Taking Projects Digital: Experiences at the New Karolinska Solna Project with Revu.

Swaroop Kadur

Presenter:

Page 2: Skanska NKS - Bluebeam IRC 2013

Overview of New Karolinska Solna (NKS)Area: 320 000 square meters gross total area

No. of rooms: total approx. 8 000

Single rooms for all in-patients

800 beds:

600 in-patient beds

100 day-care beds

100 rooms at adjacent patient-hotel

35 operating theatres

8 radiation bunkers

Clinical research laboratories

Teaching facilities

Page 3: Skanska NKS - Bluebeam IRC 2013

Availability of Drawings for New Karolinska Solna (NKS) team Members Challenge

Digitally manage drawings and documents and enable team members to quickly find up-to-date information.

Easily bring documentation into the field, without needing to print.

Information

Typical Architectural Drawing set for one phase of the project consist of 600 sheets (the project has 7 phases) .

Drawings are updated on average on a weekly basis.

Page 4: Skanska NKS - Bluebeam IRC 2013

Some of the Drawings Needed to find the relevant information for One Room

Floor Plan Scale 1:500

Floor Plan Scale 1:200

Setting out planScale 1:100

Ceiling Plan

FFE Plan

Floor Finishes

Ceiling Detail

Room Detail Sink Detail

Page 5: Skanska NKS - Bluebeam IRC 2013

Traditional Process for drawings Drawings are available for 2 users at a time.

Drawings are at the office so users have to come back to Office if they have not taken everything when they leave

A challenge maintaining them for job and ensuring that they are up to date.

Users have to remember all the relationships between the drawings

Page 6: Skanska NKS - Bluebeam IRC 2013

Workflow for Revu and SharePoint

Publication

Publication

Distribution/Field Production (Revu ipad)Production (Revu Desktop)

Page 7: Skanska NKS - Bluebeam IRC 2013

Using Revu and SharePoint for accessing the drawings

Page 8: Skanska NKS - Bluebeam IRC 2013

Using Revu for ipad for accessing the drawings

Page 9: Skanska NKS - Bluebeam IRC 2013

Using Revu for ipad for accessing the drawings

Page 10: Skanska NKS - Bluebeam IRC 2013

Using Revu for ipad for accessing the drawings

Page 11: Skanska NKS - Bluebeam IRC 2013

Using Revu for ipad for accessing the drawings

Page 12: Skanska NKS - Bluebeam IRC 2013

Room Sign offs in Real time

Challenge

Conduct Room sign offs in real time with the relevant subcontractors.

Keep track of sign offs by each contractor.

Get overall status of each floor during the sign-off process.

Page 13: Skanska NKS - Bluebeam IRC 2013

Floor Status

Page 14: Skanska NKS - Bluebeam IRC 2013

Close up of Floor status

Page 15: Skanska NKS - Bluebeam IRC 2013

Progression of Room Sign off

Page 16: Skanska NKS - Bluebeam IRC 2013

Floor status

Page 17: Skanska NKS - Bluebeam IRC 2013

Close up of Floor Status

Page 18: Skanska NKS - Bluebeam IRC 2013

Room Status Tracking

Page 19: Skanska NKS - Bluebeam IRC 2013

Questions