section no 1 bill no 1 building agreement and ... - unisa departments...given in the said model...
TRANSCRIPT
AmountR
ItemNo
Quantity Rate
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
SECTION NO 1
BILL NO 1
PRELIMINARIES
The JBCC Principal Building Agreement (March 2014 Edition 6.1) prepared by the Joint Building Contracts Committee shall be the applicable building agreement, amended as hereinafter described
BUILDING AGREEMENT AND PRELIMINARIES
The JBCC Principal Building Agreement contract data from an integral part of this agreement
The ASAQS Preliminaries (March 2014 edition) published by the Association of South African Quantity Surveyors for use with the JBCC Principal Building Agreement shall be deemed to be incorporated in these bills of quantities
The contractor is deemed to have referred to the above-mentioned documents for the full intent and meaning of each clause
The clauses in the above-mentioned documents are herein after referred to by clause number and heading only. Where standard clauses or alternatives are not entirely applicable to this agreement such modifications, corrections or supplements as will apply are given under each relevant clause heading and such modifications, corrections or supplements shall take precedence not withstanding anything to the contrary contained in the above-mentioned documents
Where any item is not relevant to this agreement such item is marked N/A (signifying “not applicable”)
-1-
PreliminariesBill No. 1PRELIMINARIES
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
The Model Preambles for Trades (September 2008 edition) as published by the Association of South African Quantity Surveyors shall be deemed to be incorporated in these bills of quantities and no claims arising from brevity of description of items fully described in the said Model Preambles will be entertained
PREAMBLES FOR TRADES
Supplementary preambles are incorporated in these bills of quantities to satisfy the requirements of this project. Such supplementary preambles shall take precedence over the provisions of the said Model Preambles
The contractor's prices for all items throughout these bills of quantities must take account of and include for all of the obligations, requirements and specifications given in the said Model Preambles and in any supplementary preambles
Should he contractor select Option A in terms of clause 26.9.4 of the contract data for the purpose of adjustment of these preliminaries, the amount entered into the amount column in these preliminaries is to be divided into one or more of the three categories provided namely fixed (F), value related (V) and time related (T)
PRICING OF PRELIMINARIES
PRINCIPAL BUILDING AGREEMENT (JBCC-CODE EDITION 6.1, MARCH 2014)
Item
Clause 1.0 - Definitions and interpretation F:............................. V:............................ T:............................
1
INTERPRETATION
Item
Clause 2.0 - Law, Regulations and Notices F:............................. V:............................ T:............................
2
-2-
PreliminariesBill No. 1PRELIMINARIES
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
ItemClause 3.0 - Offer and Acceptance F:............................. V:............................ T:............................
3
Item
Clause 4.0 - Assignment and Cession F:............................. V:............................ T:............................
4
ItemClause 5.0 - Contract Documents F:............................. V:............................ T:............................
5
ItemClause 6.0 - Employer’s Agents F:............................. V:............................ T:............................
6
ItemClause 7.0 - Design Responsibility F:............................. V:............................ T:............................
7
ItemClause 8.0 - Works risk F:............................. V:............................ T:............................
8
INSURANCE AND SECURITY
ItemClause 9.0 - Indemnities F:............................. V:............................ T:............................
9
ItemClause 10.0 - Insurances F:............................. V:............................ T:............................
10
ItemClause 11.0 - Security F:............................. V:............................ T:...........................
11
ItemClause 12.0 - Duties of the Parties F:............................ V:............................T:............................
12
EXECUTION
ItemClause 13.0 - Setting Out F:............................. V:............................ T:............................
13
Item
Clause 14.0 - Nominated Subcontractors F:......................... V:............................ T:............................
14
-3-
PreliminariesBill No. 1PRELIMINARIES
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
Item
Clause 15.0 - Selected Subcontractors F:......................... V:............................ T:............................
15
ItemClause 16.0 - Direct Contractors F:............................. V:............................ T:............................
16
ItemClause 17.0 - Contract Instructions F:............................. V:............................ T:............................
17
Item
Clause 18.0 - Interim Completion = N/S Subcontract Agreement F: ............................ V:...........................T:...........................
18
COMPLETION
ItemClause 19.0 - Practical Completion F:.......................... V:............................ T:............................
19
ItemClause 20.0 - Sectional Completion F:.......................... V:............................ T:............................
20
Item
Clause 21.0 - Defects Liability Period and Final Completion F:............................. V:............................ T:............................
21
Item
Clause 22.0 - Latent Defects Liability Period F:.......................... V:............................ T:............................
22
Item
Clause 23.0 - Revision of the Date for Practical Completion F:............................. V:............................ T:............................
23
Item
Clause 24.0 - Penalty for Late or Non-Completion F:............................. V:............................ T:............................
24
ItemClause 25.0 - Payment F:............................. V:............................ T:............................
25
PAYMENT
-4-
PreliminariesBill No. 1PRELIMINARIES
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
Item
Clause 26.0 - Adjustment of the Contract Value and Final Account F:............................. V:............................ T:............................
26
Item
Clause 27.0 - Recovery of Expense and/or Loss F:............................. V:............................ T:............................
27
Item
Clause 28.0 - Suspension by the Contractor F:............................. V:............................ T:............................
28
SUSPENSION AND TERMINATION
ItemClause 29.0 - Termination F:............................. V:............................ T:............................
29
ItemClause 30.0 - Dispute Resolution F:............................. V:............................ T:............................
30
DISPUTE RESOLUTION
Agreement
AGREEMENT
Category : Fixed R.........................................................
Category : Value R.........................................................
Category : Time R.........................................................
SUMMARY OF CATEGORIES
-5-
PreliminariesBill No. 1PRELIMINARIES
Delta Quantity Surveyors CC
Carried to Abstract R
Preliminaries
Section No. 1
Bill No. 1
AmountR
PageNo
COLLECTION PAGE
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
5Total Brought Forward from Page No.
4Total Brought Forward from Page No.
3Total Brought Forward from Page No.
2Total Brought Forward from Page No.
1Total Brought Forward from Page No.
-6-
PreliminariesBill No. 1PRELIMINARIES
Delta Quantity Surveyors CC
Carried to Final Summary R
AmountR
ItemNo
Quantity Rate
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
SECTION NO. 3
BILL NO. 1
ALTERATIONS
The contractor is referred to the Model Preambles for Trades (2008 Edition) as issued by the Association of South African Quantity Surveyors before pricing this bill.
PREAMBLES
TEMPORARY BARRIERS, SCREENS, ETC
399m
Dust screen 3000mm high between concrete floor and ceiling formed of suitable timber framing with 375 micronpolyethylene sheeting stapled on including corners, ends, etc
1
Temporary barriers, screens, etc including removal
REMOVAL OF EXISTING WORK
143m²Half brick wall2
Breaking down and removing brickwork etc
949m²One brick wall3
30NoTimber single door and steel frame not exceeding 2,5m2
4
Taking out and removing doors, windows, etc including thresholds, sills, etc and prepare opening for new doors, windows, etc elsewhere measured
-7-
AlterationsBill No. 1BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
2,625m²Gypsum plasterboard suspended ceilings including cornices, timber brandering, etc
5
Taking down and removing roofs, floors, panelling, ceilings, partitions, etc
502mDrywall partitioning 3000m high including doors, ironmongery, glazed borrowed lights, etc
6
191mCurtain wall partitioning 3000m high including doors, ironmongery, glazed borrowed lights, etc
7
209mTimber joinery fittings size 1000 x 800mm high (Provisional)
8
Taking out and removing joinery fittings etc
2,625m²30mm Screed from floors9
Hacking up/off and removing granolithic, screeds, plaster, etc from concrete or brickwork and preparing surfaces for new screeds, plaster, etc
2,892m²Internal plaster from walls and columns10
1,770m²Porcelain/Ceramic tiles to floors11
Hacking up/off and removing ceramic tile floor and wall finishes including skirtings, removing mortar bed or backing and preparing concrete or brick surfaces for new screed, plaster or tile finishes
308m²Porcelain/Ceramic tiles to walls12
200mGalvanised steel piping including fittings and brackets13
Taking out and removing piping, sanitary fittings, etc including disconnecting piping from fittings and making good floor and wall finishes (making good tiling and paintwork elsewhere)
250mCopper piping including fittings and brackets14
150m50mm uPVC piping including fittings and brackets15
-8-
AlterationsBill No. 1BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
19NoVitreous china wash hand basin16
21NoVitreous china WC pan with cistern17
1NoStainless single steel sink including cupboard18
2NoStainless steel double sink including cupboard19
2NoVitreous china wall hung urinal with flush valve20
19NoMirror 800 x 800mm high from wall21
Taking out and removing glass and mirrors
2,625m²Making good defects in existing screeded floors with "Pavelite"
22
PREPARATORY WORK TO EXISTING SURFACES
MAKING GOOD OF FINISHES ETC
74mFloors where one brick walls removed23
Making good screed on
2,625m²Floors where tiles removed24
502mFloors where partitions removed25
200m²Timber floors26
Making good internal timber floors including sanding down, treating where needed by specialist (varnish elsewhere)
-9-
AlterationsBill No. 1BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
Alterations
Section No. 2
Bill No. 1
AmountR
PageNo
COLLECTION PAGE
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
9Total Brought Forward from Page No.
8Total Brought Forward from Page No.
7Total Brought Forward from Page No.
-10-
AlterationsBill No. 1BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried Forward to Summary of Section No. R
AmountR
ItemNo
Quantity Rate
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
SECTION NO. 3
BILL NO. 2
MASONRY
The contractor is referred to the Model Preambles for Trades (2008 Edition) as issued by the Association of South African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
BRICKWORK
Where sizes in descriptions are given in brick units, "one brick" shall represent the length and "half brick" the width of a brick
Sizes in descriptions
Lintels shall bear at least 160mm onto adjacent walling. Where such bearing cannot be obtained due to the proximity of adjacent openings the lintel shall be continuous
Reinforced brick lintels
SUPERSTRUCTURE
143m²Half brick walls27
Brickwork of NFP bricks in class II mortar
949m²One brick walls28
-11-
MasonryBill No. 2BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
BRICKWORK SUNDRIES
561m75mm Wide reinforcement built in horizontally29
Brickwork reinforcement
3,720m150mm Wide reinforcement built in horizontally30
22mLintels in lengths not exceeding 3m31
Concrete prestressed fabricated lintels
-12-
MasonryBill No. 2BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
Masonry
Section No. 2
Bill No. 2
AmountR
PageNo
COLLECTION PAGE
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
12Total Brought Forward from Page No.
11Total Brought Forward from Page No.
-13-
MasonryBill No. 2BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried Forward to Summary of Section No. R
AmountR
ItemNo
Quantity Rate
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
SECTION NO. 3
BILL NO. 3
CARPENTRY AND JOINERY
The contractor is referred to the Model Preambles for Trades (2008 Edition) as issued by the Association of South African Quantity Surveyors before pricing this bill.
PREAMBLES
Joinery
Descriptions of frames shall be deemed to include frames, transomes, mullions, rails, etc
SUPPLEMENTARY PREAMBLES
Descriptions of hardwood joinery shall be deemed to include pelleting of bolt holes
Fixing
Items described as "nailed" shall be deemed to be fixed with hardened steel nails or shot pins to brickwork or concrete
Decorative laminate finish
Laminate finish shall be glued under pressure. Edge strips shall be butt jointed at junctions with adjacent similar finish
DOORS, ETC
26No40mm Door 813 x 2032mm high32
Hollow core flush doors with commercial veneer on both sides hung to timber frames
-14-
Carpentry and JoineryBill No. 3BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
3No40mm Door, size 813 x 2100mm high33
1No40mm Door, size 813 x 2032mm high34
11No40mm single Door 900 x 2420m high35
Solid timber door hung to steel frames
7No40mm Double Door 1600 x 2420mm high36
-15-
Carpentry and JoineryBill No. 3BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
Carpentry and Joinery
Section No. 2
Bill No. 3
AmountR
PageNo
COLLECTION PAGE
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
15Total Brought Forward from Page No.
14Total Brought Forward from Page No.
-16-
Carpentry and JoineryBill No. 3BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried Forward to Summary of Section No. R
AmountR
ItemNo
Quantity Rate
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
SECTION NO. 3
BILL NO. 4
CEILINGS, PARTITIONS, ETC
The contractor is referred to the Model Preambles for Trades (2008 Edition) as issued by the Association of South African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Items described as "nailed" shall be deemed to be fixed with hardened steel nails or pins or shot pinned to brickwork or concrete
Descriptions
Items described as "plugged" shall be deemed to include screwing to fibre, plastic or metal plugs at not exceeding 600mm centres, and where described as "bolted", the bolts are measured elsewhere
Electric light fittings, diffusers, panels, etc generally are "lay in" units of the same dimensions as the suspension grid described and allowance shall be made accordingly for their support, inclusive of any flexibility in setting out that may be required (ceiling panels have not been deducted and pricing shall take cognisance thereof)
Proprietary suspended ceilings
-17-
Ceilings, Partitions and Acess FlooringBill No. 4BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
SUSPENDED CEILINGS
Proprietary suspended ceilings
74m²Suspended flush plaster moisture resistant ceiling37
New Gyproc acoustic ceiling tiles 595 x 595mm, celotex mineral fibre, perforated white from saint Gabain to be on Donn Tee system and M6 wall angle.
131m²suspended flush plaster ceiling 38
49m²Horizontal bulkhead ceilings nailed not exceeding 1m below timber trusses soffits
39
35m²Laminated timber boards40
604mShadowline cornices 41
Cornices to suspended ceilings
Drywall partitioning shall comprise steel studding formed of 64mm top and bottom tracks with vertical studs at maximum 600mm centres, friction fitted or pop-riveted to the top and bottom tracks with similar additional vertical studs as necessary at abutments, ends, etc and covered as described with wallboard screwed to studding with drywall screws at maximum 220mm centres. Boards are to be butt jointed and finished with tape and readymix jointing compound all inaccordance with the manufacturer's instructions. Intersections and abutments are measured separately and descriptions shall be deemed to include any additional studs, corner beads, jointing compound, tape, etc
PARTITIONS ETC
223mPartitioning 3000mm high with bottom and top tracks plugged
42
" 90mm Drywall System No 1" steel stud partitioning with "Wallboard" on both sides
-18-
Ceilings, Partitions and Acess FlooringBill No. 4BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
47NoExtra over partition 3000mm high for vertical abutment43
33NoExtra over partition 3000mm high for fair end44
67NoExtra over partition 3000mm high for T-intersection45
45NoExtra over partition 3000mm high for corner46
7No
Extra over partition for 44mm solid flush panel door 813 x 2032mm high with commercial veneer on both sides and hardwood edge strips to vertical edges hung to and including standard bronze coated aluminium door frame with two pairs of 100mm heavy duty 100mm brass butt hinges including three lever lockset and additional studding, trimming, etc
47
Doors
-19-
Ceilings, Partitions and Acess FlooringBill No. 4BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
Ceilings, Partitions and Acess Flooring
Section No. 2
Bill No. 4
AmountR
PageNo
COLLECTION PAGE
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
19Total Brought Forward from Page No.
18Total Brought Forward from Page No.
17Total Brought Forward from Page No.
-20-
Ceilings, Partitions and Acess FlooringBill No. 4BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried Forward to Summary of Section No. R
AmountR
ItemNo
Quantity Rate
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
SECTION NO. 3
BILL NO. 5
FLOOR COVERINGS, PLASTIC LININGS, ETC
The contractor is referred to the Model Preambles for Trades (2008 Edition) as issued by the Association of South African Quantity Surveyors before pricing this bill.
PREAMBLES
NOTE : All materials shall be in colours to be selected by the Representative/Agent and, where applicable, laid to approved patterns
SUPPLEMENTARY PREAMBLES
FLOOR COVERINGS
224m²On floors48
Approved carpet tiles by specialist (allow a PC of R 250.00 per square metre installed)
98m²On floors49
Approved wood laminate by specialist (allow a PC ofR 250.00 per square metre installed)
92mSkirting 100mm high50
306m100mm High Aluminium skirtings51
SKIRTINGS, NOSINGS, ETC
-21-
Floor CoveringsBill No. 5BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried Forward to Summary of Section No. R
AmountR
ItemNo
Quantity Rate
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
SECTION NO. 3
BILL NO. 6
IRONMONGERY
The contractor is referred to the Model Preambles for Trades (2008 Edition) as issued by the Association of South African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Where applicable finishes to ironmongery are indicated by suffixes in accordance with the following list: BS Satin bronze lacquered CH Chromium plated SC Satin chromium plated SE Silver enamelled GE Grey enamelled AS Anodised silver AB Anodised bronze AG Anodised gold ABL Anodised black PB Polished brass PL Polished and lacquered PT Epoxy coated SD Sanded
Finishes to ironmongery
HINGES, BOLTS, ETC
60No100 x 75 x 3mm Brass butt hinge52
Approved
5NoH102SC type: 200 x 32mm Chromium plated brass barrel bolt
53
"Union"
-22-
IronmongeryBill No. 6BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
LOCKS
30No2157- 78SS three lever dead lock54
"Union"
30NoPS 53035-24S keyhole escutcheon55
HANDLES
30NoA6-300mm satin chrome brass offset pull handles56
"Union"
PUSH PLATES AND KICKING PLATES
30No813 x 1200mm Thick anodised aluminium kick plate57
"Solid"
DOOR CLOSERS
30NoTS73 standard arm door closer58
"Dorma"
SUNDRIES
30NoCZ8731SC door stop floor mounted59
"Union"
-23-
IronmongeryBill No. 6BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
Ironmongery
Section No. 2
Bill No. 6
AmountR
PageNo
COLLECTION PAGE
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
23Total Brought Forward from Page No.
22Total Brought Forward from Page No.
-24-
IronmongeryBill No. 6BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried Forward to Summary of Section No. R
AmountR
ItemNo
Quantity Rate
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
SECTION NO. 3
BILL NO. 7
METALWORK
The contractor is referred to the Model Preambles for Trades (2008 Edition) as issued by the Association of South African Quantity Surveyors before pricing this bill.
PREAMBLES
Descriptions
Descriptions of bolts shall be deemed to include nuts and washers
Descriptions of expansion anchors and bolts and chemical anchors and bolts shall be deemed to include nuts, washers and mortices in brickwork or concrete
Metalwork described as "holed for bolt(s)" shall be deemed to exclude the bolts unless otherwise described
SUPPLEMENTARY PREAMBLES
PRESSED STEEL DOOR FRAMES
25NoFrame for door 813 x 2032mm high60
1,6mm Rebated frames suitable for half brick walls
5NoFrame for door 813 x 2032mm high61
1,6mm Rebated frames suitable for one brick walls
ALUMINIUM SHOPFRONTS
-25-
MetalworkBill No. 7BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
14NoPurpose made shopfront SH01, size 2500 x 3000mm high with one double door 1800 x 2400mm high
62
Powder coated aluminium shopfront with 6.38mm laminated safety clear/obscured glass with Low E coating with structural silicone all round and secret fixed glazing beads on one side including ironmongery, subframes, etc and plugged to brickwork or concrete
72NoPurpose made shopfront SH02, size 2500 x 3000mm high
63
10NoPurpose made shopfront SH04, size 7560 x 3000mm high with one single door 895 x 2100mm high
64
6NoPurpose made shopfront SH03, size 3650 x 3000mm high
65
-26-
MetalworkBill No. 7BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
Metalwork
Section No. 2
Bill No. 7
AmountR
PageNo
COLLECTION PAGE
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
26Total Brought Forward from Page No.
25Total Brought Forward from Page No.
-27-
MetalworkBill No. 7BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried Forward to Summary of Section No. R
AmountR
ItemNo
Quantity Rate
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
SECTION NO. 3
BILL NO. 8
PLASTERING
The contractor is referred to the Model Preambles for Trades (2008 Edition) as issued by the Association of South African Quantity Surveyors before pricing this bill.
PREAMBLES
SCREEDS
1,831m²30mm Thick on floors 66
1:3 Screeds wood trowelled on concrete
INTERNAL PLASTER
1,770m²On walls67
Two coat plaster with gypsum finish on brickwork
31m²On narrow widths68
24m3 x 25mm Flat section brass dividing strip between different floor finishes
69
CORNER PROTECTORS, DIVIDING STRIPS, ETC.
-28-
PlasteringBill No. 8BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried Forward to Summary of Section No. R
AmountR
ItemNo
Quantity Rate
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
SECTION NO. 3
BILL NO. 9
TILING
The contractor is referred to the Model Preambles for Trades (2008 Edition) as issued by the Association of South African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding
Descriptions
WALL TILING
307m²On walls70
Porcelain wall tiles (allow a PC of R 250.00/m2 excluding VAT) fixed with adhesive to plaster (plaster elsewhere) and flush pointed with tinted waterproof jointing compound
10m²On narrow widths71
-29-
TilingBill No. 9BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
FLOOR TILING
169m²On floors 72
Porcelain floor tiles (allow a PC of R 250.00/m2 excluding VAT) fixed with adhesive to screed (screed elsewhere) and flush pointed with tinted waterproof jointing compound
206mSkirtings 100mm high 73
206mStainless steel brushed edge strip along the top edge of wall tiles
74
FLOOR TRIM, EXPANSION JOINT ETC
-30-
TilingBill No. 9BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
Tiling
Section No. 2
Bill No. 9
AmountR
PageNo
COLLECTION PAGE
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
30Total Brought Forward from Page No.
29Total Brought Forward from Page No.
-31-
TilingBill No. 9BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried Forward to Summary of Section No. R
AmountR
ItemNo
Quantity Rate
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
SECTION NO. 3
BILL NO. 10
PLUMBING AND DRAINAGE (PROVISIONAL)
The contractor is referred to the Model Preambles for Trades (2008 Edition) as issued by the Association of South African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Tenderers are advised to study the Model Preambles for Trades (1995 edition) as recommended and published by the Association of South African Quantity Surveyors
PREAMBLES
Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent
TRADE NAMES
Reference shall be made to other trades for preambles and full descriptions of items not fully described in this trade which shall apply equally to work in this trade, unless otherwise described
DESCRIPTIONS AND PREAMBLES
-32-
Plumbing and Drainage (Provisional)Bill No. 10BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
Rates for all piping, fittings, etc shall include for all fixing in position of fittings, cutting of chases in brickwork or concrete, excavation of trenches, backfilling, etc unless otherwise described
RATES
Diameters stated for pipes, traps, valves, etc are internaldiameters, except uPVC, polyethylene, stainless steel and copper pipes for which external diameters are stated
DIAMETER OF PIPES
Where fittings have reducing ends or branches they are described as "reducing"
In the case of pipes with diameters not exceeding 60mm, only the largest end or branch is given. Should the contractor wish to use other fittings and bushes or reducers, he may do so on the understanding that no claim in this regard will be entertained
In the case of pipes with diameters exceeding 60mm, all sizes are given and no claim for extra bushes, reducers, etc will be entertained
REDUCING FITTINGS
Sewer and drainage pipes and fittings shall be according to SABS 791, jointed and sealed with butyl rubber rings
Soil, waste and vent pipes and fittings shall be according to SABS 967 and solvent jointed
Cold water supply pressure pipes and fittings shall be according to SABS 966 and jointed by means of the "Lyng" type jointing system
Pipes shall be fixed and jointed according to SABS 0112
uPVC PIPES AND FITTINGS
-33-
Plumbing and Drainage (Provisional)Bill No. 10BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
Pipes shall be hard drawn and half-hard pipes of the class stated. Class 0 (thin wall hard drawn) pipes shall not be bent. Class 1 (thin walled half-hard), class 2 (half-hard) and class 3 (heavy walled half-hard) pipes shall only be bent with benders with inner and outer formers. Fittings to copper pipes, capillary soldier fittings and compression fittings shall be Cobra Watertech or other equal approved type. Capillary soldier fittings shall comply with ISO 2016
COPPER PIPES
HDPE pipes shall be according to SABS 533 and fittings shall be of plastic compression type jointing. Jointing and laying shall be in accordance with the manufacturer's instructions
HEAVY DUTY POLYETHYLENE PIPING (HDPE)
Descriptions of gutter outlets, etc shall be deemed to include wire balloon gratings
WIRE GRATINGS
SANITARY FITTINGS
19No
Vitreous china semi close couple washdown pan comprising 90 degrees outlet open rim, flushing valve including lid and accessories and heavy duty seat, and including 20mm BSP with union brass built-in front access box type toilet flushing valve complete with galvanised box, stainless steel concealing cover plate, flush pipe, elbow and pan connector and with ability to maintain water pressure at 100 - 600 kPa.
75
Water Closet
-34-
Plumbing and Drainage (Provisional)Bill No. 10BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
2No
Paraplegic vitreous china floor mounted washdown suite, colour White, comprising,semi close couple 900
outlet open rim washdown pan and matching 9 Litre cistern, including lid, fitments, purpose made chromium plated side flush lever and double flap heavy duty plasticseat all fixed in accordance with manufacturer's instructions.
76
Paraplegic Water Closet
17No
Vitreous china wall mounted basin, colour white, size 510 x 400mm with two tap holes including integrated overflow and chainstay hole bolted to wall with two 10mm bolts and sealed with silicone sealant where basin meets wall.
77
Wash hand basin
2No
Wall mounted paraplegic basin colour white, size 510 x 405mm with one tap hole including intergrated overflow and chainstay hole bolted wall with two 10mm bolts and including floor mounted pedestal and sealed with silicone sealant where basin meets wall with 2 x medical elbow action pillar tap with raised nose and blue and red indicater 1/4 turn ceramic disc 1/2 BSP male connection inlet Hot on left / Cold on right complete with pop-up waste mounting kit. Manufactured in accordance with SANS 226:2004 Type 2
78
6No
White vitreous wall mounted top inlet urinal, size 600 x 385 x 380mm fixed on and including two hanger brackets
79
Urinal
2NoDouble centre bowl sink code 313852 inset type size 1800 x 535mm complete
80
Sink
-35-
Plumbing and Drainage (Provisional)Bill No. 10BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
1No
Polished stainless steel sink size 1000 x 460mm, Grade 304 18/10 single end drop in bowel size 350 x 460 x 140mm deep, fitted onto cupboard (elsewhere measured) fixed in accordance with manufacturer's instructions.
81
WASTE UNIONS ETC
19No32mm Cobra no 301 waste union82
"Cobra Watertech" or equal approved
3No40mm Cobra no 317-40 sink waste83
TRAPS ETC
3No38 x 38mm Deep seal "P" or "S" trap84
Rubber
3No40 x 300mm Sink combination for double bowl with reseal "P" trap
85
25No50mm No.365/50 chromium plated bottle trap86
"Cobra Watertech" or equal approved
TAPS, VALVES ETC
3NoTivoli Monza Sink mixer pillar type87
"Cobra Watertech" or equal approved
19NoTivoli Riveira basin mixer88
HOLES ETC
16No200mm Reinforced concrete slab, beam, wall, etc89
Core drilling of hole for pipe not exceeding 100mm diameter
-36-
Plumbing and Drainage (Provisional)Bill No. 10BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
17No200mm Reinforced concrete slab, beam, wall, etc90
Core drilling of hole for pipe not exceeding 100mm and not exceeding 150mm diameter
21No200mm Reinforced concrete slab, beam, wall, etc91
Core drilling of hole for pipe not exceeding 150mm and not exceeding 300mm diameter
-37-
Plumbing and Drainage (Provisional)Bill No. 10BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
Plumbing and Drainage (Provisional)
Section No. 2
Bill No. 10
AmountR
PageNo
COLLECTION PAGE
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
37Total Brought Forward from Page No.
36Total Brought Forward from Page No.
35Total Brought Forward from Page No.
34Total Brought Forward from Page No.
33Total Brought Forward from Page No.
32Total Brought Forward from Page No.
-38-
Plumbing and Drainage (Provisional)Bill No. 10BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried Forward to Summary of Section No. R
AmountR
ItemNo
Quantity Rate
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
SECTION NO. 3
BILL NO. 11
ELECTRICAL WORKS
The contractor is referred to the Model Preambles for Trades (2008 Edition) as issued by the Association of South African Quantity Surveyors before pricing this bill.
PREAMBLES
General trenching work for sleeves along the routes as pegged out on site after co-ordination with other services.
Excavation and Trenching
Allowance must be made for the sifting of soil when required, removal and carting away of all stones and rocks including dumping off site. Backfilling and compaction shall be carried out as specified for overall siteworks.
27m³Excavation and backfilling in soft soil92
7m³Excavation and backfilling in hard rock-supply cable93
Cable and Data Sleeves
20m50mm diameter for data94
Supply and installation of PVC Sleeves through floor construction to power distribution board and communication board complete with standard radius sleeve bends
10m75mm diameter for power cable95
-39-
Electrical WorksBill No. 11BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
3No50mm diameter 96
Radius bends:
2No75mm diameter97
800mSupply and install a 0.6mm diameter galvanised draw wire in sleeves and conduit for data installation
98
Draw Wires
Distribution Boards
1NoDistribution Board for outdoor packaged units, complete with equipment as per drawing.
99
Supply, delivery, storage and submission of workshop drawings for the Flush mounted architrave steel type power distribution boards complete with flush trays,doors,switch gear mounting trays, copper busbars, neutral and earth bars, correctly sized internal PVC wiring, labelling and legend cards
1No200A 3P 10kA, circuit breaker100
Low Voltage PVC Cables
180m120mm2 4 core PVC SWA Cable101
Supply and installation of PVC SWA PVC cable and Bare Copper Earth Wire on cable tray or in duct
180m70mm2 BCEW102
2No120mm2 4 core PVC SWA Cable103
Terminations:
2No70mm2 BCEW104
-40-
Electrical WorksBill No. 11BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
Conduit Work
Supply, delivery and installation of SABS approved Conduits completed with all required conduit accessories.
150m20mm PVC Conduit105
Built or Chase into brick or concrete work:
100m25mm PVC Conduit106
100m20mm Galvanised Conduit107
50m25mm Galvanised Conduit108
150m20mm PVC Conduit109
In Ceiling space and Timber work:
100m25mm PVC Conduit110
400m20mm Galvanised Conduit111
400m25mm Galvanised Conduit112
Conduit Boxes
10No20mm diameter PVC 4 way type (round box)113
Supply and installation of SABS approved conduit boxes, installed in the run of the conduit installation, cast into concrete and built into brickwork or flush inside false ceiling spaces, complete with all required conduit termination accessories.
150No20mm diameter Galvenised 4 way type (round box)114
-41-
Electrical WorksBill No. 11BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
Supply and installation of SABS approved galvanised pressed steel wall boxes for building flush into brickwork or cast into concrete work.
Wall Boxes
30No100 x 50 x 50mm115
Flush mounted type:
30No100 x 100 x 50mm116
PVC Wiring
7,000m2.5mm² for lights circuits117
PVC Wiring in conduits:
8,000m4mm² for plug sockets circuits118
100m6mm² 119
Stranded Copper Earth Wire
3,500m2.5mm² 120
Supply and installation of stranded copper earth wire along with PVC wiring in conduits. Tendered rates shall make provision for wastage.
4,000m4mm² 121
50m6mm² 122
Light Switches
-42-
Electrical WorksBill No. 11BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
5No1 Lever 1 way123
Supply and installation of SABS approved type 16A flush and surface type light switches. Final paint finishes shall be confirmed at a later stage, allowance shall however be made as specified in the general specification. All boxes for flush mounting measured elsewhere.
2No1 Lever 2 way124
30NoRadiant 06SE10-W occupancy sensor or similar approved.
125
Supply and installation of SABS approved switched and unswitched type flush and surface mounted type 16A switched socket outlets suitable for mounting in flush steel wall boxes or in steel pedestal units or on surface.
Socket Outlets
The final colour of the paint finish shall be confirmed at a later stage, allowance shall be made as specified in the specification.
All flush type boxes and special pedestals measured elsewhere.
70No16A 3 pin single socket outlets126
Flush switched sockets type:
SUM16A 3 pin double socket outlets127
Supply, delivery to site, storage and installation of the below specified light fittings complete with lamps and tubes. Allowance must be made in the rates for all the required fixing materials and accessories.
Light Fittings
-43-
Electrical WorksBill No. 11BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
Fittings to be equal and similar approved to the below quoted manufacture.
150NoRegent Linear Maxi LED 1200mm 56W (flush mounted) or similar approved
128
50NoRegent Perox Elux 10W down light or similar approved129
20NoLED Bulkhead130
20NoRazzle 5 chandelier or similar approved131
Making provision for the required inspection, tests and the commissioning of the complete installation and the issuing of the required certificate.
Electrical Tests
SUMBuilding Installation132
Make allowance for decommissioning existing installation.
Decommisioning
300mDecommission existing power skirting.133
150NoDecommission existing lighting.134
200mSupply and install 2 compartment power skirting complete with accessories
135
Others
52No16A power socket outlet on power skirting136
35No60A D/P Isolator (waterproof)137
145NoDesktop mount (consisting 2 socket outlets and 1 Cat6 data point)
138
6NoDesk mount for boardroom (consisting 1 socket outlets, 1 Cat6 data point, 1 VGA and 1 HDMI point)
139
-44-
Electrical WorksBill No. 11BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
1,500mP9000 trunking complete with accessories140
800mP2000 trunking complete with accessories141
200m25mm flexible conduit142
1,200mHeavy duty 305mm width perforated cable tray complete with accessories
143
700mHeavy duty 300mm width wire mesh cable tray completewith accessories
144
7NoCisco 3650 Switch 24 port PoE or similar approved.145
IT INFRASTRUCTURE
3No9U Wallmount Swingframe Network Cabinet 450mm for blocks
146
3No9U Collar 100mm147
7NoCat6 Patch Panel 24 Port 148
3NoBrush Panel 50mm Base149
3NoFan FS 2× Fan Tray150
3NoPower Rail 6 Way 16A 19" Rack151
200NoCat6 UTP Patch cord 1M152
5,000NoCat6 Ethernet Cable153
60NoCat 6 Network point154
SUMInstallation and comissioning155
300m4 Core HDD multi mode fibre including routing156
Optical Fibre Network
4NoSplice box - Ext Enclosure LC DPX157
-45-
Electrical WorksBill No. 11BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
4NoFibre Optic Management Kit158
4NoLC Duplex mid couplar159
8NoLC Pig tails160
4NoLead MM LC-LC 1m161
4NoMM Midcouplar LC162
4NoEntry Glands163
4NoSplicing164
20NoSmoke detectors complete with accessories165
Fire Detection Equipment
3NoHeat detector complete with accessories166
4NoLoop Sounders/Sirens167
5NoBreak glass unit168
600NoFR20 Fire Cable installed in trunking/conduits169
30NoReposition/refit existing smoke detectors170
ItemInstalling and Commissioning (link to existing fire control panel)
171
-46-
Electrical WorksBill No. 11BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
Electrical Works
Section No. 2
Bill No. 11
AmountR
PageNo
COLLECTION PAGE
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
46Total Brought Forward from Page No.
45Total Brought Forward from Page No.
44Total Brought Forward from Page No.
43Total Brought Forward from Page No.
42Total Brought Forward from Page No.
41Total Brought Forward from Page No.
40Total Brought Forward from Page No.
39Total Brought Forward from Page No.
-47-
Electrical WorksBill No. 11BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried Forward to Summary of Section No. R
AmountR
ItemNo
Quantity Rate
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
SECTION NO. 3
BILL NO. 12
MECHANICAL WORKS
The contractor is refered to the Model Preambles for Trades (2008 edition) as issued by the Association of South African Quantity Surveyors before pricing this bill.
PREAMBLES
PRELIMINARIES AND GENERAL
All items shall be priced for whatever cost may be considered necessary for Preliminary and General items to carry out the Fire Protection installations in full. This bill must be read and completed in conjunction with specifications and drawings.
Important notice:
4No
Provision of fire plan in laminated A3 size for each building. The plans are to be fixed in the Foyer of each floor level.
172
FIRE HYDRANTS, HOSE REELS AND PORTABLE FIRE EXTINGUISHERS
25mØ25mm173
Supply and Install SANS 62-1/2 class medium steel piping. Pipes shall be free of rust, flakes or other defects and shall be cleaned internally before installation. The pipework shall be c/w Victaulic connections, hangers, supports, fittings and all necessary accessories. 25NB piping to be screwed.
-48-
Mechanical WorksBill No. 12BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
5mUnions - 25mm174
8mElbows - 25mm175
1mReducing Tees - 100/25/100176
14No4.5kg Dry Powder Fire Extinguisher177
25mPainting and labelling of all fire pipework(25NB) as per SANS 10252 and SANS 10140.
178
SUMFlushing of pipework and pressure testing as per SANS 10287 and 10252
179
7NoEscape and Exit signage with directional arrow180
Photoluminescent Signage in line with SANS 1186. Signage detail and fixing detail to be allowed for. Sign fixing detail to be presented to the architect for approval before procurement and installation
6NoHose reel and extinguisher signage with directional arrow
181
10NoHydrant, hose reel and extinguisher with directional arrow
182
18NoAccess and Direction of travel Signage183
2No
Supply and install Fire Hose Reels (30m long) swing type c/w chromium plated 25mm valve, connection, fittings, fixings and dial type (100mm) glycerine filled pressure gauge with union and isolating valve suitable for systems working pressure. Allowance for Weld-o-let to connect onto existing piping.
184
SUMTest and commission fire installation as required by SANS 10400 and SANS 10287
185
TESTING AND COMPLETION
5NoRefurbish and maintain Hydrant in line with SANS 1128186
-49-
Mechanical WorksBill No. 12BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
5NoRefurbish and maintain Hose Reel in line with SANS 543
187
Where trades names are used, it shall be read to include the phrase "or approved equal".
AIR CONDITIONING AND VENTILATION
ACCEPTABLE TRADE NAMES: Midea, Samsung, LG, Carrier, McQuay, Panasonic, Trane, Daikin, York
Installation and Commissioning of air conditioning units and ducting must include for all hangers, support, condensate drains and trunking
All items on the Bill are re-measurable
Controllers for cassette units to be wired, controllers for midwall units to be wireless.
Drip tray to be installed below slab penetration between condensor and indoor unit. Drain to be connected to condensate pipe. Tray to sit in ceiling void.
Reverse Cycle Split Units
AIR-CONDITIONING
7No
Mid wall indoor unit Midea MDV-D 28 G/N1-S or similar approved, cooling capacity of 9 000 BTU, to include all necessary supports, controllers, and ancillaries
188
Supply, delivery and install to site of the following items
7No
Mid wall indoor unit Midea MDV-D 36 G/N1-S or similar approved, cooling capacity of 12 000 BTU, to include all necessary supports, controllers, and ancillaries
189
1No
Mid wall indoor unit Midea MDV-D 45 G/N1-S or similar approved, cooling capacity of 15 000 BTU, to include all necessary supports, controllers, and ancillaries
190
-50-
Mechanical WorksBill No. 12BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
5No
Mid wall indoor unit Midea MDV-D 56 G/N1-S or similar approved, cooling capacity of 18 000 BTU, to include all necessary supports, controllers, and ancillaries
191
1No
Cassette indoor unit Midea MDV-D 36 Q4/N1-D or similar approved, cooling capacity of 12 000 BTU, to include all necessary supports, controllers, and ancillaries
192
2No
Cassette indoor unit Midea MDV-D 45 Q4/N1-D or similar approved, cooling capacity of 15 000 BTU, to include all necessary supports, controllers, and ancillaries
193
3No
Cassette indoor unit Midea MDV-D 56 Q4/N1-D or similar approved, cooling capacity of 18 000 BTU, to include all necessary supports, controllers, and ancillaries
194
7No
Cassette indoor unit Midea MDV-D 71 Q4/N1-D or similar approved, cooling capacity of 24 000 BTU, to include all necessary supports, controllers, and ancillaries
195
4No
Cassette indoor unit Midea MDV-D 80 Q4/N1-D or similar approved, cooling capacity of 27 000 BTU, to include all necessary supports, controllers, and ancillaries
196
11No
Cassette indoor unit Midea MDV-D 100 Q4/N1-D or similar approved, cooling capacity of 34 000 BTU, to include all necessary supports, controllers, and ancillaries
197
1No
Variable refrigerant outdoor heat pump unit Midea MDV-560W/DRN1-i(C) or similar approved, cooling capacity of 56kW, to include all necessary supports, controllers, and ancillaries
198
100mComplete piping installation including but not limited to piping, junction boxes, cable trays
199
-51-
Mechanical WorksBill No. 12BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
1No
Variable refrigerant outdoor heat pump unit Midea MDV-615W/DRN1-i(C) or similar approved, cooling capacity of 61.5kW, to include all necessary supports, controllers, and ancillaries
200
200mComplete piping installation including but not limited to piping, junction boxes, cable trays
201
2No
Variable refrigerant outdoor heat pump unit Midea MDV-900W/DRN1-i(C) or similar approved, cooling capacity of 90kW, to include all necessary supports, controllers, and ancillaries
202
300mComplete piping installation including but not limited to piping, junction boxes, cable trays
203
4NoInstallation and commissioning of each complete system204
FRESH AIR SYSTEMS
2NoAxial Fan - 1600 l/s @ 250 Pa in line duct fan mounted on anti-vibration mounts
205
Supply, delivery and install to site of the following items
2NoFilter box with washable pleated filters to suit 1600l/s fanspec, mounted on roof
206
2NoWeather louvre 1200x700 natural anodized with wire mesh screen.
207
22NoEpoxy Powder coated diffuser with damper to suit 20l/s -50l/s air flow.
208
26NoBalancing Damper - 250 diameter 209
645m²Galvanised ducting including all transformation pieces (including all brackets and supports)
210
2NoInstallation & Commissioning (incl all brackets, supports etc.) for each system
211
-52-
Mechanical WorksBill No. 12BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
TOILET EXTRACTION SYSTEMS
1NoAxial Fan - 1100 l/s @ 150 Pa in line duct fan mounted on anti-vibration mounts
212
Supply, delivery and install to site of the following items
1NoCowl to suit fan with wire mesh screen213
19No300X200 wall mounted RA extract louvre epoxy powder coated c/w balancing damper
214
6No500x400 Epoxy Powder coated Door grille215
25m²Galvanised ducting including all transformation pieces (including all brackets and supports)
216
1NoInstallation & Commissioning (incl all brackets, supports etc.) for each system
217
2NoCeiling mounted extract fan 50l/s @ 100Pa boxed and suitable for duct connection
218
1NoCeiling mounted extract fan 200l/s @ 100Pa boxed and suitable for duct connection
219
30m²Galvanised ducting including all transformation pieces (including all brackets and supports)
220
3NoInstallation & Commissioning (incl all brackets, supports etc.) of each system
221
Item4 copies of the O&M Manuals222
SUNDRIES
ItemAs-Built Drawings (4 copies)223
Item12 month guarantee period224
ItemFree maintenance during guarantee period225
-53-
Mechanical WorksBill No. 12BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
Item
Stripping of all existing ducting and air handling units in areas receiving new AC plant (chilled water piping to remain and blocked at ends)
226
PLUMBING INSTALLATION
All items shall be priced for whatever cost may be considered necessary for Preliminary and General items to carry out the Fire Protection installations in full. This bill must be read and completed in conjunction with specifications and drawings.
This BOQ is to be read in conjunction with the project specification document.
1No
Provision of fire plan in laminated A3 size for each building. The plans are to be fixed in the Foyer of each floor level.
227
COLD WATER AND HOT WATER
Supply and install SABS 460 Class 2, pipes, fittings,saddles, bracketing and accessories fixed to soffit and walls, or as described in accordance with the manufacturer's specification complete with labour. Size indicated is the Pipes Norminal Diamter in mm.
35mØ 15 mm Pipe228
Chased into Wall Pipes
59mØ 22 mm Pipe229
6mØ 28 mm Pipe230
52mØ 15 mm Pipe231
Surface Mounted Pipes
67mØ 22 mm Pipe232
-54-
Mechanical WorksBill No. 12BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
6mØ 28 mm Pipe233
30NoØ 15 mm234
Bends
29NoØ 22 mm235
4NoØ 28 mm236
1NoØ 35 mm237
24NoØ 15 mm238
Equal Tees
41NoØ 22 mm239
4NoØ 28 mm 240
2NoØ 35mm to Ø 28mm241
Reducers
8NoØ 28mm to Ø 22mm242
1NoØ 28mm to Ø 15mm243
7NoØ 22mm to Ø 15mm244
1NoØ 35mm to Ø 15mm245
10NoØ 15 mm246
Supply and install lever ball valve, including connection fittings to piping:
8NoØ 22 mm247
3NoØ 28 mm248
-55-
Mechanical WorksBill No. 12BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
18NoWash Basin- Ø 15 mm249
Sanitary connection equipment to include all necessary fittings to facilitate connection between supply pipe and sanitary fitting, to facilitate correct working of sanitary ware. Any exposed fittings to be approved by the architect . The sanitary schedule is in the main bill.
23NoToilet- Ø 22 mm250
4NoUrinal- Ø 15 mm251
3NoTaps- Ø 22 mm 252
24NoØ 15 mm253
Supply and Install Insulation
13NoØ 22 mm254
SUNDRIES
1No5% pressure test255
Testing and commissioning of hot water system in the presence of the manufacturer.
1No50 Litres,600kPa cylinder, Kwikot256
Supply and install Hot water cylinder complete with electric back up element, drip tray with P traps, multi control valve and all necessary accessories. All products and installation are to be in accordance to SANS 1098, SABS 115102002 and SANS 10254 respectively. The HWC shall be installed and positioned as indicated on the drawings.
1NoAllow for adapter for Galvanised steel to Copper adapter to suit 28 NB Copper pipe.
257
1NoAllow for adapter for Galvanised steel to Copper adapter to suit 35 NB Copper pipe.
258
-56-
Mechanical WorksBill No. 12BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
1NoTesting and commissioning of water systems259
1No
Supply, install and commission 10 litre hydro boil with associated piping and take-off from nearest water line. Position to be mounted above sink
260
DRAINAGE INSTALLATION
36m50mm diameter pipes261
Supply and install uPVC pipes and fittings, in accordance with the manufacturers approved installation procedure complete with labour, saddles, bracketing and accessories.
30m110mm diameter pipes262
3m110mm diameter 90 degree bend with inspection eye263
Extra over uPVC pipes for fittings:
6m110mm diameter 90 degree bend264
3m110mm diameter Tee265
19m110mm diameter Tee with inspection eye266
2m50mm diameter 90 degree bend with inspection eye267
8m50mm diameter 90 degree bend268
3m50mm diameter Tee269
9m50mm diameter Tee with inspection eye270
10No50mm diameter 45° junction 271
6No50mm diameter socket adaptor272
5No50mm diameter male adaptor 273
6No50mm diameter 45° Bend with inspection eye274
-57-
Mechanical WorksBill No. 12BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
5No50mm diameter 45° Bend 275
3No110mm double junction 276
2No110mm double 45 degree junction277
4No110 x 50mm Access Junction278
1No110 x 50mm double Junction279
6No110mm Access straight pan connector 280
2No50mm "Flexi Trap" P or S type trap jointed to waste pipe including connection or clamp etc
281
2No110mm uPVC to cast iron adapter282
4No110mm vent cowl283
70No22mm diameter PVC- for HVAC Drainage284
5NoAllow for adapter for cast iron to uPVC connection and tap off with existing system (110mm pipe)
285
-58-
Mechanical WorksBill No. 12BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
Mechanical Works
Section No. 2
Bill No. 12
AmountR
PageNo
COLLECTION PAGE
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
58Total Brought Forward from Page No.
57Total Brought Forward from Page No.
56Total Brought Forward from Page No.
55Total Brought Forward from Page No.
54Total Brought Forward from Page No.
53Total Brought Forward from Page No.
52Total Brought Forward from Page No.
51Total Brought Forward from Page No.
50Total Brought Forward from Page No.
49Total Brought Forward from Page No.
48Total Brought Forward from Page No.
-59-
Mechanical WorksBill No. 12BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried Forward to Summary of Section No. R
AmountR
ItemNo
Quantity Rate
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
SECTION NO. 3
BILL NO. 13
GLAZING
The contractor is referred to the Model Preambles for Trades (2008 Edition) as issued by the Association of South African Quantity Surveyors before pricing this bill.
PREAMBLES
GLAZING TO STEEL WITH PUTTY
13m²Panes exceeding 0,1m2 and not exceeding 0,5m2286
4mm Clear glass
21m²Panes exceeding 0,1m2 and not exceeding 0,5m2287
4mm Obscure glass
TOPS, SHELVES, DOORS, MIRRORS, ETC
21NoMirror 420 x 860mm high288
Mirrors with polished edges holed for and fixed with chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork or concrete
-60-
GlazingBill No. 13BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried Forward to Summary of Section No. R
AmountR
ItemNo
Quantity Rate
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
SECTION NO. 3
BILL NO. 14
PAINTWORK
The contractor is referred to the Model Preambles for Trades (2008 Edition) as issued by the Association of South African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Descriptions of paintwork shall be deemed to include for all cutting in
DESCRIPTIONS
Previously painted plastered surfacesSurfaces shall be thoroughly washed down and allowed to dry completely before any paint is applied. Blistered or peeling paint shall be completely removed and cracks shall be opened, filled with a suitable filler and finished smooth
PREPARATORY WORK TO EXISTING WORK
Previously painted metal surfacesSurfaces shall be thoroughly rubbed and cleaned down. Blistered or peeling paint shall be completely removed down to bare metal
Previously painted wood surfacesSurfaces shall be thoroughly cleaned down. Blistered or peeling paint shall be completely removed and cracks and crevices shall be primed, filled with suitable filler and finished smooth
-61-
PaintworkBill No. 14BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
All painting shall be done in accordance with "Plascon-Evans" specifications
PAINT SPECIFICATIONS
PAINTWORK ETC TO NEW WORK
METAL SURFACES WITH
39m²Door frames289
Spot priming defects in pre-primed surfaces with zinc phosphate metal primer, one coat universal undercoat and two coats super universal enamel paint on steel
WOOD SURFACES WITH
99m²Doors290
Three coats Plascon matt vanish paint on
39m²Door frames, etc291
92mSkirtings292
One coat dulux trade alkali resistant plaster primer and two coats final coats dulux 100 low sheen to be applied after surfaces have been cleaned and dried. Moisture content should not exceed 12%. Coats two and three to be applied to achieve a close film and solid colour after coat one has been applied as a patch primer.
-62-
PaintworkBill No. 14BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
PAINTWORK, ETC TO PREVIOUSLY PAINTED WORK ON
FLOATED PLASTER SURFACES WITH
1,770m²Internal walls293
One coat dulux trade alkali resistant plaster primer and two final coats dulux 100 low sheen (code 20YY 57/060) to be applied after surfaces have been cleaned and dried. Moisture content should not exceed 12%. Coats two and three to be applied to achievea close film and solid colour after first coat has been applied as a patch primer.
1,592m²Ceilings and beams294
METAL SURFACES WITH
47m²Door frames, etc295
Spot priming defects in pre-primed surfaces with zinc phosphate metal primer, one coat universal undercoat and two coats super universal enamel paint on steel
WOOD SURFACES WITH
98m²Timber floors296
Two coats Plascon matt vanish paint on
104m²Doors297
Two coats Plascon matt vanish paint on
-63-
PaintworkBill No. 14BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
Paintwork
Section No. 2
Bill No. 14
AmountR
PageNo
COLLECTION PAGE
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
63Total Brought Forward from Page No.
62Total Brought Forward from Page No.
61Total Brought Forward from Page No.
-64-
PaintworkBill No. 14BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried Forward to Summary of Section No. R
AmountR
ItemNo
Quantity Rate
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
SECTION NO. 3
BILL NO. 15
PROVISIONAL SUMS ETC
The contractor is referred to the Model Preambles for Trades (2008 Edition) as issued by the Association of South African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Unless otherwise described, all prime cost amounts and provisional sums exclude the cash discount of 5% and include for delivery to site of all articles concernedAll prime cost amounts and provisional sums are net and include for delivery to siteof all articles concerned
General
The contractor is referred to the Preliminaries for further amplification of "Prime Cost Amounts and Provisional Sums"
Preliminaries
BUDGETARY ALLOWANCES
The Following budgetary allowances are for work to be executed by the contractor and will be measured and valued at bill and sub-contractors rates in accordance with the Principal Building Agreement :
-65-
Provisional SumsBill No. 15BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
100,000.00Item
Provide the sum of R 100 000.00 (One Hundred Thousand Rand) for Electrical builders work to be used at the discretion of the Employer and deducted in whole or in part if not required.
298
Electrical Builders Work
100,000.00Item
Provide the sum of R 100 000.00 (One Hundred Thousand Rand) for Mechanical builders work to be used at the discretion of the Employer and deducted in whole or in part if not required.
299
Mechanical Builders Work
100,000.00Item
Provide the sum of R 100 000.00 (One Hundred Thousand Rand) for Plumbing and Drainage Repairs to be used at the discretion of the Employer and deducted in whole or in part if not required.
300
Plumbing and Drainage Works Repairs
50,000.00Item
Provide the sum of R 50 000.00 (Fifty Thousand Rand) for Ironmongery to existing doors to be used at the discretion of the Employer and deducted in whole or in part if not required.
301
Ironmongery to existing doors
1,000,000.00Item
Provide the sum of R 1000 000-00 (One Million Rand) for Asbestos Removal to be used at the discretion of the Employer and deducted in whole or in part if not required.
302
Asbestos Removal
-66-
Provisional SumsBill No. 15BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried to Abstract R
Provisional Sums
Section No. 2
Bill No. 15
AmountR
PageNo
COLLECTION PAGE
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
66Total Brought Forward from Page No.
65Total Brought Forward from Page No.
-67-
Provisional SumsBill No. 15BILLS OF QUANTITIES - CVV BUILDING
Delta Quantity Surveyors CC
Carried Forward to Summary of Section No. R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
SECTION SUMMARY - BILLS OF QUANTITIES - CVV BUILDING
BillNo
PageNo
AmountR
10Alterations1
13Masonry2
16Carpentry and Joinery3
20Ceilings, Partitions and Acess Flooring4
21Floor Coverings5
24Ironmongery6
27Metalwork7
28Plastering8
31Tiling9
38Plumbing and Drainage (Provisional)10
47Electrical Works11
59Mechanical Works12
60Glazing13
64Paintwork14
67Provisional Sums15
-68-
BILLS OF QUANTITIES - CVV BUILDINGDelta Quantity Surveyors CC
Carried to Final Summary R
FOR UNIVERSITY OF SOUTH AFRICA
AT MUCKLENEUK CAMPUS
TO CVV 3RD FLOOR BUILDING
PROPOSED ALTERATIONS AND REFURBISHMENTS
PageNo
FINAL SUMMARY
SectionNo
AmountR
6PRELIMINARIES1
68BILLS OF QUANTITIES - CVV BUILDING2
RSUB TOTAL
600,000.00Item
Contingency
Allow an amount of R 600 000.00 (Six Hundred Thousand Rand) for Contingencies for unforeseen items to be authorized and deducted in part or whole if not required.
CONTINGENCIES
RSUB-TOTAL
RProvision for Value-Added Tax (VAT) at 15 percent
Note:
Tenderers must submit their tenders on the official form supplied for this purpose.
-69-
Delta Quantity Surveyors CC
TOTAL CARRIED TO FORM OF TENDER R