Agile / PACİS ) IEC61850 Protections, PRP Network.
Substation Scada System for 154kV/34kV SS (ABB MicroScada) Optical Fiber Network Installation for Wind Turbines and Substation CCTV Security System for Wind Turbines and SubstationIP Phone Exchance for Wind Turbines and Substation
TEİAŞ (NCC) RTU System (ABB RTU560 )BCU Systems (Micom C264) database engineering.Substation Scada System (PACiS - Ds Agile)Scada Adaptation of GE F650, L90, Micom C264, Micom P14x, P64x. Data exchange between Factory Automation System and PACiS.
Substation Secondary Design and Drawing.Acceptance procedures of documents.
TEİAŞ (NCC) Telecommunication System (SDH, MUX, etc.)Remote Access System of IEDs.Scada and Communication Settings of Protections (Micom, Vamp) Transformer Monitoring System (Alstom Ms3000)Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination Issues.
Substation Scada System (Areva / Alstom PACİS) *Scada System Maintenance Contract for 3 years.
Substation Scada System (GE DS Agile / PACİS ) BCU Systems (Micom C264) database engineering.Scada Adaptation of GE and ABB Protections.IEC61850 Protections, PRP Network.
WE HAVE BIG IDEAS
Reference Projects (1)
SOMA-B THERMAL POWER PLANT 380/154/33kV TEPP
PETKİM ALİAĞA WPP 154KV/33kV AIS
TOSÇELİK IRON AND STEEL PLANT 380/33kV AIS
MARNEULİ AIS 154kV AIS
ITM 161 ÇAĞLAYAN GIS 380/154/33kV GIS
TCDD ANKARA - KONYA Fast Train Project
ITM 172 ALAŞEHİR HAVZA 154kV AIS
ITM 159 ATAŞEHİR 380/33kV GIS
TEİAŞ (NCC) Telecommunication System.Remote Access System of IEDs.Scada and Communication Settings of Protections (Micom, Vamp) Transformer Monitoring System (Alstom Ms3000)Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination Issues.
2018
YEAR
2017
MAIN CONTRACTOR / CUSTOMER
2017
2017
2017
2017
2017
2017
PROJECT NAME
WE HAVE BIG IDEAS
Reference Projects (2)
SAĞMALCILAR GIS 380/33kV GIS
SCOPESupply, Design, Documentation, Software, Commissioning, FAT/SAT, etc.
TEİAŞ (NCC) Telecommunication System Remote Access System of IEDs.Scada and Communication Settings of Protections (Micom, Vamp) Transformer Monitoring System (Alstom Ms3000)Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination Issues
YEAR
2016
MAIN CONTRACTOR / CUSTOMER
ITM 155 BELEK GIS 154kV GIS
TEİAŞ (NCC) Telecommunication System Remote Access System of IEDs.Scada and Communication Settings of Protections (Micom, Vamp) Transformer Monitoring System (Alstom Ms3000)Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination Issues
2016
DEVOLL-ELBASAN 2 154kV AIS
Micom C264 RTU System database engineering.IEDs (transducer, protection relay, analyzer etc) settings and communication issues.
2016
ITM89 ÇİĞDEM GIS 154/33kV GIS
TEİAŞ (NCC) Telecommunication System Remote Access System of IEDs.Scada and Communication Settings of Protections (Micom, Vamp) Transformer Monitoring System (Alstom Ms3000)Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination Issues
2016
ITM124 ERENKÖY 154/33kV GIS
TEİAŞ (NCC) Telecommunication System Remote Access System of IEDs.Scada and Communication Settings of Protections (Micom, Vamp) Transformer Monitoring System (Alstom Ms3000)Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination Issues
2016
ADIGÜZEL-2 HEPP 154kV AIS
TEİAŞ (NCC) RTU System (ABB RTU560 ) TEİAŞ (NCC) Telecommunication System Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination
2016
ZETES-3 GIS / 1320 MW 380KV GIS
TEİAŞ (NCC) RTU System (ABB RTU560 )Zenon Scada and ABB RTU data exchange engineering Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination Issues
2017
PROJECT NAME
WE HAVE BIG IDEAS
Reference Projects (3)
Samsung & ACWA Power Kırıkkale CCP / 950 MW 380kV Nautral Gas CCP
SCOPESupply, Design, Documentation, Software, Commissioning, FAT/SAT, etc.
TEİAŞ (NCC) RTU System (ABB RTU560) Substation Scada System( Alstom DS Agile PACİS ) TEİAŞ (NCC) Telecommunication System Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination
2015
YEAR
2015
MAIN CONTRACTOR / CUSTOMER
KARABİGA TEPP 1320MW 380kV TEPP GIS
Substation Scada System( Alstom / GE DS Agile PACİS ) Reaktive Power Control Test and Data Recording System TEİAŞ (NCC) RTU System (ABB RTU560)Data Exchange Scope of DS Agile PACiS and ABB RTU TEİAŞ (NCC) Telecommunication System (SDH, MUX, etc.)
2015DBATT14YENİBOSNA GIS 380/154/33kV GIS
Secondary DrawingProtection Relays Tests and Commissioning (Alstom/Areva Micom) Substation Scada System (Alstom/Areva PACİS)
2015KAYALI CCP 77,13 MW 154 KV Neutral Gas CCP
Substation Scada System (ABB MicroScada)TEİAŞ (NCC) RTU System (ABB RTU)TEİAŞ (NCC) Telecommunication System (SDH, MUX, etc.) Primary Frequency Control TestReaktive Power Control Test and Data Recording System
2015HeNan Roady Road Machinery Comp. KAZAKHISTAN
Aspalt Plant Automation System (Siemens)
2015Kayseri Municipality Water Treatment Plant
Control and Monitoring System (Siemens)
2015Ministry of Treasury and Finance
Scada System (Zenon)Energy Monitoring System
İZDEMİR GIS 350 MW 380kV GIS
2014
Substation Scada System( Alstom DS Agile PACİS ) Micom C264 BCU SystemData Exchange Scope of DS Agile PACiS and ABB RTU SCADA Maintenance Issues
PROJECT NAME
WE HAVE BIG IDEAS
Reference Projects (4)
SCOPESupply, Design, Documentation, Software, Commissioning, FAT/SAT, etc
YEARMAIN CONTRACTOR / CUSTOMER
2014FACTORY CEMENT FACTORY154kV AIS
TEİAŞ (NCC) RTU System (Areva / Alstom Micom C264)
2014YENİKAPI GIS 154kV GIS
Event Recorder System (Micom C264)
2014ZETES-2 GIS / 1200 MW 380kV GIS
Substation Scada System( Areva / Alstom PACİS ) SCADA Maintenance Issues
2014Burhaniye Municipality
Water Treatment Plant Control and Monitoring System (Siemens)
2013TCDD ANKARA - KONYA Fast Train Project
Substation Scada System( Areva / Alstom PACİS ) Redundant Servers, 6 Clients, 18 BCU, 86 Protection Relays 4 154/27.5 KV TM, 4 Neutral Zone, 5 Siding Zone Secondary DrawingEnergy Monitoring System
TRANING TYPE
WE HAVE BIG IDEAS
Training and Consultancy Services (5)
TEORIC PRACTICAL ENGINEERING
MAIN CONTRACTOR / CUSTOMER
SCOPE
Alstom PACiS / GE DS Agile Connection to IEDs Setting Parametres and Download Configurations System Settings Micom IEDs - IEC61850 Configuration
PRACTICAL
Alstom PACiS / GE DS Agile Detailed Database Engineering (SCE, SMT, IED Conf. etc.) Application on site.
ENGINEERING
Alstom PACiS / GE DS Agile All Teoric Traning Application on test platform
TEORIC PRACTICAL ENGINEERING
ABB MicroScada EngineeringABB RTU560 Engineering
TEORIC PRACTICAL ENGINEERING
Copadata / ZENON All Teoric Traning Application on test platform
TEORIC PRACTICAL ENGINEERING
ABB MicroScada EngineeringABB RTU560 Engineering
TEORIC PRACTICAL ENGINEERING
ABB MicroScada EngineeringABB RTU560 Engineering
TEORIC PRACTICAL ENGINEERING
Alstom / GE PACiS GatewayABB RTU560 Engineering
TEORIC PRACTICAL ENGINEERING
Scada System General ViewCommunication ProtocolsAlstom PACiS / GE DS Agile Micom IEDs (RTU, Protection and Automation Products) Softwares of Alstom / GE
PRODUCTS
PROJECT NAME
WE HAVE BIG IDEAS
Network / Fiber Optic Projects (6)
ITM 155 BELEK154kV GIS
MAIN CONTRACTOR / CUSTOMER
SCOPESupply, Design, Documentation, Installation, FAT/SAT, etc.
Fiber Optic Patchcords Manufacturing for IEDs (Micom Protection Relays) Factory Acceptance Test (FAT) and Site Acceptance Test (SAT) Installation and Cabling of fiber cables on siteSupply and installation of Coaxial cables for PLCs (Power Line Carrier) OPGW/FO Splicing and Termination Works
ITM 161 ÇAĞLAYAN 380kV GIS
ITM 186 BURSA GIS 154kV GIS
Fiber Optic Patchcords Manufacturing for IEDs (Micom Protection Relays) Factory Acceptance Test (FAT) and Site Acceptance Test (SAT) Installation and Cabling of fiber cables on siteSupply and installation of Coaxial cables for PLCs (Power Line Carrier) OPGW/FO Splicing and Termination Works
ITM 206 GÜZYURDU 154kV AIS
ITM 215 BURSA DOĞU GIS 380kV GIS
ITM SAĞMALCILAR GIS 154kV GIS
ITM OSMANİYE AIS154kV AIS
Fiber Optic Patchcords Manufacturing for IEDs (Micom Protection Relays) Factory Acceptance Test (FAT) and Site Acceptance Test (SAT) Installation and Cabling of fiber cables on siteSupply and installation of Coaxial cables for PLCs (Power Line Carrier) OPGW/FO Splicing and Termination Works
ITM 235 GİRESUN 154kV GIS
Fiber Optic Patchcords Manufacturing for IEDs (Micom Protection Relays) Factory Acceptance Test (FAT) and Site Acceptance Test (SAT) Installation and Cabling of fiber cables on siteSupply and installation of Coaxial cables for PLCs (Power Line Carrier) OPGW/FO Splicing and Termination Works
ITM 265 KIZILIRMAK 154kV GIS
ITM 274 ALİAĞA-1 154kV GIS
ITM 217 TAŞOLUK 154kV GIS
WE HAVE BIG IDEAS
Areva (Alstom) PACiS Scada SystemScope:
Design, Documentation, Engineering, Installation and Commissioning.
Redundant Servers and 2 Clients in Telecomand Center.
4 Clients in Substation Control Rooms.
2 BCUs (C264) and 24 Micom Protections for each Substation.
1 BCU (C264) for each Neutral and Siding Zones.
Monitoring, Control and Reporting of:
4 154/27.5 KV Substations.
4 Neutral Zones.
5 Siding Zones.
* Additionally 3-years maintenance agreement was signed.
FAST TRAIN PROJECT (ANKARA - KONYA)
154 KV Substation Detailed View Alarm - State - Event Pages Single Line Diagram Page
SOMA-B (TEİAŞ ITM) Thermal Power Plant
WE HAVE BIG IDEAS
ALSTOM DS Agile (PACiS)Scope:
Design, Documentation, Engineering, Installation and Commissioning.
Redundant Servers and 2 Clients in 380 KV Substation.
IEC61850 PRP Application for Micom C264 BCUs and Protections.
IEC61850 Integration of:
Micom Protections for 380 KV Substation.
MV Protections.
Power Plant DCS System.
Monitoring, Control and Reporting of:
380 KV Substation.
Auxiliary Service Page Alarm - State - Event Page Transformer Detailed Page
GAMA - İÇANADOLU Nautral Gas CCP
WE HAVE BIG IDEAS
System Architecture Alarm - State - Event Page Feeder Control & Interlock Page
ALSTOM DS Agile (PACiS)Scope:
Engineering, Installation and Commissioning.
Redundant Servers and 1 Client in 380 KV Substation.
1 Client in Power Plant Control Room.
IEC61850 Integration of:
Micom Protections for 380 KV Substation.
MV Protections.
Power Plant DCS System.
Monitoring, Control and Reporting of:
380 KV Substation.
CENAL Thermal Power Plant
WE HAVE BIG IDEAS
ALSTOM DS Agile (PACiS)Scope:
Engineering, Installation and Commissioning.
Redundant Servers and 2 Clients in 380 KV Substation.
2 Clients in Power Plant Control Room.
Redundant Gateways for Plant DCS Communication.
IEC61850 Integration of:
Micom Protections for 380 KV Substation.
MV Protections.
Power Plant DCS System.
Monitoring, Control and Reporting of:
380 KV Substation.
Gateway Communication Power Plant & RCC Achive Crawler - Trend Viewer Alarm - State - Event Page
SCADA - NCC RTU / GATEWAY - FIBER OPTIC - TELECOMMUNICATION
PETKİM & SOCAR Wind Power Plant
WE HAVE BIG IDEAS
ABB MicroScada SystemScope:
Design, Documentation, Engineering, Installation and Commissioning.
Redundant Servers and 1 Client in 34,5KV Substation.
1 Client in 154 KV Substation Control Room.
IEC61850 Integration of:
Micom Protections for 154 KV Substation.
ABB Protections for 34,5 KV Substation.
GE Power Plant DCS System.
Monitoring, Control and Reporting of:
154/34,5 KV Substation.
System Architecture Trend Viewer Transformer Detailed View
SCADA - NCC RTU - FIBER OPTIC - CCTV - IP PHONE EXCHANGE
WE HAVE BIG IDEAS
ABB MicroScada SystemScope:
Design, Documentation, Engineering, Installation and Commissioning.
1 Server and 1 Client in 154KV Substation.
IEC61850 Integration of:
Micom Protections for 154 KV Substation.
ABB Protections for 34,5 KV Substation.
Power Plant DCS System.
Monitoring, Control and Reporting of:
154/34,5 KV Substation.
Single Line Page Trend Viewer Transformer Detailed View
KAYALI Nautral Gas CCPSCADA - NCC RTU / GATEWAY - FIBER OPTIC - TELECOMMUNICATION
WE HAVE BIG IDEAS
ADIGÜZEL-2 Hydroelectric Power Plant
WE HAVE BIG IDEAS
ABB RTU560 and Telecommunication System
Scope: Design, Documentation, Engineering, Installation and Commissioning.
National Control Center (NCC) Communication System TEİAŞ (NCC) RTU SystemCommunication Structure Installation
ABB RTU560 and Telecommunication System
Scope: Design, Documentation, Engineering, Installation and Commissioning.
National Control Center (NCC) Communication System TEİAŞ (NCC) RTU SystemOPGW Fiber Optic Installation
RTU and TELECOMMUNICATION
CENAL Thermal Power PlantRTU and TELECOMMUNICATION
WE HAVE BIG IDEAS
Ministry of Treasury and Finance
WE HAVE BIG IDEAS
ZENON Scada System
Scope: Design, Documentation, Engineering, Installation and Commissioning.
Micom C264 and ABB RTU560 Systems
Scope: Design, Documentation, Engineering, Installation and Commissioning.
National Control Center (NCC) Communication System TEİAŞ (NCC) RTU System
SCADA and COMMUNICATION
TOSÇELİK FACTORY AISTEİAŞ (NCC) RTU SYSTEM
WE HAVE BIG IDEAS
GSE - MARNEULI AIS
WE HAVE BIG IDEAS
380 KV Substation Secondary Design
Scope: Design, Documentation and Engineering.
SECONDARY DESIGN
TEİAŞ (DBATT.14) YENİBOSNA GISSECONDARY DESIGN
500 KV Substation Secondary Design
Scope: Design, Documentation, Engineering.
WE HAVE BIG IDEAS
TRANING - PACiS / DS Agile TRANING PROGRAM
SCE - System Configuration Editor
CMT - Computer Maintenance Tool SMT- System Management Tool
Micom C264 - LHMI Configuration PACiS /Ds Agile Traning
Operator Level:
Scada System General ViewCommunication ProtocolsAlstom PACiS / GE DS Agile Micom IEDs (RTU, Protection and Automation Products) Softwares of Alstom / GE
Engineering Level:
Alstom PACiS / GE DS Agile Detailed Database Engineering (SCE, SMT, IED Conf. etc.)Includes the Operator Level
Intermediate Level:
Connection to IEDsSetting Parametres and Download Configurations System Settings Micom IEDs - Goose & IEC61850 Configuration Application on siteIncludes the Operator and Engineering Levels
WE HAVE BIG IDEAS
TRANING - ABB RTU560 and MicroScadaTRANING PROGRAM
ITT600 - IEC61850 Engineering
GTW - Gateway Functions RTUtill and MicroScada Engineering
RTU560 - Goose Engineering ABB RTU and MicroScada Traning
RTUtil560 pattern file and SCD Import (Client)
RTU560 IEC61850 Mapping Client
RTU560 IEC Engineering
RTUtil560 Server Engineering
RTU560 Server and Client
CCT600 Tool
GOOSE Engineering
MicroScada HMI Engineering
Detailed Database Engineering
Connection to IEDs
Setting Parametres and Download Configurations System
Application on site