Speaker Bio Jason Ballen*ne holds a Bachelor Degree in Mechanical Engineering and is a Cer*fied Maintenance and Reliability Professional. At ARMS Reliability, Jason manages the mul*tude of reliability projects undertaken by ARMS Reliability Engineers in North America. This includes maintenance strategy development and op*miza*on, RAMS studies and life cycle analysis studies for different industry sectors. Availability Workbench™ is a trademark of Isograph Ltd. ARMS Reliability is a global implementa@on partner and distributor of this soBware. All material displayed in this presenta@on is for private use. You may not distribute, modify, transmit, reuse, repost, or use the content of this presenta@on for any public or commercial purposes.

Upload: dinhtu

Post on 20-Mar-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

Speaker  Bio  Jason   Ballen*ne   holds   a   Bachelor   Degree   in   Mechanical  Engineering   and   is   a   Cer*fied  Maintenance   and   Reliability  Professional.     At   ARMS   Reliability,   Jason   manages   the  mul*tude   of   reliability   projects   undertaken   by   ARMS  Reliability   Engineers   in   North   America.   This   includes  maintenance  strategy  development  and  op*miza*on,  RAMS  studies   and   life   cycle   analysis   studies   for   different   industry  sectors.    Availability  Workbench™  is  a  trademark  of  Isograph  Ltd.  ARMS  Reliability  is  a  global  implementa@on  partner  and  distributor  of  this  soBware.      All  material  displayed  in  this  presenta@on  is  for  private  use.  You  may  not  distribute,  modify,  transmit,  reuse,  re-­‐post,  or  use  the  content  of  this  presenta@on  for  any  public  or  commercial  purposes.      

Page 2: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

Maintenance  Strategy  Development  Jason  Ballen@ne  

Engineering  Manager  

Page 3: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

What  you  will  learn  today  

1.  How  to  drive  Maintenance  Strategy  Development  

2.  The  elements  required  for  Maintenance  Strategy  Development  

3.  How  to  select  an  effec@ve  maintenance  task  4.  Risks  of  a  sta@c  asset  strategy  

Page 4: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

What needs to be considered when making

maintenance strategy decisions?

Page 5: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

Maintenance  Decision?  

•  Selec@ng  what  to  do  and  when  to  do  it  

•  Defining  what  spares  are  required  

•  Defining  what  resources  are  required  

•  Calcula@ng  what  budget  is  needed  

In its simplest form …

Page 6: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

Asset  Managers  Require  Maintenance decisions that …

•  Can  be  jus@fied  against  the  business  objec@ves  

•  Can  respond  to  changing  environments  

•  Proac@ve  not  reac@ve  

•  Judged  against  qualita@ve  criteria  

•  Can  be  openly  challenged  

•  Can  be  Measured  

•  Can  be  Improved  

•  Can  be  Planned  and  implemented  efficiently    

Page 7: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

Reliability  Engineer  Requires???  

Page 8: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

Requirements  

•  Training  •  Data  •  Tool  •  Plan  and  Schedule  •  Support  

Page 9: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

Training  Requirements  

•  Cri@cality  Analysis  

•  Strategy  Development  Methodologies  –  Maintenance  Task  Analysis  

–  Preven@ve  Maintenance  Op@miza@on  

–  Failure  Mode  and  Effects  Analysis  

–  Reliability  Centered  Maintenance  

•  Failure  Detec@on  Methodologies  

•  Facilita@on    

9  

Page 10: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

Data  Requirements  •  Maintenance  History  

–  Planned  –  Unplanned  

•  Condi@on  Reports  •  Risk  Thresholds  •  Down@me  Cost  •  Labor  Rates  •  Spare  Parts  

–  Cost  –  Lead  Time  

Page 11: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

Tool  Requirements  

•  Powerful  overview  and  drill  down  

•  Captures  current  knowledge  

•  Data  driven  

•  Business  decisions  made  at  lowest  level  

•  Simple  decision  making  using  models  

•  Define  gap  between  current  and  op@mum  states  

•  Dynamic  and  easily  updated  

•  Supports  efficient  implementa@on  

 

11  

Page 12: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

Plan  &  Schedule  

•  Manage  as  a  Project  

–  Set  deliverables  

–  Set  deadlines  

•  Plan  for  implementa@on  

•  Provide  updates  on  progress  

 

12  

Page 13: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

Support  

•  Senior  Managers  •  Direct  Manager  •  Tradesman  

Page 14: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

Functional Analysis

Functional Failures

Failure Modes

Failure Consequences

Maintenance Tasks

Maintenance Plan

Implementation

FMEA  

The Seven Questions of RCM

Asset Hierarchy

Job Instructions

Building The Maintenance

Program

Maintenance  Strategy  Development  

Page 15: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making
Page 16: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

RCM  Packages  

Define Functions, Functional Failure & Failure Modes Assign Failure Effects Associate Failure Distribution Estimate Corrective Repair Resources and Duration Evaluate • Preventive Schemes • Predictive Schemes

Page 17: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

Task  Interval  Selec@on  

Task  Interval  Op@misa@on  

Page 18: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

Task  Effec@veness  Simula@on  

Page 19: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

•  Now that we understand what is failing and how important it is to our business we are in a position to decide a maintenance plan.

•  The alternatives to RTF is: – Preventive task – Predictive task – Proactive task.

Tac@c  Value  

Page 20: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

Con@nuous  Improvement  

Redesign  &    Root  Cause  Analysis  

Page 21: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

Maintenance  Plans  

Page 22: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

CMMS  Load  Sheets  

Page 23: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

Remaining  Dynamic  •  Triggers  for  review  

•  Calendar  

•  Changes  in  Consequence  –  The  “New  Reality”  

•  Pareto  

•  CI  Process  (Defect  Elimina@on)  

! COMBINATION  OF  ABOVE  

Page 24: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

Process  Map  

Page 25: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

Key  Points  

1.  RAMS  should  be  linked  to  Maintenance  Strategy  

2.  Ensure  you  have  a  plan  and  support  

3.  Make  quan@fied  decisions  

4.  Keep  dynamic  

Page 26: Speaker’Bio’ - Reliability Bio ’ Jason& Ballen*ne ... – Reliability’Centered’Maintenance ... • Business’decisions’made’atlowestlevel’ • Simple’decision’making

JASON BALLENTINE Engineering Manager

[email protected]

Questions?