Solyndra Confidential
Northern California OAUGSolyndra makes transition to multi-org planning
Aaron Baird, Business System Manager, Solyndra SCPManoj Rathi, Consulting Manager, US Jade
January 13, 2011
Solyndra Confidential
Introductions
Aaron BairdBusiness System Manager, Solyndra SCP
Manoj Rathi CSCPConsulting Manager, Jade GlobalOracle certified Advanced Planning Implementation ChampFeatured speaker on OAUG forums
2
Solyndra Confidential
Safe Harbor Statement
The following is intended for information purposes only, and may not be
incorporated into any contract. It is not a commitment to deliver any
services, material, code, or functionality, and should not be relied upon
in making purchasing decisions.
The development, release, and timing of any features or functionality
described for Oracle’s products remains at the sole discretion of Oracle.
The company information shared in this presentation may not be used
by anyone, except with a prior written permission.
3
Solyndra Confidential
Agenda
•About Solyndra•Challenges with SCP and before Fab 2•New Fab Requirements•About Jade Global•Solution
–Supply Chain Planning–Inventory Planning–Production Planning–Warehouse Management–Inter-org transactions
•Challenges•Benefits•Q&A
4
Solyndra Confidential
About Solyndra Inc.
Product• Solyndra designs and manufactures
proprietary cylindrical modules incorporating copper indium gallium diselenide (CIGS) thin-film technology.
• Panels employ cylindrical modules which capture sunlight across a 360-degree surface capable of converting direct, diffuse and reflected sunlight into electricity.
Manufacturing• 23 steps to manufacture; cleaning,
deposition, scribing, binning, insertion, filling , testing, panel framing and flash testing.
• Solyndra had produced over 16 million modules, approximately 370,000 modules each week.
5
Solyndra Confidential
Supply Chain Planning (SCP) Challenges
• 24x7; operations always on.
• High volume inventory movement; inbound, warehousing, outbound.
• Numerous and complex sub inventories
– Raw, spares, FGI
– Onsite, offsite, 3PL, overseas
– accurate containment of restricted inventory
• Complex routings
– Inbound grading
– Movement to Production Kanbans
– Movement to Maintenance Stores and carts
• Complex Allocation rules
– Lot status; Raw and FGI material grading
– Packaging; comingled packaging sizes.
– Shelf life; time sensitive material.
– FIFO
– Customer specific; ensure correct grades and power.
– Serial number control.
6
Solyndra Confidential
Solyndra SCP before Fab 2
• Solyndra had been using single org planning using ASCP and inventory planning processes.
–ASCP for supply forecasting.
– Inventory planning to forward move goods from Main Stores to Fab Stores and or Production Kanbans.
• WMS being used for pick rules, put away rules and lot status control.
7
Single Inventory Organization
ORG A
Y
BLDG 1
Sales Order Execution
D>S
Shipping Execution
Min.Max Replenish
Fab 1 FGI
MRP
Shipping Execution
Procurement
ASCPBOS
ASCPPanel
forecast
Direct Inventory
Order Managemen
t
Solyndra Confidential
Fab 2 Multi Org Business Requirements
• Fab2 Supply and FGI.– Org B pulls all Raw material from Org A.
– Org B ships FGI to Org A.
• With the new fab, Solyndra had to upgrade to multi-org planning with introduction of inter-organization transfers.
– Plan for aggregated raw material procurement for both fabs.
– Inventory planning (pull) across orgs.
– Shipping and receiving documents for internal orders
– Separate set of rules for internal material movement.
8
Org BOrg A
Y
N
BLDG 1
Sales Order Execution
D>S
Shipping Execution
Shipping Execution
Min.Max Replenish
Fab 1 FGI
MRP
Shipping Execution
Inter Company
Order
Purchase orders
Inter Company
Order
ASCPBOS
forecast
BLDG 2
ASCP Fab1Production
forecast
ASCP Fab2Production
forecast
Fab 2 FGI
Direct Inventory
Min.Max Replenish
Order Managemen
t
Org Inventory Planning
Fab2 Planned
Stock level
Fab1 Planned
Stock level
About Jade Global
© 2011 Jade Global, Inc. All rights reserved. www.jadeglobal.com 9Norcal OAUG Training Day, 04/18/23. Confidential.
Your Long Term IT Services Partner for Growth• Enterprise System Integrator• Served more than 50 customers for over 10 years
• Oracle Platinum Partner
• Oracle Certified Accelerate Solution Provider
• Strategic Partnerships
• Experience with Global Implementations
• Global Delivery Capability – US, India, China, Israel
• Right Shore Delivery Model
• Right Size
• SAS 70 Certified
Solyndra Confidential
Multi Org Solutions
10
Oracle EBS Master Scheduling Production Planning FGI
Advanced Supply Chain Planning (ASCP)
Direct and Consumables
Inventory Planning Direct and Spares Production KanbanMaintenance stock room
Panel to FGI stores
Internal Req. / Internal Sales Order(IR/ISO)
Pick, Pack, Ship Pick, Pack, Ship
Warehouse Management System(WMS)
Lot controlLocation routing
Lot controlLocation routing
Solyndra Confidential
Master SchedulingAdvanced Supply Chain Planning (ASCP)
11
Fab2 FORECAST
ITEMS
SOURCE RULE
ASSIGNMENT
SOURCE RULE
Fab 2 FORECAST
SET
Fab 1 FORECAST
SETPLAN
MRP; COLLECTION
& LAUNCH
PLANNER WORK BENCH
PURCHASE REQUISITION
FAB 1Org Item attribute
Org Min Max Planning
Import Requisitions
PLANNED STOCKING
LEVEL ITEMS
Fab 1 FORECAST
ITEMSBOM
BOM
PURCHASE ORDERS
Fab 1; Inventory Planning
Fab 1; Advanced Supply Chain Planning (ASCP)
Fab 2; Advanced Supply Chain Planning (ASCP)
Solyndra Confidential
Item Organization AttributesAttribute Name Controlled At FAB1 FAB2User Item Type Org Purchased item Purchased itemReservable Master Reservable ReservableBOM Item Type Master Standard StandardInventory Asset Value Org Yes YesInclude in Rollup Org Yes YesPurchased Master Yes YesPurchasable Master Yes YesReceipt Routing Org DirectInspection Required Org NOPlanner Org 99 99Make or Buy Org Buy BuyMRP Planning Method Master MRP and MPP planning MRP and MPP planningForecast Control Master Consume and Derive Forecast Consume and Derive ForecastEnd Assembly Pegging Master End Assembly/ Soft Pegging End Assembly/ Soft PeggingRound Order Quantities Master Round order quantities Round order quantitiesPreprocessing Lead Time Org 3 0Processing Lead Time Org 29 0Postprocessing Lead Time Org 1 0WIP Supply Type Master Push PushCustomer Ordered Master Yes YesCustomer Orders Enabled Master Yes YesInternal Ordered Master Yes YesInternal Orders Enabled Master Yes YesShippable Master Yes YesOE Transactable Master Yes YesPick Components Master No NoAssemble to Order Master No NoInvoiceable Item Master Yes YesInvoice Enabled Master Yes YesInventory Category Master Check ATP Org Material Only NoneATP Components Org None NoneATP Rule Org SOL ATP Rule
12
Solyndra Confidential
Master Scheduling ASCP and Inventory Planning
Repetitive usageASCP and Sub inventory Planning
Target stocking levelOrg and Sub inventory Planning
Fab2 forecast
3PL STORES
BLDG 1 STOCK
Fab 1 forecast
MRP
PO receiptReceiving
subinventory
BLDG 2 STOCK
Move Order Internal Order
Min Max Planning
Min Max Planning
3PL STORES
BLDG 1 STOCK
PO receiptReceiving
subinventory
BLDG 2 STOCK
Move Order Internal Order
Min Max Planning
Min Max Planning
Org Level
Planning
Solyndra Confidential14
Production PlanningFab1 to Fab2 supply
FAB2 RAW
KANBAN 1
KANBAN 2
FAB2 KATO Inter-company Delivery
FAB2 SPARES CART
PUT RULE
PUT RULE
PICK RULE
PICK RULE
RCVLOC
RECEVING TRANSACTION
DEFAULT
WMS ALLOCATION
RULE
WMS DESTINATION
RULEMIN MAX
PLANNING
Counting
MRF Process
MRF Process
MIN MAX PLANNING
CCRF
WMS ALLOCATION
RULE
WMS DESTINATION
RULE
Fab2 PRODUCTION
MAINTENANCE
CONSIGNMENT
RAW
SPARES
MISC
PICK RULE
INTERNAL ORDER
SHIPPING
ORDER IMPORT
Inter Org Receipt
IMPORT REQUISITIONS
CREATE INTERNAL ORDERS
INTRANSIT
Fab1
Solyndra Confidential
WMS Business Rule
Pick rules
• Internal Order Pick Rule; Fab 1 to Fab 2
– Lot status
– Shelf life; not expired, sort by
– FIFO
– Sub inventories
– owning party; SOLYNDRA before Supplier
– RMA rules, no restrictions apply
• Replenishment Move Order Pick Rule
– Lot status
– Shelf life; not expired, sort by
– FIFO
– Owning party; SOLYNDRA before Supplier
– When Requisition Move order, no restrictions apply
• Internal Order Pick Rule; Fab 2 to Fab 1
– Lot status
– SN attribute; Born On date > 4 hrs, restricts entire delivery.
15
Put Away Rules
•Move Order Transfer
– Item to destination.
– Source sub inventory to destination
Solyndra Confidential
Shelf life control; PO Receipt to Stock
16
Solyndra Confidential
CONSIGNMENT
RAW
SPARES
MISC
PICK RULE
INTERNAL ORDER
SHIPPINGRECEIPT BLDG1.RAW
BLDG2.RAW
BLDG1.SPARES
BLDG2.SPARES
MIN MAX PLANNING
IMPORT REQUISITIONS
CREATE INTERNAL ORDERS
ORDER IMPORT
FAB 1; CO 2 FAB 2; CO 5
Shelf life control; Warehouse movement
17
WMS Pick Rule; Lot Expiration date
Solyndra Confidential
Shelf life control; Production containment
18
BLDG2.RAW EQUIP A EQUIP B EQUIP C EQUIP DACCT ISSUE
MRFPICK RULE
Min Max
PRODUCTION
FAB2
Telnet Task; REPL
WMS Pick Rule; Expiration date.
Solyndra Confidential
FGI Fab 2 to Fab 1
19
CM to Oracle Interface
PRODFAB2 ENG STORES
FAB2 FGI STORES
N
Y
3PL ENG STORES
FAB1 FGI STORES
PICK RULE
PICK RULE
INTERNAL ORDER
INTERNAL ORDER
Ship Confirm Recieve
Ship Confirm
Recieve
Internal ReqFAB2
Internal ReqFAB1
Panel Conversion
ENG
FGI
FGI
ENGFab 2 (Co 5)
Fab 1 (Co 2)
Solyndra Confidential
Challenges
20
Technical
• Item attributes; Org vs. Master
• Source rules; inter company
• Planner work bench
• Internal Requisitions; manual and planned
• Rick release, ship confirm, receive
• Shipping documents; SN and Lot number
• WMS rules; ship delay, Shelf life, lot status
Business
• Logistics, Planning, Purchasing process changes needed to effectively support Fab 2 and Fab 1.
• Business user participation critical to being successful CRP, UAT, Production support.
Solyndra Confidential
Benefits
21
Continuing to leverage EBS benefits to support dynamic requirements
• Lot status control for material containment.
• WMS picking rules.
• WMS put away rules.
• IR/ISO for intra org movement.
• Shelf lift control; Lot expiration control.
• Multi Org planning; future Org expansion.
• Counting; WMS/Mobility
Solyndra Confidential
&AQ
Global Headquarters
1731 Technology Drive, Suite 350
San Jose, CA 95110
877-JADE-4IT (523-3448)
http://www.jadeglobal.com
Boston Area Office
1900 West Park Drive, Suite# 280
Westborough, MA 01581
(508) 983-1457
Jade Global - India
E-Space IT Park, A-3, 2nd Floor,
102 D/E, Wadgaon Sheri,
Pune-Nagar Road, Pune 411-014
Phone: 91-2066081500
VOIP: (408) 907-2730 (408) 834-8606
Norcal OAUG Training Day, 04/18/23. Confidential.© 2011 Jade Global, Inc. All rights reserved. www.jadeglobal.com
For More Information
23
Manoj RathiConsulting Manager