    OBJECTIVE :To provide a system and procedures in theimplementation of security measures

    To provide a efficient and convenientmeans in handling the system.

    To secure the plant of any instrusion andpossible losses during the operation.

  • 7/27/2019 Security Measures Head Office

    2/20

    Purpose : To protect the life of employees, and property ofcompany.The main purpose of the security measures is to maximizethe resources. To avoid losses of time and assets of the company To control unnecessary shortage of materials duringassembly process. To provide full efficiency and quality during production

  • 7/27/2019 Security Measures Head Office

    3/20

    Key Personnel :

    WAREHOUSE staff

    ASSEMBLY staff

    GUARD ON DUTYTHIRD PARTY (RUSHPAC , JRS , any othercourier, Scrap buyers.

  • 7/27/2019 Security Measures Head Office

    4/20

    Means:

    1. Installation of Checking Device (Gate TypeMetal Detector)

    2. Installation of Gates in the Assembly Area

    3. Installation of Gates in the Warehouse Area

    4. Construction of Lockers for bags, cellphone,personnal things, and the like

    5. Camera Installation in the possible area of

    entrance and exit in Assembly andWarehouse

    6. Provision of door Bell outside the main gate

  • 7/27/2019 Security Measures Head Office

    5/20

    Other means:1. T-shirt or I.D Color Coding of warehouse

    and production employees

    2.

    All cars will be parked only outside.3. All garbages disposal must be scheduled

    and properly segregated and checked by theguard on duty.

  • 7/27/2019 Security Measures Head Office

    6/20

    NO BAG , NO CELLPHONE POLICY In-out Body Frisking (Morning , Breaktime

    and After work.

    ONE GATE ENTRANCE/EXIT VEHICLE SEARCH including company

    motorcycle during exit

    Lockers closed at 8 am 5:00 pm.

    CR near canteen must be closed except atnoon break.

  • 7/27/2019 Security Measures Head Office

    7/20

    Implementation proper documentation ofhandling stocks at the warehouse area

    Withdrawals and Inputs of stocks monitoringin the warehouse

    Warehouse area should be isolated and mustbe closed at all times and be restricted.

    Stocks Level Monitoring in the Warehouse

    Warehouse, Assembly and Shipping Planning Warehouse, Assembly and Shipping Meeting

    Space and Area Monitoring in the Warehouse

  • 7/27/2019 Security Measures Head Office

    8/20

    CHECKING/VERIFICATION

    VAN DELIVERY WAREHOUSE ASSEMBLY

    WAREHOUSEMAPPING/DIRECTORY

    VERIFICATION / CHECKINGBASED ON PACKING LIST

    LIST OF LACKING PARTS

    STOCK RECORDS (IN-OUT )

    TRANSMITTAL/ DELIVERY

    WITHDRAWAL FORMS

    UNLOADING

    CHECKING /VERIFICATIONPACKING LIST BY LEADMAN

    DELIVERY RECIEPT

    1-3 DAYS Warranty forLacking parts

    LIST OF LACKING PARTS

  • 7/27/2019 Security Measures Head Office

    9/20

  • 7/27/2019 Security Measures Head Office

    10/20

  • 7/27/2019 Security Measures Head Office

    11/20

    Security guard must properly conductsearch and body frisk in all employees.

    Bus must leave the company at exactly 5:20pm , after Security conduct the checking.

    Locker room must be closed at 8:00 am till5:00 pm.

    All snacks and foods must be deposited at

    the canteen. Main Gate must be closed at all times except

    during delivery.

  • 7/27/2019 Security Measures Head Office

    12/20

    ITEMS COST DURATIONLOCKER ROOM

    RENOVATION

    ( 5 m x 6 m )-

    open type w/ cyclone PHP 20,000.00 1MONTHlocker cabinet PHP 10,000.00 1MONTH

    GATE TYPE METAL DETECTOR PHP 81,000.00 1MONTH

    INSTALLATION OF RAMP at

    parking area outside PHP 15,000.00 1MONTH

    GATE WAREHOUSE PHP 15,000.00 2 MONTHS

    GATE ASSEMBLY PHP 15,000.00 2 MONTHS

    TOTAL PHP 156,000.00

  • 7/27/2019 Security Measures Head Office

    13/20

    ITEMS COST DURATIONLOCKER ROOM AT THE TOP

    OF THE VAULT AREA

    ( 14 m x 5 m ) PHP 50,000.00 1 MONTH

    locker cabinet PHP 10,000.00 1 MONTH

    GATE TYPE METAL DETECTOR PHP 81,000.00 1 MONTH

    INSTALLATION OF RAMP at

    parking area outside PHP 15,000.00 1 MONTH

    GATE WAREHOUSE PHP 15,000.00 2 MONTHSGATE ASSEMBLY PHP 15,000.00 2 MONTHS

    TOTAL PHP 186,000.00

  • 7/27/2019 Security Measures Head Office

    14/20

    ITEMS COST DURATIONLOCKER ROOM AT THE TOP

    OF THE VAULT AREA

    ( 20 m x 5 m ) PHP 450,000.00 1 MONTH

    locker cabinet PHP 10,000.00 1 MONTHGATE TYPE METAL DETECTOR PHP 81,000.00 1 MONTH

    INSTALLATION OF RAMP at

    parking area outside PHP 15,000.00 1 MONTH

    GATE WAREHOUSEPHP 15,000.00

    2 MONTHSGATE ASSEMBLY PHP 15,000.00 2 MONTHS

    TOTAL PHP 586,000.00

  • 7/27/2019 Security Measures Head Office

    15/20

  • 7/27/2019 Security Measures Head Office

    16/20

    WAREHOUSE STOCKS MAP ITEMS STOCKS INPUT RECORDS (PERORDER)

    ITEMS STOCKS OUTPUT RECORDS(PER ORDER) WITHDRAWALS PROCEDURE (PROPERSIGNATORY)

    WAREHOUSE/ PRODUCTIONPLANNING

  • 7/27/2019 Security Measures Head Office

    17/20

  • 7/27/2019 Security Measures Head Office

    18/20

    ELIMINATION OF HAZARD OF FALLINGOBJECTS OR BOXES

    PROTECTION AND AVOIDANCE OF DAMAGEOF THE CKD PARTS

    TO HAVE AN ACCESS IN STOCKS ALL TIMES

    EFFECIENT AND CONVENIENT WAY OFRETREIVAL OF STOCKS

    IN COMPLIANCE OF OCCUPATIONALSTANDARDS