State of Reliability StandardsValerie Agnew, Sr. Director of Standards, NERCSteve Rueckert, Director Standards, WECC
RELIABILITY | ACCOUNTABILITY2
• Overview of Standards Progress to date Achieving “Steady-state”
• 2015• Going Forward
Integrating Risk Outlook for standards development projects
Topics
RELIABILITY | ACCOUNTABILITY10
• BAL Resource and Demand Balancing• CIP Critical Infrastructure Protection• COM Communications• EOP Emergency Preparedness and Operations• FAC Facilities Design, Connections and Maintenance• INT Interchange Scheduling and Coordination• IRO Interconnection Reliability Operations and Operations• MOD Modeling, Data and Analysis• NUC Nuclear• PER Personnel Performance, Training, and Qualifications• PRC Protection and Control• TOP Transmission Operations• TPL Transmission Planning• VAR Voltage and Reactive
Standard Families
RELIABILITY | ACCOUNTABILITY11
• Completing necessary work FERC directives Paragraph 81 and Independent Experts Review Panel (IERP)
recommendations for retirement Gaps
• Implementing Results-based standards Performance-based Risk-based Competency-based
• Focusing on targeted applicability
Standards – Steady-State
RELIABILITY | ACCOUNTABILITY12
Progress on FERC Directives
Pre-2013 Directives
Post 2012 Directives
Total
Issued prior to year-end 2012 191Issued in 2013/2014 53Resolved as of December 31, 2014 164 24Remaining 27 29 56Projected to be resolved in 2015 22 25 47Projected remaining at year-end 2015 5 4 9
*Does not include directives for other NERC departments
RELIABILITY | ACCOUNTABILITY13
• Paragraph 81 FERC Order issued March 15, 2012 Revise or remove requirements with little effect on reliability
• Independent Experts Reviewed all non-CIP requirements Focused on 404 Future Enforceable requirements Recommended retirements Identified gaps
Paragraph 81 and Independent Experts
RELIABILITY | ACCOUNTABILITY14
Key Findings – Status
• Total Future Enforceable requirements – 404
• Retirement -147• Retain - 257
Improve -176 Steady-State - 81 Consolidate retained
257 requirements (232)
RELIABILITY | ACCOUNTABILITY16
Progress on Paragraph 81 and Independent Experts Review Panel
(IERP)
Resolution Number Percent Retired 110 46% Modified 103 43% Retained 25 11% 238
RELIABILITY | ACCOUNTABILITY18
• Eastern Interconnection 1 Standard, 4 Requirements • NPCC 2 Standards, 40 Requirements*• ReliabilityFirst 1 Standard, 2 Requirements• SERC 1 Standard, 2 Requirements• Texas RE 2 Standard, 12 Requirements• WECC 8 Standards, 24 Requirements**
*1 Standard becomes enforceable July 1,2015**Reduced from 26 as of April 1, 2015
Regional Standards with Requirements
RELIABILITY | ACCOUNTABILITY19
• 2014 RSDP identified 26 projects to be completed in 2014 Four projects were added after plan was developed
• 2015 Twelve projects, or portions of projects, were extended into 2015 Four new projects are identified in the RSDP
Reliability Standards Development Plans (RSDP)
RELIABILITY | ACCOUNTABILITY20
• Outlook for standards development projects Enhanced Periodic Reviews FERC Directives Newly identified risks
• Concurrent development of compliance expectations• Transition to implementation• Post enforcement activities
Standards – Next Steps
RELIABILITY | ACCOUNTABILITY21
• Measured, in-depth review to improve quality and content of standards
• Look for opportunities to make standards more concise• Verify content is appropriate to be included in a standard• Incorporate Regional Standards into Continent-wide Standards• Builds on Independent Experts’ work with industry input• Plan to be developed in first half of 2015• No mandated timeline
Enhanced Periodic Reviews
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L
WECC Coordinates with NERC
24
25W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L
Efforts to Coordinate
• Transition Existing WECC Regional Reliability Standards (RRS) to NERC Variances
• Retire Unnecessary or Outdated WECC RRS• Retire Unnecessary or Outdated WECC
Variances• Participate in Enhanced Periodic Reviews• Review and comment/vote on NERC Projects
26W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L
Current WECC Standards Projects
Project Number
Title
WECC-0101 Generator Validation ConversionWECC-0105 P81 VAR RedraftWECC-0107 PSS Design and PerformanceWECC-0111 TOP-007-WECC-1a Retirement or ModificationWECC-0113 Retire WECC Variance in FAC-010-2.1 and FAC-011-2