Statement of Work Computer Lab Renovation – USCGC HEALY December 1, 2011 In Jan-Apr 2012, STARC would like to renovate the Computer Lab on Healy in accordance with the original ECR submitted for the project. The following documents are submitted for the renovation project showing changes and additions from the original ECR: Page No. Description 1 Computer Lab drawing showing current configuration and new configuration 2 Relocation and addition of 19” equipment racks (6 total) 3-4 Power distribution to new racks utilizing one central UPS unit 5 new Unistrut welded to bulkheads 6 replacement of new benches in lab 7 Ventilation and Lighting changes in the lab above the new racks 8 Alarm panel removal 9-10 Communications equipment move to a different location STARC will be responsible for any subcontract work and costs that involve welding, electrical, ventilation, and flooring modifications. Technicians from STARC and ESU will coordinate and manage the movement and rewiring of equipment going into the new 19” racks in the Computer Lab. The new proposed Watchstander Station in the Computer Lab will be located on the aft bulkhead. (This will be the location for the “wall of monitors”). MET equipment located in AftConn will be relocated to the Computer Lab. MST bench space will be retained in the Computer Lab for one Coast Guard work terminal. STARC – Ship based Science Technical Support in the Arctic Scott Hiller – Scripps Institution of Oceanography, La Jolla, CA 92093 Tel: (858)822-6624 Email: [email protected]

Upload: others

Post on 04-Nov-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Statement of Work Computer Lab Renovation – USCGC HEALY

Statement of Work

Computer Lab Renovation – USCGC HEALY

December 1, 2011

In Jan-Apr 2012, STARC would like to renovate the Computer Lab on Healy in accordance with the

original ECR submitted for the project. The following documents are submitted for the renovation

project showing changes and additions from the original ECR:

Page No. Description

1 Computer Lab drawing showing current configuration and new configuration

2 Relocation and addition of 19” equipment racks (6 total)

3-4 Power distribution to new racks utilizing one central UPS unit

5 new Unistrut welded to bulkheads

6 replacement of new benches in lab

7 Ventilation and Lighting changes in the lab above the new racks

8 Alarm panel removal

9-10 Communications equipment move to a different location

STARC will be responsible for any subcontract work and costs that involve welding, electrical,

ventilation, and flooring modifications. Technicians from STARC and ESU will coordinate and manage

the movement and rewiring of equipment going into the new 19” racks in the Computer Lab.

The new proposed Watchstander Station in the Computer Lab will be located on the aft bulkhead. (This

will be the location for the “wall of monitors”).

MET equipment located in AftConn will be relocated to the Computer Lab.

MST bench space will be retained in the Computer Lab for one Coast Guard work terminal.

STARC – Ship based Science Technical Support in the Arctic

Scott Hiller – Scripps Institution of Oceanography, La Jolla, CA 92093

Tel: (858)822-6624 Email: [email protected]

Page 2: Statement of Work Computer Lab Renovation – USCGC HEALY

 

Current Computer Lab 

New Computer Lab 

1

Page 3: Statement of Work Computer Lab Renovation – USCGC HEALY

 

MET computers and associated equipment moved from Aftconn  

New UPS unit 

Current Computer Lab 

New Computer Lab 

19” Racks relocated and consolidated into the center of the lab.  

19” RACKS 

Old rack base cut off flush from deck and floor tile repaired  Old rack base cut off flush from deck 

and floor tile repaired 

2

Page 4: Statement of Work Computer Lab Renovation – USCGC HEALY

Install one 20kVA UPS power unit to

provide power to all equipment racks.

Re-route power from Power Panel

# 01-119-4 to the new UPS.

Power from the new UPS would

return to Power Panel # 01-119-4

and be distributed by 20A load

breakers to each equipment rack.

3

Page 5: Statement of Work Computer Lab Renovation – USCGC HEALY

FORWARD

20 kVAUPS

19" RACK

19" RACK

19" RACK

19" RACK

19" RACK

19" RACK

20A

20A

20A

20A

20A

20A

Power Panel01-119-4

(1-117-2)-1PS-(01-119-4)Power Input toPower Panel

4

Page 6: Statement of Work Computer Lab Renovation – USCGC HEALY

 

Unistrut  welded to the bulkhead at even intervals (9’ high)  

Unistrut  welded to the bulkhead at even intervals (9’ high)  

5

Page 7: Statement of Work Computer Lab Renovation – USCGC HEALY

 

Current Computer Lab 

New Computer Lab 

Old benches, 3 filing cabinets and some book shelves will be removed. 

New benches will be installed. 

6

Page 8: Statement of Work Computer Lab Renovation – USCGC HEALY

Ventilation and Lighting changes:

shorten Air Return 12”

extend Air Vent closer to bulkhead

shorten Light mount by 14” and move

closer to bulkhead

Area of concern

7

Page 9: Statement of Work Computer Lab Renovation – USCGC HEALY

    Remove Transducer Alarm Panel

XDCR WTR SYS ALM Panel C‐12SB11  

Part No. 118‐112‐010   Ser No. 001 

8

Page 10: Statement of Work Computer Lab Renovation – USCGC HEALY

        DC Communications equipment mounted on Aft Bulkhead: 

21MC Intercomm  /  CKT 7JV SND PWR Tel  /  TA‐970 Radio Handset 

Relocate all of this equipment to this bulkhead 

9

Page 11: Statement of Work Computer Lab Renovation – USCGC HEALY

 

Moving the 21MC, JA Phone and TA‐970 RadioTelephone to a different bulkhead in the Computer Lab 

10