Page 1: Shane Wright, Danielle Gregory, Chet Manning, Hector Alanis · 2012-04-12 · Differences between 12-Year and 20-Year Lifespans include: Construction Costs Total Liner Filter Fabric

Shane Wright, Danielle Gregory, Chet Manning, Hector Alanis

Page 2: Shane Wright, Danielle Gregory, Chet Manning, Hector Alanis · 2012-04-12 · Differences between 12-Year and 20-Year Lifespans include: Construction Costs Total Liner Filter Fabric

• Production 10,000 person development

Each person produces 5 pounds of waste per day

This means 350,000 pounds of trash per week

Each truck can handle 18,750 pounds per load and 5 loads per day

Only two trucks needed

• Landfill Capacity 12 year

Capable of holding roughly 265,000 CY of solid waste

20 year

Capable of holding 430,000 CY of solid waste

Page 3: Shane Wright, Danielle Gregory, Chet Manning, Hector Alanis · 2012-04-12 · Differences between 12-Year and 20-Year Lifespans include: Construction Costs Total Liner Filter Fabric

Operating Cost 20-Year

Truck Driver $30,000

Equipment $42,000

Facility Manager $60,000

Truck Maintenance $10,000

Gas $12,000

Total $154,000

Capital Cost 20-Year

Liner (clay, and plastic) $250,000

Bulldozer $70,000

Trash Compactor $85,000

Truck $250,000

Dirt Work ($5/yd^3) $1,000,000

Paved Area $200,000

Filter Fabric $6,000

Leachate System $100,000

Total $2,211,000

Landfill budget includes: Infrastructure Construction Gas Maintenance Employee wages

Page 4: Shane Wright, Danielle Gregory, Chet Manning, Hector Alanis · 2012-04-12 · Differences between 12-Year and 20-Year Lifespans include: Construction Costs Total Liner Filter Fabric

Differences between 12-Year and 20-Year Lifespans include: Construction Costs

Total Liner

Filter Fabric

Total number of landfill closures and openings

Operating Cost 12-Year

Truck Driver $30,000

Equipment $42,000

Facility Manager $60,000

Truck Maintenance $10,000

Gas $12,000

Total $154,000

Capital Cost 12-Year

Liner (clay, and plastic) $132,600

Bulldozer $70,000

Trash Compactor $85,000

Truck $250,000

Dirt Work ($5/yd^3) $665,000

Paved Area $200,000

Filter Fabric $3,300

Leachate System $100,000

Total $1,755,900

Page 5: Shane Wright, Danielle Gregory, Chet Manning, Hector Alanis · 2012-04-12 · Differences between 12-Year and 20-Year Lifespans include: Construction Costs Total Liner Filter Fabric

Assumptions Interest rate of 7%

Lifespan, and capital and operating costs shown above

Yearly income of $288,000 found using current Brazos Valley tipping fees of $30/ton

60 year analysis

Option 1 (20 years) is $100,000 cheaper than Option 2 (12 years)

Page 6: Shane Wright, Danielle Gregory, Chet Manning, Hector Alanis · 2012-04-12 · Differences between 12-Year and 20-Year Lifespans include: Construction Costs Total Liner Filter Fabric

How to Pay Cost of Landfill:

$157 per household in entire city

$1,480 per household in neighborhood

Grants Covers 50-100% of the leachate system cost

Bonds 7% interest, 10 Years

Total Capital Cost: $3.7 Million

Potential Bonds

Performance bond

General Revenue Bonds

Page 7: Shane Wright, Danielle Gregory, Chet Manning, Hector Alanis · 2012-04-12 · Differences between 12-Year and 20-Year Lifespans include: Construction Costs Total Liner Filter Fabric
Page 8: Shane Wright, Danielle Gregory, Chet Manning, Hector Alanis · 2012-04-12 · Differences between 12-Year and 20-Year Lifespans include: Construction Costs Total Liner Filter Fabric
Page 9: Shane Wright, Danielle Gregory, Chet Manning, Hector Alanis · 2012-04-12 · Differences between 12-Year and 20-Year Lifespans include: Construction Costs Total Liner Filter Fabric

•Will meet TCEQ requirements •430,000 cy volume, 5 acre Footprint •25 ft deep and 25 feet above grade •125’ buffer zone around landfill •Will utilize a 1600 sq ft work area and compact a 3ft depth of trash 6” cover over compacted trash •Work area will be able to process 177,000 lbs of trash •Waiting and truck inspection area at landfill entrance

Page 10: Shane Wright, Danielle Gregory, Chet Manning, Hector Alanis · 2012-04-12 · Differences between 12-Year and 20-Year Lifespans include: Construction Costs Total Liner Filter Fabric
Page 11: Shane Wright, Danielle Gregory, Chet Manning, Hector Alanis · 2012-04-12 · Differences between 12-Year and 20-Year Lifespans include: Construction Costs Total Liner Filter Fabric

Go With 12 year landfill design, cheaper upfront cost, higher long term cost

Coordinate with the City of College Station to make use of the Twin City Landfill.