Status

• Met twice– June 5– July 25

• Followed 2008 SRS meeting schedule

• Utilized SRS Exploder List

Page 3: Standards Review Subcommittee Update May – August 2008 August 19, 2008

3 Free Template from www.brainybetty.com 3

Accomplishments

• NERC Standards Development Plan 2008 - 2010– Reviewed the plan and provided

comments to NERC - July 31, 2008.

• 2008 WEQ Annual Plan – 6.f– Review and evaluate whether to cut off or

put a size limit on the entities for which the standard apply.

• Recommended that cut off limit should not be addressed by NAESB.

• Entities should use the existing request for waiver or exemption established by FERC.

Page 4: Standards Review Subcommittee Update May – August 2008 August 19, 2008

4 Free Template from www.brainybetty.com 4

Accomplishments

• 2008 WEQ Annual Plan – Provisional Item 5– Review Market System Back-Up existing

language and review of existing back-up language

• Developed White Paper for EC Review• Request for Executive Committee Guidance -

No Action is needed and SRS can close books on this item.

• Requests from other Subcommittees– BPS/ESS/ITS – Review FAC Standards

• No new standards need to be developed– BPS – Review EOP-002 R4 and R6

• Recommended adding an item to the Annual Plan

Page 5: Standards Review Subcommittee Update May – August 2008 August 19, 2008

5 Free Template from www.brainybetty.com 5

Accomplishments

• Formal Comments on Draft Standards to EC– 2008 AP Item 6.d – Ancillary

Services Definitions– 2008 AP Items 2.a.i.2, 2a.vii.1 –

Conditional Firm– 2008 AP Items 2a.iv.4, 2.a.vi.4,

2.b.ii.1 – Existing Transmission Commitments

– 2008 AP Items 2.b.ii.2 – Postbacks and Counterflows

Page 6: Standards Review Subcommittee Update May – August 2008 August 19, 2008

6 Free Template from www.brainybetty.com 6

Ongoing• Continue to track NERC Activity

through the SRS Review of NERC Activity Report

• Reviewing NERC/NAESB definitions for consistency where applicable

• For the subcommittee to accomplish its work, it is going to need continuous industry support.

Page 7: Standards Review Subcommittee Update May – August 2008 August 19, 2008

7 Free Template from www.brainybetty.com 7

Questions/Feedback

• Are there other activities the subcommittee should be performing?