sta performance update february 28, 2006 long-term plan annual update tracey piccone, p.e. february...

16
STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E.

Upload: thomas-pearson

Post on 14-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E. February 28, 2006 Long-Term Plan Annual Update Tracey Piccone,

STA Performance Update

STA Performance Update

February 28, 2006 Long-Term Plan Annual Update

Tracey Piccone, P.E.

February 28, 2006 Long-Term Plan Annual Update

Tracey Piccone, P.E.

Page 2: STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E. February 28, 2006 Long-Term Plan Annual Update Tracey Piccone,

Enhanced STA-1E Design

Cell 3

East Distribution Cell

A.R.M. LoxahatcheeNational WildlifeRefuge (WCA 1)

Cell 6 Cell 4N

Cell 4S

Cell 2

Cell 1Cell 5

West Distribution Cell

S-369

C-51 Canal

S-372

S-370

S-364

S-363S-366S-373

S-368

S-374 S-371 G-367

N

S-365

S-375

Cell 7

S-361

S-319

G-311

EffectiveArea (ac)Cell

1 5562 5523 5894N 6454S 752 5 5716 1,0497 418

Total 5,132 acDischarge Canal

S-362

EDC 470 WDC 576 1 556 2 552 3 589 4N 645 4S 752 5 571 6 1,049 7 418 Total 6,178

Effective Cell Area (acres)

Page 3: STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E. February 28, 2006 Long-Term Plan Annual Update Tracey Piccone,

STA-1E Update STA-1E Update

Eastern Flow-way: Off-line Corps constructing PSTA Demo project

Central Flow-way: On-line Good vegetation grow-in

Western flow-way: On-line SAV not growing in as well Considering transplanting from donor sites

Eastern Flow-way: Off-line Corps constructing PSTA Demo project

Central Flow-way: On-line Good vegetation grow-in

Western flow-way: On-line SAV not growing in as well Considering transplanting from donor sites

Page 4: STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E. February 28, 2006 Long-Term Plan Annual Update Tracey Piccone,

STA-1E Update STA-1E Update

Performance: WY06 (5/1/05 – 12/31/05) Flow in: 62,719 ac-ft TP in: 15.0 tons/194 ppb Flow out: 27,565 ac-ft TP out: 3.9 tons/114 ppb

Performance: WY06 (5/1/05 – 12/31/05) Flow in: 62,719 ac-ft TP in: 15.0 tons/194 ppb Flow out: 27,565 ac-ft TP out: 3.9 tons/114 ppb

Page 5: STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E. February 28, 2006 Long-Term Plan Annual Update Tracey Piccone,

Cell 1

Cell 5A

Cell 3

Cell 2

Cell 5B

Cell 4

A.R.M. LoxahatcheeNational WildlifeRefuge (WCA 1)

EffectiveCell Area (ac)

1A 745

2A 471

3 1,026 4 358 5A 5625B 2,293

Total 6,670 ac

NG-259

G-258

G-305 A-V

G-304 A-J

G-254 A-I

G-327 A

G-306 A-J

G-256

G-257L-7

Canal

DischargeCanal

Ocean Canal

G-252 H-J

S-5AS

G-300

G-303

G-302

G-308

G-309

S-5A

G-251

G-310

G-250 S

G-253 A-J

P

G-255

G-301

2B 470

1B 745

Cell 5B

Limerock

Berm

G-327 B

G-307

G-311

Cell 1

Cell 5A

Cell 3

Cell 2

Cell 5B

Cell 4

A.R.M. LoxahatcheeNational WildlifeRefuge (WCA 1)

EffectiveCell Area (ac)

1A 745

2A 471

3 1,026 4 358 5A 5625B 2,293

Total 6,670 ac

NG-259

G-258

G-305 A-V

G-304 A-J

G-254 A-I

G-327 A

G-306 A-J

G-256

G-257L-7

Canal

DischargeCanal

Ocean Canal

G-252 H-J

S-5AS

G-300

G-303

G-302

G-308

G-309

S-5A

G-251

G-310

G-250 S

G-253 A-J

P

G-255

G-301

2B 470

1B 745

Cell 5B

Limerock

Berm

G-327 B

Cell 1

Cell 5A

Cell 3

Cell 2

Cell 5B

Cell 4

A.R.M. LoxahatcheeNational WildlifeRefuge (WCA 1)

EffectiveCell Area (ac)

1A 745

2A 471

3 1,026 4 358 5A 5625B 2,293

Total 6,670 ac

NG-259

G-258

G-305 A-V

G-304 A-J

G-254 A-I

G-327 A

G-306 A-J

G-256

G-257L-7

Canal

DischargeCanal

Ocean Canal

G-252 H-J

S-5AS

G-300

G-303

G-302

G-308

G-309

S-5A

G-251

G-310

G-250 S

G-253 A-J

P

G-255

G-301

Cell 1

Cell 5A

Cell 3

Cell 2

Cell 5B

Cell 4

A.R.M. LoxahatcheeNational WildlifeRefuge (WCA 1)

EffectiveCell Area (ac)

1A 745

2A 471

3 1,026 4 358 5A 5625B 2,293

Total 6,670 ac

NG-259

G-258

G-305 A-V

G-304 A-J

G-254 A-I

G-327 A

G-306 A-J

G-256

G-257L-7

Canal

DischargeCanal

Ocean Canal

G-252 H-J

S-5AS

G-300

G-303

G-302

G-308

G-309

S-5A

G-251

G-310

G-250 S

G-253 A-J

P

G-255

G-301

Cell 1

Cell 5A

Cell 3

Cell 2

Cell 5B

Cell 4

A.R.M. LoxahatcheeNational WildlifeRefuge (WCA 1)

EffectiveCell Area (ac)

1A 745

2A 471

3 1,026 4 358 5A 5625B 2,293

Total 6,670 ac

NG-259

G-258

G-305 A-V

G-304 A-J

G-254 A-I

G-327 A

G-306 A-J

G-256

G-257L-7

Canal

DischargeCanal

Ocean Canal

G-252 H-J

S-5AS

G-300

G-303

G-302

G-308

G-309

S-5A

G-251

G-310

G-250 S

G-253 A-J

P

G-255

G-301

2B 470

1B 745

Cell 5B

Limerock

Berm

G-327 B

G-307

G-311

Enhanced STA-1W Design

Page 6: STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E. February 28, 2006 Long-Term Plan Annual Update Tracey Piccone,

STA-1W UpdateSTA-1W Update Limited operation: enhancement and recovery Enhancements

Construction of Cell 2 levee complete Other enhancements underway in Cells 4 & 5

Recovery Cell 5 off-line for recovery activity

Limited operation: enhancement and recovery Enhancements

Construction of Cell 2 levee complete Other enhancements underway in Cells 4 & 5

Recovery Cell 5 off-line for recovery activity

Page 7: STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E. February 28, 2006 Long-Term Plan Annual Update Tracey Piccone,

STA-1W UpdateSTA-1W Update

Performance: WY06 (5/1/05 – 12/31/05) Flow in: 122,554 ac-ft TP in: 30.2 tons/200 ppb (high) Flow out: 119,987 ac-ft TP out: 16.5 tons/112 ppb (high)

Performance: WY06 (5/1/05 – 12/31/05) Flow in: 122,554 ac-ft TP in: 30.2 tons/200 ppb (high) Flow out: 119,987 ac-ft TP out: 16.5 tons/112 ppb (high)

Page 8: STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E. February 28, 2006 Long-Term Plan Annual Update Tracey Piccone,

Expanded STA-2 Design

Page 9: STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E. February 28, 2006 Long-Term Plan Annual Update Tracey Piccone,

STA-2 UpdateSTA-2 Update

Normal operations Performance: WY06 (5/1/05 – 12/31/05)

Flow in: 260,126 ac-ft TP in: 36.9 tons/115 ppb Flow out: 296,515 ac-ft TP out: 7.2 tons/20 ppb

Normal operations Performance: WY06 (5/1/05 – 12/31/05)

Flow in: 260,126 ac-ft TP in: 36.9 tons/115 ppb Flow out: 296,515 ac-ft TP out: 7.2 tons/20 ppb

Page 10: STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E. February 28, 2006 Long-Term Plan Annual Update Tracey Piccone,

Enhanced STA-3/4 Design

G-380 A-F G-377 A-E G-374 A-F

G-381 A-F

G-376 A-F

G-375 A-F

G-379 A-E

G-378 A-E

G-383

G-382AG-382B

G-357

S-150

Inflow Canal

NNRCanal

Cell 1A

Cell 1B

Cell 2A

Cell 2B

Cell 3A

Holey Land(Toe of the Boot)

WCA 3A

Supply Canal

L-5 Canal

Cell 3 DischargeCanal

Discharge Canal

Auxiliary SeepagePump Station

Borrow Pits

~10 miles

~8 miles

EffectiveCell Area (ac)1A 3,0391B 3,4882A 2,5422B 2,8943A3B

2,1532,427

Total 16,543 ac

G-372

G-370

S-7

S-8

G-404

G-371

Cell 3BP

PP

PSTA Demo Cell

G-373

Miami Canal

N

G-380 A-F G-377 A-E G-374 A-F

G-381 A-F

G-376 A-F

G-375 A-F

G-379 A-E

G-378 A-E

G-383

G-382AG-382B

G-357

S-150

Inflow Canal

NNRCanal

Cell 1A

Cell 1B

Cell 2A

Cell 2B

Cell 3A

Holey Land(Toe of the Boot)

WCA 3A

Supply Canal

L-5 Canal

Cell 3 DischargeCanal

Discharge Canal

Auxiliary SeepagePump Station

Borrow Pits

~10 miles

~8 miles

EffectiveCell Area (ac)1A 3,0391B 3,4882A 2,5422B 2,8943A3B

2,1532,427

Total 16,543 ac

EffectiveCell Area (ac)1A 3,0391B 3,4882A 2,5422B 2,8943A3B

2,1532,427

Total 16,543 ac

G-372

G-370

S-7

S-8

G-404

G-371

Cell 3BP

PPP

PSTA Demo Cell

G-373G-373

Miami Canal

N

SAV conversion

Page 11: STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E. February 28, 2006 Long-Term Plan Annual Update Tracey Piccone,

STA-3/4 UpdateSTA-3/4 Update

Eastern and central flow-ways on-line Cell 3 off-line to complete

enhancements PSTA demonstration project:

operational Performance: Good

High rainfall (>33 inches) during June-August

Eastern and central flow-ways on-line Cell 3 off-line to complete

enhancements PSTA demonstration project:

operational Performance: Good

High rainfall (>33 inches) during June-August

Page 12: STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E. February 28, 2006 Long-Term Plan Annual Update Tracey Piccone,

STA-3/4 UpdateSTA-3/4 Update

Performance: WY06 (5/1/05 – 12/31/05) Flow in: 599,239 ac-ft TP in: 81.8 tons/111 ppb Flow out: 843,979 ac-ft TP out: 23.6 tons/23 ppb

Performance: WY06 (5/1/05 – 12/31/05) Flow in: 599,239 ac-ft TP in: 81.8 tons/111 ppb Flow out: 843,979 ac-ft TP out: 23.6 tons/23 ppb

Page 13: STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E. February 28, 2006 Long-Term Plan Annual Update Tracey Piccone,

Canal L-2

Deer FenceCanal

1A 1B

2A 2B

G-343A

G-343B

G-343C

G-343D

G-343E

G-343F

G-343G

G-343H

G-344B

G-344A

G-344C

G-344D

G-360A

G-360B

G-342D

G-342C

G-342B

G-342A

G-350A

G-349A

G-410

G-349B

G-348

G-350B

G-406

STA-5 Structures & Flow*To Miami

CanalRemote Structure Manual Structure

Inflow Treatment Flow Outflow Diversion Flow Seepage Return

Rotenberger WMA

N

*Not to Scale

G-344E

G-344F

G-342E

G-342F

G-343I

G-343J

3B3ACanal L-3

G-507

G-345

G-349C

S&M Canal

Canal L-2

Deer FenceCanal

1A 1B

2A 2B

G-343A

G-343B

G-343C

G-343D

G-343E

G-343F

G-343G

G-343H

G-344B

G-344A

G-344C

G-344D

G-360A

G-360B

G-342D

G-342C

G-342B

G-342A

G-350A

G-349A

G-410

G-349B

G-348

G-350B

G-406

STA-5 Structures & Flow*To Miami

CanalRemote Structure Manual Structure

Inflow Treatment Flow Outflow Diversion Flow Seepage Return

Rotenberger WMA

N

*Not to Scale

G-344E

G-344F

G-342E

G-342F

G-343I

G-343J

3B3ACanal L-3

G-507

G-345

G-349C

S&M Canal

Expanded STA-5

Page 14: STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E. February 28, 2006 Long-Term Plan Annual Update Tracey Piccone,

STA-5 UpdateSTA-5 Update

Northern flow-way: on-line; enhancements done

Southern flow-way: off-line for enhancement Performance WY06 (5/1/05 – 12/31/05)

Flow in: 213,240 ac-ft TP in: 52.6 tons/200 ppb (high) Flow out: 199,625 ac-ft TP out: 23.4 tons/95 ppb (high)

Northern flow-way: on-line; enhancements done

Southern flow-way: off-line for enhancement Performance WY06 (5/1/05 – 12/31/05)

Flow in: 213,240 ac-ft TP in: 52.6 tons/200 ppb (high) Flow out: 199,625 ac-ft TP out: 23.4 tons/95 ppb (high)

Page 15: STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E. February 28, 2006 Long-Term Plan Annual Update Tracey Piccone,

Inflow

Treatment Flow

Outflow

Diversion Flow L-4 Canal

Cell 5

Cell 3Manual Structure

Passive Structure

STA-6 Structures & Flow*

G-601

G-602

G-603

G-607

G-354A

G-354B

G-354C

G-393B

G-393A

G-393C

Canal L-3

G-604

G-600

N*Not to Scale

G-396A

G-396B

G-396C

G-352A

G-352B

G-352C

Section 2

G-353A

G-353B

G-353C

G-407

Inflow

Treatment Flow

Outflow

Diversion Flow L-4 Canal

Cell 5

Cell 3Manual Structure

Passive Structure

STA-6 Structures & Flow*

G-601

G-602

G-603

G-607

G-354A

G-354B

G-354C

G-393B

G-393A

G-393C

Canal L-3

G-604

G-600

N*Not to Scale

G-396A

G-396B

G-396C

G-352A

G-352B

G-352C

Section 2

G-353A

G-353B

G-353C

G-407

Expanded STA-6

Page 16: STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E. February 28, 2006 Long-Term Plan Annual Update Tracey Piccone,

STA-6 UpdateSTA-6 Update

Existing treatment cells operational

Performance WY06 (5/1/05 – 12/31/05) Flow in: 32,781 ac-ft TP in: 4.5 tons/111 ppb Flow out: 25,648 ac-ft TP out: 0.8 tons/26 ppb

Existing treatment cells operational

Performance WY06 (5/1/05 – 12/31/05) Flow in: 32,781 ac-ft TP in: 4.5 tons/111 ppb Flow out: 25,648 ac-ft TP out: 0.8 tons/26 ppb