January 2012
Ernst Koenemann
Director Programme Development
Austrian Industry Day 13th January 2012
Status of EUMETSAT Future
Programmes
Slide: 1
January 2012
EUMETSAT´s Satellite Configuration, LEO&GEO
Slide: 2
January 2012
EUMETSAT space segment
January 2012
The EUMETSAT/ESA Co-operation Model
• EUMETSAT is responsible defining with its Member States the user requirements for the new meteorological satellite systems
• EUMETSAT has the end to end system responsibility
• ESA develops on behalf of EUMETSAT the prototype satellites and acts as an procurement agent for the recurrent satellites
• ESA Member States fund 70% of the development cost, EUM contributes to this with 30%
• EUM fully funds the recurring satellites, the development of the Ground Segment, Launch Service and the operations of the system over the life time of the satellites ( normally 15 to 20 years)
Slide: 4
January 2012
EUMETSAT’s geostationary satellite coverage
Meteosat-9 (0° Longitude)
Meteosat-8 (9.5° E)
Meteosat-7 (57.5° E)
0 40 60 80 100 120 140 160 180 20 40 60 80 100 120 140 160 20
60 S
0
60 N
January 2012 Visit to IM
Portugal,
May
2010
MTG MSG MOP/MTP
Observation missions:
- Flex.Comb. Imager: 16 channels
- Infra-Red Sounder
- Lightning Imager
- UVN
3-axis stabilised satellites
Twin Sat configuration
Class 2,5 - 3 ton
Observation mission:
- MVIRI: 3 channels
Spinning satellite
Class 800 kg
Observation missions:
- SEVIRI: 12 channels
- GERB
Spinning satellite
Class 2-ton
1977 2017 2002
Atmospheric Chemistry Mission (UVN-S4):
coordinated with ESA for implementation
via GMES Sentinel 4
Implementation of the EUMETSAT Mandate
for the Geostationary Programme
... 30 years of continuous operations achieved ...
MTG : continuity of EUMETSAT GEO Services
MTG-I/S
January 2012
Meteosat Third Generation (MTG)
Geostationary satellites
• 4 imaging (MTG-I) and 2 sounding (MTG-S) satellites
• Start of operations: 2018 and 2019
• Imaging mission • Imaging European weather every 10
minutes with 16 spectral bands • new Lightning Imager
• Sounding mission:
• Infrared sounder providing 4D high-resolution soundings of water vapour, temperature, O3
• Synergy with Global Monitoring for Environment and Security Sentinel-4 Ultraviolet Visible Near-infrared spectrometer: atmospheric chemistry and air quality monitoring
January 2012
MTG – Overall system configuration - overview
To deliver the required operational service, the MTG system consists of
- Space Segment, • embedding the protoflight (MTG-I1 and MTG-S1) satellites and the recurrent
imaging (MTG-I2, I3, I4) and sounding satellites (MTG-S2), plus all the related
ground support elements;
- Ground Segment, composed of
• Ground Station Facility (GSTF) – TTC (Telemetry, Tracking and teleCommand),
and MDA (Mission Data Acquisition);
• Mission Operations Facility (MOF);
• Instrument Data Processing Facility (IDPF);
• Application Ground Processing system:
– Level 2 Processing Facility (L2PF);
– Satellite Application Facilities (SAFs);
• Multi-Programme Facilities (MPF) – e.g EUMETCast, EUMETSAT Data Centre, EO
Portal; Infrastructure Facilities and Supporting Facilities;
- Launch and LEOP Provider services.
January 2012
MTG – Overall system configuration - overview
L0 D
ata
L1 & L2+ Data, DCP, etc.
Diversity MDA
GST
TTC GST Sites
MCC (at EUMETSAT HQ)
Mission
Operations
Facility
Payload Data (K
a-Band)
TT&C (S-Band)
DCP (up)
SAR Messages
(up)
Prime MDA GST
External
Data
Sources
L0 Data
RequestsGround Dissemination:
- Internet
- GTS / RMDCN
- High-Rate (TBC)
DC
P, F
DS
,
L1
& L
2+ D
ata
S/C
M&
C
GSt M&C
GS
M&C
TelecomSatellites
MTG
-I FD
SS
MTG
-I RSS
MTG
-S
SAR MCCs
SAR
Beacons
MTG Operational System Configuration
DCS (and
ARGOS)
Platforms
FDS, ECMWF,.. Data
Reference
DCP Platform
Reference
EumetCast
User Station
Reference Ground
Diss. User Station
FD & INR
data SAFs
EumetCast
Uplink Statio
n
IDPF
L2PF
MP
F
End-Users
SAR Messages (down)
S/C TM
satellites -
nominal operational
configuration
two MTG-I
one MTG-S Ground segment –
MCC (Mission Control
Centre) is the aggregate
of the Ground Segment
elements at the central
site.
Satellites P/L
MTG-I :
FCI, LI , plus
DCS, and SAR
MTG-S: IRS , UVN
January 2012
MTG in Orbit deployment, Status September 2010
2014 2016 2018 2020 2022 2024 2026 2028 2030 2032 2034 2036 2038
MTG-I-1
MTG-I-2
MSG-4
MTG-I-3
MTG-I-4
MTG-S-1 with S4
MTG-S-2 with S4
At least 20 years of Operational Service – Imaging Missions
15.5 years of Operational Service – Sounding Missions
Dec-17
Dec-22
Jan-26
Dec-30
Jun-19
Jun-27
January 2012
Polar-orbiting satellites as part of the shared IJPS
EUMETSAT Polar System (EPS) Europe’s first series of polar-orbiting meteorological satellites: 3 Metop for at least 14 years of operations Part of Initial Joint Polar System shared with NOAA Metop-A (launched in 2006) • Imagery (VIS, IR), sounding (IR, MW, UV, GPS
occultation) and radar (Ascat) instruments • direct broadcasting and data collection capabilities Applications • Numerical Weather Prediction • Nowcasting at high latitudes • Marine meteorology and oceanography • Air quality, atmospheric chemistry
• EPS –SG (preparatory programme in approval process)
• Second Generation EPS ready in 2020 • Twin satellite configuration under study (phase A) • Payload to include GMES Sentinel-5
January 2012
Impact of Metop Data to NWP forecast
Slide: 12
Relative Contribution of Observations to NWP forecast
3.1
15.3
13.2
9.9
5.9
7.9
20.4
24.3
0 5 10 15 20 25 30
Ob
serv
ati
on
Typ
es
Relative Observation Impact[%]
METOP
NOAA
OTHER LEO
GEO
AIRCRAFT
SONDE
SFC LAND
SFC SEA
Source: UK Met Office
January 2012
EUM /NOAA transition to the Joint Polar System (JPS)
, EPS-SG
• Joint Transition Agreement (JTA):
• NOAA 19, NPP, JPSS1
• Metop-C
• Access to DMSP data
• Joint Polar system:
• JPSS-2, JPSS-......
• EPS-SG
• Access to DWSS data
• Access to foreign Satellite Data
Slide: 13
January 2012
Transition from EPS to EPS Second Generation
Slide: 14
Where do We Go From here ??
January 2012
Proposed EPS-SG Missions taking affordability
constraints into account
EPS-SG
Missions
and Priorities as defined during the User Consultation Process in Phase 0/A
High-Resolution Infrared Sounding IAS
Very high Microwave Sounding MWS
VIS/IR Imaging VII
Scatterometry SCA
Radio Occultation Sounding RO High
Nadir-viewing UV/VIS/NIR/SWIR UVNS
Sounding (GMES Sentinel-5)
Medium
Multi-viewing, -channel, 3MI
-polarisation Imaging
Microwave Imaging MWI
Radiant Energy Radiometry RER*
Low Ice Cloud Imaging ICI
Low Light Imaging LLI*
(not ranked) ARGOS DCS
Search and Rescue S&R
Space Environment Monitoring SEM*
* Removed because of decision by NOAA
January 2012
Proposed Payload Complement for Council 75
Slide: 16
Satellite-A Missions Instrument
(and Provider)
Predecessor on
Metop
Infrared Atmospheric Sounding (IAS) IASI-NG (CNES) IASI (CNES)
Microwave Sounding (MWS) MWS (ESA) AMSU-A (NOAA)
MHS (EUM)
Visible-infrared Imaging (VII) METImage (DLR) AVHRR (NOAA)
Radio Occultation (RO) RO (ESA) GRAS (ESA)
UV/VIS/NIR/SWIR Sounding (UVNS) Sentinel-5 (GMES, ESA) GOME-2 (ESA)
Multi-viewing, -channel, -polarisation Imaging (3MI) 3MI (ESA) -/-
Satellite-B Missions Instrument
(and Provider)
Predecessor on
Metop
Scatterometer (SCA) SCA (ESA) ASCAT
Radio Occultation (RO) RO #2 (ESA) GRAS (ESA)
Microwave Imaging for Precipitation (MWI) MWI (ESA) -/-
Other equipment
Advanced Data Collection System (ADCS) Argos-4 (CNES) A-DCS
January 2012
3+ 3 Satellites 21 years of operations
Cost to EUM: 3.42 B€
2+ 2 Satellites
14 years of operations Cost To EUM: 2.47 B€
EPS-SG Satellite Configurations, Phase A Cost
Estimates for Council 75 (2012 e.c.)
3+ 2 Satellites 21 years of operations
for Sat “a” 14 years of operations
for Sat “b” Cost to EUM: 3.06 B€
Minimum Configuration Still allowing for optimal deployment in orbit of Sat A and SAT B depending on METOP C performance
Optimal Configuration Robustness
JPS-robust Configuration
January 2012
EUMETSAT and ESA Overall Planning
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Phase 0 Phase A Phase B Phase C/D
Launch readiness SAT A
Launch readiness SAT B
Satellites
Development
Phase A/B1 Phase B2/C/D Pre-Phase A
Operations
Phase E Supp.
Slide: 18
2021
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
EPS-SG System
Development
January 2012
Climate change monitoring
Global average sea level rise (1994-2010) Source: University of Colorado, LEGOS/CNES
- 3 0
- 2 0
- 1 0
0
1 0
2 0
3 0
4 0
1 9 9 4 1 9 9 6 1 9 9 8 2 0 0 0 2 0 0 2 2 0 0 4 2 0 0 6 2 0 0 8 1 9 9 5 1 9 9 7 1 9 9 9 2 0 0 1 2 0 0 3 2 0 0 5 2 0 0 7 2 0 1 0 2 0 0 9
A L T I M E T R I C M E A N S E A L E V E L ( M E R G E D )
T O P E X / P O S E I D O N
6 0 - D A Y S M O O T I N G
R A T E = 3 . 2 + - 0 . 4 M M / Y R
J A S O N
- 3 0 - 3 0
G L O B A L A V E R A G E S E A L E V E L ( m m )
January 2012
Distribution of Sea Level Rise
Although the global trend indicates a rise in the mean level of the
oceans, there are marked regional differences that vary between -10
and 10 mm/year
January 2012
Monitoring the oceans in partnership
High precision altimetry Jason-2 • launched in June 2008 • EUMETSAT’s first optional programme (new
convention) • Applications: marine meteorology,
operational oceanography, seasonal prediction and climate monitoring
Jason-3 • under development, to provide continuity
with Jason-2 • launch scheduled in April 2014
Jason-CS • future programme under discussion with
ESA, EC, NOAA in the context of GMES • to provide continuity after Jason-3
Partners:
January 2012
GMES High precision Altimetry activity
• In 2008, the GMES High Level Coordination Group reached a political “European” consensus recommending a “hybrid solution” to secure observations until 2030, based on:
• Jason-3 ( recurrent Jason-2)
• Two Jason-CS satellites (Cryosat heritage): JCS-A and JCS-B
• As a consequence:
• Jason-CS Phase B approved at ESA CMIN 08 (GMES SC Programme)
• Jason-3 programme approved in February 2010 at EUMETSAT, in partnership with NOAA, NASA, CNES and ESA
• ESA and EUMETSAT agreed to include J-3/J-CS in GMES Long Term Scenario proposed to EC in May 2011
• EUM will present a draft Jason-CS Programme Proposal to the Summer Council, ESA will present a Jason-CS satellite Development Programme at the C-MIN 2012
Slide: 22
January 2012
EUM operating GMES Sentinel-3 Ocean Mission