Standards Recently Approved
Missing Measures and Compliance Elements 20 different standards Initial ballot held October 6-16, 2006 Final ballot held October 20-29 91.6% Quorum 69.48% approval
System Operating Limits Methodology and Communication (FAC-010, 011, and 014) Initial ballot held September 19-29, 2006 Final ballot held October 13-23 84.93% Quorum 71.66% approval (vs. 74.5% on initial ballot)
Standards Recently Voted Down
Operating Personnel Credentials (PER-003-1) Clarification of interpretation Initial ballot held September 19-29 90.87% Quorum 9.90% Approval Interpretation of applicability not passed
Standards Recently Balloted Violation Risk Factors
Protection and control 81.52% quorum, 71.62% approval
Balance and Interchange 82.67% quorum, 77.15% approval
Communications and Facilities 81.59% quorum, 75.64% approval
Emergency Operations 82.01% quorum, 68.85% approval
Interconnection Reliability Operations 81.59% quorum, 75.77% approval
Standards Recently Balloted Violation Risk Factors
Modeling 82.25% quorum, 83.62% approval
Personnel 81.65% quorum, 65.34% approval
Transmission Operations and Voltage Control 81.65% quorum, 77.83% approval
Transmission Planning 82.01% quorum, 73.45% approval
Standards in the Ballot Process
None
Standards Posted for 30-day Pre-ballot Review
None
Standards Undergoing Comments Transmission Relay Loadability (PRC-023-1)
TOS Codifies relay loadability criteria from Blackout
Recommendations Second draft of this standard Comments due February 7 (30 day)
Standards Undergoing Comments Balance Resources and Demand (BAL-007 –
011) OC/CMOPS/PWG Changes based on stakeholder input Conformance with NERC Standards
Development Procedures and ROP Comments due January 31
Standards Undergoing Comments IROL Standards (IRO-007 – 010)
OC/CMOPS Require RC to monitor wide area, have plans to
prevent and mitigate IROLs, direct action to support operating within IROLs, and spedify and collect data to meet these requirements.
Conformance with NERC Standards Development Procedures and ROP
Comments due February 15
Standards Undergoing Comments Facility Ratings (FAC-008-1 and 009-1)
TSS/RS ?? SAR and Standard posted together Few changes Merge into one standard Address FERC Concerns Conform with NERC Rules of Procedure (ROP) Comments due February 28 (45 day)
SARs Undergoing Comments Vegetation Management (FAC-003-1 )
Responsibility ?? Address FERC Concerns Conform with NERC ROP Comments due February 14 (30 day)
SARs Undergoing Comments Reliability Coordinator Standards (27 standards)
OC/RCS ?? Proposes retiring, modifying, or additions Address FERC Concerns Conform with NERC ROP Comments due February 14 (30 day)
Drafting Team Nominations Facility Ratings SAR and SDT (FAC-008
and FAC-009)Vegetation Management SAR Drafting
Team (FAC-003)
Address concerns identified by FERCConform with NERC Rules of ProcedureNominations due by January 29
Other ActivitiesOperate within IROL Limits Standard
Drafting Team Addresses RC preparations and actions Nominations closed January 19 WECC representation?
Three-year Reliability Standards Development Plan Plan for addressing necessary changes to
NERC Standards Posted on NERC web site
New NERC Websitewww.nerc.comRecognizes NERC as North American
Electric Reliability CorporationBetter layoutStandard activity page is very helpful
From home page select standards From standards page select Standards Under
Development Link from WECC home page