security measures head office
TRANSCRIPT
-
7/27/2019 Security Measures Head Office
1/20
OBJECTIVE :To provide a system and procedures in theimplementation of security measures
To provide a efficient and convenientmeans in handling the system.
To secure the plant of any instrusion andpossible losses during the operation.
-
7/27/2019 Security Measures Head Office
2/20
Purpose : To protect the life of employees, and property ofcompany.The main purpose of the security measures is to maximizethe resources. To avoid losses of time and assets of the company To control unnecessary shortage of materials duringassembly process. To provide full efficiency and quality during production
-
7/27/2019 Security Measures Head Office
3/20
Key Personnel :
WAREHOUSE staff
ASSEMBLY staff
GUARD ON DUTYTHIRD PARTY (RUSHPAC , JRS , any othercourier, Scrap buyers.
-
7/27/2019 Security Measures Head Office
4/20
Means:
1. Installation of Checking Device (Gate TypeMetal Detector)
2. Installation of Gates in the Assembly Area
3. Installation of Gates in the Warehouse Area
4. Construction of Lockers for bags, cellphone,personnal things, and the like
5. Camera Installation in the possible area of
entrance and exit in Assembly andWarehouse
6. Provision of door Bell outside the main gate
-
7/27/2019 Security Measures Head Office
5/20
Other means:1. T-shirt or I.D Color Coding of warehouse
and production employees
2.
All cars will be parked only outside.3. All garbages disposal must be scheduled
and properly segregated and checked by theguard on duty.
-
7/27/2019 Security Measures Head Office
6/20
NO BAG , NO CELLPHONE POLICY In-out Body Frisking (Morning , Breaktime
and After work.
ONE GATE ENTRANCE/EXIT VEHICLE SEARCH including company
motorcycle during exit
Lockers closed at 8 am 5:00 pm.
CR near canteen must be closed except atnoon break.
-
7/27/2019 Security Measures Head Office
7/20
Implementation proper documentation ofhandling stocks at the warehouse area
Withdrawals and Inputs of stocks monitoringin the warehouse
Warehouse area should be isolated and mustbe closed at all times and be restricted.
Stocks Level Monitoring in the Warehouse
Warehouse, Assembly and Shipping Planning Warehouse, Assembly and Shipping Meeting
Space and Area Monitoring in the Warehouse
-
7/27/2019 Security Measures Head Office
8/20
CHECKING/VERIFICATION
VAN DELIVERY WAREHOUSE ASSEMBLY
WAREHOUSEMAPPING/DIRECTORY
VERIFICATION / CHECKINGBASED ON PACKING LIST
LIST OF LACKING PARTS
STOCK RECORDS (IN-OUT )
TRANSMITTAL/ DELIVERY
WITHDRAWAL FORMS
UNLOADING
CHECKING /VERIFICATIONPACKING LIST BY LEADMAN
DELIVERY RECIEPT
1-3 DAYS Warranty forLacking parts
LIST OF LACKING PARTS
-
7/27/2019 Security Measures Head Office
9/20
-
7/27/2019 Security Measures Head Office
10/20
-
7/27/2019 Security Measures Head Office
11/20
Security guard must properly conductsearch and body frisk in all employees.
Bus must leave the company at exactly 5:20pm , after Security conduct the checking.
Locker room must be closed at 8:00 am till5:00 pm.
All snacks and foods must be deposited at
the canteen. Main Gate must be closed at all times except
during delivery.
-
7/27/2019 Security Measures Head Office
12/20
ITEMS COST DURATIONLOCKER ROOM
RENOVATION
( 5 m x 6 m )-
open type w/ cyclone PHP 20,000.00 1MONTHlocker cabinet PHP 10,000.00 1MONTH
GATE TYPE METAL DETECTOR PHP 81,000.00 1MONTH
INSTALLATION OF RAMP at
parking area outside PHP 15,000.00 1MONTH
GATE WAREHOUSE PHP 15,000.00 2 MONTHS
GATE ASSEMBLY PHP 15,000.00 2 MONTHS
TOTAL PHP 156,000.00
-
7/27/2019 Security Measures Head Office
13/20
ITEMS COST DURATIONLOCKER ROOM AT THE TOP
OF THE VAULT AREA
( 14 m x 5 m ) PHP 50,000.00 1 MONTH
locker cabinet PHP 10,000.00 1 MONTH
GATE TYPE METAL DETECTOR PHP 81,000.00 1 MONTH
INSTALLATION OF RAMP at
parking area outside PHP 15,000.00 1 MONTH
GATE WAREHOUSE PHP 15,000.00 2 MONTHSGATE ASSEMBLY PHP 15,000.00 2 MONTHS
TOTAL PHP 186,000.00
-
7/27/2019 Security Measures Head Office
14/20
ITEMS COST DURATIONLOCKER ROOM AT THE TOP
OF THE VAULT AREA
( 20 m x 5 m ) PHP 450,000.00 1 MONTH
locker cabinet PHP 10,000.00 1 MONTHGATE TYPE METAL DETECTOR PHP 81,000.00 1 MONTH
INSTALLATION OF RAMP at
parking area outside PHP 15,000.00 1 MONTH
GATE WAREHOUSEPHP 15,000.00
2 MONTHSGATE ASSEMBLY PHP 15,000.00 2 MONTHS
TOTAL PHP 586,000.00
-
7/27/2019 Security Measures Head Office
15/20
-
7/27/2019 Security Measures Head Office
16/20
WAREHOUSE STOCKS MAP ITEMS STOCKS INPUT RECORDS (PERORDER)
ITEMS STOCKS OUTPUT RECORDS(PER ORDER) WITHDRAWALS PROCEDURE (PROPERSIGNATORY)
WAREHOUSE/ PRODUCTIONPLANNING
-
7/27/2019 Security Measures Head Office
17/20
-
7/27/2019 Security Measures Head Office
18/20
ELIMINATION OF HAZARD OF FALLINGOBJECTS OR BOXES
PROTECTION AND AVOIDANCE OF DAMAGEOF THE CKD PARTS
TO HAVE AN ACCESS IN STOCKS ALL TIMES
EFFECIENT AND CONVENIENT WAY OFRETREIVAL OF STOCKS
IN COMPLIANCE OF OCCUPATIONALSTANDARDS
-
7/27/2019 Security Measures Head Office
19/20
-
7/27/2019 Security Measures Head Office
20/20