SECTION 5

SETTING OUT

Page 2: Section 5 - Setting Out

RTA Structural Drafting Setting Out and Detailing Manual

OTB005 Issue 1- Revision 0 (09 July 2007) Page 1 of 7

5 SETTING OUT

5.1 GENERAL

The geometry of the road defines the shape of the bridge (more particularly the deck). The geometry of the deck therefore must be defined before that of the substructure and footings and/or piles. Road design information and bridge site survey information provide relevant coordinates, alignment data etc. Generally setting out is carried out by one of two methods; a) alignment method (chainage and offset) b) a coordinate system

For structures which are on a straight alignment, setting out should be carried out using the control line. The use of chainages and offsets is the preferred method, however, coordinates may be used.

Chainages and offsets or, alternatively, coordinates may be used to locate the centre of elements ie spread footings etc as shown in Figure 5.6 whilst the dimensions for each particular element shall be related to the defined location and shall be normal to the element centreline (defined by a grid bearing). The preparation of a CAD Base Plan as a design aid for the purposes of checking the setting out of structures is strongly recommended as it may be used to verify dimensions. For designs prepared by the Authority, The Bridge Deck Geometry program (loaded on Bridge Engineering PC’s) may be used for the purpose of calculating/checking distances to required offset points and calcualtion of the reduced levels of offset points Figure 5.1 (Sheets 1 and 2) illustrates an appropriate method for the setting out of a bridge deck where the bridge is on a curved horizontal alignment.

Where there are multiple alignments, including spiral curves, an appropriate method is the use of chainages, offsets and coordinates in conjunction with a CAD base plan. Chainages and coordinates of points on the control line shall be given with a bearing and offset to other points required.

5.2 CHAINAGES

Chainages, give along the Control Line, shall be adopted from the road design and/or site survey information provided.

Where possible and practical, chainages for the centrelines of piers, bearings etc shall be given in metres to the nearest 0.005 metre, eg. 320.605. Chainages being used for calculating purposes shall not be rounded off. Chainages with values in excess of 1 km shall be given in metres, eg. 320.605 NOT 2 km 320.605 except at the beginning of the alignment or when the km values change along the alignment. In such cases the full chainage shall be shown in the following manner: eg 2km 320.605.

Page 3: Section 5 - Setting Out

RTA Structural Drafting Setting Out and Detailing Manual

OTB005 Issue 1- Revision 0 (09 July 2007) Page 2 of 7

5.3 COMPASS BEARING

The bearing of a line is the angle measured clockwise from grid north to the subject line and is given in degrees, minutes and seconds. The bearing of the Control Line shall always be given in the direction of increasing chainage along the line. The bearing of a line is relative to where one is stationed, See Figure 5.3.

5.4 COORDINATES

The coordinate system adopted for a project may be an arbitrary local one, ISG (Integrated Survey Grid) or GDA (Geocentric Datum of Australia). The coordinates are normally quoted in metres to the nearest 0.001 metre. In recording both GDA and ISG coordinates, the Easting is always placed before the Northing. The following procedure is recommended for the listing of coordinates. At the head of any listing of coordinates the figures common to all coordinates are noted as constants. These constants, one for the Eastings and one for the Northings are subtracted from all coordinates in the coordinate list and in the computations, in order to avoid carrying redundant digits. A gap shall be placed between the third and fourth figures, and also between the sixth and seventh figures from the decimal point to assist in the alignment of figures, as indicated in the example below.

E N

Location 200 000.000 1 100 000.000 A5 155.161 115.153 B27 311.002 351.854 B39 101.113 295.695 C11 115.354 015.706

The coordinates shall be obtained from the road design and/or the site survey information. The method of calculating the length and bearing of a line between two coordinated points is given in Figure 5.4. Alternatively, where electronic survey or design information is available, required information may be measured directly from the electronic file. Generally, lists of coordinates can be obtained by electronic means and this information can be transferred to drawing files on the CAD System.

5.5 PILES

The setting out of the piles shall be shown on a “Pile Layout”. This drawing is not necessarily to scale but should have reasonable proportions. On curved bridges it is sometimes advantageous to exaggerate the curvature to show dimensions more clearly. Horizontal alignment data for the Control Line shall be provided on the pile layout drawing. The pile layout should be shown on Pile Detail Sheet where possible and include all information necessary for the positioning of the piles. Generally piles are in a straight line or groups.

Page 4: Section 5 - Setting Out

RTA Structural Drafting Setting Out and Detailing Manual

OTB005 Issue 1- Revision 0 (09 July 2007) Page 3 of 7

Piles in one line:. The centreline of the pile group shall be defined by chainage and bearing to the Control Line with the location of each individual pile being dimensioned from the intersection of the control line and the centreline of piles, parallel / normal to the centreline of the piles. Piles in a group: The centre of the pile group shall be defined by a chainage and bearing to the Control Line together with a dimension from the Control Line or alternatively by a set of coordinates with the location of each individual pile being dimensioned from centre of the pile group parallel / normal to the centreline of the piles. Raked piles - Where raked piles are used, a note shall be added to the drawing to indicate that the location shown is at a nominated RL (usually the top of pile).

Raked piles shall also have the degree of rake shown together with an arrow to indicate the direction of the rake in relation to the centreline of piles. Where raked piles are in two or more rows beneath a pilecap, a dimension between the design location of pile centrelines at the top of the finished pile shall be provided.

For examples of pile setting out, refer to Section 6 of this Manual. 5.6 FOOTINGS

The setting out of footings on structures with complicated geometry shall generally be shown on a “Footing Layout”, however on straight, square bridges, the location of footings can be clearly indicated on the plan of piers or abutments. The “Footing Layout” shall indicate plan dimensions of individual footings and relative position in relation to a known point, see Figure 5.6. Where a layout is a combination of piles and footings it shall be known as a “Foundation Plan”. The “Footing Layout” does not necessarily need to be to scale, however it should be reasonably proportioned. On curved bridges it is advantageous to exaggerate the curvature in order that dimensions may be shown more clearly. Horizontal alignment data for the Control Line shall be provided on the Footing Layout drawing.

5.7 PIERS AND ABUTMENTS

Each part of a pier or an abutment shall be defined from a known point (such as the intersection of the pier centreline or the end of deck and the Control Line. NEVER dimension from footings or piles when setting out columns, ALWAYS dimension from a known point. By always dimensioning from a known point, the chance of compounding any differences in location due to allowable construction tolerances can be greatly reduced. Curved Bridges Bridges on geometric and/or transition spirals and more particularly those on skews, could have supports of varying lengths. Ends of spans may not be parallel and this should be particularly noted when setting out the superstructure and wingwalls.

5.8 BEARINGS

Bearings shall be set out from either the pier centreline or abutment curtain wall and a known point eg. the intersection of the Control Line and the centreline of pier. Where bearings are not parallel to the pier centreline, the orientation shall be indicated on an enlarged detail. The setting out details shall be shown on the pier or abutment by means of formed holes for bearing anchor bolts or dowels as appropriate. A Northpoint shall be included on all Plan views where setting out information is shown.

Page 5: Section 5 - Setting Out

RTA Structural Drafting Setting Out and Detailing Manual

OTB005 Issue 1- Revision 0 (09 July 2007) Page 4 of 7

5.9 GIRDERS

Girders are placed at bearing locations. Bearing locations shall be indicated on pier and abutment drawings. Curved Bridges Care shall be exercised when locating girders due to the variations caused by the curvature. It should be noted that variations become greater on skewed bridges. Steps for calculating spacing and length of girders - (using Figure 5.9 as an example). i. Given number of girders(n) and approximate spacing(s), locate outside girders at abutment and pier. Initially spacing should be worked out on pier centreline and front face of curtain wall. Spacing will be converted to skew. ii. The width of the deck may vary between the abutment and pier and between the

piers. In such cases the spacing of girders/planks must be adjusted so that x's are approximately equal and y's are approximately equal. Generally several locations need to be trialled to determine which is the best fit.

iii. When satisfied with the fit of the girders/planks in Span 1, repeat the procedure for

Span 2 or, if required, other spans. Attempt to maintain the spacing at the pier and adjust the spacing at the abutment

so that the 'x’s' are approximately equal and so are the 'y’s'. iv. When satisfied with spacing fit, the length of the girders needs to be

determined. Determine the length of each individual girder from the centreline of the pier to the front face of the curtain wall and compare the differences.

v. If the girders are to be the same length then the distance from the end of the girder to centreline of the pier or the front face of the abutment needs to vary across the span and from span to span. vi. Abutments and piers shall be checked to ensure that bearings will fit on headstocks. If the variation is too great, the skew of the supports may need to be adjusted to suit (ie supports may not be parallel). Radial Supports Radial supports are not normally considered when using girders but they may be an option provided that the length of the span on the outer curve is not significantly greater than that on inner curve. If the variation is not great, then constant length girders can be used. This can be achieved by varying the distance from centreline of pier to centreline of bearings The use of girders of many different lengths is neither practical or economical and should be avoided.

5.10 DECK

5.10.1 General

Page 6: Section 5 - Setting Out

RTA Structural Drafting Setting Out and Detailing Manual

OTB005 Issue 1- Revision 0 (09 July 2007) Page 5 of 7

As stated in Clause 5.1, setting out must start with the deck and then moved down through girders, bearing, piers and abutments, and finally footings and/or pile caps and piles. In general, all bridge structures shall be set out in accordance with the principles shown in Figure 5.1

5.10.2 Determination of parameters For a bridge of length 30 m or less with a mid-ordinate of D = 50 mm or less, the horizontal alignment of the bridge shall be straight, ie. the chord of the arc between the ends of the deck. For a bridge over 30 m long with a horizontal mid-ordinate of D = 75mm or less, the horizontal alignment of the bridge shall also be straight, eg. a bridge 40m long with a Control Line on radius 2700m gives D = 74mm, so the bridge shall be straight. No increase in road width is necessary in such cases (other than that required by the RTA Road Design Guide). The mid-ordinate can be found with the formula: D = R-0.5 √ 4R2 – C2

See Figure 5.10(a) For any other bridge the horizontal alignment of the deck is to be set out on the curve or in chords of such length that the mid-ordinate between the chord and the curve does not exceed D = 5 mm. The maximum length of this chord can be found with the formula C = √40R. See Figure 5.10(a). However, for a simply-supported bridge when the length of the span is less than this chord, the horizontal alignment is to be set out from pier to pier. For spans up to and including 12 metres, where the mid-ordinate of individual spans is 10mm or less and the angular deviation from one span to the next is less than one degree(10 ), consideration shall be given to making individual spans straight. See Figure 5.10(b). If individual spans are set out as being straight on structures which will carry barrier railings, careful examination of railing joints shall be made to ensure that the angular difference can be accommodated.

5.10.3 Procedure Set up a “Base Plan” on CAD. The base plan initially includes Control Line outline of parapets, kerb lines, median, coordinates of main points, chainages, bearings, radii, etc. Location of piers, abutments may then be superimposed on the base plan. If drawn accurately many dimensions for elements may be measured directly off the plan. Information such as length of abutments, piers, angles of wing walls, lengths of railings etc may be measured. Although values will be correct if basic input is correct, they should be checked independently. Final details of deck setting out shall include a Plan, Cross Section and Table(s). See Figure 5.1, Sheets 1 and 2. On curved structures, where the piers, abutments and ends of superstructure are skewed to the Control Line, the setting out information at supports shall be given along the skew. The setting out data for all other chainage increments shall be given radially. See Figure 5.1, Sheets 1 and 2.

Page 7: Section 5 - Setting Out

RTA Structural Drafting Setting Out and Detailing Manual

OTB005 Issue 1- Revision 0 (09 July 2007) Page 6 of 7

Skew angles for curved structures shall be defined in a Skew Diagram as shown on Sheet 2 of Figure 5.1 Reduced levels for selected points on the cross section shall be given to the top of the finished concrete surface, not the top of the asphalt wearing surface. The Plan view shall show the outline of the deck, the Control Line, the ends of deck and the pier centrelines. Locations of the deck accessories may be shown, however it is preferable that they be shown on a separate deck layout plan. The Plan view is generally not to scale and the curvature shall, in most cases be exaggerated for clarity. Setting Out Tables shall show the values of offsets and levels at chosen locations along bridge. Increments for cross sections taken along the bridge should not exceed the following: Radius (m) Increment (m) 50 1.5 100 2.0 150 2.5 200 3.0 300 3.5 400 4.0 500 4.5 1000 5.0 2000 and straight bridges 10.0 The increments shown are guidelines only and values should be adjusted to suit span lengths etc.

5.10.4 Bridge on a Curved Vertical Alignment For a bridge of length 30 m or less on a sag vertical curve only with a mid-ordinate over the length of the bridge of D = 50 mm or less, the vertical alignment of the bridge shall be straight. Levels can be calculated using the Vertical Curve Geometry program or the Bridge Deck Geometry program, each of which is loaded on Bridge Section PC’s. The maximum increment used in the program and to be shown on Table of Levels shall be the value C. An example of setting out points that should be included are shown in Figure 5.1. Increments for cross sections taken along the bridge shall not exceed the following: (i) Increments determined for straight bridges or for bridges on a curved horizontal

alignment above and (ii) The difference between the vertical curve and the chord between the two sections

must not exceed 20mm.

5.10.5 Information required on drawings where it is not required for construction

Where it is positively known that the provision of deck setting out information, as defined in Clauses 5.10.1 to 5.10.4 of this Manual, will not be required for construction purposes, such as on large Design/Construct/Maintain or Public Private Partnership type contracts where an interactive Design Model File, used in conjunction with survey equipment

Page 8: Section 5 - Setting Out

RTA Structural Drafting Setting Out and Detailing Manual

OTB005 Issue 1- Revision 0 (09 July 2007) Page 7 of 7

method of setting out may be used, the information for deck offsets and Reduced Levels shall be provided on the drawings for records and maintenance purposes, however, the spacing of cross sections as defined in Clause 5.10.3 of this Manual may be increased to double the increments shown in Clause 5.10.03, up to R = 10 000m. The maximum increment will remain the same at 10.0m.

5.11 BARRIER RAILINGS

All types of barrier railings shall be divided into panels of a length which are not difficult to handle and erect. Approximate maximum panel lengths are; 6000 mm for traffic barrier railings and 3000 mm for pedestrian railings Panel lengths and post spacing should be calculated along a concrete edge (usually the inside top edge of the concrete safety barrier for traffic barrier railings and the outside edge of the footway for pedestrian railings). Spacing of posts and hence bolt groups, shall be given horizontally in accordance with Figure 5.11. Where traffic barrier railings are used, each panel shall have a maximum of two posts, as a general rule, to facilitate ease of erection. On rare occasions, it may be necessary to detail panels containing three posts to ensure that panels can be placed to clear expansion joints and other obstructions. The detailing of railing panels containing three posts shall be kept to an absolute minimum, especially on curved bridges. When structures are constructed on grades of less than 4%, anchor bolts for all types of railings shall be cast-in normal to the concrete surface. See Figure 5.11. When the grade on any structure is 4% or greater at any one point, anchor bolts for traffic barrier railings shall shall be cast-in so that they are truly vertical over the full length of the structure. See Figure 5.11. Where aluminium pedestrian barrier railings are used on any structure, the anchor bolts for the railing shall be cast-in so that they are truly vertical in all cases. See Figure 5.11. In all cases, the spacing of anchor bolt groups shall be given horizontally in accordance with Figure 5.11.

Page 9: Section 5 - Setting Out

CO-ORDINATES

LOCATION

END OF SUPERSTRUCTURE

ABUTMENT A

END OF SUPERSTRUCTURE

ABUTMENT B

151.000

156.000

161.000

166.000

171.000

181.000

186.000

191.000

196.000

201.000

206.000

211.000

216.000

221.000

226.000

176.000

SPAN 1

SPAN 2

SPAN 3

PIER 1

PIER 2

POINT 1

RLEASTING ’a’ NORTHING ’b’

231.000

236.000

241.000

GENERAL NOTES

CHAINAGE ’Z’

(m)

SCALE: 0 1000

5001000

2000 3000mm

OR AS SHOWN.

CO-ORDINATES

LOCATION

END OF SUPERSTRUCTURE

ABUTMENT A

END OF SUPERSTRUCTURE

ABUTMENT B

151.000

181.000

211.000

PIER 1

PIER 2

POINT 1

RL ’X’ RL

POINT 2

’Y’ RL

POINT 3

’X’ RL

POINT 4

’Y’ RL

POINT 5

EASTING ’a’ NORTHING ’b’

241.000

CHAINAGE ’Z’

(m)

Lc

Lc

DIAPHRAGM

DIAPHRAGM

CJ

CJ

CJ

CJ

151.773

180.000

182.000

210.000

212.000

4012.056

4011.541

3993.359

3992.738

3992.119

3975.462

3974.892

3974.323

3958.948

3958.585

3964.301

3963.725

3942.139

3941.354

3940.569

3918.068

3917.246

3916.424

3892.670

3892.071

198.522

198.526

198.611

198.613

198.615

198.624

198.623

198.621

198.553

198.549

7105

7092

6623

6608

6593

6212

6200

6188

5869

5862

198.223

198.227

198.331

198.333

198.336

198.358

198.357

198.356

198.298

198.295

7008

6996

6553

6538

6524

6161

6149

6137

5831

5824 198.801

198.805

198.884

198.886

198.888

198.893

198.892

198.890

198.822

198.819 7900

7886

7364

7347

7330

6906

6892

6879

6523

6515

199.044

199.049

199.169

199.172

199.174

199.198

199.197

199.197

199.125

199.122 199.624

199.628

199.723

199.725

199.727

199.734

199.732

199.731

199.650

199.6477781

7768

7276

7261

7245

6842

6829

6816

6477

6469

Lc

Lc

POINT 2

RL

POINT 3

RL

POINT 4

RL

POINT 5

RL

311.88349

311.28666

310.68983

310.09300

309.49617

308.89934

308.30251

307.70568

307.10885

306.51202

305.91518

305.31835

304.72152

304.12469

303.52786

302.93103

302.33420

301.73737

301.14054

4012.056

4008.737

4005.458

4002.218

3999.018

3995.858

3992.738

3989.660

3986.622

3983.627

3980.673

3977.761

3974.892

3972.065

3969.282

3966.542

3963.845

3961.193

3958.585

3964.301

3960.561

3956.787

3952.978

3949.137

3945.262

3941.354

3937.415

3933.443

3929.440

3925.406

3921.341

3917.246

3913.122

3908.968

3904.786

3900.575

3896.337

3892.071

198.522

198.531

198.553

198.572

198.589

198.602

198.613

198.622

198.627

198.630

198.630

198.628

198.623

198.615

198.604

198.591

198.574

198.556

198.549

198.237

198.261

198.283

198.302

198.319

198.332

198.343

198.352

198.357

198.360

198.360

198.358

198.353

198.345

198.334

198.321

198.304

198.286

198.823

198.842

198.859

198.872

198.883

198.892

198.897

198.900

198.900

198.898

198.893

198.885

198.874

198.861

198.844

198.826

198.804 199.644

199.666

199.684

199.701

199.714

199.725

199.733

199.738

199.740

199.740

199.737

199.732

199.723

199.712

199.699

199.682

199.663

199.077

199.101

199.123

199.142

199.159

199.172

199.183

199.192

199.197

199.200

199.200

199.198

199.193

199.185

199.174

199.161

199.144

199.126

-

-

-

-

--

240.227

SKEW SECTIONS SIMILAR EXCEPT FOR X AND Y OFFSETS

RADIAL

BEARING

(DEGREES)

POINTS 1, 2 AND 3 ARE GIVEN ON THE TOP SURFACE OF DECK CONCRETE.

CO-ORDINATES

LOCATION

END OF SUPERSTRUCTURE

ABUTMENT A

END OF SUPERSTRUCTURE

ABUTMENT B

151.000

156.000

161.000

166.000

171.000

181.000

186.000

191.000

196.000

201.000

206.000

211.000

216.000

221.000

226.000

176.000

SPAN 1

SPAN 2

SPAN 3

PIER 1

PIER 2

POINT 1

RLEASTING ’a’ NORTHING ’b’

231.000

236.000

241.000

GENERAL NOTES

CHAINAGE ’Z’

(m)

SCALE: 0 1000

5001000

2000 3000mm

OR AS SHOWN.

CO-ORDINATES

LOCATION

END OF SUPERSTRUCTURE

ABUTMENT A

END OF SUPERSTRUCTURE

ABUTMENT B

151.000

181.000

211.000

PIER 1

PIER 2

POINT 1

RL ’X’ RL

POINT 2

’Y’ RL

POINT 3

’X’ RL

POINT 4

’Y’ RL

POINT 5

EASTING ’a’ NORTHING ’b’

241.000

CHAINAGE ’Z’

(m)

Lc

Lc

DIAPHRAGM

DIAPHRAGM

CJ

CJ

CJ

CJ

151.773

180.000

182.000

210.000

212.000

4012.056

4011.541

3993.359

3992.738

3992.119

3975.462

3974.892

3974.323

3958.948

3958.585

3964.301

3963.725

3942.139

3941.354

3940.569

3918.068

3917.246

3916.424

3892.670

3892.071

198.522

198.526

198.611

198.613

198.615

198.624

198.623

198.621

198.553

198.549

7105

7092

6623

6608

6593

6212

6200

6188

5869

5862

198.223

198.227

198.331

198.333

198.336

198.358

198.357

198.356

198.298

198.295

7008

6996

6553

6538

6524

6161

6149

6137

5831

5824 198.801

198.805

198.884

198.886

198.888

198.893

198.892

198.890

198.822

198.819 7900

7886

7364

7347

7330

6906

6892

6879

6523

6515

199.044

199.049

199.169

199.172

199.174

199.198

199.197

199.197

199.125

199.122 199.624

199.628

199.723

199.725

199.727

199.734

199.732

199.731

199.650

199.6477781

7768

7276

7261

7245

6842

6829

6816

6477

6469

Lc

Lc

POINT 2

RL

POINT 3

RL

POINT 4

RL

POINT 5

RL

311.88349

311.28666

310.68983

310.09300

309.49617

308.89934

308.30251

307.70568

307.10885

306.51202

305.91518

305.31835

304.72152

304.12469

303.52786

302.93103

302.33420

301.73737

301.14054

4012.056

4008.737

4005.458

4002.218

3999.018

3995.858

3992.738

3989.660

3986.622

3983.627

3980.673

3977.761

3974.892

3972.065

3969.282

3966.542

3963.845

3961.193

3958.585

3964.301

3960.561

3956.787

3952.978

3949.137

3945.262

3941.354

3937.415

3933.443

3929.440

3925.406

3921.341

3917.246

3913.122

3908.968

3904.786

3900.575

3896.337

3892.071

198.522

198.531

198.553

198.572

198.589

198.602

198.613

198.622

198.627

198.630

198.630

198.628

198.623

198.615

198.604

198.591

198.574

198.556

198.549

198.237

198.261

198.283

198.302

198.319

198.332

198.343

198.352

198.357

198.360

198.360

198.358

198.353

198.345

198.334

198.321

198.304

198.286

198.823

198.842

198.859

198.872

198.883

198.892

198.897

198.900

198.900

198.898

198.893

198.885

198.874

198.861

198.844

198.826

198.804 199.644

199.666

199.684

199.701

199.714

199.725

199.733

199.738

199.740

199.740

199.737

199.732

199.723

199.712

199.699

199.682

199.663

199.077

199.101

199.123

199.142

199.159

199.172

199.183

199.192

199.197

199.200

199.200

199.198

199.193

199.185

199.174

199.161

199.144

199.126

-

-

-

-

--

240.227

RADIAL

BEARING

(DEGREES)

POINTS 1, 2 AND 3 ARE GIVEN ON THE TOP SURFACE OF DECK CONCRETE.

TABLE II - SKEW SECTIONS

TABLE I - RADIAL SECTIONS

SEE SHEET No 2 FOR HORIZONTAL ALIGNMENT DATA FOR CONTROL LINE MC01.

199.077- -199.077- -148.000

145.475

243.000

244.681

300.97526

300.78451

3956.418

3955.798

- - -

- - -

198.795

198.776

199.623

199.601

3888.082

3887.946

312.41586

313.12543

4016.105 3968.231

4015.982 3971.681

198.215

198.196

198.512

198.493 - --

FIGURE 5.1

PREPARED BY

BRIDGE ENGINEERING

110 GEORGE STREET

PARRAMATTA NSW 2150

PHONE (02) 8837-0802

FACSIMILE (02) 8837-0055

1

CLIENT

CAD No KP2F51A.dgn

CO-ORDINATES

LOCATION

END OF SUPERSTRUCTURE

ABUTMENT A

END OF SUPERSTRUCTURE

ABUTMENT B

151.000

156.000

161.000

166.000

171.000

181.000

186.000

191.000

196.000

201.000

206.000

211.000

216.000

221.000

226.000

176.000

SPAN 1

SPAN 2

SPAN 3

PIER 1

PIER 2

POINT 1

RLEASTING ’a’ NORTHING ’b’

231.000

236.000

241.000

GENERAL NOTES

CHAINAGE ’Z’

(m)

SCALE: 0 1000

5001000

2000 3000mm

OR AS SHOWN.

CO-ORDINATES

LOCATION

END OF SUPERSTRUCTURE

ABUTMENT A

END OF SUPERSTRUCTURE

ABUTMENT B

151.000

181.000

211.000

PIER 1

PIER 2

POINT 1

RL ’X’ RL

POINT 2

’Y’ RL

POINT 3

’X’ RL

POINT 4

’Y’ RL

POINT 5

EASTING ’a’ NORTHING ’b’

241.000

CHAINAGE ’Z’

(m)

Lc

Lc

DIAPHRAGM

DIAPHRAGM

CJ

CJ

CJ

CJ

151.773

180.000

182.000

210.000

212.000

4012.056

4011.541

3993.359

3992.738

3992.119

3975.462

3974.892

3974.323

3958.948

3958.585

3964.301

3963.725

3942.139

3941.354

3940.569

3918.068

3917.246

3916.424

3892.670

3892.071

198.522

198.526

198.611

198.613

198.615

198.624

198.623

198.621

198.553

198.549

7105

7092

6623

6608

6593

6212

6200

6188

5869

5862

198.223

198.227

198.331

198.333

198.336

198.358

198.357

198.356

198.298

198.295

7008

6996

6553

6538

6524

6161

6149

6137

5831

5824 198.801

198.805

198.884

198.886

198.888

198.893

198.892

198.890

198.822

198.819 7900

7886

7364

7347

7330

6906

6892

6879

6523

6515

199.044

199.049

199.169

199.172

199.174

199.198

199.197

199.197

199.125

199.122 199.624

199.628

199.723

199.725

199.727

199.734

199.732

199.731

199.650

199.6477781

7768

7276

7261

7245

6842

6829

6816

6477

6469

Lc

Lc

POINT 2

RL

POINT 3

RL

POINT 4

RL

POINT 5

RL

311.88349

311.28666

310.68983

310.09300

309.49617

308.89934

308.30251

307.70568

307.10885

306.51202

305.91518

305.31835

304.72152

304.12469

303.52786

302.93103

302.33420

301.73737

301.14054

4012.056

4008.737

4005.458

4002.218

3999.018

3995.858

3992.738

3989.660

3986.622

3983.627

3980.673

3977.761

3974.892

3972.065

3969.282

3966.542

3963.845

3961.193

3958.585

3964.301

3960.561

3956.787

3952.978

3949.137

3945.262

3941.354

3937.415

3933.443

3929.440

3925.406

3921.341

3917.246

3913.122

3908.968

3904.786

3900.575

3896.337

3892.071

198.522

198.531

198.553

198.572

198.589

198.602

198.613

198.622

198.627

198.630

198.630

198.628

198.623

198.615

198.604

198.591

198.574

198.556

198.549

198.237

198.261

198.283

198.302

198.319

198.332

198.343

198.352

198.357

198.360

198.360

198.358

198.353

198.345

198.334

198.321

198.304

198.286

198.823

198.842

198.859

198.872

198.883

198.892

198.897

198.900

198.900

198.898

198.893

198.885

198.874

198.861

198.844

198.826

198.804 199.644

199.666

199.684

199.701

199.714

199.725

199.733

199.738

199.740

199.740

199.737

199.732

199.723

199.712

199.699

199.682

199.663

199.077

199.101

199.123

199.142

199.159

199.172

199.183

199.192

199.197

199.200

199.200

199.198

199.193

199.185

199.174

199.161

199.144

199.126

-

-

-

-

--

240.227

SKEW SECTIONS SIMILAR EXCEPT FOR X AND Y OFFSETS

RADIAL

BEARING

(DEGREES)

POINTS 1, 2 AND 3 ARE GIVEN ON THE TOP SURFACE OF DECK CONCRETE.

CO-ORDINATES

LOCATION

END OF SUPERSTRUCTURE

ABUTMENT A

END OF SUPERSTRUCTURE

ABUTMENT B

151.000

156.000

161.000

166.000

171.000

181.000

186.000

191.000

196.000

201.000

206.000

211.000

216.000

221.000

226.000

176.000

SPAN 1

SPAN 2

SPAN 3

PIER 1

PIER 2

POINT 1

RLEASTING ’a’ NORTHING ’b’

231.000

236.000

241.000

GENERAL NOTES

CHAINAGE ’Z’

(m)

SCALE: 0 1000

5001000

2000 3000mm

OR AS SHOWN.

CO-ORDINATES

LOCATION

END OF SUPERSTRUCTURE

ABUTMENT A

END OF SUPERSTRUCTURE

ABUTMENT B

151.000

181.000

211.000

PIER 1

PIER 2

POINT 1

RL ’X’ RL

POINT 2

’Y’ RL

POINT 3

’X’ RL

POINT 4

’Y’ RL

POINT 5

EASTING ’a’ NORTHING ’b’

241.000

CHAINAGE ’Z’

(m)

Lc

Lc

DIAPHRAGM

DIAPHRAGM

CJ

CJ

CJ

CJ

151.773

180.000

182.000

210.000

212.000

4012.056

4011.541

3993.359

3992.738

3992.119

3975.462

3974.892

3974.323

3958.948

3958.585

3964.301

3963.725

3942.139

3941.354

3940.569

3918.068

3917.246

3916.424

3892.670

3892.071

198.522

198.526

198.611

198.613

198.615

198.624

198.623

198.621

198.553

198.549

7105

7092

6623

6608

6593

6212

6200

6188

5869

5862

198.223

198.227

198.331

198.333

198.336

198.358

198.357

198.356

198.298

198.295

7008

6996

6553

6538

6524

6161

6149

6137

5831

5824 198.801

198.805

198.884

198.886

198.888

198.893

198.892

198.890

198.822

198.819 7900

7886

7364

7347

7330

6906

6892

6879

6523

6515

199.044

199.049

199.169

199.172

199.174

199.198

199.197

199.197

199.125

199.122 199.624

199.628

199.723

199.725

199.727

199.734

199.732

199.731

199.650

199.6477781

7768

7276

7261

7245

6842

6829

6816

6477

6469

Lc

Lc

POINT 2

RL

POINT 3

RL

POINT 4

RL

POINT 5

RL

311.88349

311.28666

310.68983

310.09300

309.49617

308.89934

308.30251

307.70568

307.10885

306.51202

305.91518

305.31835

304.72152

304.12469

303.52786

302.93103

302.33420

301.73737

301.14054

4012.056

4008.737

4005.458

4002.218

3999.018

3995.858

3992.738

3989.660

3986.622

3983.627

3980.673

3977.761

3974.892

3972.065

3969.282

3966.542

3963.845

3961.193

3958.585

3964.301

3960.561

3956.787

3952.978

3949.137

3945.262

3941.354

3937.415

3933.443

3929.440

3925.406

3921.341

3917.246

3913.122

3908.968

3904.786

3900.575

3896.337

3892.071

198.522

198.531

198.553

198.572

198.589

198.602

198.613

198.622

198.627

198.630

198.630

198.628

198.623

198.615

198.604

198.591

198.574

198.556

198.549

198.237

198.261

198.283

198.302

198.319

198.332

198.343

198.352

198.357

198.360

198.360

198.358

198.353

198.345

198.334

198.321

198.304

198.286

198.823

198.842

198.859

198.872

198.883

198.892

198.897

198.900

198.900

198.898

198.893

198.885

198.874

198.861

198.844

198.826

198.804 199.644

199.666

199.684

199.701

199.714

199.725

199.733

199.738

199.740

199.740

199.737

199.732

199.723

199.712

199.699

199.682

199.663

199.077

199.101

199.123

199.142

199.159

199.172

199.183

199.192

199.197

199.200

199.200

199.198

199.193

199.185

199.174

199.161

199.144

199.126

-

-

-

-

--

240.227

RADIAL

BEARING

(DEGREES)

POINTS 1, 2 AND 3 ARE GIVEN ON THE TOP SURFACE OF DECK CONCRETE.

TABLE II - SKEW SECTIONS

TABLE I - RADIAL SECTIONS

SEE SHEET No 2 FOR HORIZONTAL ALIGNMENT DATA FOR CONTROL LINE MC01.

199.077- -199.077- -148.000

145.475

243.000

244.681

300.97526

300.78451

3956.418

3955.798

- - -

- - -

198.795

198.776

199.623

199.601

3888.082

3887.946

312.41586

313.12543

4016.105 3968.231

4015.982 3971.681

198.215

198.196

198.512

198.493 - --

CAD No KP2F51A.dgn

CH 181.000 CH 211.000

CH 151.000

CH 241.000

PLAN

NOT TO SCALE

Lc OF PIER 1 Lc OF PIER 2

END OF SUPERSTRUCTURE ABUTMENT A

END OF SUPERSTRUCTURE ABUTMENT B

SPAN 1

SPAN 2SPAN 3

CH ’Z’

E ’a’

N ’b’

2

-

2

-

1

-

1

-

2

-

2

-

CH 244.681

CH 237.225CH 156.347

CH 145.475

FOR RADIAL SECTION DETAILS SEE TABLE No I

FOR SKEW SECTION DETAILS SEE TABLE No II

CH 148.000

CH 243.000

PROVIDE SUFFICIENT RADIAL SECTIONS AT

ENDS TO ENSURE CORRECT SETTING OUT

PROVIDE SUFFICIENT RADIAL SECTIONS AT

ENDS TO ENSURE CORRECT SETTING OUT

FROM TO

CONTROL LINE MC01

UPSTREAM DOWNSTREAM

13

2

4

5

600 4500 4500 600

RADIAL SECTION 1

- SECTION 2

-

RL AS SHOWN IN

TABLES I AND II

CO-ORDINATES

LOCATION

END OF SUPERSTRUCTURE

ABUTMENT A

END OF SUPERSTRUCTURE

ABUTMENT B

151.000

156.000

161.000

166.000

171.000

181.000

186.000

191.000

196.000

201.000

206.000

211.000

216.000

221.000

226.000

176.000

SPAN 1

SPAN 2

SPAN 3

PIER 1

PIER 2

POINT 1

RLEASTING ’a’ NORTHING ’b’

231.000

236.000

241.000

GENERAL NOTES

CHAINAGE ’Z’

(m)

SCALE: 0 1000

5001000

2000 3000mm

OR AS SHOWN.

CO-ORDINATES

LOCATION

END OF SUPERSTRUCTURE

ABUTMENT A

END OF SUPERSTRUCTURE

ABUTMENT B

151.000

181.000

211.000

PIER 1

PIER 2

POINT 1

RL ’X’ RL

POINT 2

’Y’ RL

POINT 3

’X’ RL

POINT 4

’Y’ RL

POINT 5

EASTING ’a’ NORTHING ’b’

241.000

CHAINAGE ’Z’

(m)

Lc

Lc

DIAPHRAGM

DIAPHRAGM

CJ

CJ

CJ

CJ

151.773

180.000

182.000

210.000

212.000

4012.056

4011.541

3993.359

3992.738

3992.119

3975.462

3974.892

3974.323

3958.948

3958.585

3964.301

3963.725

3942.139

3941.354

3940.569

3918.068

3917.246

3916.424

3892.670

3892.071

198.522

198.526

198.611

198.613

198.615

198.624

198.623

198.621

198.553

198.549

7105

7092

6623

6608

6593

6212

6200

6188

5869

5862

198.223

198.227

198.331

198.333

198.336

198.358

198.357

198.356

198.298

198.295

7008

6996

6553

6538

6524

6161

6149

6137

5831

5824 198.801

198.805

198.884

198.886

198.888

198.893

198.892

198.890

198.822

198.819 7900

7886

7364

7347

7330

6906

6892

6879

6523

6515

199.044

199.049

199.169

199.172

199.174

199.198

199.197

199.197

199.125

199.122 199.624

199.628

199.723

199.725

199.727

199.734

199.732

199.731

199.650

199.6477781

7768

7276

7261

7245

6842

6829

6816

6477

6469

Lc

Lc

POINT 2

RL

POINT 3

RL

POINT 4

RL

POINT 5

RL

311.88349

311.28666

310.68983

310.09300

309.49617

308.89934

308.30251

307.70568

307.10885

306.51202

305.91518

305.31835

304.72152

304.12469

303.52786

302.93103

302.33420

301.73737

301.14054

4012.056

4008.737

4005.458

4002.218

3999.018

3995.858

3992.738

3989.660

3986.622

3983.627

3980.673

3977.761

3974.892

3972.065

3969.282

3966.542

3963.845

3961.193

3958.585

3964.301

3960.561

3956.787

3952.978

3949.137

3945.262

3941.354

3937.415

3933.443

3929.440

3925.406

3921.341

3917.246

3913.122

3908.968

3904.786

3900.575

3896.337

3892.071

198.522

198.531

198.553

198.572

198.589

198.602

198.613

198.622

198.627

198.630

198.630

198.628

198.623

198.615

198.604

198.591

198.574

198.556

198.549

198.237

198.261

198.283

198.302

198.319

198.332

198.343

198.352

198.357

198.360

198.360

198.358

198.353

198.345

198.334

198.321

198.304

198.286

198.823

198.842

198.859

198.872

198.883

198.892

198.897

198.900

198.900

198.898

198.893

198.885

198.874

198.861

198.844

198.826

198.804 199.644

199.666

199.684

199.701

199.714

199.725

199.733

199.738

199.740

199.740

199.737

199.732

199.723

199.712

199.699

199.682

199.663

199.077

199.101

199.123

199.142

199.159

199.172

199.183

199.192

199.197

199.200

199.200

199.198

199.193

199.185

199.174

199.161

199.144

199.126

-

-

-

-

--

240.227

SKEW SECTIONS SIMILAR EXCEPT FOR X AND Y OFFSETS

RADIAL

BEARING

(DEGREES)

POINTS 1, 2 AND 3 ARE GIVEN ON THE TOP SURFACE OF DECK CONCRETE.

CO-ORDINATES

LOCATION

END OF SUPERSTRUCTURE

ABUTMENT A

END OF SUPERSTRUCTURE

ABUTMENT B

151.000

156.000

161.000

166.000

171.000

181.000

186.000

191.000

196.000

201.000

206.000

211.000

216.000

221.000

226.000

176.000

SPAN 1

SPAN 2

SPAN 3

PIER 1

PIER 2

POINT 1

RLEASTING ’a’ NORTHING ’b’

231.000

236.000

241.000

GENERAL NOTES

CHAINAGE ’Z’

(m)

SCALE: 0 1000

5001000

2000 3000mm

OR AS SHOWN.

CO-ORDINATES

LOCATION

END OF SUPERSTRUCTURE

ABUTMENT A

END OF SUPERSTRUCTURE

ABUTMENT B

151.000

181.000

211.000

PIER 1

PIER 2

POINT 1

RL ’X’ RL

POINT 2

’Y’ RL

POINT 3

’X’ RL

POINT 4

’Y’ RL

POINT 5

EASTING ’a’ NORTHING ’b’

241.000

CHAINAGE ’Z’

(m)

Lc

Lc

DIAPHRAGM

DIAPHRAGM

CJ

CJ

CJ

CJ

151.773

180.000

182.000

210.000

212.000

4012.056

4011.541

3993.359

3992.738

3992.119

3975.462

3974.892

3974.323

3958.948

3958.585

3964.301

3963.725

3942.139

3941.354

3940.569

3918.068

3917.246

3916.424

3892.670

3892.071

198.522

198.526

198.611

198.613

198.615

198.624

198.623

198.621

198.553

198.549

7105

7092

6623

6608

6593

6212

6200

6188

5869

5862

198.223

198.227

198.331

198.333

198.336

198.358

198.357

198.356

198.298

198.295

7008

6996

6553

6538

6524

6161

6149

6137

5831

5824 198.801

198.805

198.884

198.886

198.888

198.893

198.892

198.890

198.822

198.819 7900

7886

7364

7347

7330

6906

6892

6879

6523

6515

199.044

199.049

199.169

199.172

199.174

199.198

199.197

199.197

199.125

199.122 199.624

199.628

199.723

199.725

199.727

199.734

199.732

199.731

199.650

199.6477781

7768

7276

7261

7245

6842

6829

6816

6477

6469

Lc

Lc

POINT 2

RL

POINT 3

RL

POINT 4

RL

POINT 5

RL

311.88349

311.28666

310.68983

310.09300

309.49617

308.89934

308.30251

307.70568

307.10885

306.51202

305.91518

305.31835

304.72152

304.12469

303.52786

302.93103

302.33420

301.73737

301.14054

4012.056

4008.737

4005.458

4002.218

3999.018

3995.858

3992.738

3989.660

3986.622

3983.627

3980.673

3977.761

3974.892

3972.065

3969.282

3966.542

3963.845

3961.193

3958.585

3964.301

3960.561

3956.787

3952.978

3949.137

3945.262

3941.354

3937.415

3933.443

3929.440

3925.406

3921.341

3917.246

3913.122

3908.968

3904.786

3900.575

3896.337

3892.071

198.522

198.531

198.553

198.572

198.589

198.602

198.613

198.622

198.627

198.630

198.630

198.628

198.623

198.615

198.604

198.591

198.574

198.556

198.549

198.237

198.261

198.283

198.302

198.319

198.332

198.343

198.352

198.357

198.360

198.360

198.358

198.353

198.345

198.334

198.321

198.304

198.286

198.823

198.842

198.859

198.872

198.883

198.892

198.897

198.900

198.900

198.898

198.893

198.885

198.874

198.861

198.844

198.826

198.804 199.644

199.666

199.684

199.701

199.714

199.725

199.733

199.738

199.740

199.740

199.737

199.732

199.723

199.712

199.699

199.682

199.663

199.077

199.101

199.123

199.142

199.159

199.172

199.183

199.192

199.197

199.200

199.200

199.198

199.193

199.185

199.174

199.161

199.144

199.126

-

-

-

-

--

240.227

RADIAL

BEARING

(DEGREES)

POINTS 1, 2 AND 3 ARE GIVEN ON THE TOP SURFACE OF DECK CONCRETE.

TABLE II - SKEW SECTIONS

TABLE I - RADIAL SECTIONS

SEE SHEET No 2 FOR HORIZONTAL ALIGNMENT DATA FOR CONTROL LINE MC01.

199.077- -199.077- -148.000

145.475

243.000

244.681

300.97526

300.78451

3956.418

3955.798

- - -

- - -

198.795

198.776

199.623

199.601

3888.082

3887.946

312.41586

313.12543

4016.105 3968.231

4015.982 3971.681

198.215

198.196

198.512

198.493 - --

CAD No KP2F51A.dgn

Page 10: Section 5 - Setting Out

PREPARED BY

BRIDGE ENGINEERING

110 GEORGE STREET

PARRAMATTA NSW 2150

PHONE (02) 8837-0802

FACSIMILE (02) 8837-0055

CLIENT

SOUTH WEST REGIONAL OFFICE

1 SIMMONS STREET WAGGA WAGGA

PO BOX 484 WAGGA WAGGA NSW 2650

PHONE (02) 6938-1111

FACSIMILE (02) 6938-1183

FIGURE 5.1

2

CAD No KP2F51B.dgn

VERTICAL ALIGNMENT DIAGRAM

NOT TO SCALE

IP CH 34 200.000

RL 199.187

LENGTH OF VERTICAL CURVE = 200 000

B R I D G E

SKEW DIAGRAM

10 000

NOT TO SCALE

TP TP

CONTROL LINE MC01

CH 34 151.000 CH 34 241.000

EASTING

4369.418

4087.068

3930.577

NORTHING

3643.844

4032.018

3838.315

CENTRE OF CIRCLE

CHAINAGE 34 049.756

CHAINAGE 34 301.655

HCEN

HTP1

HTP2

LOCATIONPOINT BEARING IN BEARING OUT

233 58’ 8.7’

203 54’ 1.0’

TABLE 1 - HORIZONTAL ALIGNMENT DATA FOR CONTROL MC01

HCEN

HTP1 HTP2

HORIZONTAL ALIGNMENT DIAGRAM

EASTING

4369.418

4087.068

3930.577

NORTHING

3643.844

4032.018

3838.315

CENTRE OF CIRCLE

CHAINAGE 34 049.756

CHAINAGE 34 301.655

HCEN

HTP1

HTP2

LOCATIONPOINT BEARING IN BEARING OUT

233 58’ 8.7’

203 54’ 1.0’

TABLE 1 - HORIZONTAL ALIGNMENT DATA FOR CONTROL MC01

HCEN

HTP1 HTP2

HORIZONTAL ALIGNMENT DIAGRAM

Page 11: Section 5 - Setting Out

BE

AR

ING

300 0

0’

00"

INCREASING CHAINAGE

FIGURE 5.3

KP

2F

53

30

BEARING 30 00’ 00"

BE

AR

ING

12

0 0

0’

00

"

STATION

BEARING 210 00’ 00"

Page 12: Section 5 - Setting Out

1Y = Y + L COS O

KP

2F

54

BEARING OF LINE OA IN FIRST QUADRANT = O

OB IN SECOND QUADRANT = 180 - O

OC IN SECOND QUADRANT = 180 + O

OD IN SECOND QUADRANT = 360 - O

THE CO-ORDINATES OF A POINT (X Y ) GIVEN ITS DISTANCE (L)

AND BEARING ( O ) FROM A CO-ORDINATED POINT (X,Y) CAN BE

CALCULATED BY THE FOLLOWING FORMULAE :

-1O = TAN = TAN

1

X = X + L SIN O1

1

1( Y )

-1

(DIFFERENCE IN NORTHINGS)

1 (DIFFERENCE IN EASTINGS)

THE LENGTH OF THE LINES OA, OB, OC AND OD IS GIVEN BY

Y

1 1( X ) + ( Y )

2

( X )

2

1 1

X

1 1

1 1 1( X - X , Y + Y )

( X - X , Y - Y )1

( X + X , Y - Y )

( X + X , Y + Y )

C

11

1

O

11(X Y )

B

D

NORTH

Y

A

X EAST

BEARING ANGLE

1

1 1 11

FIGURE 5.4

Page 13: Section 5 - Setting Out

SHEETS No 14 AND 15 FOR PIER FOOTING DETAILS.

E 297 487.500

N 1138 857.094

Lc

Lc

E 297 495.246

N 1138 759.560

E 297 493.202

N 1138 792.079

E 297 490.623

N 1138 824.561

PLAN

DENOTES DIMENSION NORMAL TO OF FOOTING AND PIERS AND FRONT FACE OF

CURTAINWALL AT ABUTMENTS

CURTAINWALL AT ABUTMENTS

DENOTES DIMENSION PARALLEL TO OF FOOTING AND PIERS AND FRONT FACE OF

ARE TYPICAL FOR SIMILAR LOCATIONS ON NORTHBOUND BRIDGE

NOT TO SCALE

DIMENSIONS SHOWN FOR FOOTINGS ON SOUTHBOUND BRIDGESEE SHEETS No 4 AND 5 FOR ABUTMENT FOOTING DETAILS AND

SCALES AS SHOWN.

GENERAL NOTES

E 297 496.756

N 1138 727.011 E 297 497.731

N 1138 694.432

Lc

BE

AR

ING

84 5

9’2

1.6

"P

IER

1 N

/BO

F F

OO

TIN

G A

ND

FR

ON

T F

AC

E O

F

CU

RT

AIN

WA

LL

AB

UT

ME

NT

A N

/B

BE

AR

ING

84 2

’51.7

"

4500CH 354.900

CH 370.880

34101090

1750

CH 7 337.900

Lc

Lc

PIE

R 3

N/B

CH 452.500

CH 436.640

BE

AR

ING

86

52

’23

.6"

BE

AR

ING

85 5

5’5

2.6

"

CH 420.000CH 387.500

3500

CH 403.760

PIE

R 2

N/B

OF

FO

OT

ING

AN

D

3500

1750 17501750 1750

Lc

Lc

NORTHBOUND BRIDGE

3500CH 485.000

PIE

R 4

N/B

BE

AR

ING

87 4

8’5

4.6

"

CH 469.520

OF

FO

OT

ING

AN

D

AB

UT

ME

NT

B N

/B

FR

ON

T F

AC

E O

FC

UR

TA

INW

AL

L

BE

AR

ING

88 4

5"2

4.6

"

CH 502.410

1750 1750

3500

1750 1750

SOUTHBOUND CONTROL LINE

NORTHBOUND CONTROL LINE

5800

CH 517.510

14304370

3000

1250

R 2 000 000

R 1 987 000

FROM

YASS

FR

ON

T F

AC

E O

F

CU

RT

AIN

WA

LL

AB

UT

ME

NT

A S

/B

2000

2000

E 297 512.072

N 1138 842.523

BE

AR

ING

84 3

1’5

4"

1750

7500

Lc

Lc

PIE

R 1

S/B

PIE

R 2

S/B

E 297 517.233

N 1138 777.467

E 297 514.921

N 1138 809.966

BE

AR

ING

85 2

7’5

5.7

"

BE

AR

ING

86 2

3’4

7.5

"

2250

2250

4500

2250

2250

4500

OF

FO

OT

ING

AN

D

OF

FO

OT

ING

AN

D

Lc

Lc

Lc

PIE

R 3

S/B

4500

2250

2250

PIE

R 4

S/B

E 297 519.016

N 1138 744.935

E 297 520.271

N 1138 712.379

BE

AR

ING

87 1

9’3

9.3

"

BE

AR

ING

88 1

5’3

1.1

"

OF

FO

OT

ING

AN

D

SOUTHBOUND BRIDGE

2250

2250

4500

CANBERRA

TO

AB

UT

ME

NT

B S

/B

FR

ON

T F

AC

E O

FC

UR

TA

INW

AL

L

3000

BE

AR

ING

89 1

1’2

4"

E 297 520.997

N 1138 679.796

8 5

00

1250

FIGURE 5.6

CLIENT

SOUTH WEST REGIONAL OFFICE

1 SIMMONS STREET WAGGA WAGGA

PO BOX 484 WAGGA WAGGA NSW 2650

PHONE (02) 6938-1111

FACSIMILE (02) 6938-1183

PREPARED BY

BRIDGE ENGINEERING

110 GEORGE STREET

PARRAMATTA NSW 2150

PHONE (02) 8837-0802

FACSIMILE (02) 8837-0055

PREPARED CHECKED

DESIGN

DRAWING

ISSUE DATE REVISION PREP AUTH

ROADS AND TRAFFIC AUTHORITY OF NSW

CHECK

TH

IS D

RA

WIN

G I

S C

ON

FID

EN

TIA

L A

ND

SH

AL

L O

NL

Y B

E U

SE

D F

OR

TH

E P

UR

PO

SE

OF

TH

E N

OM

INA

TE

D P

RO

JEC

T.

REGISTRATION No OF PLANS

SHEET No

ISSUE STATUS:

RTA BRIDGE NUMBER

ISSUE

CAD No KP2F56.dgn

MANAGER, BRIDGE DESIGN PROJECTS

Page 14: Section 5 - Setting Out

c

G6

G4

G5

YA2

OF BEARINGS

BETWEEN SUPPORTS

A2-P2

LONGEST LENGTH

SPAN 1

X

P2

SPAN 2

X

G3

Y c

c

G10

G11

G12

B2

FRONT FACE OF

ABUTMENT CURTAINWALL

X

OF GIRDERS

OF BEARINGS

G9 B1-B2

FIGURE 5.9

G2

ABUTMENT CURTAINWALL

FRONT FACE OF

c

c

A1

LONGEST LENGTH

OF SUPPORT A1-A2

Y

OUTER FACE

G1

X

Y

P1

Y

SHORTEST LENGTH

OF SUPPORT

OF BEARINGS

G8

G7

X

B1

OF PIERSHORTEST LENGTH

BETWEEN SUPPORTS

P1-B1

CONTROL LINE

OF CONCRETE

SAFETY BARRIER

OUTER FACE

OF CONCRETE

SAFETY BARRIER

Page 15: Section 5 - Setting Out

SPAN LENGTH 12 000 OR LESS

TYPICAL

FIGURE 5.10(b)

R

KP

2F

51

0

D = 10mm OR LESS

TYPICAL

DETERMINATION OF CURVATURE

THE MID-ORDINATE, D, CAN BE FOUND USING THE FORMULA :

C(mm)

FIGURE 5.10(a)

R(m

m)

BASEc

D

MID-ORDINATE RULE

D = R-‰ ¾4R†-C†

Page 16: Section 5 - Setting Out

c OF ANCHOR BOLT GROUP

KP

2F

51

1

SPACING OF ANCHOR

ANCHOR BOLTS CAST-IN

NORMAL TO CONCRETE SURFACE

BOLT GROUPS BOLT GROUPS

75

M20 ANCHOR BOLTS

c

NOT TO SCALE

ANCHOR BOLT GROUP ELEVATION

FOR TRAFFIC BARRIER RAILINGS

OF ANCHOR BOLT GROUP

NORMAL TO CONCRETE SURFACE

SPACING OF ANCHOR

ANCHOR BOLTS CAST-IN

45

BOLT GROUPS

SPACING OF ANCHOR SPACING OF ANCHOR

45

BOLT GROUPS

75

M20 ANCHOR BOLTS

NOT TO SCALE

TOP OF PARAPET ON

GRADE UP TO 4%

FIGURE 5.11

ANCHOR BOLT GROUP ELEVATION FOR

STEEL PEDESTRIAN BARRIER RAILINGS

c OF ANCHOR BOLT GROUP

SPACING OF ANCHOR

ANCHOR BOLTS CAST-IN

BOLT GROUPS BOLT GROUPS

M20 ANCHOR BOLTS

SPACING OF ANCHOR

NOT TO SCALE

ANCHOR BOLT GROUP ELEVATION FOR

ALUMINIUM PEDESTRIAN BARRIER RAILINGS

TO BE TRULY VERTICAL

55

55

IN ALL CASES

TOP OF PARAPET

ON ANY GRADE

FOR GRADES GREATER THAN 4%, ANCHOR BOLTS FOR

ALL TRAFFIC BARRIER RAILINGS SHALL BE TRULY VERTICAL

6565

TOP OF PARAPET

ON ANY GRADE

75