subject:proposed liaison from tsg-x to bbf date: 21 august 2009 source: chair, fmoahg airvana...
DESCRIPTION
14 September Subject:Overview of 3GPP2 cdma2000® Femtocell Management Architecture and Proposed Working Relationship with BBF Date: 21 August 2009 Source: Chair, FMOAHG Airvana Contact: Doug Knisely cdma2000® is the trademark for the technical nomenclature for certain specifications and standards of the Organizational Partners (OPs) of 3GPP2.TRANSCRIPT
Subject: Proposed Liaison from TSG-X to BBF
Date: 21 August 2009Source: Chair, FMOAHG
AirvanaContact: Doug Knisely
cdma2000® is the trademark for the technical nomenclature for certain specifications and standards of the Organizational Partners (OPs) of 3GPP2.
Airvana, Inc., grants a free, irrevocable license to 3GPP2 and its Organizational Partners to incorporate text or other copyrightable material contained in the contribution and any modifications thereof in the creation of 3GPP2 publications; to copyright and sell in Organizational Partner's name any Organizational Partner's standards publication even though it may include all or portions of this contribution; and at the Organizational Partner's sole discretion to permit others to reproduce in whole or in part such contribution or the resulting Organizational Partner's standards publication. Airvana, Inc., is also willing to grant licenses under such contributor copyrights to third parties on reasonable, non-discriminatory terms and conditions for purpose of practicing an Organizational Partner’s standard which incorporates this contribution.This document has been prepared by Airvana, Inc., to assist the development of specifications by 3GPP2. It is proposed to the Committee as a basis for discussion and is not to be construed as a binding proposal on Airvana, Inc. Airvana, Inc., specifically reserves the right to amend or modify the material contained herein and to any intellectual property of Airvana, Inc.,other than provided in the copyright statement above.
14 September 2009
2
Recommendations for TSG-X
• Approve Doug Knisely acting as liaison to BBF for ongoing discussions
• Approved the remainder of this contribution as a 3GPP2 liaison contribution to the BBF meeting week of 14 September 2009
14 September 2009
3
Subject: Overview of 3GPP2 cdma2000® Femtocell Management Architecture and Proposed Working Relationship with BBF
Date: 21 August 2009Source: Chair, FMOAHG
AirvanaContact: Doug Knisely
cdma2000® is the trademark for the technical nomenclature for certain specifications and standards of the Organizational Partners (OPs) of 3GPP2.
14 September 2009
4
Overview
• Quick overview of approved 3GPP2 femtocell management architecture
• 3GPP2 MO standardization process and liaison relationship with BBF
• Proposal for MO report format and TSG inputs• Proposed workplan• Proposed process for working with BBF• Recommendations
14 September 2009
5
Background
• 3GPP2 began work on femtocell-related standardization in early 2007
• Technical activities were initiated in all 3GPP2 TSGs in late 2007– System requirements– Security aspects– Air interface (radio) enhancements– Support for legacy 1x circuit services– Packet data services for 1x and HRPD (EV-DO)
• Throughout 2008, extensive work has been done in all areas
• Publication expected in Q3-Q4 2009
14 September 2009
6
3GPP2 Femtocell Architecture –1x Circuit
HLR/AC
MSC
MC
MAP
Mg (SIP)
Fx3
Fx2 (SIP)
AAA
Ma or ISC
(SIP)
MAP
1xMacro
Cell A2
PDE MPC
Fm(TR-096/
196)
ISUP
ISUP
TDM
TDM
Mm (SIP)
ISUPTDM
IPNetwork
Fx2 (SIP)
1x Macro BSC
A1 PSTN
1x
Femto Access Point
SIPUAMS
MGCF/MGW
IMS
IP MultimediaNetwork
FCS
PSAP
Fx1 (RTP)
FemtoSecurityGateway
FMSFemtoAAA
Fx1 (RTP)
Fx1 (RTP)
Legend:FCS Femto Convergence ServerFMS Femto Management System
14 September 2009
7
3GPP2 Femtocell Architecture –Packet Data (1x+DO)
Ty
FGW
Femto-AAA
MS/AT 1x/EV-DO
A11
Internet
(P)M
IP
AA
A(A
12)AN-AAA
AAA
HA/LMA
PDSN
For A12 Device Authentication
For Femto Device
Authentication
EV-DOAN
FAP
A13
A16 -19
SeGW
A10
BS/AN
PCRF
FMS
Fm(TR
-096/196)
14 September 2009
8
Role of The TR-069 Standard inFemtocell Management (1)
• Broadband Forum TR-069 universally selected as the framework for femtocell management– Selected by 3GPP & 3GPP2 for femtocell management– Endorsed by Femto Forum
• Management architecture and TR-069 ACS are the backbone of the key femtocell operational and provisioning call flows in 3GPP and 3GPP2– Discovery– Registration– Redirection to alternate SeGW, ACS, or Femto Gateway– Self-organizing network/auto-configuration– Location verification– Provisioning and radio parameter assignments are managed
only by ACS– AAA and back-office interfaces are required only on ACS
14 September 2009
9
Proposed Femtocell ManagementStandardization Process
FemtoForum
3GPPRAN3->SA5
3GPP2TSG-X/A/C/S->
FMOAHG TR-196Femto Mgmnt Objects
Mgmnt ObjectFramework Broadband
Forum3GPP AI MO
Contents(UMTS, LTE)
3GPP2 AI MOContents
(1x, EVDO)
3GPP SpecificProcedures(Disc., etc.)
3GPP2 SpecificProcedures(Disc., etc.)
Mgmnt ObjectFramework
TR-069Framework
14 September 2009
10
Scope of Work for 3GPP2 Femto MOs
• Management Object contents– Attributes– Range of values– Hierarchical structure that is appropriate for 3GPP2 AIs– 3GPP2 will document these in a new technical report X.R00xx– This will serve as input to BBF to drive the 3GPP2 AI extensions to
TR-196• Definition of procedures that are required for the proper
interworking between the FMS (TR-069 ACS) and the FAP(s)– Procedures for discovery, registration, location verification,
provisioning, etc.– Sequences/high level call flows for those procedures– Any additional semantic rules for MOs– 3GPP2 will document these in a new specification X.R00xx
14 September 2009
11
Proposed Format for Management Object Input to BBF from 3GPP2
Feature ParameterRange ofValues Write Description
ObjectDefault Reference
14 September 2009
12
Workplan, Process, and Recommendations
14 September 2009
13
Proposed Draft Workplan (1)
• Preliminary discussions with BBF indicates:– Tentative proposal to incorporate 3GPP2 AI MO
extensions into a new version of TR-196 makes sense
– Would like to receive inputs from 3GPP2 as early as possible
– Prefer to receive preliminary draft of MO contents early
– Final (extremely) stable version as a followup– Crude estimate is 6 months from final MO inputs to
publication
14 September 2009
14
Proposed Draft Workplan (2)
• Initial proposal for 3GPP2 workplan:– June – Call for MO inputs within 3GPP2– August – First draft of MO inputs– November – Harmonized draft of X.R00xx containing
MOs baselined– November – Transmit X.R00xx to BBF as first draft– January 2010 – X.R00xx enters first pass V&V– January 2010 – Transmit final version of X.R00xx to
BBF– March 2010 – X.R00xx enters TSG-X Re-V&V– ~March 2010 – BBF Straw Ballot– June 2010 – X.R00xx published– ~June 2010 – BBF Final Ballot completes
14 September 2009
15
Proposed Process for Working with BBF
• Complete establishment of liaison relationship (BBF and 3GPP2 Secretariat)– Correspondence 8 July 2009– BBF “Collaboration” relationship– IPR policies– Establish document sharing rules– Meeting sponsorship and working rules for joint calls and/or meetings
(e.g., who’s running the meeting under what rules and with which IPR policies)
– Negotiate rules for comments provided to/from 3GPP2 from/to BBF• Complete establishment of day-to-day working liaison relationship
– Periodic leadership calls between BBF and 3GPP2 to coordinate (esp. after exchanges start occurring)
– Procedures for submission of comments against BBF straw ballots, etc.– Re-use of text from each others’ specifications
14 September 2009
16
Recommendations
• Adopt proposed work process jointly (previous slide)• Agree on intent to follow proposed workplan (previous slide)• Agree that 3GPP2 femtocell MOs will be in a new version of
TR-196• Identify points of contact
– 3GPP2 liaison contact: Douglas Knisely– BBF technical and management contacts?